Draft_CIIDS_MMDLS__CDRLs.pdf
PDF 473 KB Posted
- Attached to
- 4. 11 Combat Integratiion & Identification Systems (CI&IDS) Division Multi Mission data Link Support (MMDLS) Federal contract opportunity
- Solicitation number
- N00421-15-R-0010
About this file
Contract Data Requirement Lists (CDRLs)
View the file
Other files for this federal contract opportunity
Show all 50
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACTS DATA REQUIREMENTS LIST Form Approved
(1 Data Item) OMB No. 0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP_________ TM ________ Other X (MISC)
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A001
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
REQUIRED
8. APP CODE 13. DATE OF SUBSEQUENT SUBMISSION a. ADDRESSEE
N/A Reg Repro
16. REMARKS NAWCAD 4.11.2.2 1 1
15. TOTAL 0 1 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 1 of 34
1007/183
Blk 16
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
7000, 7001, 7010
Multi-Mission Data Link Systems Support
Technical Report - Study Service
SOW 4.1.1, 4.1.2, 4.1.3, 4.1.5.1, 4.1.5.2, 4.1.6.1, 4.1.6.2, 4.1.6.3, 4.1.7, 4.1.8, 4.1.9, 4.1.10, 4.1.11, 4.1.12, 4.2.1, 4.2.2.1, 4.2.2.2, 4.2.3, 4.2.4, 4.2.5, 4.2.6, 4.3, 4.3.1, 4.3.2, 4.3.3.1, 4.3.3.2, 4.3.4, 4.4.1, 4.4.2, 4.4.3.1, 4.4.3.2, 4.4.3.3, 4.5.1, 4.5.2, 4.5.3, 4.5.5, 4.5.6, 4.7.5, 4.8.1.1, 4.8.1.2, 4.8.1.4, 4.8.1.5, 4.8.1.6, 4.8.2.1, 4.8.2.2, 4.8.2.9, 4.8.3, 4.8.3.1.1, 4.8.3.1.2, 4.8.3.1.4, 4.8.3.2.1, 4.8.3.2.2, 4.8.3.2.3, 4.8.3.2.4, 4.8.3.2.5, 4.8.3.2.6, 4.9.1, 4.9.2, 4.9.3, 4.9.4, 4.10.1.3, 4.10.1.4, 4.10.1.5, 4.11, 5.5
A
TBD
NAWCAD 4.11.2.2DI-MISC-80508B
Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 9).
Blocks 11, 12, and 13: Submit IAW SOW 4.1.1, 4.1.2, 4.1.3, 4.1.5.1, 4.1.5.2, 4.1.6.1, 4.1.6.2, 4.1.6.3, 4.1.7, 4.1.8, 4.1.9, 4.1.10, 4.1.11, 4.1.12, 4.2.1, 4.2.2.1, 4.2.2.2, 4.2.3, 4.2.4, 4.2.5, 4.2.6, 4.3, 4.3.1, 4.3.2, 4.3.3.1, 4.3.3.2, 4.3.4, 4.4.1, 4.4.2, 4.4.3.1, 4.4.3.2, 4.4.3.3, 4.5.1, 4.5.2, 4.5.3, 4.5.5, 4.5.6, 4.7.5, 4.8.1.1, 4.8.1.2, 4.8.1.4, 4.8.1.5, 4.8.1.6, 4.8.2.1, 4.8.2.2, 4.8.2.9, 4.8.3, 4.8.3.1.1, 4.8.3.1.2, 4.8.3.1.4, 4.8.3.2.1, 4.8.3.2.2, 4.8.3.2.3, 4.8.3.2.4, 4.8.3.2.5, 4.8.3.2.6, 4.9.1, 4.9.2, 4.9.3, 4.9.4, 4.10.1.3, 4.10.1.4, 4.10.1.5, 4.11, 5.5.
Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2007 unless otherwise approved by the government.
Deliver to: Multi Mission Data Link Systems Branch, Code 4.11.2.2
17169 Tacan Street, St. Inigoes, MD 20684-0010
Mark for: Contracts Deliverable Manager (insert contract number)
Draft
J. Yoe R. Scruitsky1/6/2016 1/6/2016
D
Blk 16
XX
Blk 16 Blk 16
b. COPIES
11. AS OF DATE Final
ASREQ
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP_________ TM ________ Other X (NDTI)
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A002
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
A Reg Repro
16. REMARKS NAWCAD 4.11.2.2 1 1 1
15. TOTAL 1 1 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 2 of 34
1007/183
7000, 7001, 7010 A
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Multi-Mission Data Link Systems Support TBD
Test Procedures
DI-NDTI-80603A SOW 4.1.4, 4.1.5.1, 4.1.5.2, 4.1.9, 4.4.3.2, 4.8.3, 4.8.1.6 NAWCAD 4.11.2.2
Blk 16
XX
ASREQ Blk 16 b. COPIES
D 11. AS OF DATE
Draft
Final
1/6/2016
Blk 16 Blk 16
Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 9).
Blocks 11, 12, and 13: Final due 10 days after receipt of government comments on draft submission. Government has 30 days to comment.
Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2007 unless otherwise approved by the government.
Deliver to: Multi Mission Data Link Systems Branch, Code 4.11.2.2
17169 Tacan Street, St. Inigoes, MD 20684-0010
J. Yoe 1/6/2016 R. Scruitsky
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP_________ TM ________ Other X (NDTI)
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A003
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
16. REMARKS NAWCAD 4.11.2.2 1 1
15. TOTAL 0 1 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 3 of 34
1007/183
7000, 7001, 7010 A
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Multi-Mission Data Link Systems Support TBD
Test/Inspection Report
DI-NDTI-80809B SOW 4.1.5.1, 4.1.5.2, 4.1.9, 4.1.11, 4.4.3.2, 4.8.1.6, 4.8.3 NAWCAD 4.11.2.2
Blk 16
XX
ASREQ Blk 16 b. COPIES
D 11. AS OF DATE
Draft
Final
1/6/2016
Blk 16 Blk 16
Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 9).
Blocks 11, 12, and 13: Submit IAW SOW 4.1.5.1, 4.1.5.2, 4.1.9, 4.1.11, 4.4.3.2, 4.8.1.6, 4.8.3.
Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2007 unless otherwise approved by the government.
Deliver to: Multi Missions Data Link Systems Branch, Code 4.11.2.2
17169 Tacan Street, St. Inigoes, MD 20684-0010
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP_________ TM ________ Other X (ADMN)
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A004
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
16. REMARKS NAWCAD 4.11.2.2 1 1
15. TOTAL 0 1 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 4 of 34
1007/183
7000, 7001, 7010 A
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Multi-Mission Data Link Systems Support TBD
Documentation Revision
Blk 16
SOW 4.1.5.1, 4.1.5.2, 4.1.9, 4.1.11, 4.4.3.2, 4.8.1.6, 4.8.3
NAWCAD 4.11.2.2
Blk 16
XX
ASREQ ASREQ b. COPIES
D 11. AS OF DATE
Draft
Final
1/6/2016
Blk 16 Blk 16
Block 4: Revise existing documentation using previous form/format as a guideline. Some document updates will require manual or automated completion of fill-in forms. Original documents, specific guidance and/or forms will be provided to the contractor at the time of specific tasking.
Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 9).
Blocks 11, 12, and 13: Submit IAW SOW 4.1.5.1, 4.1.5.2, 4.1.9, 4.1.11, 4.4.3.2, 4.8.1.6, 4.8.3.
B
Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2007 unless otherwise approved by the government.
Deliver to: Multi Missions Data Link Systems Branch, Code 4.11.2.2
17169 Tacan Street, St. Inigoes, MD 20684-0010
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP_________ TM ________ Other X (NDTI)
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A005
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
16. REMARKS NAWCAD 4.11.2.2 1 1 1
15. TOTAL 1 1 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 5 of 34
1007/183
7000, 7001, 7010 A
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Multi-Mission Data Link Systems Support TBD
Test Plan
DI-NDTI-80566A SOW 4.4.3.2, 4.8.1.6, 4.8.3 NAWCAD 4.11.2.2
Blk 16
XX
ASREQ Blk 16 b. COPIES
D 11. AS OF DATE
Draft
Final
1/6/2016
Blk 16 Blk 16
Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 9).
Blocks 11, 12, and 13: Final due 10 days after receipt of government comments on draft submission. Government has 30 days to comment.
Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2007 unless otherwise approved by the government.
Deliver to: Multi Missions Data Link Systems Branch, Code 4.11.2.2
17169 Tacan Street, St. Inigoes, MD 20684-0010
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP__X______ TM ________ Other
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A006
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
16. REMARKS NAWCAD 4.11.2.2 1 1 1
15. TOTAL 1 1 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 6 of 34
1007/183
7000, 7001, 7010 A
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Multi-Mission Data Link Systems Support TBD
Engineering Change Proposal
DI-CMAN-80639C, and Blk 16 SOW 4.1.13, 4.5.2, 4.8.3.1.1 NAWCAD 4.11.2.2
Blk 16
XX
ASREQ Blk 16 b. COPIES
D 11. AS OF DATE
Draft
Final
1/6/2016
Blk 16 Blk 16
Blk 4: ECPs shall be submitted electronically in Microsoft Office 2007 or later version or Adobe PDF
Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 9).
Blk 10: Submit ECP as required for changes to baseline and/or directed by TOM.
Blocks 11, 12, and 13: Final due 10 days after receipt of government comments on draft submission ECP. Government has 30 days to comment.
Shall include: ECP name/title; purpose/description, type of change, authority for ECP, accomplishment, material identification, engineering data, test requirements, ship type/hull number, related alterations, craft type/serial number.
Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2007 unless otherwise approved by the government.
Deliver to: Multi Missions Data Link Systems Branch, Code 4.11.2.2
17169 Tacan Street, St. Inigoes, MD 20684-0010
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP________ TM ________ Other X (ADMN)
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A007
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
16. REMARKS NAWCAD 4.11.2.2 1 1
15. TOTAL 0 1 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 7 of 34
1007/183
7000, 7001, 7010 A
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Multi-Mission Data Link Systems Support TB
Report, Record of Meeting/Minutes
DI-ADMN-81505 SOW 4.1.1, 4.8.1.7, 11.2, 11.4 NAWCAD 4.11.2.2
Blk 16
XX
ASREQ Blk 16 b. COPIES
D 11. AS OF DATE
Draft
Final
1/6/2016
Blk 16 Blk 16
Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 9).
Blocks 11, 12, and 13: Submit IAW SOW 4.1.1, 4.8.1.7, 11.2, 11.5
Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2007 unless
Deliver to: Multi Mission Data Link Systems Branch, Code 4.11.2.2
17169 Tacan Street, St. Inigoes, MD 20684-0010
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP__X______ TM ________ Other
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A008
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
16. REMARKS NAWCAD 4.11.2.2 1 1
15. TOTAL 0 1 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 8 of 34
1007/183
7000, 7001, 7010 A
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Multi-Mission Data Link Systems Support TBD
Logistic Management Information Data Product
DI-ALSS-81529
SOW 4.2.6, 4.3.3.1, 4.4, 4.4.1, 4.4.3.2, 4.4.3.3, 4.5.4, 4.5.6, 4.8.3.2.1, 4.8.3.2.2,
4.8.3.2.3. 4.8.3.2.4, 4.8.3.2.5, 4.8.3.2.6, 4.9.4, 4.9.5.1, 4.10.1.2, 4.10.1.3, 4.10.1.4, 4.10.1.5
NAWCAD 4.11.2.2
Blk 16
XX
ASREQ Blk 16 b. COPIES
D 11. AS OF DATE
Draft
Final
1/6/2016
Blk 16 Blk 16
Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 9).
Blocks 11, 12, and 13: Submit IAW SOW 4.2.6, 4.3.3.1, 4.4, 4.4.1, 4.4.3.2, 4.4.3.3, 4.5.4, 4.5.6, 4.8.3.2.1, 4.8.3.2.2, 4.8.3.2.3. 4.8.3.2.4, 4.8.3.2.5, 4.8.3.2.6, 4.9.5, 4.10.1.2, 4.10.1.3, 4.10.1.4, 4.10.1.5. Frequency of subsequent submissions will be identified per specific tasking.
Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2007 unless otherwise approved by the government.
Deliver to: Multi Missions Data Link Systems Branch, Code 4.11.2.2
17169 Tacan Street, St. Inigoes, MD 20684-0010
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP_________ TM ________ Other X (ILSS)
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A009
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
16. REMARKS NAWCAD 4.11.2.2 1 1 1
15. TOTAL 1 1 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 9 of 34
1007/183
7000, 7001, 7010 A
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Multi-Mission Data Link Systems Support TBD
Training Materials
DI-ILSS-80872 SOW 4.11 NAWCAD 4.11.2.2
Blk 16
XX
ASREQ Blk 16 b. COPIES
D 11. AS OF DATE
Draft
Final
1/6/2016
Blk 16 Blk 16
Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 9).
Blocks 11, 12, and 13: Final due 10 days after receipt of government comments on draft submission. Government has 30 days to comment.
Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2007 unless otherwise approved by the government.
Deliver to: Multi Mission Data Link Systems Branch, Code 4.11.2.2
17169 Tacan Street, St. Inigoes, MD 20684-0010
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP___X_____ TM ________ Other
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A010
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
16. REMARKS NAWCAD 4.11.2.2 1 1 1
15. TOTAL 1 1 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 10 of 34
1007/183
7000, 7001, 7010 A
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Multi-Mission Data Link Systems Support TBD
Software Development Plan (SDP)
DI-IPSC-81427A SOW 4.4.3.2, 4.6, 4.7, 4.7.1, 4.7.2, 4.7.4, 4.8.2.2 NAWCAD 4.11.2.2
Blk 16
XX
ASREQ Blk 16 b. COPIES
D 11. AS OF DATE
Draft
Final
1/6/2016
Blk 16 Blk 16
Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 9).
Blocks 11, 12, and 13: Final due 10 days after receipt of government comments on draft submission. Government has 30 days to comment.
Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2007 unless
Deliver to: Multi Mission Data Link Systems Branch, Code 4.11.2.2
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP__X_______ TM ________ Other
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A011
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
16. REMARKS NAWCAD 4.11.2.2 1 1 1
15. TOTAL 1 1 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 11 of 34
1007/183
7000, 7001, 7010 A
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Multi-Mission Data Link Systems Support TBD
Software Requirements Specification (SRS)
DI-IPSC-81433A SOW 4.4.3.2, 4.6, 4.7, 4.7.1, 4.7.2, 4.8.2.2 NAWCAD 4.11.2.2
Blk 16
XX
ASREQ Blk 16 b. COPIES
D 11. AS OF DATE
Draft
Final
1/6/2016
Blk 16 Blk 16
Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 9).
Blocks 11, 12, and 13: Final due 10 days after receipt of government comments on draft submission. Government has 30 days to comment.
Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2007 unless otherwise approved by the government.
Deliver to: Multi Missions Data Link Systems Branch, Code 4.11.2.2
17169 Tacan Street, St. Inigoes, MD 20684-0010
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP__X_______ TM ________ Other
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A012
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
16. REMARKS NAWCAD 4.11.2.2 1 1 1
15. TOTAL 1 1 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 12 of 34
1007/183
7000, 7001, 7010 A
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Multi-Mission Data Link Systems Support TBD
Software Design Description (SDD)
DI-IPSC-81435A SOW 4.4.3.2, 4.6, 4.7, 4.7.1, 4.7.2, 4.8.2.2 NAWCAD 4.11.2.2
Blk 16
XX
ASREQ Blk 16 b. COPIES
D 11. AS OF DATE
Draft
Final
1/6/2016
Blk 16 Blk 16
Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 9).
Blocks 11, 12, and 13: Final due 10 days after receipt of government comments on draft submission. Government has 30 days to comment.
Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2007 unless otherwise approved by the government.
Deliver to: Multi Mission Data Link Systems Branch, Code 4.11.2.2
17169 Tacan Street, St. Inigoes, MD 20684-0010
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP_________ TM ________ Other X (MCCR)
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A013
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
16. REMARKS NAWCAD 4.11.2.2 1 1
15. TOTAL 0 1 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 13 of 34
1007/183
7000, 7001, 7010 A
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Multi-Mission Data Link Systems Support TBD
Software Development Status Report (SDSR)
DI-MCCR-80459 SOW 4.4.3.2, 4.6, 4.7, 4.7.1, 4.7.2, 4.8.2.2 NAWCAD 4.11.2.2
Blk 16
XX
ASREQ Blk 16 b. COPIES
D 11. AS OF DATE
Draft
Final
1/6/2016
Blk 16 Blk 16
Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 9).
Blocks 11, 12, and 13: Submit IAW SOW 4.4.3.2, 4.6, 4.7, 4.7.1, 4.7.2, 4.8.2.2.
Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2007 unless otherwise approved by the government.
Deliver to: Multi Mission Data Link Systems Branch, Code 4.11.2.2
17169 Tacan Street, St. Inigoes, MD 20684-0010
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP__X_____ TM ________ Other
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A014
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
16. REMARKS NAWCAD 4.11.2.2 1 1 1
15. TOTAL 1 1 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 14 of 34
1007/183
7000, 7001, 7010 A
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Multi-Mission Data Link Systems Support TBD
Software Test Plan (STP)
DI-IPSC-81438A SOW 4.4.3.2, 4.6, 4.7, 4.7.1, 4.7.2, 4.8.2.2 NAWCAD 4.11.2.2
Blk 16
XX
ASREQ Blk 16 b. COPIES
D 11. AS OF DATE
Draft
Final
1/6/2016
Blk 16 Blk 16
Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 9).
Blocks 11, 12, and 13: Final due 10 days after receipt of government comments on draft submission. Government has 30 days to comment.
Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2007 unless otherwise approved by the government.
Deliver to: Multi Mission Data Link Systems Branch, Code 4.11.2.2
17169 Tacan Street, St. Inigoes, MD 20684-0010
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP_________ TM ________ Other X (IPSC)
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A015
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
16. REMARKS NAWCAD 4.11.2.2 1 1
15. TOTAL 0 1 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 15 of 34
1007/183
7000, 7001, 7010 A
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Multi-Mission Data Link Systems Support TBD
Software Test Report (STR)
DI-IPSC-81440A SOW 4.4.3.2, 4.6, 4.7, 4.7.1, 4.7.2, 4.8.2.2 NAWCAD 4.11.2.2
Blk 16
XX
ASREQ Blk 16 b. COPIES
D 11. AS OF DATE
Draft
Final
1/6/2016
Blk 16 Blk 16
Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 9).
Blocks 11, 12, and 13: Final due 10 days after receipt of government comments on draft submission. Government has 30 days to comment.
Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2007 unless otherwise approved by the government.
Deliver to: Multi Mission Data Link Systems Branch, Code 4.11.2.2
17169 Tacan Street, St. Inigoes, MD 20684-0010
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP_________ TM _X_______Other
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A016
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
16. REMARKS NAWCAD 4.11.2.2 1 1 1
15. TOTAL 1 1 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 16 of 34
1007/183
7000, 7001, 7010 A
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Multi-Mission Data Link Systems Support TBD
Software User Manuals (SUM)
DI-IPSC-81443A SOW 4.4.3.2, 4.6, 4.7, 4.7.1, 4.7.2, 4.8.2.2 NAWCAD 4.11.2.2
Blk 16
XX
ASREQ Blk 16 b. COPIES
D 11. AS OF DATE
Draft
Final
1/6/2016
Blk 16 Blk 16
Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 9).
Blocks 11, 12, and 13: Final due 10 days after receipt of government comments on draft submission. Government has 30 days to comment.
Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2007 unless otherwise approved by the government.
Deliver to: Multi Mission Data Link Systems Branch, Code 4.11.2.2
17169 Tacan Street, St. Inigoes, MD 20684-0010
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP_________ TM ________ Other X (MCCR)
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A017
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
16. REMARKS NAWCAD 4.11.2.2 1 1 1
15. TOTAL 1 1 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 17 of 34
1007/183
7000, 7001, 7010 A
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Multi-Mission Data Link Systems Support TBD
Computer Software Product End Items End Item Deliverable
DI-MCCR-80700 SOW 4.4.3.2, 4.6, 4.7, 4.7.1, 4.7.2, 4.7.3, 4.8.2.2 NAWCAD 4.11.2.2
Blk 16
XX
ASREQ Blk 16 b. COPIES
D 11. AS OF DATE
Draft
Final
1/6/2016
Blk 16 Blk 16
Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 9).
Blocks 11, 12, and 13: Final due 10 days after receipt of government comments on draft submission. Government has 30 days to comment.
Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2007 unless otherwise approved by the government.
Deliver to: Multi Mission Data Link Systems Branch, Code 4.11.2.2
17169 Tacan Street, St. Inigoes, MD 20684-0010
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP_________ TM ________ Other X
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A018
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
16. REMARKS NAWCAD 4.11.2.2 1 1 1
15. TOTAL 1 1 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 18 of 34
1007/183
7000, 7001, 7010 A
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Multi-Mission Data Link Systems Support TBD
Detailed Project Schedule
Blk 16
SOW 4.8.3.1.6, 4.8.3.2.2, 4.8.3.2.3, 4.8.3.2.4, 4.8.3.2.5, 4.8.3.2.6
NAWCAD 4.11.2.2
Blk 16
XX
ASREQ Blk 16 b. COPIES
D 11. AS OF DATE
Draft
Final
1/6/2016
Blk 16 Blk 16
Block 4: Intermediate Project Schedules are schedules that include key tasks/milestones at a summary level. They shall include at a minimum the following elements: major tasks/activities and/or milestones (to include deliverables) and a Work Breakdown Structure that includes 100% of the work defined by the project scope at a summary task and/or milestone level. A Plan of Action and Milestones (POA&M) may also be requested in this format.
Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 9).
Blocks 11, 12, and 13: First report due 15 calendar days after notification of tasking. Final due 10 days after receipt of government comments on draft submission. Government has 30 days to comment. Frequency of subsequent submissions will be identified per specific tasking.
Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2007 unless otherwise approved by the government.
Deliver to: Multi Missions Data Link Systems Branch, Code 4.11.2.2
17169 Tacan Street, St. Inigoes, MD 20684-0010
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP_________ TM ________ Other X
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A019
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
16. REMARKS NAWCAD 4.11.2.2 1 1 1
15. TOTAL 1 1 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 19 of 34
1007/183
7000, 7001, 7010 A
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Multi-Mission Data Link Systems Support TBD
Integrated Program Management Report Integrated Master Schedule
DI-MGMT-81861, and Blk 16 SOW 4.10.1.1, 5.7 NAWCAD 4.11.2.2
Blk 16
XX
ASREQ Blk 16 b. COPIES
D 11. AS OF DATE
Draft
Final
1/6/2016
Blk 16 Blk 16
Block 4: The Integrated Master Schedule is a top-level schedule of key tasks/activities and milestones at the summary level of the WBS. It will be an integrated roll-up of the Detailed Project Schedules (A018). The Integrated Master Schedule shall include at a minimum the following elements:
major tasks/project milestones (to include deliverables), a Work Breakdown Structure (WBS) that includes 100% of the work defined by the project scope, task details including dependencies, schedule baseline, lag times, status, supporting project critical path identification and resource loading with assignments.
Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 9).
Blocks 11, 12, and 13: First report due 15 calendar days after notification of tasking . Final due 10 days after receipt of government comments on draft submission. Government has 30 days to comment. Frequency of subsequent submissions will be identified per specific tasking.
Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2007 unless otherwise approved by the government.
Deliver to: Multi Missions Data Link Systems Branch, Code 4.11.2.2
17169 Tacan Street, St. Inigoes, MD 20684-0010
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP_X______ TM ________ Other
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A020
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
16. REMARKS NAWCAD 4.11.2.2 1 1 1
15. TOTAL 1 1 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 20 of 34
1007/183
7000, 7001, 7010 A
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Multi-Mission Data Link Systems Support TBD
Installation Control Drawings
DI-DRPR-81242 SOW 4.5.1, 4.8.2.3, 4.8.2.6, 4.8.3.1.3, 4.8.3.1.3.4, 4.8.3.1.5 NAWCAD 4.11.2.2
Blk 16
XX
ASREQ Blk 16 b. COPIES
D 11. AS OF DATE
Draft
Final
1/6/2016
Blk 16 Blk 16
Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 9).
Blocks 11, 12, and 13: Final due 10 days after receipt of government comments on draft submission. Government has 30 days to comment.
Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2007 unless otherwise approved by the government.
Deliver to: Multi Missions Data Link Systems Branch, Code 4.11.2.2
17169 Tacan Street, St. Inigoes, MD 20684-0010
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP_________ TM ________ Other X (CMAN)
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A021
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
16. REMARKS NAWCAD 4.11.2.2 1 1
15. TOTAL 0 1 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 21 of 34
1007/183
7000, 7001, 7010 A
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Multi-Mission Data Link Systems Support TBD
Configuration Audit Summary Report
DI-CMAN-81022C SOW 4.8.3.1.5, 4.9.5.2, 4.10.1.6 NAWCAD 4.11.2.2
Blk 16
XX
ASREQ Blk 16 b. COPIES
D 11. AS OF DATE
Draft
Final
1/6/2016
Blk 16 Blk 16
Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment 9).
Blocks 11, 12, and 13: Submit IAW SOW 4.8.3.1.5, 4.9.5.2, 4.10.1.6.
Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with Office 2007 unless otherwise approved by the government.
Deliver to: Multi Missions Data Link Systems Branch, Code 4.11.2.2
17169 Tacan Street, St. Inigoes, MD 20684-0010
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP_________ TM ________ Other X (CMAN)
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A022
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
16. REMARKS NAWCAD 4.11.2.2 1 1 1
15. TOTAL 1 1 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 22 of 34
1007/183
1/6/2016
Blk 16 Blk 16
Block 7: Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (Attachment…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .