Att_P2.xlsx
XLSX spreadsheet 18 KB Posted
- Attached to
- 4. 11 Combat Integratiion & Identification Systems (CI&IDS) Division Multi Mission data Link Support (MMDLS) Federal contract opportunity
- Solicitation number
- N00421-15-R-0010
About this file
Fully Burdened Rates
View the file
Other files for this federal contract opportunity
Show all 50
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions Instructions to Prime Contractors for completing Attachment xx Fully Burdened Labor Rates
RFP #
| COLUMN | COLUMN HEADING | DESCRIPTION OF DATA UNDER THIS COLUMN HEADING |
| A | Offeror Name | Enter the Offeror (Prime's name or Subcontractor's name) in this field to distinguish between the companies |
| B | Proposed Labor Category (Furnished by Government) | Enter the Proposed Labor Category, as recorded in the Prime or Subcontractor's accounting system, that correlates to each of the Government solication Labor Category on that row. Spell and format entry the same every time it is used on the template (for example, when it relates to the Prime Offeror's rates on one row and to a Subcontractor's rates on another row). If the Offeror determines that no personnel will be proposed to perform work defined by one of the Government Estimate Labor Categories listed, enter "NA". |
| C | Individual Designator* | For each individual Contractor employee proposed; enter a different Identifing title in the form of FTE## (e.g. FTE01, FTE02, etc.) for each individual to distinguish them from one another. Do not enter the individual's name into the template; rather, provide that information separately in accordance with the requirements of NAVAIR Clause 5252.232-9529. Enter one FTE# for EACH indiviual proposed. (The number of FTE's must coordinate with the submitted P-6 for evaluation purposes.) |
| D | Proposed Fully-Burdened Labor Rate per Hour, per Labor Category | Enter the Fully-Burdened Labor Rate per Hour proposed for the applicable performance period (e.g. Base or Year_#) for personnel associated with the Proposed Labor Category. Enter numbers only, in U.S. Dollar format $###.## rounded to the nearest cent. Fully-Burdened Labor Rates shall include fringe, overhead, G&A, subcontractor pass-through rate, and fee on total cost, but should not include Fully-Burdened Other Direct Costs (ODCs) such as Materials, Travel, and Cost of Money costs. |
Burdened Labor Rates
| Offeror Name | ATTACHMENT P8 | Individual Designator* | Proposed Fully Burdened Rates | ||||||
| Proposed Labor Category | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Option Period 1 | Option Period 2 | ||
| Cable Splicer | |||||||||
| Clerk Typist | |||||||||
| Computer Programmer III | |||||||||
| Computer Programmer IV | |||||||||
| Computer Systems Analyst III | |||||||||
| Configuration Management Analyst | |||||||||
| Data Entry Operator II | |||||||||
| Drafter/CAD Operator, Journey Level | |||||||||
| Drafter/CAD Operator, Senior | |||||||||
| Engineering/Electronics Technician, Senior (Installation) | |||||||||
| Engineering Technician, Journey Level | |||||||||
| Engineering Technician, Junior | |||||||||
| Engineering Technician, Senior | |||||||||
| Engineer/Scientist, Journey Level | |||||||||
| Engineer/Scientist, Junior | |||||||||
| Engineer/Scientist, Senior (Computer) | |||||||||
| Engineer/Scientist, Senior (Digital Design) | |||||||||
| Engineer/Scientist, Senior (Electrical/Electronics) | |||||||||
| Engineer/Scientist, Senior (Systems, RF) | |||||||||
| Financial Analyst | |||||||||
| Logistician III | |||||||||
| Logistics Analyst | |||||||||
| Manager | |||||||||
| Material Coordinator | |||||||||
| Material Expediter | |||||||||
| Program Manager, Senior | |||||||||
| Project Analyst | |||||||||
| Quality Control Inspector | |||||||||
| Secretary | |||||||||
| Supply Technician | |||||||||
| Technical Writer II | |||||||||
| Technical Writer III | |||||||||
| Travel Clerk I | |||||||||
| Warehouse Specialist (Warehouse Worker) | |||||||||
| Word Processor I |
Attachment xx
RFP #
File details come from the government source that posted it. Updated .