About this file

OT-13-20042

View the file

Other files

File Type Posted
Amendment_0005.pdf PDF
Selected_Q A's_Posted_FBO_11-22-13.xlsx XLSX spreadsheet
OT-13-20045.pdf PDF
Selected_Q A's_Posted_FBO_11-15-13.xlsx XLSX spreadsheet
OT_DID_Final_WIS_Archival_Data_F-5.pdf PDF
OT-13-XXXXX_draft_Materials_Utilization_and_Forecasting_Report_F-5_CLS.pdf PDF
OT_DID_Final_Monthly_Maintenance_Plan_F-5.pdf PDF
OT_DID_Final_Phase_Out_Transition_Plan_F-5_rev_1.pdf PDF
Att_L-9_Parts_Material_Travel_O A_131101.xlsx XLSX spreadsheet
Selected_Q A's_Posted_FBO_11-08-13.xlsx XLSX spreadsheet
Att_L-7_Prime_CCS_131104.xlsx XLSX spreadsheet
F-5_ADVERSARY_PWS_131107.pdf PDF
Att_L-6_Price_Matrix_131104.xlsx XLSX spreadsheet
Amend_0004.pdf PDF
CAC_Procedures.pdf PDF
Amendment_0003.pdf PDF
Selected_Q A's_Posted_FBO_11-05-13.xlsx XLSX spreadsheet
List_of_F5_Tech_Library_Supplemental_Info_Oct_22_13.pdf PDF
Selected_Q A's_Posted_FBO_10-22-13.xlsx XLSX spreadsheet
Att_L-8_Sub_CCS_131010.xlsx XLSX spreadsheet
Amendment_0002_10-15-13.pdf PDF
Selected_Q A's_Posted_FBO_9-30-13.xlsx XLSX spreadsheet
TPL_Listing.pdf PDF
Att_L-8_Sub_CCS_130918.xlsx XLSX spreadsheet
Amendment_0001_09-24-13.pdf PDF
Att_L-9_Parts_Material_Travel_O A_130919.xlsx XLSX spreadsheet
Att_L-7_Prime_CCS_130918.xlsx XLSX spreadsheet
F-5_Draft_RFP_Q A's.xlsx XLSX spreadsheet
Attachment_4A_FALLON_A004_2012.xlsx XLSX spreadsheet
Attachment_5A_Fallon _NV_AWD_2005-2334.pdf PDF
F-5_ADVERSARY__Draft_PWS_130821.docx DOCX document
Attachment_10B_Yuma _AZ_CBA.pdf PDF
Att_L-8_Sub_CCS_130820.xlsx XLSX spreadsheet
Attachment_4C_KEY_WEST__A004_2012.xlsx XLSX spreadsheet
Att_L-2_Vol_1_ES_Tables_Rev1.xlsx XLSX spreadsheet
Attachment_8_F5_QASP_Final_130402.docx DOCX document
Att_L-1_GenInst_3.2_CRM.xlsx XLSX spreadsheet
Att_L-7_Prime_CCS_130820.xlsx XLSX spreadsheet
Attachment_5B_Yuma _AZ_AWD_2005-2028.pdf PDF
Att_L-10_Manpower_Chart.xlsx XLSX spreadsheet
Att_L-6_Price_Matrix_130913.xlsx XLSX spreadsheet
Attachment_5C_Key_West _FL_AWD_2005-2120.pdf PDF
Att_L-4_Vol_3_PPQ_20130419.docx DOCX document
Attachment_10A_Fallon _NV_CBA.pdf PDF
Attachment_4B_YUMA_A004__2012.xlsx XLSX spreadsheet
Att_L-5_Vol_3_PP-1_PP_Cont_Data.xlsx XLSX spreadsheet
Att_L-3_Vol_2_T-1_SB_Goals.xlsx XLSX spreadsheet
F-5_CDRL's_8-23-13.pdf PDF
Att_L-9_Direct_Parts_Material_and_Travel.xlsx XLSX spreadsheet
F-5_Final_RFP.doc DOC document
Show 40 more

Latest 50 of 57 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA ITEM DESCRIPTION

Title: Phase-Out Transition Plan

Number: OT-13-20042 AMSC Number: N/A DTIC Applicable: N/A Office of Primary Responsibility: AS/PMA-207 Applicable Forms: N/ A

Use/relationship:

Approval Date: 20130604 Limitation: N/ A GIDEP Applicable: N/A

Phase-Out Transition Plan provides a detailed description of the transfer of full assumption of duties at each site, Airframe and Engine Depot to the follow-on contractor.

This Data Item Description (DID) contains format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract and described in the Performance Work Statement (PWS). It should be tailored to the minimum data requirements of the applicable contract or purchase order.

This DID is for One-Time use for solicitation N00019-12-R-0008.

Requirements:

1. Format. Contractor format is acceptable.

2. Content. The Phase-Out Transition Plan content shall include the following:

a. A written comprehensive plan explaining actions required to complete the total transition effort within a sixty (60) calendar day transition period.

b. Details of accounts and subscription services to be terminated or transferred.

c. Process to conduct a full joint inventory and transference of all Government Furnished

Material inventory including all records.

d. Status of all items in inventory as well as the items that have been inducted into repair facilities, being modified or are being purchased.

e. Details for the removal of all contractor owned items.

f. Critical path schedule for risk mitigation of the transition period.

g. Plan to make training and certification records available of contractor personnel who are considering employment with the succeeding contractor.

End of: OT -13-20042

Pagelofl 23 October 2012

File details come from the government source that posted it. Updated .