This notice announces an upcoming solicitation for design-build construction services for eight military construction projects at Marine Corps Base Camp Lejeune as part of Hurricane Florence recovery efforts. The projects include construction of new battalion and regimental headquarters facilities, an armory, and an environmental management division building. The combined value of construction for all projects is estimated between $100-250 million. The solicitation will utilize best value tradeoff source selection and award a firm-fixed price design-build contract with an anticipated period of performance of 1,826 calendar days. The solicitation is designated as unrestricted and will require technical, past performance, and price proposals. Evaluation factors will assess technical approach, corporate experience, past performance, safety, technical solution, project management, and small business participation. Large businesses must submit a subcontracting plan. The drawings and specifications will be made available with the Phase 2 amendment on 7 October 2019.

View the file

Other files

File Type Posted
Amendment 0020.pdf PDF
Amendment 0019.pdf PDF
Amendment 0018.pdf PDF
Amendment 0017.pdf PDF
Amendment 0016.pdf PDF
Amendment 0015.pdf PDF
Addendum 014.2_P1522_P1529 Comm Map from Bldg. 1.pdf PDF
Addendum 014.3_Trailer_on_Reasoner_Comm.pdf PDF
Addendum 014.5_MCIEAST-MCBCAMLEJ SURPLUS SOIL MILCON SPEC REVISION - 6APRIL2020.pdf PDF
Amendment 0014.pdf PDF
Updated Attachment I Price Proposal_Revisions 04.15.2020.pdf PDF
PACKAGE 2 ATTACHMENT (6) HISTORIC GEOTECHNICAL DATA Part 2.pdf PDF
Addendum 014.6 Locker Concrete Pad DWGS.pdf PDF
Addendum 013.9_Substation Impedances.pdf PDF
Addendum 013.4_HP Final SW Master Plan.pdf PDF
Addendum 013.7_DM for HQ.pdf PDF
Addendum 013.6_SW8 081015 MOD 01.17.18.pdf PDF
Amendment 0013.pdf PDF
Updated Attachment I Price Proposal_Revisions 04.05.2020.pdf PDF
Addendum 013.5_SW 081015 DA.PDF PDF
Addendum 013.2_Wheeled Assets.pdf PDF
Addendum 013.3_SW NPDES PERMIT NCS000290.pdf PDF
Amendment 0012.pdf PDF
Updated Attachment I Price Proposal_Revisions 03.26.2020.pdf PDF
Updated Attachment H 3.26.2020.pdf PDF
Amendment 0011.pdf PDF
Package 2 Site Visit Agenda.pdf PDF
Amendment 0010.pdf PDF
Attachments.zip ZIP file
Site MapWC.pdf PDF
Site Visit HA Map.pdf PDF
Site Visit Main Side Map.pdf PDF
01 57 19.pdf PDF
Site Visit WC Map.pdf PDF
Site Visit Waiver.pdf PDF
Bldg. 812 Map.pdf PDF
Updated Attachment H.pdf PDF
Amendment 0009.pdf PDF
Attachment I Price Proposal Form.pdf PDF
TFF2_RFP_RTA_PART6_CHAPTER_C-G.pdf PDF
TFF2_RFP_RTA_PART_1-5.pdf PDF
TFF2_RFP_RTA_PART6_CHAPTER_A-B.pdf PDF
TFF2_RFP_RTA_PART6_CHAPTER_H-K.pdf PDF
Amendment 0008.pdf PDF
Amendment_0005.pdf PDF
Amendment_0004.pdf PDF
Amendment_0003.pdf PDF
Amendment_0003.pdf PDF
One_Day_Pass_Request.xls XLS spreadsheet
Amendment_0002.pdf PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNITED STATES MARINE CORPS

MARINE CORPS INSTALLATIONS EAST-MARINE CORPS BASE

PSC BOX 20005

CAMP LEJEUNE NC 28542-0005

03 Mar 20

From: Director, Environmental Management Division

To: Director, Installation Development Division

Subj: DECISION MEMORANDUM, CATEGORICAL EXCLUSION; 2D TANK BN

ARMORY REPLACEMENT, P1300 , (NEPA LE20014)

Ref: (a) MCO 5090.2

(b) 32 C.F.R. 775.6(f)

Encl: (1) 2D Tank BN REIR of 29 Oct 19

(2) Supporting Documents

(3) Applicable Conditions

1. In response to enclosure (1), this document satisfies the National

Environmental Policy Act (NEPA) review requirement under reference (a) and qualifies as a categorical exclusion in compliance with reference (b).

2. As outlined in enclosure (1) and (2), the proposed scope of the project is:

Constructs a low-rise reinforced concrete masonry unit building with structural walls supported on pile foundation, structural steel framing, reinforced CMU walls with brick veneer, and reinforced concrete roof with standing seam metal roof. The facility includes administrative space and secure storage for crew serve weapons. Construction also includes a covered cleaning area for the armory.

3. Pursuant to paragraph (34) of reference (b), this project qualifies for the following categorical exclusion: " (34) New construction that is similar to existing land use and, when completed, the use or operation of which complies with existing regulatory requirements (e.g., a building within a cantonment area with associated discharges/runoff within existing handling capacities).." This project will not result in any extraordinary circumstances.

4. In accordance with NEPA, this decision memorandum documents the proper level of environmental review for this project but may not constitute authority to proceed with implementation of the project. Please carefully review and follow all applicable conditions.

5. If the project changes, coordinate with the NEPA Program Manager at

(910-451-4542) to determine if this decision memorandum continues to cover your proposed action.

Accepted r/s J. Baker

Receipt Acknowledged Rugumamu, Reggie

04 Mar 20

Enclosure 1: REIR

REQUEST FOR ENVIRONMENTAL IMPACT REVIEW

SECTION I - PROPONENT INFORMATION

Project Title: 2D Tank BN Armory Replacement

Short Plain English Description of Action: Constructs an 8,378 SF Armory with a 4,730 SF Weapons Cleaning Area.

Project ID: P1300

Start By Date: 1-Apr-21

End By Date: 2-Apr-23

Activity Sponsor (Unit/Command): 2D Tank BN

Activity Sponsor POC: Charles Callahan

Phone/Fax: 910-451-8070

Activity Sponsor POC (Alternate): Reggie Rugumamu

Phone/Fax: 910-451-1105

Base Location: Mainside

Project Required To: Accomplish Military Training

Action Will Be Performed By: Contract

Project will result in permanent site improvement?: Yes

New or Modified Real Estate License Will Be Issued By Base?: N/A

Descriptive Information

Purpose and Need of Action: To provide adequate and efficiently configured armory/weapons cleaning areas to secure, preserve and maintain crew served weapons, small arms and optical/night vision equipment for 2D Tank Battalion. 2D Tank BN is currently using an armory inside their building and receiving an annual waiver to do so. This current armory configuration is 25% of the size they should have.

Scope of Project (Project Narrative): Constructs a low-rise reinforced concrete masonry unit building with structural walls supported on pile foundation, structural steel framing, reinforced CMU walls with brick veneer, and reinforced concrete roof with standing seam metal roof. The facility includes administrative space and secure storage for crew serve weapons. Construction also includes a covered cleaning area for the armory.

Identify Other Alternatives Considered: N/A

Information concerning avoidance, specific best management practices,or mitigation necessary to complete the project: N/A

Preferred and Alternative Sites

Preferred Site Description: The armory will be located off Duncan Street (adjacent to old CEB dig-pit) within walking distance of other 2D Tank BN assets.

RDD or IDD Comments, Site Approval: Pending

Clarify Pending status:: Site Approval being submitted concurrently with

REIR

Towers working group coordination (if applicable): Not Applicable

Action Sponsor: N/A

Rank: N/A

Title: N/A

End of Form

SECTION II - PRELIMINARY ENVIRONMENTAL SURVEY

a. AIR QUALITY

1. Will your project involve any of the following?: No

(Indicate all that apply, indicate "new" or "modified" as appropriate):

Abrasive Blasting:

Landfill:

Lime Storage:

Open Burning:

Painting:

Paint Booth:

Paint Gun Cleaners:

Paint Strippers:

Refrigerant Storage Recovery, and/or Recycling:

Tanks (ASTs, USTs):

Surface Coating:

Welding:

Woodworking:

Boilers:

Generators:

Engine Test Stands:

Fiberglass Repair:

Bulk Chemical Storage (liquid or solid):

Remediation:

Grinding:

Jet Engine Testing:

Fuel Dispensing:

Parts Oven:

Parts Cleaner:

Fire Training Pit:

Provide proposed construction dates, equipment size, specification, and estimated types.: N/A

2. Will pollution control equipment be involved (e.g.filter or incinerators)?: No

3. Will the project involve the use of disposal of asbestos?: No

4. Will project cause dust problems either temporarily during construction or over the long term?: Yes

b. LAND QUALITY

1. Number of acres involved? Indicate total project area and total disturbed area.: 2

2. Will the action require use of earthen fill material?: Yes

3. Will vegetation be cleared?: Yes

4. Will the project increase impervious area by 10,000ft squared or more?: Yes

5. Will wetlands be involved? How many acres? What work will be done in wetlands?': No

c. GROUNDWATER QUALITY

1. Does the project involve use of herbicides, insecticides, or pesticides?: No

2. Does the project involve installation/use of septic tanks, leach beds, or other on-site disposal of sanitary waste?: No

3. Will there be any wells dug or any excavation deeper than 20 feet?:

No

4. Will the project generate or use any toxic or hazardous/waste materials?: No

5. Are there any known Installation Restoration Program (Comprehensive Environmental Response, Compensation, and Liability Act - CERCLA or Resource Conservation Recovery Act - RCRA) sites or hazardous waste treatment, storage, and disposal (RCRA) facilities within the proposed project area?: No

6. Will there be an increase of solid waste (temporarily or permanently) caused by implementing the project/action?: No

7. Will the project or action be carried out within 100 to 500 feet of a drinking water supply well? If yes, provide distance to nearest drinking water well.: No

8. Does the project require the installation or removal of any petroleum or non-petroleum underground storage tank (UST)?: No

d. SURFACE WATER QUALITY

1. Is the project located on or in a water body or adjacent to or in the 100-year flood plain?: No

2. Will the project involve construction of drainage ditches/underground drains for purposes of lowering water table?: No

3. After construction is complete, will petroleum products including fuel, oil and lubricants be routinely stored or used (temporarily or permanently) at the site? : Yes

4. Does the project require the installation of any petroleum or non-petroleum above ground storage tank (AST)?: No

e. NATURAL RESOURCES

1. Will trees be removed?: Yes

Amount to be removed:: 1 Acre

2. Will shrubs, or other low-growing vegetation be cut?: No

3. Will completion of the project result in a change in land use from what is presently shown in the Base Master Plan? : No

4. Will public access for hunting, boating, fishing, ect., be restricted?: No

5. Are there potential effects on any threatened or endangered species?:

No

6. Does the project involve the transfer (purchase, sale, lease, easement or otherwise) of any real estate interest?: No

f. CULTURAL RESOURCES

1. Are there any known archaeological sites in the area of your project/action?: No

2. Are there any known historic buildings or districts affected by the project/action?: No

3. If known, please contact the Base Archaeologist/Cultural Resources Program Manager for assistance at (910) 451-7230.:

g. UTILITIES AND SERVICES

1. Will utilities be required? : Yes

If yes, please list below.: Electrical, Water, Wastewater, Gas and Telecommunication.

2. Will modifications to existing utilities be required? : Yes

If yes, please list below.: Electrical, Water, Wastewater, Gas and Telecommunication.

h. SOCIAL ECONOMIC CONSIDERATIONS

1. Will the project cause an increase/decrease in on-base or off-base military population? : No

2. Will there be any increased demand on a local or state government to provide services? : No

3. Will there be any changes to traffic flow and patterns on or off base?: No

4. Will the project cause noise or safety issues that could potentially impact off-base persons or property either during construction or from the project itself?: No

i. GENERAL CONSIDERATIONS

1. Are alternative procedures, practices, or technologies available to minimize environmental impact or utility use? : No

2. Are there likely effects on the human environment that:: d. N/A

Explain YES answers here:: N/A

Enclosure 2: Site Map

Armory Site

Land Use Restricitons

Enclosure 3: Applicable Conditions

AST/UST (Land use Restrictions):

1. This site is located within a Land Use Restriction (LUR) for groundwater. Any encountered groundwater within this LUR boundary must be containerized and properly disposed of, or sampled prior to dewatering activities.

AST/UST/IR/MRP (Soil):

1. If contaminants are suspected through odors or visual observation during construction activities, immediately stop work, call 911, and contact EQB at 910-451-5878 for further instructions.

2. There are known monitoring wells in the project areas, however, if an unmarked well is discovered and inadvertently damaged, immediately contact EQB at 910-451-5878 for further instructions.

3. 3R UXO Safety Awareness Training is recommended for all construction workers (available through EOD, the OICC or EMD) as a precaution given that Camp Lejeune has been an active military base since the 1940s.

Should a munitions-related item be found during construction, follow appropriate notifications as detailed in the 3R training. Any munitions related item found during project construction should additionally be reported to EMD within 10 days (K. Hiortdahl, 910-451-5878) to determine if additional evaluation and precautions are necessary (Explosives Safety Submission, UXO Tech Support, etc).

3R Safety Awareness Training is available online at the following link:

http://www.lejeune.marines.mil/Offices-Staff/Environmental-Mgmt/Training-Vi deo/

Contact Info:

IR Program, 910-451-5878/9610 AST/UST Program,910-451-9641

Water Quality Program/ECB:

1. This project requires the installation/testing of backflow prevention devices on potable water lines in accordance with the Safe Drinking Water Act. Coordinate with Public Works Design Branch.

2. This project involves a water and/or wastewater line serving more than one building and will require a water or wastewater extension permit. A wastewater extension permit also requires a wastewater flow acceptance form. Coordinate this request through Utilities Director Public Works Division. Coordinate all other concerns with Water Quality Manager.

3. This project involves a water line for fire protection. Any line used for fire protection requires a water extension permit from NCDEQ.

4. All construction must be at least 200 feet from any existing or proposed drinking water supply wells. Coordinate with Water Quality Manager.

5. If project proposes any discharges of non-contact cooling water, cooling tower blowdown or boiler blowdown, coverage under the NCG500000 general permit is required. Coordinate with Water Quality Manager.

6. Reduction of Lead in Drinking Water Act:

Installation or repair of any piping, fittings, fixtures, solder or flux providing water for possible human consumption must be “lead-free” as defined by the Reduction of Lead in Drinking Water Act (RLDWA). The RLDWA revised the definition of lead free to a weighted average of 0.25% of the wetted surfaces of plumbing products. A methodology for calculating the weighted average of wetted surfaces can be found at www.epa.gov.

Contact info:

Water Quality Manager, 910-451-9518 Public Works Design Branch, 910-451-2212 Public Works Utilities Director, 910-451-5024

Air Quality:

1. Ensure that any fugitive dust emissions generated by construction/renovation/demolition are appropriately controlled.

2. If the project includes installation of new activities/equipment which generate air emissions, and have not been evaluated for air permitting, contact AQ program at phone numbers below. Please note that air emission sources are required to be permitted prior to their installation/operation. Examples of such sources include, but are not limited to: boilers, water heaters, generators, fuel storage tanks, painting/coating operations, woodworking, welding, abrasive blasting, engine testing, and parts ovens.

3. If the project involves any refrigerant handling or manipulation, ensure that appropriate Ozone Depleting Substance (ODS) servicing procedures are followed.

AQ program contacts:

Lillian Malloy, 910-451-9017

ECB (Stormwater):

1. Ensure sediment does not leave a construction site of any size as a result of land-disturbing activities. Coordinate with the Stormwater Manager.

2. This project involves the disturbance of over 5,000 square feet.

Therefore, requirements under Section 438 of the Energy Independence and Security Act (EISA) will be enforced. The policy directs all DoD construction projects and redevelopment projects with footprints greater than 5,000 square feet to implement Low Impact Development (LID) techniques to maintain predevelopment hydrology to the maximum extent technically feasible. Coordinate with the Stormwater Manager or Public Works Design Branch.

3. This project involves the disturbance of 1 or more acres of land and will require a State approved sedimentation/erosion control plan and stormwater permit. For questions regarding stormwater requirements coordinate with the Stormwater Manager. To coordinate the permit application contact Public Works Design Branch.

4. This project involves addition/construction of 10,000 sqft of impervious surface area. It requires State permitting through the NCDEMLR and the design/construction of approved BMPs (Coastal County Rules).

Coordinate with the Stormwater Manager.

Contact Info:

Stormwater Manager, 910-451-9657 (Stormwater Requirements) Pubic Works Design Branch, 910-451-2212 (Permit Application)

Note 1: In accordance with MCIEAST-MCB CAMLEJO 11013.4, projects that include construction will require site approval from G-F. Please contact Installation Development Division (IDD).

Note 2: The following EMD Sections reviewed the REIR, replied to it and have no concerns: RTAM, MCB CL Explosive Safety, Cultural Resources, Stream/Wetland

File details come from the government source that posted it. Updated .