Addendum 014.3_Trailer_on_Reasoner_Comm.pdf

PDF 334 KB Posted

Attached to
Hurricane Florence Recovery MILCON Package 2
Solicitation number
N4008519R9252
Issued by

About this file

This synopsis provides details for a design-build construction services contract supporting Hurricane Florence recovery efforts at Marine Corps Base Camp Lejeune in North Carolina. The solicitation will result in an award of a firm-fixed-price contract to complete eight MILCON projects replacing various headquarters facilities and support buildings totaling over $100 million. Projects include construction of new battalion and regimental headquarters, MEU buildings, transportation and environmental management facilities. The design-build contract is for a period of 1,826 calendar days following a two-phase evaluation of technical approach, experience, past performance, safety, technical solution, project management and small business utilization, as well as price. The solicitation is open to all and will be issued on October 7, 2019, with proposals due on July 20, 2020 to the Naval Facilities Engineering Command.

View the file

Other files

File Type Posted
Amendment 0020.pdf PDF
Amendment 0019.pdf PDF
Amendment 0018.pdf PDF
Amendment 0017.pdf PDF
Amendment 0016.pdf PDF
Amendment 0015.pdf PDF
Addendum 014.2_P1522_P1529 Comm Map from Bldg. 1.pdf PDF
Addendum 014.5_MCIEAST-MCBCAMLEJ SURPLUS SOIL MILCON SPEC REVISION - 6APRIL2020.pdf PDF
Amendment 0014.pdf PDF
Updated Attachment I Price Proposal_Revisions 04.15.2020.pdf PDF
PACKAGE 2 ATTACHMENT (6) HISTORIC GEOTECHNICAL DATA Part 2.pdf PDF
Addendum 014.6 Locker Concrete Pad DWGS.pdf PDF
Addendum 013.9_Substation Impedances.pdf PDF
Addendum 013.4_HP Final SW Master Plan.pdf PDF
Addendum 013.7_DM for HQ.pdf PDF
Addendum 013.6_SW8 081015 MOD 01.17.18.pdf PDF
Addendum 013.8_DM for Armory.pdf PDF
Amendment 0013.pdf PDF
Updated Attachment I Price Proposal_Revisions 04.05.2020.pdf PDF
Addendum 013.5_SW 081015 DA.PDF PDF
Addendum 013.2_Wheeled Assets.pdf PDF
Addendum 013.3_SW NPDES PERMIT NCS000290.pdf PDF
Amendment 0012.pdf PDF
Updated Attachment I Price Proposal_Revisions 03.26.2020.pdf PDF
Updated Attachment H 3.26.2020.pdf PDF
Amendment 0011.pdf PDF
Package 2 Site Visit Agenda.pdf PDF
Amendment 0010.pdf PDF
Attachments.zip ZIP file
Site MapWC.pdf PDF
Site Visit HA Map.pdf PDF
Site Visit Main Side Map.pdf PDF
01 57 19.pdf PDF
Site Visit WC Map.pdf PDF
Site Visit Waiver.pdf PDF
Bldg. 812 Map.pdf PDF
Updated Attachment H.pdf PDF
Amendment 0009.pdf PDF
Attachment I Price Proposal Form.pdf PDF
TFF2_RFP_RTA_PART6_CHAPTER_C-G.pdf PDF
TFF2_RFP_RTA_PART_1-5.pdf PDF
TFF2_RFP_RTA_PART6_CHAPTER_A-B.pdf PDF
TFF2_RFP_RTA_PART6_CHAPTER_H-K.pdf PDF
Amendment 0008.pdf PDF
Amendment_0005.pdf PDF
Amendment_0004.pdf PDF
Amendment_0003.pdf PDF
Amendment_0003.pdf PDF
One_Day_Pass_Request.xls XLS spreadsheet
Amendment_0002.pdf PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AA

PP

R O

X

IM

A

TE

LO

C

A

TI

O N

O F

N

EW

H A

N D

H O

LE

TTO

T

R A

IL

ER

(B A

S) C

O M

M U

N

IC

A

TI

O N

S R

O O

M F

U R

TE

R

D O

W N

IN

PA

R

K

IN

G L

O T

((1 ) 2

O

R A

N G

E H

PD

E

W /1

-2

P

E-

((1 ) 2

O

R A

N G

E H

-2

PE

-3

((1 ) 2

O

R A

N G

E H

-2

PE

-3

(1 ) 1

/4

O

R A

N G

E H

ST

R F

O S

M

CGowan Callout 406'

CGowan Callout 253'

CGowan Callout 86'

CGowan Callout 498'

CGowan Callout 308'

CGowan Callout 227'

CGowan Text Box Total Directional Bore distance = 1,778 LF

File details come from the government source that posted it. Updated .