| Number | Industry Question | Government Response |
| 1 | We have been unable to find the DD254 associated with this solicitation. |
Could you please provide a copy to my attention?
| The DD Form 254 is not required for this solicitation/requirement. | ||
| 2 | Does data exist on a DVD that could be mailed out? If so, does the tail numbers and maintenace history exist on the DVD? | Selected data is available on DVD. Please refer to FBO or NAVAIR website for instructions on how to receive a DVD and to view the Technical Library List, which shows what is available in the library and on the DVD. |
| 3 | The Government’s response to industry question #67, for the draft RFP, indicated there are “I” level repair capabilities only at Fallon (VFC 13) and Yuma (VMFT 401), yet paragraph 4.0 of Addendum 1C to the PWS lists Intermediate maintenance requirements for NAS Key West. Please clarify. |
All 3 sites have Intermediate maintenance requirements as indicated in each individual site Addendum in the PWS. The PWS Addendum 1C will be updated in Amendment 0003 to clarify the Government's intent of a master ICRL list maintained at Yuma that indicates the repair capabilities at each site.
| 4 | Will the contractor be required to perform the stripping function as well as the full paint? If yes, What kind of stripping process does the Navy provide at each site? What are the estimated man-hour requirements to strip an aircraft? What are the estimated man-hour requirements to fully paint an aircraft? | The contractor is responsible for stripping functions. It is estimated to require mechanical stripping (i.e. sanding) that takes approximately three personnel 60 hours total. Also, estimated to require two personnel 40 hours to paint. |
| 5 | Will the Navy provide all materials necessary to perform strip and full paint? If not, please provide cost estimates for materials need for stripping and painting of an aircraft. | The Government will provide all necessary paint equipment. |
| 6 | PWS, Page 5, Section 3.3.6 states that individuals will be given access to NMCI. Please clarify the IT Level of Sensitivity (Level I, II or III) for these positions to allow for determination of investigation requirements. | NMCI access requires IT Level of Sensitivity III. |
| 7 | PWS, Page 8, Section 4.5 states that discrepancy reports are to be submitted via Naval Aviation Logistics Command Management Information System (NALCOMIS) Optimized Organizational Maintenance Activity (OOMA) database. Please clarify if there are additional background investigation requirements for access to this system. | The Government has no additional background investigation requirements. |
| 8 | PWS Page 14, Section 4.22.9.1, GFP Data Update. Please clarify where the GFP database is to reside. In a Government provided system or in the contractor provided WIS. | Upon completion of the GFP form in accordance with PWS, Section 4.22.9.1, the Government will upload the information to the Electronic Document Access (EDA). |
| 9 | PWS Addendums 1A and 1B state requirements for the contractor to perform “First through Third Degree Engine Repair of J85 Engine”. |
a) Please provide the different engine inspections performed at each site (i.e.: Periodic Maintenance, Hot Section, Unscheduled Maintenance, …). For each inspection provide: the inspection interval, the Maintenance Man Hours for each inspection, and the estimated number of inspection each year.
b) Please state the number of spare engines at each site to include Key West. a) The PMIC deck (NA01-F5AAA-6) provided at the Technical Library provides all of the scheduled engine and aircraft inspections.
b) The current inventory is 147 J85 engines. The contractor will determine the number of spare engines on hand at each site to accomplish the RFT IAW the PWS.
| 10 | PWS Addendum 1B VMFT-401, MCAS YUMA, AZ paragraph 5.0 Facilities: states the Government is not going to provide the current trailers used for shop space. Can you clarify all shop space required, what shop space is available, and what the Government will and will not provide? | Please refer to the PWS Addendums 1A, 1B, and 1C in Section 5.0, Facilities. The Government does not intend to breakdown shop space any further than provided. |
| 11 | PWS paragraph 4.1.1 Phase In Plan: Paragraph 4.1.1 (g) states All applicable facility leases. What are all the applicable facility leases? There is no other RFP reference to any leased facilities. | Please refer to the PWS Addendums 1B, Section 5.0, Facilities for the available Government provided space. Any additional facilities required by the offeror to perform the requirement should be included in the Phase-in Plan as defined in PWS paragraph 4.1.1. |
| 12 | Currently offerors are not allowed to reproduce reference materials while visiting the Technical Library and have to manually record what they can. This labor-intensive effort has reduced the offerors ability to evaluate the entire library for useful data. We would like to request a DVD containing the F-5 TPL Inventory’s electronic and hard copy data (excluding publications) be provided to us before visiting the F-5 TPL. Could this be provided to us now? | Please refer to FBO "date" post for further instructions on how to obtain the CD or contact the contract specialist Ms. Karen Lynch. |
| 13 | CDRL A003 Block 4 lists DID OT-13-20002 and CDRL A008 Block 4 lists DID OT-13-20045 as references. If the Government has already provided OT-13-20002 and OT-13-20045, please tell us where those documents are located. If they have not yet been provided, please provide them. | The Government will provide OT-13-20002 and OT-13-20045 and post to FBO. |
| 14 | RFP Section L, Part B, Paragraph 5.0.d: Is the separately bound hard-copy of the Model Contract and the separate CD-ROM disk specified in paragraph 5.0.d, in addition to the Volume 5 submittal requirements identified in RFP Sections L.A.3.0, Table 3.0 and L.A.2.1.1? If so, do we understand correctly that only one copy of this “Model Contract Only” book and CD is required? | One standalone hard copy and CD-ROM of the Model Contract are requested, in addition to the Volume 5 submittal requirements. |
| 15 | RFP Section L, Part A, Paragraph 2.1.1 Electronic Proposal Media & Part B, Paragraph 3.3.a Relevancy: Is the one electronic copy of the full SOW/PWS as part of Annex B in addition to the TWO electronic versions required of all sections of the proposal? | No. The two electronic copies, one primary and one backup, are sufficient. |
| 16 | RFP Section L, Part B Specific Instructions, 4.0 Volume Price, 4.2.1 Price Proposal Instructions, Section 2 – Contractor Rates FAR 52.222-43: |
a) The RFP informs offerors that higher than AWD wage rates are historically required to sustain the local workforce at NAS Key West. Without the benefit of wage escalation, how does the contractor receive wage adjustment increases due to AWD revisions in light of FAR clause 52.222-43 which prohibits receiving adjustments when the contractor chooses to pay above the wage listed in the AWD?
b) For example: the prior year wage determination required a minimum wage rate of $10.00 per hour. The Contractor chose to pay $11.50. The new wage determination increases the minimum rate to $10.75 per hour. Is the contractor entitled to a pass through adjustment of $0.75 per hour?
c) Should the contractor separately label and cost the premium needed above the AWD wage as COLA, Per Diem, or Stateside Area Pay to sustain the local workforce at Key West? a/b) Any wage adjustment due to Area Wage Determination revisions are to be in compliance wtih the Service Contract Act of 1965, as amended, (41 U.S.C. 351, et seq., Fair Labor Standards Act and the applicable FAR clauses ( see the following clauses FAR 52.222-41 through 52.222-44).
c) See Section L, 4.0 Volume Price and Attachment L-6, L-7, L-8, and L-9 ; for instruction on the format for submission of pricing information.
17 RFP Section B - Supplies and Services and Prices: In Section B of the RFP, SLINs 0X01AA, 0X01AB, and 0X01AC each state “total flight hours flown by the aircraft maintained by the contractor in a particular month”.
a) Based upon this information, is it possible to operate in one SLIN one month and another SLIN the next, and another SLIN the next month?
b) Will the contractor bill monthly in the appropriate SLIN for the flight hours flown in that month.
c) Does the Government intend to provide the contractor a quarterly or annual flight hour projection, by month, in order for the contractor to plan staffing levels?
a) Yes, The Government may order different SLINs within the same ordering period. The specific SLIN ordered will vary based upon the total number of flight hours flown by the aircraft maintained by the contractor in a particular month (all Type/Model/Series (T/M/S))
b) Fixed Price SLINs will be billed IAW the delivery order.
c) It is the Government intent to provide projections of expected Flight Hours quarterly.
18 PWS 4.21. Management Information System, Data Collection, Documentation and Reporting Requirements. PWS 4.21 requires the Contractor to develop and maintain a Web-based Information System that provides maintenance and logistics support information and functions with query and update capability on a real time basis. These capabilities are not dissimilar to those found in NALCOMIS OOMA and the reporting capabilities of DECKPLATE.
a) Is it the Government’s intent for the Contractor to provide a system that duplicates the data and functionality in NALCOMIS OOMA and DECKPLATE?
b) Will the Government allow for Contractor system interface with NALCOMIS OOMA and DECKPLATE in order to provide the real time information and query capability required by PWS 4.21?
c) If so, when will this interface capability be provided in order to assure development and validation prior to full performance - contract start?
d) Please clarify what is meant by “real-time”.
a/d) No.The WIS system is required for at a minimun CDRL reporting requirements. It is not meant to be a dupicate for NALCOMIS or DECKPLATE, so no interaface is necessary. It is to replace the mail or e-mail method of suibmission for the CDRL reports to an active database, hence the "real-time" description.
b) No interface is available.
c) N/A
| 19 | RFP Section L, Part B Specific Instructions, 5.0 Volume 5 – Contract Administration: Sub-paragraphs of Volume 5.0 consist of a, b, b, c, and d. Is it the Governments intent for the Offeror to number paragraphs within Volume 5 of the proposal in this manner or should the paragraphs be numbered sequentially 5.0.a through 5.0.e? | The sub-paragraphs is updated in Amendment 2 to reflect 5.0a through 5.0e. |
| 20 | RFP Section B, B-2, O&A Tables: Per RFP Section B, O&A Tables: “The Government is providing the estimate of direct labor and fringe as a total dollar amount for each labor category.” |
This same paragraph reference also states: “The Offeror shall insert their proposed labor burden rates (LESS FEE) using the total dollar amount for each labor category”
a) It appears that only one number is provided rather than separate numbers for each labor category, is this an oversight?
b) Will the Government please clarify the directions for filling out B-2 O&A Tables by color coding them to assist in further explaining which specific cells the contractor is expected to complete?
| Revised Section B tables and B-2 description are posted to FBO and Doing Business with NAVAIR Website on Amendment 0001. | |
| 21 | RFP Section B, B-2, O&A Tables: Per RFP Section B, O&A Tables: “The contractor….must use rates from approved Collective Bargaining Agreements or AWD” |
This same paragraph reference also states: “In the event direct labor and fringe benefit rates are changed due to changes in the Collective Bargaining Agreement or Area Wage Determination, as determined by the Department of Labor (DOL), the changes would be incorporated via revised CBA or revised AWD into this basic contract.”
| Is the Maintenance Supervisor in the B-2 O&A table correctly classified? How will the contractor account for wage increases for the Maintenance Supervisor without the benefit of cost escalation? | Please refer to Amendment 0001 for change in section B-2 description and O&A tables. | |
| 22 | RFP Section F – Delivery Information; RFP Section L, Part B Specific Instructions, 4.0 Volume Price, 4.2.1 Price Proposal Instructions, Section 2 – Contractor Rates; RFP Attachments 10A (Fallon Collective Bargaining Agreement) and 10B (Yuma Collective Bargaining Agreement): Based upon the RFP references above, it can be assumed the estimated base period of performance is 01–APR–2014 to 31–MAR–2015. Attachments 10A and 10B are predecessor agreements that include wage rate increases (effective 01 March and 01 January of the base period) that are not considered escalation contingencies for which adjustment is provided under FAR 52.222-43. |
a) Will the Government confirm that the Offeror is to include these wage escalations in the base year pricing, in accordance with the rate increase schedules provided in the predecessor agreements?
b) Additionally, will the Government please confirm all Option Year Pricing shall be in accordance with CBA wage rates effective and March 1, 2015 for Fallon, and January 1, 2015 for Yuma, and not be escalated for any contingency to cover increased costs for which an adjustment is provided under FAR 52.222-43, Fair Labor Standards Act and Service Contract Act-Price Adjustment (Multiple Year and Option Contracts)?
a) For the base year pricing the offeror is to be in compliance with the Service Contract Act of 1965, as amended, (41 U.S.C. 351, et seq.)(SCA), Fair Labor Standards Act and the applicable FAR clauses ( see the following clauses FAR 52.222-41 through 52.222-44). If the SCA and FAR permit the inclusions of the wage rate increases under Attachments 10A and 10B, then those should be included in the base year pricing.
b) For option year pricing, the pricing shall be in accordance with FAR 52.222-43.
Please see Amendment 2 for adjustment to updated estimated Period of Performance date.
| 23 | In reference Table 3-2, Cross Reference Matrix, on page 149 of the RFP, the Section L paragraphs 2.0-2.6 have corresponding PWS references. Are the references in the second column (PWS) required locations to address specific PWS paragraphs or are those references provided as an example of a cross reference matrix? | IAW Section L "A Cross Reference Matrix (CRM), Table 3.2, is included to help the Offeror develop its proposal and to ensure traceability of Section L paragraphs to the requirements." The PWS references are the appropriate references corresponding to the Section L requirements. |
| 24 | Paragraph 2.2.2 Training and Qualification of Safety Personnel lists 4.20 Monthly Maintenance Planning and 4.25 Contractor Manpower Reporting, but does not list 4.23 Safety Program. Does the Government want 4.20 and 4.25 included in Section L Paragraph 2.2.2? | Section L Cross Reference Matrix in the RFP has been updated to reflect the correct PWS references. See Amendment 0002. |
| 25 | With regard to the Monthly Maintenance Plan (MMP), PWS 4.20 states the contractor shall submit a Monthly Maintenance Plan IAW CDRL A003. PWS 11.3 states the Contractor shall be provided a MMP and shall ensure all personnel are accurately listed per their depot level certification IAW 4790.2B. Please clarify PWS 11.3, specifically, from whom the Contractor will receive the MMP. | The contractor will receive a signed copy of the MMP from the MMCO/MO. |
| 26 | Please provide a list of all documents that will be made available in the technical library. | The technical library list has been posted to FBO and the NAVAIR website. |
| 27 | Will the Government provide a CD of technical library data as was provided to bidders for the NSAWC proposal process? | Yes, A disk of selected electronic material is available. Other information is available in hard copy and is only accessable at NAS Fallon in the Technical Library. Please refer to FBO and NAVAIR website for information available electronically and for instructions on how to receive the disk. |
| 28 | PWS Page 6, Section 4.1, Transition Phase-In and Exhibit A CDRLs. The term “contract start date” is unclear. Since there is no transition phase-in CLIN, it appears that the “contract start date” would be when the transition phase-in begins with “full contract performance” beginning after the transition phase-in period ends. 4.1 states “The Contractor shall ensure a smooth transition prior to full-scale performance by accomplishing the following:” 4.1.1 states “CDRL AA02 appears to define the “contract start date” as the first day after the transition phase-in ends. Please clarify the “contract start date” and “full scale performance start date”. | The CDRL was revised via Amendment 0002 and the actual CDRL will be physically replaced at Time of Award. To clarify: CDRL AA02 delivery will begin after the 60 day transition period concludes, not the contract award date. |
| 29 | PWS, Page 8, Section 4.11 Transient Services: Please provide the estimated or historic number of transient aircraft serviced each month for all sites. | The Government estimates one or two aircraft six to nine times per year. |
| 30 | PWS Page 15, Section 4.24.5 Navy Local Asset Management System (LAMS): What specific types of items will have their property records in the LAMS system? | IMRL items are tracked on the LAMS System |
| 31 | RFP Section L, Table 3.2, Cross Reference Matrix, lists PWS paragraphs 4.20 (Monthly Maintenance Planning) and 4.25 (Contractor Manpower Reporting) for Proposal Section 2.2.2 (Training and Qualification of Safety Personnel). |
a. Should the correct PWS paragraphs be 4.18 (Armament), and 4.25 (Safety Program)?
| Section L Cross Reference Matrix in the RFP has been updated to reflect the correct PWS references. See Amendment 0002. | |
| 32 | RFP Page 107-108, Clauses 52.217-8 and 52.217-9 set government notification of termination at one day before contract expiration. |
a. Recommend amending the (1) day advance written “notice to extend” to give greater notice and thereby allow contractor to better prepare for extension and to avoid potential conflict with the WARN Act which requires a minimum of 60 days notification to the workforce prior to closings and layoffs.
| The clause will remain unchanged. | |
| 31 | RFP Page 153, Section L, Paragraph 2.2.1.1 Key Personnel – Requires Offeror’s to provide Key Personnel position descriptions and requirements of the Key Personnel position in each of the functional areas and five resumes. The Government provided page count relief for the required Key Personnel Résumés in response to a previous offeror question so as not to impact the 100 page Technical Volume limitation. |
a. Request the government provide page count relief for the required Job Position descriptions as well.
The Key Personnel position descriptions should be included in the suggested page count for the Technical Volume.
Selected Q and A's Posted 10-22-13