About this file

Contract Data Requirement Lists (CDRLs)

View the file

Other files for this federal contract opportunity

Other files attached to 4. 11 Combat Integratiion & Identification Systems (CI&IDS) Division Multi Mission data Link Support (MMDLS), newest first.
File Type Posted
N00421-17-R-0019-0001_Revised_Cost.xlsx XLSX spreadsheet
N00421-17-R-0019-0001.docx DOCX document
N00421-17-R-0019-0001_Revised_Fully_Burdened.xlsx XLSX spreadsheet
Govt_response.docx DOCX document
Att_2_QASP.docx DOCX document
Att_1_DD254.pdf PDF
Att_3_OCI.docx DOCX document
Exhibit_A_CDRLS.xlsx XLSX spreadsheet
Att_P4_CPAQ.pdf PDF
Att_P5_CPAQ_Instructions.docx DOCX document
Att_P3_PPIF.pdf PDF
Att_5_WD.txt TXT text file
Att_4_Data_Transmittal.docx DOCX document
N00421-17-R-0019.docx DOCX document
Att_P2_Annual_Fully_Burdened_Labor.xlsx XLSX spreadsheet
Att_P1.xlsx XLSX spreadsheet
Att_5_WD.txt TXT text file
Exhibit_A_CDRLS.xlsx XLSX spreadsheet
N00421-17-R-0019.docx DOCX document
Att_6_SGFP.xlsx XLSX spreadsheet
Att_P1.xlsx XLSX spreadsheet
Att_7_RGFP.xlsx XLSX spreadsheet
Att_P2.xlsx XLSX spreadsheet
Att_4_Data_Transmittal.docx DOCX document
Att_3_OCI.docx DOCX document
N0042117R0019_revised.docx DOCX document
Att_5_WD.txt TXT text file
Att_P3.pdf PDF
Att_P4.pdf PDF
Exhibit_A.xlsx XLSX spreadsheet
Att_2_QASP.docx DOCX document
Att_1_DD254.docx DOCX document
Draft_CIIDS_MMDLS__SOW.docx DOCX document
Draft_CIIDS_MMDLS_LOE.docx DOCX document
Draft_CIIDS_MMDLS_P_Quals.docx DOCX document
Revised_Personnel_Qualifications_10_June_2013.docx DOCX document
Labor_Rate_key_to_Function_labor_Catagories_Dec_2013.xlsx XLSX spreadsheet
LAMPS_Sign_in_Sheet_allowed_to_be_posted.doc DOC document
Questions_and_Answers_from_SEAPORT-E.docx DOCX document
Data_Link_Recompete_-_OCI_List.docx DOCX document
Small_Business_Brief.ppt PPT presentation
LAMPS_Sources_Sought.docx DOCX document
Data_Link_Recompete_-_SOW.docx DOCX document
DRAFT_LEVEL_OF_EFFORT.xlsx XLSX spreadsheet
DRAFT_LAMPS_SOW.docx DOCX document
SOURCES_SOUGHT_FBO.docx DOCX document
Supplemental_Eng_Integration_Support_Overiew.docx DOCX document
Data_Link_Recompete_-_LOE.xlsx XLSX spreadsheet
LAMPS_US_Navy_Recorder_System_USCG_SLEP.PPTX PPTX presentation
LAMPS_Industry_Day_Brief.PPTX PPTX presentation
Show all 50

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTS DATA REQUIREMENTS LIST Form Approved

(1 Data Item) OMB No. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP_________ TM ________ Other X (MISC)

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A001

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

REQUIRED

8. APP CODE 13. DATE OF SUBSEQUENT SUBMISSION a. ADDRESSEE

N/A Reg Repro

16. REMARKS NAWCAD 4.11.2.2 1 1

15. TOTAL 0 1 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 1 of 34

1007/183

Blk 16

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

7000, 7001, 7010

Multi-Mission Data Link Systems Support

Technical Report - Study Service

SOW 4.1.1, 4.1.2, 4.1.3, 4.1.5.1, 4.1.5.2, 4.1.6.1, 4.1.6.2, 4.1.6.3, 4.1.7, 4.1.8, 4.1.9, 4.1.10, 4.1.11, 4.1.12, 4.2.1, 4.2.2.1, 4.2.2.2, 4.2.3, 4.2.4, 4.2.5, 4.2.6, 4.3, 4.3.1, 4.3.2, 4.3.3.1, 4.3.3.2, 4.3.4, 4.4.1, 4.4.2, 4.4.3.1, 4.4.3.2, 4.4.3.3, 4.5.1, 4.5.2, 4.5.3, 4.5.5, 4.5.6, 4.7.5, 4.8.1.1, 4.8.1.2, 4.8.1.4, 4.8.1.5, 4.8.1.6, 4.8.2.1, 4.8.2.2, 4.8.2.9, 4.8.3, 4.8.3.1.1, 4.8.3.1.2, 4.8.3.1.4, 4.8.3.2.1, 4.8.3.2.2, 4.8.3.2.3, 4.8.3.2.4, 4.8.3.2.5, 4.8.3.2.6, 4.9.1, 4.9.2, 4.9.3, 4.9.4, 4.10.1.3, 4.10.1.4, 4.10.1.5, 4.11, 5.5

A

TBD

NAWCAD 4.11.2.2DI-MISC-80508B

Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 9).

Blocks 11, 12, and 13: Submit IAW SOW 4.1.1, 4.1.2, 4.1.3, 4.1.5.1, 4.1.5.2, 4.1.6.1, 4.1.6.2, 4.1.6.3, 4.1.7, 4.1.8, 4.1.9, 4.1.10, 4.1.11, 4.1.12, 4.2.1, 4.2.2.1, 4.2.2.2, 4.2.3, 4.2.4, 4.2.5, 4.2.6, 4.3, 4.3.1, 4.3.2, 4.3.3.1, 4.3.3.2, 4.3.4, 4.4.1, 4.4.2, 4.4.3.1, 4.4.3.2, 4.4.3.3, 4.5.1, 4.5.2, 4.5.3, 4.5.5, 4.5.6, 4.7.5, 4.8.1.1, 4.8.1.2, 4.8.1.4, 4.8.1.5, 4.8.1.6, 4.8.2.1, 4.8.2.2, 4.8.2.9, 4.8.3, 4.8.3.1.1, 4.8.3.1.2, 4.8.3.1.4, 4.8.3.2.1, 4.8.3.2.2, 4.8.3.2.3, 4.8.3.2.4, 4.8.3.2.5, 4.8.3.2.6, 4.9.1, 4.9.2, 4.9.3, 4.9.4, 4.10.1.3, 4.10.1.4, 4.10.1.5, 4.11, 5.5.

Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2007 unless otherwise approved by the government.

Deliver to: Multi Mission Data Link Systems Branch, Code 4.11.2.2

17169 Tacan Street, St. Inigoes, MD 20684-0010

Mark for: Contracts Deliverable Manager (insert contract number)

Draft

J. Yoe R. Scruitsky1/6/2016 1/6/2016

D

Blk 16

XX

Blk 16 Blk 16

b. COPIES

11. AS OF DATE Final

ASREQ

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP_________ TM ________ Other X (NDTI)

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A002

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

A Reg Repro

16. REMARKS NAWCAD 4.11.2.2 1 1 1

15. TOTAL 1 1 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 2 of 34

1007/183

7000, 7001, 7010 A

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

Multi-Mission Data Link Systems Support TBD

Test Procedures

DI-NDTI-80603A SOW 4.1.4, 4.1.5.1, 4.1.5.2, 4.1.9, 4.4.3.2, 4.8.3, 4.8.1.6 NAWCAD 4.11.2.2

Blk 16

XX

ASREQ Blk 16 b. COPIES

D 11. AS OF DATE

Draft

Final

1/6/2016

Blk 16 Blk 16

Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 9).

Blocks 11, 12, and 13: Final due 10 days after receipt of government comments on draft submission. Government has 30 days to comment.

Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2007 unless otherwise approved by the government.

Deliver to: Multi Mission Data Link Systems Branch, Code 4.11.2.2

17169 Tacan Street, St. Inigoes, MD 20684-0010

J. Yoe 1/6/2016 R. Scruitsky

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP_________ TM ________ Other X (NDTI)

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A003

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

16. REMARKS NAWCAD 4.11.2.2 1 1

15. TOTAL 0 1 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 3 of 34

1007/183

7000, 7001, 7010 A

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

Multi-Mission Data Link Systems Support TBD

Test/Inspection Report

DI-NDTI-80809B SOW 4.1.5.1, 4.1.5.2, 4.1.9, 4.1.11, 4.4.3.2, 4.8.1.6, 4.8.3 NAWCAD 4.11.2.2

Blk 16

XX

ASREQ Blk 16 b. COPIES

D 11. AS OF DATE

Draft

Final

1/6/2016

Blk 16 Blk 16

Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 9).

Blocks 11, 12, and 13: Submit IAW SOW 4.1.5.1, 4.1.5.2, 4.1.9, 4.1.11, 4.4.3.2, 4.8.1.6, 4.8.3.

Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2007 unless otherwise approved by the government.

Deliver to: Multi Missions Data Link Systems Branch, Code 4.11.2.2

17169 Tacan Street, St. Inigoes, MD 20684-0010

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP_________ TM ________ Other X (ADMN)

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A004

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

16. REMARKS NAWCAD 4.11.2.2 1 1

15. TOTAL 0 1 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 4 of 34

1007/183

7000, 7001, 7010 A

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

Multi-Mission Data Link Systems Support TBD

Documentation Revision

Blk 16

SOW 4.1.5.1, 4.1.5.2, 4.1.9, 4.1.11, 4.4.3.2, 4.8.1.6, 4.8.3

NAWCAD 4.11.2.2

Blk 16

XX

ASREQ ASREQ b. COPIES

D 11. AS OF DATE

Draft

Final

1/6/2016

Blk 16 Blk 16

Block 4: Revise existing documentation using previous form/format as a guideline. Some document updates will require manual or automated completion of fill-in forms. Original documents, specific guidance and/or forms will be provided to the contractor at the time of specific tasking.

Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 9).

Blocks 11, 12, and 13: Submit IAW SOW 4.1.5.1, 4.1.5.2, 4.1.9, 4.1.11, 4.4.3.2, 4.8.1.6, 4.8.3.

B

Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2007 unless otherwise approved by the government.

Deliver to: Multi Missions Data Link Systems Branch, Code 4.11.2.2

17169 Tacan Street, St. Inigoes, MD 20684-0010

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP_________ TM ________ Other X (NDTI)

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A005

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

16. REMARKS NAWCAD 4.11.2.2 1 1 1

15. TOTAL 1 1 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 5 of 34

1007/183

7000, 7001, 7010 A

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

Multi-Mission Data Link Systems Support TBD

Test Plan

DI-NDTI-80566A SOW 4.4.3.2, 4.8.1.6, 4.8.3 NAWCAD 4.11.2.2

Blk 16

XX

ASREQ Blk 16 b. COPIES

D 11. AS OF DATE

Draft

Final

1/6/2016

Blk 16 Blk 16

Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 9).

Blocks 11, 12, and 13: Final due 10 days after receipt of government comments on draft submission. Government has 30 days to comment.

Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2007 unless otherwise approved by the government.

Deliver to: Multi Missions Data Link Systems Branch, Code 4.11.2.2

17169 Tacan Street, St. Inigoes, MD 20684-0010

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP__X______ TM ________ Other

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A006

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

16. REMARKS NAWCAD 4.11.2.2 1 1 1

15. TOTAL 1 1 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 6 of 34

1007/183

7000, 7001, 7010 A

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

Multi-Mission Data Link Systems Support TBD

Engineering Change Proposal

DI-CMAN-80639C, and Blk 16 SOW 4.1.13, 4.5.2, 4.8.3.1.1 NAWCAD 4.11.2.2

Blk 16

XX

ASREQ Blk 16 b. COPIES

D 11. AS OF DATE

Draft

Final

1/6/2016

Blk 16 Blk 16

Blk 4: ECPs shall be submitted electronically in Microsoft Office 2007 or later version or Adobe PDF

Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 9).

Blk 10: Submit ECP as required for changes to baseline and/or directed by TOM.

Blocks 11, 12, and 13: Final due 10 days after receipt of government comments on draft submission ECP. Government has 30 days to comment.

Shall include: ECP name/title; purpose/description, type of change, authority for ECP, accomplishment, material identification, engineering data, test requirements, ship type/hull number, related alterations, craft type/serial number.

Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2007 unless otherwise approved by the government.

Deliver to: Multi Missions Data Link Systems Branch, Code 4.11.2.2

17169 Tacan Street, St. Inigoes, MD 20684-0010

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP________ TM ________ Other X (ADMN)

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A007

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

16. REMARKS NAWCAD 4.11.2.2 1 1

15. TOTAL 0 1 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 7 of 34

1007/183

7000, 7001, 7010 A

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

Multi-Mission Data Link Systems Support TB

Report, Record of Meeting/Minutes

DI-ADMN-81505 SOW 4.1.1, 4.8.1.7, 11.2, 11.4 NAWCAD 4.11.2.2

Blk 16

XX

ASREQ Blk 16 b. COPIES

D 11. AS OF DATE

Draft

Final

1/6/2016

Blk 16 Blk 16

Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 9).

Blocks 11, 12, and 13: Submit IAW SOW 4.1.1, 4.8.1.7, 11.2, 11.5

Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2007 unless

Deliver to: Multi Mission Data Link Systems Branch, Code 4.11.2.2

17169 Tacan Street, St. Inigoes, MD 20684-0010

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP__X______ TM ________ Other

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A008

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

16. REMARKS NAWCAD 4.11.2.2 1 1

15. TOTAL 0 1 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 8 of 34

1007/183

7000, 7001, 7010 A

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

Multi-Mission Data Link Systems Support TBD

Logistic Management Information Data Product

DI-ALSS-81529

SOW 4.2.6, 4.3.3.1, 4.4, 4.4.1, 4.4.3.2, 4.4.3.3, 4.5.4, 4.5.6, 4.8.3.2.1, 4.8.3.2.2,

4.8.3.2.3. 4.8.3.2.4, 4.8.3.2.5, 4.8.3.2.6, 4.9.4, 4.9.5.1, 4.10.1.2, 4.10.1.3, 4.10.1.4, 4.10.1.5

NAWCAD 4.11.2.2

Blk 16

XX

ASREQ Blk 16 b. COPIES

D 11. AS OF DATE

Draft

Final

1/6/2016

Blk 16 Blk 16

Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 9).

Blocks 11, 12, and 13: Submit IAW SOW 4.2.6, 4.3.3.1, 4.4, 4.4.1, 4.4.3.2, 4.4.3.3, 4.5.4, 4.5.6, 4.8.3.2.1, 4.8.3.2.2, 4.8.3.2.3. 4.8.3.2.4, 4.8.3.2.5, 4.8.3.2.6, 4.9.5, 4.10.1.2, 4.10.1.3, 4.10.1.4, 4.10.1.5. Frequency of subsequent submissions will be identified per specific tasking.

Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2007 unless otherwise approved by the government.

Deliver to: Multi Missions Data Link Systems Branch, Code 4.11.2.2

17169 Tacan Street, St. Inigoes, MD 20684-0010

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP_________ TM ________ Other X (ILSS)

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A009

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

16. REMARKS NAWCAD 4.11.2.2 1 1 1

15. TOTAL 1 1 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 9 of 34

1007/183

7000, 7001, 7010 A

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

Multi-Mission Data Link Systems Support TBD

Training Materials

DI-ILSS-80872 SOW 4.11 NAWCAD 4.11.2.2

Blk 16

XX

ASREQ Blk 16 b. COPIES

D 11. AS OF DATE

Draft

Final

1/6/2016

Blk 16 Blk 16

Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 9).

Blocks 11, 12, and 13: Final due 10 days after receipt of government comments on draft submission. Government has 30 days to comment.

Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2007 unless otherwise approved by the government.

Deliver to: Multi Mission Data Link Systems Branch, Code 4.11.2.2

17169 Tacan Street, St. Inigoes, MD 20684-0010

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP___X_____ TM ________ Other

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A010

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

16. REMARKS NAWCAD 4.11.2.2 1 1 1

15. TOTAL 1 1 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 10 of 34

1007/183

7000, 7001, 7010 A

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

Multi-Mission Data Link Systems Support TBD

Software Development Plan (SDP)

DI-IPSC-81427A SOW 4.4.3.2, 4.6, 4.7, 4.7.1, 4.7.2, 4.7.4, 4.8.2.2 NAWCAD 4.11.2.2

Blk 16

XX

ASREQ Blk 16 b. COPIES

D 11. AS OF DATE

Draft

Final

1/6/2016

Blk 16 Blk 16

Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 9).

Blocks 11, 12, and 13: Final due 10 days after receipt of government comments on draft submission. Government has 30 days to comment.

Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2007 unless

Deliver to: Multi Mission Data Link Systems Branch, Code 4.11.2.2

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP__X_______ TM ________ Other

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A011

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

16. REMARKS NAWCAD 4.11.2.2 1 1 1

15. TOTAL 1 1 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 11 of 34

1007/183

7000, 7001, 7010 A

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

Multi-Mission Data Link Systems Support TBD

Software Requirements Specification (SRS)

DI-IPSC-81433A SOW 4.4.3.2, 4.6, 4.7, 4.7.1, 4.7.2, 4.8.2.2 NAWCAD 4.11.2.2

Blk 16

XX

ASREQ Blk 16 b. COPIES

D 11. AS OF DATE

Draft

Final

1/6/2016

Blk 16 Blk 16

Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 9).

Blocks 11, 12, and 13: Final due 10 days after receipt of government comments on draft submission. Government has 30 days to comment.

Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2007 unless otherwise approved by the government.

Deliver to: Multi Missions Data Link Systems Branch, Code 4.11.2.2

17169 Tacan Street, St. Inigoes, MD 20684-0010

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP__X_______ TM ________ Other

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A012

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

16. REMARKS NAWCAD 4.11.2.2 1 1 1

15. TOTAL 1 1 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 12 of 34

1007/183

7000, 7001, 7010 A

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

Multi-Mission Data Link Systems Support TBD

Software Design Description (SDD)

DI-IPSC-81435A SOW 4.4.3.2, 4.6, 4.7, 4.7.1, 4.7.2, 4.8.2.2 NAWCAD 4.11.2.2

Blk 16

XX

ASREQ Blk 16 b. COPIES

D 11. AS OF DATE

Draft

Final

1/6/2016

Blk 16 Blk 16

Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 9).

Blocks 11, 12, and 13: Final due 10 days after receipt of government comments on draft submission. Government has 30 days to comment.

Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2007 unless otherwise approved by the government.

Deliver to: Multi Mission Data Link Systems Branch, Code 4.11.2.2

17169 Tacan Street, St. Inigoes, MD 20684-0010

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP_________ TM ________ Other X (MCCR)

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A013

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

16. REMARKS NAWCAD 4.11.2.2 1 1

15. TOTAL 0 1 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 13 of 34

1007/183

7000, 7001, 7010 A

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

Multi-Mission Data Link Systems Support TBD

Software Development Status Report (SDSR)

DI-MCCR-80459 SOW 4.4.3.2, 4.6, 4.7, 4.7.1, 4.7.2, 4.8.2.2 NAWCAD 4.11.2.2

Blk 16

XX

ASREQ Blk 16 b. COPIES

D 11. AS OF DATE

Draft

Final

1/6/2016

Blk 16 Blk 16

Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 9).

Blocks 11, 12, and 13: Submit IAW SOW 4.4.3.2, 4.6, 4.7, 4.7.1, 4.7.2, 4.8.2.2.

Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2007 unless otherwise approved by the government.

Deliver to: Multi Mission Data Link Systems Branch, Code 4.11.2.2

17169 Tacan Street, St. Inigoes, MD 20684-0010

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP__X_____ TM ________ Other

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A014

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

16. REMARKS NAWCAD 4.11.2.2 1 1 1

15. TOTAL 1 1 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 14 of 34

1007/183

7000, 7001, 7010 A

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

Multi-Mission Data Link Systems Support TBD

Software Test Plan (STP)

DI-IPSC-81438A SOW 4.4.3.2, 4.6, 4.7, 4.7.1, 4.7.2, 4.8.2.2 NAWCAD 4.11.2.2

Blk 16

XX

ASREQ Blk 16 b. COPIES

D 11. AS OF DATE

Draft

Final

1/6/2016

Blk 16 Blk 16

Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 9).

Blocks 11, 12, and 13: Final due 10 days after receipt of government comments on draft submission. Government has 30 days to comment.

Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2007 unless otherwise approved by the government.

Deliver to: Multi Mission Data Link Systems Branch, Code 4.11.2.2

17169 Tacan Street, St. Inigoes, MD 20684-0010

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP_________ TM ________ Other X (IPSC)

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A015

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

16. REMARKS NAWCAD 4.11.2.2 1 1

15. TOTAL 0 1 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 15 of 34

1007/183

7000, 7001, 7010 A

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

Multi-Mission Data Link Systems Support TBD

Software Test Report (STR)

DI-IPSC-81440A SOW 4.4.3.2, 4.6, 4.7, 4.7.1, 4.7.2, 4.8.2.2 NAWCAD 4.11.2.2

Blk 16

XX

ASREQ Blk 16 b. COPIES

D 11. AS OF DATE

Draft

Final

1/6/2016

Blk 16 Blk 16

Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 9).

Blocks 11, 12, and 13: Final due 10 days after receipt of government comments on draft submission. Government has 30 days to comment.

Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2007 unless otherwise approved by the government.

Deliver to: Multi Mission Data Link Systems Branch, Code 4.11.2.2

17169 Tacan Street, St. Inigoes, MD 20684-0010

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP_________ TM _X_______Other

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A016

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

16. REMARKS NAWCAD 4.11.2.2 1 1 1

15. TOTAL 1 1 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 16 of 34

1007/183

7000, 7001, 7010 A

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

Multi-Mission Data Link Systems Support TBD

Software User Manuals (SUM)

DI-IPSC-81443A SOW 4.4.3.2, 4.6, 4.7, 4.7.1, 4.7.2, 4.8.2.2 NAWCAD 4.11.2.2

Blk 16

XX

ASREQ Blk 16 b. COPIES

D 11. AS OF DATE

Draft

Final

1/6/2016

Blk 16 Blk 16

Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 9).

Blocks 11, 12, and 13: Final due 10 days after receipt of government comments on draft submission. Government has 30 days to comment.

Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2007 unless otherwise approved by the government.

Deliver to: Multi Mission Data Link Systems Branch, Code 4.11.2.2

17169 Tacan Street, St. Inigoes, MD 20684-0010

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP_________ TM ________ Other X (MCCR)

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A017

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

16. REMARKS NAWCAD 4.11.2.2 1 1 1

15. TOTAL 1 1 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 17 of 34

1007/183

7000, 7001, 7010 A

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

Multi-Mission Data Link Systems Support TBD

Computer Software Product End Items End Item Deliverable

DI-MCCR-80700 SOW 4.4.3.2, 4.6, 4.7, 4.7.1, 4.7.2, 4.7.3, 4.8.2.2 NAWCAD 4.11.2.2

Blk 16

XX

ASREQ Blk 16 b. COPIES

D 11. AS OF DATE

Draft

Final

1/6/2016

Blk 16 Blk 16

Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 9).

Blocks 11, 12, and 13: Final due 10 days after receipt of government comments on draft submission. Government has 30 days to comment.

Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2007 unless otherwise approved by the government.

Deliver to: Multi Mission Data Link Systems Branch, Code 4.11.2.2

17169 Tacan Street, St. Inigoes, MD 20684-0010

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP_________ TM ________ Other X

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A018

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

16. REMARKS NAWCAD 4.11.2.2 1 1 1

15. TOTAL 1 1 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 18 of 34

1007/183

7000, 7001, 7010 A

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

Multi-Mission Data Link Systems Support TBD

Detailed Project Schedule

Blk 16

SOW 4.8.3.1.6, 4.8.3.2.2, 4.8.3.2.3, 4.8.3.2.4, 4.8.3.2.5, 4.8.3.2.6

NAWCAD 4.11.2.2

Blk 16

XX

ASREQ Blk 16 b. COPIES

D 11. AS OF DATE

Draft

Final

1/6/2016

Blk 16 Blk 16

Block 4: Intermediate Project Schedules are schedules that include key tasks/milestones at a summary level. They shall include at a minimum the following elements: major tasks/activities and/or milestones (to include deliverables) and a Work Breakdown Structure that includes 100% of the work defined by the project scope at a summary task and/or milestone level. A Plan of Action and Milestones (POA&M) may also be requested in this format.

Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 9).

Blocks 11, 12, and 13: First report due 15 calendar days after notification of tasking. Final due 10 days after receipt of government comments on draft submission. Government has 30 days to comment. Frequency of subsequent submissions will be identified per specific tasking.

Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2007 unless otherwise approved by the government.

Deliver to: Multi Missions Data Link Systems Branch, Code 4.11.2.2

17169 Tacan Street, St. Inigoes, MD 20684-0010

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP_________ TM ________ Other X

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A019

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

16. REMARKS NAWCAD 4.11.2.2 1 1 1

15. TOTAL 1 1 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 19 of 34

1007/183

7000, 7001, 7010 A

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

Multi-Mission Data Link Systems Support TBD

Integrated Program Management Report Integrated Master Schedule

DI-MGMT-81861, and Blk 16 SOW 4.10.1.1, 5.7 NAWCAD 4.11.2.2

Blk 16

XX

ASREQ Blk 16 b. COPIES

D 11. AS OF DATE

Draft

Final

1/6/2016

Blk 16 Blk 16

Block 4: The Integrated Master Schedule is a top-level schedule of key tasks/activities and milestones at the summary level of the WBS. It will be an integrated roll-up of the Detailed Project Schedules (A018). The Integrated Master Schedule shall include at a minimum the following elements:

major tasks/project milestones (to include deliverables), a Work Breakdown Structure (WBS) that includes 100% of the work defined by the project scope, task details including dependencies, schedule baseline, lag times, status, supporting project critical path identification and resource loading with assignments.

Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 9).

Blocks 11, 12, and 13: First report due 15 calendar days after notification of tasking . Final due 10 days after receipt of government comments on draft submission. Government has 30 days to comment. Frequency of subsequent submissions will be identified per specific tasking.

Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2007 unless otherwise approved by the government.

Deliver to: Multi Missions Data Link Systems Branch, Code 4.11.2.2

17169 Tacan Street, St. Inigoes, MD 20684-0010

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP_X______ TM ________ Other

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A020

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

16. REMARKS NAWCAD 4.11.2.2 1 1 1

15. TOTAL 1 1 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 20 of 34

1007/183

7000, 7001, 7010 A

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

Multi-Mission Data Link Systems Support TBD

Installation Control Drawings

DI-DRPR-81242 SOW 4.5.1, 4.8.2.3, 4.8.2.6, 4.8.3.1.3, 4.8.3.1.3.4, 4.8.3.1.5 NAWCAD 4.11.2.2

Blk 16

XX

ASREQ Blk 16 b. COPIES

D 11. AS OF DATE

Draft

Final

1/6/2016

Blk 16 Blk 16

Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 9).

Blocks 11, 12, and 13: Final due 10 days after receipt of government comments on draft submission. Government has 30 days to comment.

Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2007 unless otherwise approved by the government.

Deliver to: Multi Missions Data Link Systems Branch, Code 4.11.2.2

17169 Tacan Street, St. Inigoes, MD 20684-0010

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP_________ TM ________ Other X (CMAN)

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A021

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

16. REMARKS NAWCAD 4.11.2.2 1 1

15. TOTAL 0 1 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 21 of 34

1007/183

7000, 7001, 7010 A

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.

Multi-Mission Data Link Systems Support TBD

Configuration Audit Summary Report

DI-CMAN-81022C SOW 4.8.3.1.5, 4.9.5.2, 4.10.1.6 NAWCAD 4.11.2.2

Blk 16

XX

ASREQ Blk 16 b. COPIES

D 11. AS OF DATE

Draft

Final

1/6/2016

Blk 16 Blk 16

Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 9).

Blocks 11, 12, and 13: Submit IAW SOW 4.8.3.1.5, 4.9.5.2, 4.10.1.6.

Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2007 unless otherwise approved by the government.

Deliver to: Multi Missions Data Link Systems Branch, Code 4.11.2.2

17169 Tacan Street, St. Inigoes, MD 20684-0010

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP_________ TM ________ Other X (CMAN)

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A022

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

16. REMARKS NAWCAD 4.11.2.2 1 1 1

15. TOTAL 1 1 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 22 of 34

1007/183

1/6/2016

Blk 16 Blk 16

Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .