About this file

Cost/Price Summary

View the file

Other files for this federal contract opportunity

Other files attached to 4. 11 Combat Integratiion & Identification Systems (CI&IDS) Division Multi Mission data Link Support (MMDLS), newest first.
File Type Posted
N00421-17-R-0019-0001_Revised_Cost.xlsx XLSX spreadsheet
N00421-17-R-0019-0001.docx DOCX document
N00421-17-R-0019-0001_Revised_Fully_Burdened.xlsx XLSX spreadsheet
Govt_response.docx DOCX document
Exhibit_A_CDRLS.xlsx XLSX spreadsheet
Att_P4_CPAQ.pdf PDF
Att_P5_CPAQ_Instructions.docx DOCX document
Att_P3_PPIF.pdf PDF
Att_5_WD.txt TXT text file
Att_2_QASP.docx DOCX document
Att_1_DD254.pdf PDF
Att_3_OCI.docx DOCX document
Att_4_Data_Transmittal.docx DOCX document
N00421-17-R-0019.docx DOCX document
Att_P2_Annual_Fully_Burdened_Labor.xlsx XLSX spreadsheet
Att_P1.xlsx XLSX spreadsheet
Att_5_WD.txt TXT text file
Exhibit_A_CDRLS.xlsx XLSX spreadsheet
N00421-17-R-0019.docx DOCX document
Att_5_WD.txt TXT text file
Att_P3.pdf PDF
Att_P4.pdf PDF
Att_6_SGFP.xlsx XLSX spreadsheet
Att_7_RGFP.xlsx XLSX spreadsheet
Att_P2.xlsx XLSX spreadsheet
Att_4_Data_Transmittal.docx DOCX document
Att_3_OCI.docx DOCX document
N0042117R0019_revised.docx DOCX document
Exhibit_A.xlsx XLSX spreadsheet
Att_2_QASP.docx DOCX document
Att_1_DD254.docx DOCX document
Draft_CIIDS_MMDLS_LOE.docx DOCX document
Draft_CIIDS_MMDLS_P_Quals.docx DOCX document
Draft_CIIDS_MMDLS__SOW.docx DOCX document
Draft_CIIDS_MMDLS__CDRLs.pdf PDF
LAMPS_Sources_Sought.docx DOCX document
Data_Link_Recompete_-_SOW.docx DOCX document
DRAFT_LEVEL_OF_EFFORT.xlsx XLSX spreadsheet
DRAFT_LAMPS_SOW.docx DOCX document
Revised_Personnel_Qualifications_10_June_2013.docx DOCX document
Labor_Rate_key_to_Function_labor_Catagories_Dec_2013.xlsx XLSX spreadsheet
LAMPS_Sign_in_Sheet_allowed_to_be_posted.doc DOC document
Questions_and_Answers_from_SEAPORT-E.docx DOCX document
Data_Link_Recompete_-_OCI_List.docx DOCX document
Small_Business_Brief.ppt PPT presentation
SOURCES_SOUGHT_FBO.docx DOCX document
Supplemental_Eng_Integration_Support_Overiew.docx DOCX document
Data_Link_Recompete_-_LOE.xlsx XLSX spreadsheet
LAMPS_US_Navy_Recorder_System_USCG_SLEP.PPTX PPTX presentation
LAMPS_Industry_Day_Brief.PPTX PPTX presentation
Show all 50

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Instructions for Prime Contractor:
1Enter Prime offeror name into cell A3.
2Enter all prime employee names in Column A (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas.
3Enter all prime labor categories in Column C (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas. In column C, the Offeror should insert the title of the labor category it will be utilizing. The Offeror is not required to utilize the Government's labor categories, however, each proposed labor category should appear opposite of the government labor category it is comparable to. Please note, in evaluation, the Offeror's proposal will be compared to the Government Estimate in terms of hours and labor categories. Also, labor categories with more than one person providing service shall be listed multiple times for each person performing work. For example, if the offeror proposes four Senior Analysts, then the labor category Senior Analyst shall be listed four times along with their applicable rates and information.
4Only one worksheet shall be prepared for the entire period of performance (for each Prime and Subcontractor)
5The worksheets of the workbook should all be formatted for printing on letter-size paper, without requiring "adjustments." It may be formatted for either landscape or portrait. DO NOT FORMAT FOR LEGAL SIZE PAPER.
6All cells shall be unprotected and unlocked, with formulae intact to show mathematical operations.
7All dollar figures shall be carried out no further than two decimal places.
8In column D, f identify for the specific labor category individual whether they are full-time on this acquisition or part-time. Enter "F" for full-time or "P" for part-time.
9In column E, the Offeror shall insert a "K" if the worker will be performing at the Contractor's facility or a "G" if it will be performing in the Government Spaces.
10Insert applicable indirect rates and apply accordingly. For example, if there are multiple fringe rates, insert separately and apply accordingly.
11For each subcontractor, enter the subcontractor name, total hours, and total amount for each period of performance.
12Please note if more subcontractors are needed, the contractor may add additional rows to accommodate them, but ensure integrity of formulas.
13The prime should insert the subcontractor handling charge, if any.
14The prime should insert the fixed fee rate applied to its cost excluding subcontractor labor.
15The prime should insert the fixed fee rate it is applying to the subcontractor labor, if any.
16Under Other Direct Costs, the prime contractor should separate by Travel, Material and NMCI as applicable.
17Apply indirects to the Other Direct Costs if applicable and if in compliance with the RFP instructions.
18On the Summary tab, break out all costs by CLIN. Ensure that the total costs of the CLINs match Section B and the total on the Cost Summary Spreadsheet
19When submitting this file, the instructions may be deleted.
Instructions for Subcontractors:
1Enter Prime offeror name into cell A3.
Replace Prime Contractor with Subcontractor in A7, A8, A13, and A20.
2Enter all subcontractor employee names in Column A (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas.
3Enter all subcontractor labor categories in Column C (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas. In column C, the Offeror should insert the title of the labor category it will be utilizing. The Offeror is not required to utilize the Government's labor categories, however, each proposed labor category should appear opposite of the government labor category it is comparable to. Please note, in evaluation, the Offeror's proposal will be compared to the Government Estimate in terms of hours and labor categories. Also, labor categories with more than one person providing service shall be listed multiple times for each person performing work. For example, if the offeror proposes four Senior Analysts, then the labor category Senior Analyst shall be listed four times along with their applicable rates and information.
4Only one worksheet shall be prepared for the entire period of performance (for each Prime and Subcontractor)
5The worksheets of the workbook should all be formatted for printing on letter-size paper, without requiring "adjustments." It may be formatted for either landscape or portrait. DO NOT FORMAT FOR LEGAL SIZE PAPER.
6All cells shall be unprotected and unlocked, with formulae intact to show mathematical operations.
7All dollar figures shall be carried out no further than two decimal places.
8In column D, f identify for the specific labor category individual whether they are full-time on this acquisition or part-time. Enter "F" for full-time or "P" for part-time.
9In column E, the Offeror shall insert a "K" if the worker will be performing at the Contractor's facility or a "G" if it will be performing in the Government Spaces.
10Insert applicable indirect rates and apply accordingly. For example, if there are multiple fringe rates, insert separately and apply accordingly.
11For subcontractor cost summary sheets, delete Rows 22-48.
12When submitting this file, the instructions may be deleted.

Cost Summary Spreadsheet

COST SUMMARY SPREADSHEET

Prime Offeror Name:
Subcontractor Name (if applicable):
Year 1Year 2Year 3Year 4Year 5Option Period 1Option Period 2Total
Cost ElementsGovernment Labor CategoryProposed Labor CategoryF/PSiteRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountHoursAmount
Prime Contractor Labor Cost
Prime Contractor Direct Labor
Employee Name 1Cable Splicer000000000
Employee Name 2Clerk Typist000000000
Etc.Computer Programmer III000000000
Etc.Computer Programmer IV00000000
Etc.Computer Systems Analyst III00000000
Etc.Configuration Management Analyst00000000
Etc.Data Entry Operator II00000000
Etc.Drafter/CAD Operator, Journey Level00000000
Etc.Drafter/CAD Operator, Senior00000000
Etc.Engineering/Electronics Technician, Senior (Installation)00000000
Etc.Engineering Technician, Journey Level00000000
Etc.Engineering Technician, Junior00000000
Etc.Engineering Technician, Senior00000000
Etc.Engineer/Scientist, Journey Level00000000
Etc.Engineer/Scientist, Junior00000000
Etc.Engineer/Scientist, Senior (Computer)00000000
Etc.Engineer/Scientist, Senior (Digital Design)00000000
Etc.Engineer/Scientist, Senior (Electrical/Electronics)00000000
Etc.Engineer/Scientist, Senior (Systems, RF)00000000
Etc.Financial Analyst00000000
Etc.Logistician III00000000
Etc.Logistics Analyst00000000
Etc.Manager00000000
Etc.Material Coordinator00000000
Etc.Material Expediter00000000
Etc.Program Manager, Senior00000000
Etc.Project Analyst00000000
Etc.Quality Control Inspector00000000
Etc.Secretary00000000
Etc.Supply Technician00000000
Etc.Technical Writer II00000000
Etc.Technical Writer III00000000
Etc.Travel Clerk I00000000
Etc.Warehouse Specialist (Warehouse Worker)00000000
Etc.Word Processor I00000000
Total Direct Labor Cost000000000
Prime Contractor Indirect Labor Cost
Overhead
Fringe Benefits
G&A
Total Indirect Labor Cost
Total Direct and Indirect Labor cost00000000
COM
Total Prime Contractor Labor Cost00000000
Subcontractor Labor Cost
Subcontractor proposed cost and fee
Subcontractor 1Cable Splicer
Subcontractor 2Clerk Typist
Etc.Computer Programmer III
Etc.Computer Programmer IV
Etc.Computer Systems Analyst III
Etc.Configuration Management Analyst
Etc.Data Entry Operator II
Etc.Drafter/CAD Operator, Journey Level
Etc.Drafter/CAD Operator, Senior
Etc.Engineering/Electronics Technician, Senior (Installation)
Etc.Engineering Technician, Journey Level
Etc.Engineering Technician, Junior
Etc.Engineering Technician, Senior
Etc.Engineer/Scientist, Journey Level
Etc.Engineer/Scientist, Junior
Etc.Engineer/Scientist, Senior (Computer)
Etc.Engineer/Scientist, Senior (Digital Design)
Etc.Engineer/Scientist, Senior (Electrical/Electronics)
Etc.Engineer/Scientist, Senior (Systems, RF)
Etc.Financial Analyst
Etc.Logistician III
Etc.Logistics Analyst
Etc.Manager
Etc.Material Coordinator
Etc.Material Expediter
Etc.Program Manager, Senior
Etc.Project Analyst
Etc.Quality Control Inspector
Etc.Secretary
Etc.Supply Technician
Etc.Technical Writer II
Etc.Technical Writer III
Etc.Travel Clerk I
Etc.Warehouse Specialist (Warehouse Worker)
Etc.Word Processor I
Total proposed subcontractor labor cost and fee00000000
Prime contractor pass through (not including fee)
Handling
G&A
Other (if any)
Total pass through (not including fee)
Total Subcontractor Cost including pass through0

Total Labor Cost (Prime and Subcontractor Labor)

Fixed Fee
Prime Contractor Fee for Prime Contractor Labor
Prime Contractor Fee for Subcontractor Labor *
Total Fee (for Prime and Subcontractor Labor)

Total Labor Cost Plus Fixed Fee (CPFF) 0

Other Direct Costs
Other Direct Costs (ODCs)
Any adders to ODCs such as G&A (cost only - no fee)
Total ODCs

Total CPFF all CLINs (Labor and ODCs) 0

Grand Total of CPFF all CLINs

Pass Through Analysis - Total for All YearsAmountPercent
Subcontractor proposed cost and fee$0
Pass Through Amount (not including fee)$0
Prime Contractor Fee for Subcontractor Labor *$0
Total Pass Through Amount (including fee)$0ERROR:#DIV/0!
Fee Analysis - Total for All YearsAmountPercent
Prime Contractor Labor Cost$0
Fixed Fee for Labor Performed by Prime Contractor$0ERROR:#DIV/0!

Page &P &F

KTR: (name) Source Selection Information - See: FAR 2.101 and 3.104 RFP:

Summary CLIN Summary Sheet

CLINSCLIN DescriptionTotal HoursTotal CostTotal Fixed FeeTotal Value $
0001Labor Term (LOE)
0008Labor Completion
0020Material
0027Travel
0037Field Services
Total

FFP Instructions

Instructions for Prime Contractor:
1Enter Prime offeror name into cell A3.
2Enter all prime employee names in Column A (starting at row 8) If necessary, insert additional rows--but ensure integrity of formulas.
3Enter all prime labor categories in Column B (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas. In column B, the Offeror should insert the title of the labor category it will be utilizing. Labor categories with more than one person providing service shall be listed multiple times for each person performing work. For example, if the offeror proposes four Senior Analysts, then the labor category Senior Analyst shall be listed four times along with their applicable rates and information.
4Only one worksheet shall be prepared for the entire period of performance (for each Prime and Subcontractor)
5The worksheets of the workbook should all be formatted for printing on letter-size paper, without requiring "adjustments." It may be formatted for either landscape or portrait. DO NOT FORMAT FOR LEGAL SIZE PAPER.
6All cells shall be unprotected and unlocked, with formulae intact to show mathematical operations.
7All dollar figures shall be carried out no further than two decimal places.
8When submitting this file, the instructions may be deleted.
Instructions for Subcontractors:
1Enter Prime offeror name into cell A3.
2Enter all subcontractor employee names in Column A (starting at row 8) If necessary, insert additional rows--but ensure integrity of formulas.
3Enter all subcontractor labor categories in Column B (starting at row 8) If necessary, insert additional rows--but ensure integrity of formulas. In column B, the Offeror should insert the title of the labor category it will be utilizing. Labor categories with more than one person providing service shall be listed multiple times for each person performing work. For example, if the offeror proposes four Senior Analysts, then the labor category Senior Analyst shall be listed four times along with their applicable rates and information.
4Only one worksheet shall be prepared for the entire period of performance (for each Prime and Subcontractor)
5The worksheets of the workbook should all be formatted for printing on letter-size paper, without requiring "adjustments." It may be formatted for either landscape or portrait. DO NOT FORMAT FOR LEGAL SIZE PAPER.
6All cells shall be unprotected and unlocked, with formulae intact to show mathematical operations.
7All dollar figures shall be carried out no further than two decimal places.
8When submitting this file, the instructions may be deleted.

FFP Summary Spreadsheet

FIRM FIXED PRICE (FFP) SPREADSHEET

Prime Offeror Name:
Subcontractor Name (if applicable):
Year 1Year 2Year 3Year 4Year 5Opton Period 1Option Period 2Total for all periods
Employee NameProposed Labor CategoryHoursRate*AmountHoursRate*AmountHoursRate*AmountHoursRate*AmountHoursRate*AmountHoursRate*AmountHoursRate*AmountHoursAmount
$0.00$0.00$0.00$0.00$0.00$0.00$0.000.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.000.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.000.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.000.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.000.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.000.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.000.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.000.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.000.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.000.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.000.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.000.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.000.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.000.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.000.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.000.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.000.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.000.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.000.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.000.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.000.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.000.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.000.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.000.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.000.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.000.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.000.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.000.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.000.00$0.00
*Fully burdened rate

File details come from the government source that posted it. Updated .