About this file

CDRLs

View the file

Other files for this federal contract opportunity

Other files attached to 4. 11 Combat Integratiion & Identification Systems (CI&IDS) Division Multi Mission data Link Support (MMDLS), newest first.
File Type Posted
N00421-17-R-0019-0001_Revised_Fully_Burdened.xlsx XLSX spreadsheet
N00421-17-R-0019-0001_Revised_Cost.xlsx XLSX spreadsheet
N00421-17-R-0019-0001.docx DOCX document
Govt_response.docx DOCX document
Att_2_QASP.docx DOCX document
Att_4_Data_Transmittal.docx DOCX document
N00421-17-R-0019.docx DOCX document
Att_P2_Annual_Fully_Burdened_Labor.xlsx XLSX spreadsheet
Att_P1.xlsx XLSX spreadsheet
Att_1_DD254.pdf PDF
Att_3_OCI.docx DOCX document
Exhibit_A_CDRLS.xlsx XLSX spreadsheet
Att_P4_CPAQ.pdf PDF
Att_P5_CPAQ_Instructions.docx DOCX document
Att_P3_PPIF.pdf PDF
Att_5_WD.txt TXT text file
Exhibit_A_CDRLS.xlsx XLSX spreadsheet
N00421-17-R-0019.docx DOCX document
Att_5_WD.txt TXT text file
Att_6_SGFP.xlsx XLSX spreadsheet
Att_P1.xlsx XLSX spreadsheet
Att_7_RGFP.xlsx XLSX spreadsheet
Att_2_QASP.docx DOCX document
Att_1_DD254.docx DOCX document
Att_P2.xlsx XLSX spreadsheet
Att_4_Data_Transmittal.docx DOCX document
Att_3_OCI.docx DOCX document
N0042117R0019_revised.docx DOCX document
Att_5_WD.txt TXT text file
Att_P3.pdf PDF
Att_P4.pdf PDF
Draft_CIIDS_MMDLS__SOW.docx DOCX document
Draft_CIIDS_MMDLS__CDRLs.pdf PDF
Draft_CIIDS_MMDLS_LOE.docx DOCX document
Draft_CIIDS_MMDLS_P_Quals.docx DOCX document
Revised_Personnel_Qualifications_10_June_2013.docx DOCX document
Labor_Rate_key_to_Function_labor_Catagories_Dec_2013.xlsx XLSX spreadsheet
SOURCES_SOUGHT_FBO.docx DOCX document
Supplemental_Eng_Integration_Support_Overiew.docx DOCX document
Data_Link_Recompete_-_LOE.xlsx XLSX spreadsheet
LAMPS_US_Navy_Recorder_System_USCG_SLEP.PPTX PPTX presentation
LAMPS_Industry_Day_Brief.PPTX PPTX presentation
LAMPS_Sign_in_Sheet_allowed_to_be_posted.doc DOC document
Questions_and_Answers_from_SEAPORT-E.docx DOCX document
Data_Link_Recompete_-_OCI_List.docx DOCX document
Small_Business_Brief.ppt PPT presentation
LAMPS_Sources_Sought.docx DOCX document
Data_Link_Recompete_-_SOW.docx DOCX document
DRAFT_LEVEL_OF_EFFORT.xlsx XLSX spreadsheet
DRAFT_LAMPS_SOW.docx DOCX document
Show all 50

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Input Sheet

ITEMVALUE
A. Contract Line Item Number
B. ExhibitA
D. System/ItemMulti-Mission Data Link Systems Support
E. Contract/PR No.TBD
F. ContractorTBD
G. Prepared ByJ. Yoe
I. Approved By:R. Scruitsky
6. Requiring OfficeNAWCAD 4.11.2.2
H. Date Prepared6/29/16
J. Date Approved6/29/16
Total Number of Pages32
Notes:
Renumbering of CDRLsJust rename the Tabs and the CDRL numbers will adjust.
You may also have to change the number of pages above.

A001

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDP_________TM ________Other X (MISC)
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Multi-Mission Data Link Systems SupportTBDTBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A001Technical Report - Study Service
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-MISC-80508BSOW 3.1.1, 3.1.2, 3.1.3, 3.1.5.1, 3.1.5.2, 3.1.6.1, 3.1.6.2, 3.1.6.3, 3.1.7, 3.1.8, 3.1.9, 3.1.10, 3.1.11, 3.1.12, 3.2.1, 3.2.2.1, 3.2.2.2, 3.2.3, 3.2.4, 3.2.5, 3.2.6, 3.3.1, 3.3.2, 3.3.3.1, 3.3.3.2, 3.3.4, 3.4, 3.4.1, 3.4.2, 3.4.3.1, 3.4.3.2, 3.4.3.3, 3.5.1, 3.5.2, 3.5.3, 3.5.5, 3.5.6, 3.7.5, 3.8.1.1, 3.8.1.2, 3.8.1.4, 3.8.1.5, 3.8.1.6, 4.8.2.1, 3.8.2.2, 3.8.2.9, 3.8.3, 3.8.3.1.1, 3.8.3.1.2, 3.8.3.1.4, 3.8.3.2.1, 3.8.3.2.2, 3.8.3.2.3, 3.8.3.2.4, 3.8.3.2.5, 3.8.3.2.6, 3.9.1, 3.9.2, 3.9.3, 3.9.4, 3.10.1.3, 3.10.1.4, 3.10.1.5, 4.5.6NAWCAD 4.11.2.2
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
Blk 16
XXREQUIREDASREQBlk 16b. COPIES
D
8. APP CODE11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ABlk 16Blk 16RegRepro
16. REMARKSNAWCAD 4.11.2.211
Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 4).

Blocks 11, 12, and 13: Submit IAW SOW Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2010 unless otherwise approved by the government.

Deliver to: Multi Mission Data Link Systems Branch, Code 4.11.2.2 17169 Tacan Street, St. Inigoes, MD 20684-0010 Mark for: Contracts Deliverable Manager (insert contract number)

15. TOTAL011
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
J. Yoe6/29/16R. Scruitsky6/29/16
DD Form 1423-1, JUN 90Previous editions are obsoletePage1of32
1007/183

A002

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDP_________TM ________Other X (NDTI)
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Multi-Mission Data Link Systems SupportTBDTBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A002Test Procedures
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-NDTI-80603ASOW 3.1.4, 3.1.5.1, 3.1.5.2, 3.1.9, 3.4.3.2, 3.8.1.6,3.8.3NAWCAD 4.11.2.2
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
Blk 16
XXREQUIREDASREQBlk 16b. COPIES
D
8. APP CODE11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
ABlk 16Blk 16RegRepro
16. REMARKSNAWCAD 4.11.2.2111
Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 4).

Blocks 11, 12, and 13: Final due 10 days after receipt of government comments on draft submission. Government has 30 days to comment.

Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2010 unless otherwise approved by the government.

Deliver to: Multi Mission Data Link Systems Branch, Code 4.11.2.2

15. TOTAL111
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
J. Yoe6/29/16R. Scruitsky6/29/16
DD Form 1423-1, JUN 90Previous editions are obsoletePage2of32
1007/183

A003

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDP_________TM ________Other X (NDTI)
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Multi-Mission Data Link Systems SupportTBDTBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A003Test/Inspection Report
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-NDTI-80809BSOW 3.1.5.1, 3.1.5.2, 3.1.9, 3.1.11, 3.4.3.2, 3.8.1.6, 3.8.3NAWCAD 4.11.2.2
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
Blk 16
XXREQUIREDASREQBlk 16b. COPIES
D
8. APP CODE11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ABlk 16Blk 16RegRepro
16. REMARKSNAWCAD 4.11.2.211
Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 4).

Blocks 11, 12, and 13: Submit IAW SOW

Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2010 unless otherwise approved by the government.

Deliver to: Multi Missions Data Link Systems Branch, Code 4.11.2.2

15. TOTAL011
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
J. Yoe6/29/16R. Scruitsky6/29/16
DD Form 1423-1, JUN 90Previous editions are obsoletePage3of32
1007/183

A004

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDP_________TM ________Other X (ADMN)
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Multi-Mission Data Link Systems SupportTBDTBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A004Documentation Revision
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
Blk 16SOW 3.1.6.1, 3.1.12, 3.1.13, 3.2.3, 3.5.5, 3.5.6, 3.8.2.7, 3.8.2.8, 3.8.3.1.3, 3.8.3.1.4NAWCAD 4.11.2.2
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
Blk 16
XXREQUIREDASREQASREQb. COPIES
D
8. APP CODE11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ABlk 16Blk 16RegRepro
16. REMARKSNAWCAD 4.11.2.211
Block 4: Revise existing documentation using previous form/format as a guideline. Some document updates will require manual or automated completion of fill-in forms. Original documents, specific guidance and/or forms will be provided to the contractor at the time of specific tasking.

Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 4).

Blocks 11, 12, and 13: Submit IAW SOW B Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2010 unless otherwise approved by the government.

Deliver to: Multi Missions Data Link Systems Branch, Code 4.11.2.2

15. TOTAL011
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
J. Yoe6/29/16R. Scruitsky6/29/16
DD Form 1423-1, JUN 90Previous editions are obsoletePage4of32
1007/183

A005

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDP________TM ________Other X (ADMN)
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Multi-Mission Data Link Systems SupportTBTBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A005Report, Record of Meeting/Minutes
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-ADMN-81505SOW 3.1.11, 3.8.1.7, 3.11, 4.8.4NAWCAD 4.11.2.2
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
Blk 16
XXREQUIREDASREQBlk 16b. COPIES
D
8. APP CODE11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ABlk 16Blk 16RegRepro
16. REMARKSNAWCAD 4.11.2.211
Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 4).

Blocks 11, 12, and 13: Submit IAW SOW Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2010 unless otherwise approved by the government.

Deliver to: Multi Mission Data Link Systems Branch, Code 4.11.2.2

15. TOTAL011
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
J. Yoe6/29/16R. Scruitsky6/29/16
DD Form 1423-1, JUN 90Previous editions are obsoletePage5of32
1007/183

A006

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDP__X______TM ________Other
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Multi-Mission Data Link Systems SupportTBDTBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A006Engineering Change Proposal
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-CMAN-80639C, and Blk 16SOW 3.1.13, 3.5.2, 3.8.3.1.1NAWCAD 4.11.2.2
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
Blk 16
XXREQUIREDASREQBlk 16b. COPIES
D
8. APP CODE11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
ABlk 16Blk 16RegRepro
16. REMARKSNAWCAD 4.11.2.2111
Blk 4: ECPs shall be submitted electronically in Microsoft Office 2007 or later version or Adobe PDF

Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 4).

Blk 10: Submit ECP as required for changes to baseline and/or directed by COR.

Blocks 11, 12, and 13: Final due 10 days after receipt of government comments on draft submission ECP. Government has 30 days to comment. Shall include: ECP name/title; purpose/description, type of change, authority for ECP, accomplishment, material identification, engineering data, test requirements, ship type/hull number, related alterations, craft type/serial number.

Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2010 unless otherwise approved by the government.

Deliver to: Multi Missions Data Link Systems Branch, Code 4.11.2.2

15. TOTAL111
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
J. Yoe6/29/16R. Scruitsky6/29/16
DD Form 1423-1, JUN 90Previous editions are obsoletePage6of32
1007/183

A007

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDP__X______TM ________Other
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Multi-Mission Data Link Systems SupportTBDTBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A007Logistic Management Information Data Product
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-ALSS-81529SOW 3.2.6, 3.3.3.1, 3.4, 3.4.1, 3.4.3.2, 3.4.3.3, 3.5.4, 3.5.6, 3.8.3.2.1, 3.8.3.2.2, 3.8.3.2.3. 3.8.3.2.4, 3.8.3.2.5, 3.8.3.2.6, 3.9.4, 3.9.5.1, 3.10.1.2, 3.10.1.3, 3.10.1.4, 3.10.1.5NAWCAD 4.11.2.2
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
Blk 16
XXREQUIREDASREQBlk 16b. COPIES
D
8. APP CODE11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ABlk 16Blk 16RegRepro
16. REMARKSNAWCAD 4.11.2.211
Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 4).

Blocks 11, 12, and 13: Submit IAW SOW. Frequency of subsequent submissions will be identified per specific tasking.

Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2010 unless otherwise approved by the government.

Deliver to: Multi Missions Data Link Systems Branch, Code 4.11.2.2

15. TOTAL011
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
J. Yoe6/29/16R. Scruitsky6/29/16
DD Form 1423-1, JUN 90Previous editions are obsoletePage7of32
1007/183

A008

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDP___X_____TM ________Other
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Multi-Mission Data Link Systems SupportTBDTBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A008Software Development Plan (SDP)
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-IPSC-81427ASOW 3.4.3.2, 3.6, 3.7.1, 3.7.2.k, 3.7.4, 3.8.2.2NAWCAD 4.11.2.2
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
Blk 16
XXREQUIREDASREQBlk 16b. COPIES
D
8. APP CODE11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
ABlk 16Blk 16RegRepro
16. REMARKSNAWCAD 4.11.2.2111
Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 4).

Blocks 11, 12, and 13: Final due 10 days after receipt of government comments on draft submission. Government has 30 days to comment.

Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2010 unless otherwise approved by the government.

Deliver to: Multi Mission Data Link Systems Branch, Code 4.11.2.2

15. TOTAL111
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
J. Yoe6/29/16R. Scruitsky6/29/16
DD Form 1423-1, JUN 90Previous editions are obsoletePage8of32
1007/183

A009

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDP_________TM ________Other X (NDTI)
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Multi-Mission Data Link Systems SupportTBDTBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A009Test Plan
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-NDTI-80566ASOW 3.4.3.2, 3.8.1.6, 3.8.3NAWCAD 4.11.2.2
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
Blk 16
XXREQUIREDASREQBlk 16b. COPIES
D
8. APP CODE11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
ABlk 16Blk 16RegRepro
16. REMARKSNAWCAD 4.11.2.2111
Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 4).

Blocks 11, 12, and 13: Final due 10 days after receipt of government comments on draft submission. Government has 30 days to comment.

Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2010 unless otherwise approved by the government.

Deliver to: Multi Missions Data Link Systems Branch, Code 4.11.2.2

15. TOTAL111
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
J. Yoe6/29/16R. Scruitsky6/29/16
DD Form 1423-1, JUN 90Previous editions are obsoletePage9of32
1007/183

A010

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDP__X_______TM ________Other
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Multi-Mission Data Link Systems SupportTBDTBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A010Software Requirements Specification (SRS)
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-IPSC-81433ASOW 3.4.3.2, 3.6, 3.7, 3.7.1, 3.7.2.k, 3.8.2.2NAWCAD 4.11.2.2
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
Blk 16
XXREQUIREDASREQBlk 16b. COPIES
D
8. APP CODE11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
ABlk 16Blk 16RegRepro
16. REMARKSNAWCAD 4.11.2.2111
Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 4).

Blocks 11, 12, and 13: Final due 10 days after receipt of government comments on draft submission. Government has 30 days to comment.

Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2010 unless otherwise approved by the government.

Deliver to: Multi Missions Data Link Systems Branch, Code 4.11.2.2

15. TOTAL111
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
J. Yoe6/29/16R. Scruitsky6/29/16
DD Form 1423-1, JUN 90Previous editions are obsoletePage10of32
1007/183

A011

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDP__X_______TM ________Other
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Multi-Mission Data Link Systems SupportTBDTBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A011Software Design Description (SDD)
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-IPSC-81435ASOW 3.4.3.2, 3.6, 3.7.1, 3.7.2.k, 3.8.2.2NAWCAD 4.11.2.2
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
Blk 16
XXREQUIREDASREQBlk 16b. COPIES
D
8. APP CODE11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
ABlk 16Blk 16RegRepro
16. REMARKSNAWCAD 4.11.2.2111
Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 4).

Blocks 11, 12, and 13: Final due 10 days after receipt of government comments on draft submission. Government has 30 days to comment.

Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2010 unless otherwise approved by the government.

Deliver to: Multi Mission Data Link Systems Branch, Code 4.11.2.2

15. TOTAL111
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
J. Yoe6/29/16R. Scruitsky6/29/16
DD Form 1423-1, JUN 90Previous editions are obsoletePage11of32
1007/183

A012

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDP_________TM ________Other X (MCCR)
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Multi-Mission Data Link Systems SupportTBDTBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A012Software Development Status Report (SDSR)
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-MCCR-80459SOW 3.4.3.2, 3.6, 3.7.1, 3.7.2.k, 3.8.2.2NAWCAD 4.11.2.2
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
Blk 16
XXREQUIREDASREQBlk 16b. COPIES
D
8. APP CODE11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ABlk 16Blk 16RegRepro
16. REMARKSNAWCAD 4.11.2.211
Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 4).

Blocks 11, 12, and 13: Submit IAW SOW

Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2010 unless otherwise approved by the government.

Deliver to: Multi Mission Data Link Systems Branch, Code 4.11.2.2

15. TOTAL011
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
J. Yoe6/29/16R. Scruitsky6/29/16
DD Form 1423-1, JUN 90Previous editions are obsoletePage12of32
1007/183

A013

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDP__X_____TM ________Other
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Multi-Mission Data Link Systems SupportTBDTBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A013Software Test Plan (STP)
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-IPSC-81438ASOW 3.4.3.2, 3.6, 4.7.1, 3.7.2.k, 3.8.2.2NAWCAD 4.11.2.2
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
Blk 16
XXREQUIREDASREQBlk 16b. COPIES
D
8. APP CODE11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
ABlk 16Blk 16RegRepro
16. REMARKSNAWCAD 4.11.2.2111
Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 4).

Blocks 11, 12, and 13: Final due 10 days after receipt of government comments on draft submission. Government has 30 days to comment.

Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2010 unless otherwise approved by the government.

Deliver to: Multi Mission Data Link Systems Branch, Code 4.11.2.2

15. TOTAL111
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
J. Yoe6/29/16R. Scruitsky6/29/16
DD Form 1423-1, JUN 90Previous editions are obsoletePage13of32
1007/183

A014

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDP_________TM ________Other X (IPSC)
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Multi-Mission Data Link Systems SupportTBDTBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A014Software Test Report (STR)
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-IPSC-81440ASOW 3.4.3.2, 3.6, 3.7.1, 3.7.2.k, 3.8.2.2NAWCAD 4.11.2.2
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
Blk 16
XXREQUIREDASREQBlk 16b. COPIES
D
8. APP CODE11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ABlk 16Blk 16RegRepro
16. REMARKSNAWCAD 4.11.2.211
Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 4).

Blocks 11, 12, and 13: Final due 10 days after receipt of government comments on draft submission. Government has 30 days to comment.

Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2010 unless otherwise approved by the government.

Deliver to: Multi Mission Data Link Systems Branch, Code 4.11.2.2

15. TOTAL011
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
J. Yoe6/29/16R. Scruitsky6/29/16
DD Form 1423-1, JUN 90Previous editions are obsoletePage14of32
1007/183

A015

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDP_________TM _X_______Other
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Multi-Mission Data Link Systems SupportTBDTBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A015Software User Manuals (SUM)
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-IPSC-81443ASOW 3.4.3.2, 3.6, 3.7.1, 3.7.2.k, 3.8.2.2NAWCAD 4.11.2.2
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
Blk 16
XXREQUIREDASREQBlk 16b. COPIES
D
8. APP CODE11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
ABlk 16Blk 16RegRepro
16. REMARKSNAWCAD 4.11.2.2111
Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 4).

Blocks 11, 12, and 13: Final due 10 days after receipt of government comments on draft submission. Government has 30 days to comment.

Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2010 unless otherwise approved by the government.

Deliver to: Multi Mission Data Link Systems Branch, Code 4.11.2.2

15. TOTAL111
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
J. Yoe6/29/16R. Scruitsky6/29/16
DD Form 1423-1, JUN 90Previous editions are obsoletePage15of32
1007/183

A016

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDP_________TM ________Other X (MCCR)
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Multi-Mission Data Link Systems SupportTBDTBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A016Computer Software Product End ItemsEnd Item Deliverable
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-MCCR-80700SOW 3.4.3.2, 3.6, 3.7.1, 3.7.2.k, 3.7.3, 3.8.2.2NAWCAD 4.11.2.2
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
Blk 16
XXREQUIREDASREQBlk 16b. COPIES
D
8. APP CODE11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
ABlk 16Blk 16RegRepro
16. REMARKSNAWCAD 4.11.2.2111
Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 4).

Blocks 11, 12, and 13: Final due 10 days after receipt of government comments on draft submission. Government has 30 days to comment.

Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2010 unless otherwise approved by the government.

Deliver to: Multi Mission Data Link Systems Branch, Code 4.11.2.2

15. TOTAL111
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
J. Yoe6/29/16R. Scruitsky6/29/16
DD Form 1423-1, JUN 90Previous editions are obsoletePage16of32
1007/183

A017

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDP_X______TM ________Other
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Multi-Mission Data Link Systems SupportTBDTBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A017Installation Control Drawings
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-DRPR-81242SOW 3.5.1, 3.8.2.3, 3.8.2.6, 3.8.3.1.3, 3.8.3.1.4NAWCAD 4.11.2.2
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
Blk 16
XXREQUIREDASREQBlk 16b. COPIES
D
8. APP CODE11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
ABlk 16Blk 16RegRepro
16. REMARKSNAWCAD 4.11.2.2111
Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 4).

Blocks 11, 12, and 13: Final due 10 days after receipt of government comments on draft submission. Government has 30 days to comment.

Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2010 unless otherwise approved by the government.

Deliver to: Multi Missions Data Link Systems Branch, Code 4.11.2.2

15. TOTAL111
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
J. Yoe6/29/16R. Scruitsky6/29/16
DD Form 1423-1, JUN 90Previous editions are obsoletePage17of32
1007/183

A018

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDP_________TM _X_______Other
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Multi-Mission Data Link Systems SupportTBDTBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A018Technical/Operator Maintenance Manuals
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
Blk 16SOW 3.5.4, 3.8.2.7, 3.8.2.8NAWCAD 4.11.2.2
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
Blk 16
XXREQUIREDASREQBlk 16b. COPIES
D
8. APP CODE11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
ABlk 16Blk 16RegRepro
16. REMARKSNAWCAD 4.11.2.2111
Blk 4: Use best commercial practice

Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 4).

Blocks 11, 12, and 13: Final due 10 days after receipt of government comments on draft submission. Government has 30 days to comment.

Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2010 unless otherwise approved by the government.

Deliver to: Multi Mission Data Link Systems Branch, Code 4.11.2.2

15. TOTAL111
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
J. Yoe6/29/16R. Scruitsky6/29/16
DD Form 1423-1, JUN 90Previous editions are obsoletePage18of32
1007/183

A019

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDP XTM ________Other
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
Multi-Mission Data Link Systems SupportTBDTBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A019Product Drawings/Models and Associated Lists
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-SESS-81000DSOW 3.5.5, 3.8.1.1, 3.8.1.3, 3.8.1.4, 3.8.1.5, 3.8.2.1, 3.8.2.4, 3.8.2.5, 3.8.2.6, 3.8.3.1.3, 3.8.3.1.4, 3.8.3.1.5NAWCAD 4.11.2.2
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
Blk 16
XXREQUIREDASREQBlk 16b. COPIES
D
8. APP CODE11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
ABlk 16Blk 16RegRepro
16. REMARKSNAWCAD 4.11.2.2111
Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 4).

Blocks 11, 12, and 13: Final due 10 days after receipt of government comments on draft submission. Government has 30 days to comment.

Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2010 unless otherwise approved by the government.

Deliver to: Multi Missions Data Link Systems Branch, Code 4.11.2.2

15. TOTAL111
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
J. Yoe6/29/16R. Scruitsky6/29/16

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .