Amendment_0003.pdf
PDF 111 KB Posted
- Solicitation number
- N00019-13-R-0092
View the file
Other files
Show 40 more
Latest 50 of 57 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Point of Contact:
Contract Specialist: Karen Lynch Phone: 301-757-7057 Email: karen.d.lynch@navy.mil
See continuation page for the summary of changes made in Amendment 0003.
1. CONTRACT ID CODE PAGE OF PAGES
1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Nov-2013
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N00019-13-R-0092
X 9B. DATED (SEE ITEM 11)
16-Sep-2012
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Nov-2013
CODE
NAVAL AIR SYSTEMS COMMAND
AIR-2.3.5.1
21936 BUNDY ROAD BLDG 442
PATUXENT RIVER MD 20670
N00019 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N00019-13-R-0092
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0003 SUMMARY
The following changes have been made:
Amendment 0002 Summary:
On the summary of changes page on Amendment 0002 the decription under Section F-Deliveries or Performance has changed
FROM
“The estimated period of performance has changed From “01-APR-2014 to 31-MAR-2015” To
“07-AUG-2014 to 31-JUL-2015” for CLINs 0001 – 0011”.
TO
“The estimated period of performance has changed From “01-APR-2014 to 31-MAR-2015” TO
“01-AUG-2014 to 31-JUL-2015” for CLINs 0001 – 0011”
Section A- Solicitation/Contract Form:
In Block 9 the proposal submission date has changed from 20 November 2013 to 03 December 2013.
The following have been modified:
AMENDMENT 0002 SUMMARY
The following changes have been made:
Section A- Solicitation/Contract Form:
In Block 9 the number of proposal copies required have changed from 5 to 3.
In Block 9 the proposal submission date has changed from 31 October 2013 to 20 November 2013.
Section B-2, O&A Tables
“See NAVAIR clause 5252.215-9512 in Section G.” has been deleted from the description.
Section F- Deliveries or Performance:
The estimated period of performance has changed From “01-APR-2014 to 31-MAR-2015” To “01-AUG-
2014 to 31-JUL-2015” for CLINs 0001 – 0011.
The estimated period of performance has changed From “01-APR-2015 to 31-MAR-2016” To “01-AUG-
2015 to 31-JUL-2016” for CLINs 0101 – 0111.
The estimated period of performance has changed From “01-APR-2016 to 31-MAR-2017” To “01-AUG-
2016 to 31-JUL-2017” for CLINs 0201 – 0211.
The estimated period of performance has changed From “01-APR-2017 to 31-MAR-2018” To “01-AUG-
2017 to 31-JUL-2018” for CLINs 0301 – 0311.
The estimated period of performance has changed From “01-APR-2018 to 31-MAR-2019” To “01-AUG-
2018 to 31-JUL-2019” for CLINs 0401 – 0411.
The estimated period of performance has changed From “01-FEB-2018 to 31-MAR-2019” To “01-JUN-
2018 to 31-JUL-2019” for CLIN 0412.
Section G- Contract Administration Data:
5252.215-9512 “Savings Clause(NAVAIR)(June 2012)” has been deleted in its entirety.
Section L- LA-1 CONTENT OF PROPOSALS (SERVICES)
In Part A, Table 3.0 Proposal Structure, copies required have changed from “1 Original/5 Copies” to “1
Original/3 Copies”.
In Part A, Table 3.2 Cross Reference Matrix, Section L- Proposal Instruction “2.2.2 Training and
Qualification of Saftey Personnel” PWS reference changed from 4.20 to 4.18 and from 4.25 to 4.23.
In Part A, Table 3.2 Cross Reference Matrix, Section L- Proposal Instruction “2.3.4 Aircraft Discrepancies
” PWS reference changed from 4.23 to 4.22.1 and from 4.24 to 4.22.11.
In Part B, 5.0 Volume 5- Contract Administration format was corrected.
In Part A, Section L List of Attachments, L-8 Attachment Name changed from “Sub CCS 130918” to “Sub
CCS 131010”.
Section L Attachment L-8, the following Section L-8 Attachment dated 130918 is deleted in it’s entirety and replaced with the attached amended version dated 131010.
Attachment L-8 Sub CSS 130918 is replaced with Attachment L-8 Sub CSS 131010
Exhibit A-CDRLs:
CDRL AA02, Block 16 referencing Blocks 12 &13 have been revised:
From:
“The first deliverable shall be submitted on the contract start date (after transition-in period) at 0830 hrs.
Subsequent deliverables shall be submitted each day at 0830 hrs.”
To:
“The first deliverable shall be submitted after the transition-in period at 0830 hrs. Subsequent deliverables shall be submitted each day at 0830 hrs.”
Note: Revised CDRL AA02 will be attached in Exhibit A at Time of Award.
PWS File Name listed on FBO website posted 16 September 2013 has been renamed:
The file name “F5 Adversary Draft PWS 130821” should read “F5 Adversary Official PWS 130821”.
Note: No revisions were made to the actual content of the PWS document.
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 20-Nov-2013 01:00 PM to 03-Dec-2013 01:00 PM.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .