Amend_0004.pdf
PDF 455 KB Posted
- Solicitation number
- N00019-13-R-0092
About this file
Amendment 0004
View the file
Other files
Show 40 more
Latest 50 of 57 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Point of Contact:
Contract Specialist: Karen Lynch Phone: 301-757-7057 Email: karen.d.lynch@navy.mil
See continuation page for the summary of changes made in Amendment 0004.
1. CONTRACT ID CODE PAGE OF PAGES
1 34
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 08-Nov-2013
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N00019-13-R-0092
X 9B. DATED (SEE ITEM 11)
16-Sep-2012
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Nov-2013
CODE
NAVAL AIR SYSTEMS COMMAND
AIR-2.3.5.1
21936 BUNDY ROAD BLDG 442
PATUXENT RIVER MD 20670
N00019 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N00019-13-R-0092
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0004 SUMMARY
The following changes have been made:
Section B- Supplies or Services and Prices
The word “rescue” has been deleted from the description for CLINs 0X06 - 0X08 Limited Depot
Maintenance.
SLIN 0303AC was changed From “MAX COST, FIXED FEE, TOTAL MAX COST+FEE” To “MAX
NET AMT”
CLIN 0307 was changed From “TOTAL MAX PRICE” To “MAX COST, FIXED FEE, TOTAL MAX
COST+FEE”
Section B-2 Tables for CLINs 0X06 the Government Estimated Direct Labor/Fringe was changed From
$29,050.00 To $29,400.00.
Section B-2 Tables for CLINs 0X08 the Government Estimated Direct Labor/Fringe was changed From
$4,067.00 To $4,170.00.
Section I- Contract Clauses
Clause 252.245-7004 Reporting, Reutilization, and Disposal (APR 2012) has been updated to a newer version dated MAY 2013.
Attachment 1 PWS, Addendum 1A, 1B, and 1C are deleted in their entirety and replaced with updated version. The following is a summary of the changes to the PWS and Addendums:
Date of PWS has changed From 21 August 2013 To 7 November 2013.
Table of contents has been updated.
Section 1.1 General Scope has changed.
Section 2.6 NAVAIR Publications/Instructions have been changed.
Section 3.4.2 Safety Equipment has changed.
Section 4.2 Equipment Maintenance, 4.2.1 has changed and 4.2.2 has been added.
Section 4.15 Snow Removal has changed.
Addendum 1A, Section 4.0 Selected Intermediate and Depot Maintenance has changed.
Addendum 1A, Section 5.0 Facilities has changed.
Addendum 1B, Section 4.0 Selected Intermediate and Depot Maintenance has changed.
Addendum 1C, Section 4.0 Selected Intermediate Maintenance has changed.
Section J Exhibit & Attachments table has been updated to reflect changes due to replacement PWS and
Addendums.
Section L Attachments, the following Section L Attachments are deleted in their entirety and replaced with updated versions. The following is a summary of the changes:
Attachment L-6 Price Matrix 130913 are replaced with Attachment L-6 Price Matrix 131104
Attachment L-7 Prime CCS 130918 are replaced with Attachment L-7 Prime CCS 131104
Attachment L-9 Parts Material Travel O&A 130919 are replaced with Attachment L-9 Parts Material
Travel O&A 131101
Section L- LA-1 CONTENT OF PROPOSALS (SERVICES)
Section 3.0- Section L List of Attachments table has been updated.
Section 7.0-TECHNICAL LIBRARY has changed.
SECTION B- SUPPLIES OR SERVICES AND PRICES
CLIN 0303AC has changed:
FROM
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0303AC 12 Months OPTION Key West O&I Maintenance Surge Range
FFP
460-520 total flight hours flown by aircraft maintained by the contractor in a particular month at NAS Key West, FL (VFC-111)
FOB: Destination
MAX COST
FIXED FEE
TOTAL MAX COST + FEE
TO
UNIT UNIT PRICE MAX AMOUNT
0303AC 12 Months OPTION Key West O&I Maintenance Surge Range
FFP
460-520 total flight hours flown by aircraft maintained by the contractor in a particular month at NAS Key West, FL (VFC-111)
MAX
NET AMT
CLIN 0307 has changed:
FROM
UNIT UNIT PRICE MAX AMOUNT
0307 UNDEFINED
OPTION Yuma Limited Depot Maintenance (O&A)
CPFF
Limited Depot Maintenance IAW Section C at MCAS Yuma, AZ (VMFT-401).
For Over and Above Limited Depot Maintenance: severe corrosion, modifications, rescue, and RILOP, as tasked. See Note B-2 (O&A Tables).
TOT MAX PRICE
TO
UNIT UNIT PRICE MAX AMOUNT
0307 UNDEFINED
OPTION Yuma Limited Depot Maintenance (O&A)
CPFF
Limited Depot Maintenance IAW Section C at MCAS Yuma, AZ (VMFT-401).
For Over and Above Limited Depot Maintenance: severe corrosion, modifications and RILOP, as tasked. See Note B-2 (O&A Tables).
MAX COST
FIXED FEE
TOTAL MAX COST + FEE
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0006
The CLIN extended description has changed from Limited Depot Maintenance IAW Section C at NAS
Fallon, NV (VFC-13). For Over and Above Limited Depot Maintenance: severe corrosion, modifications, rescue, and RILOP, as tasked. See Note B-2 (O&A Tables). to Limited Depot Maintenance IAW Section C at NAS Fallon, NV (VFC-13). For Over and Above Limited Depot Maintenance: severe corrosion, modifications and RILOP, as tasked. See Note B-2 (O&A Tables)..
CLIN 0007
The CLIN extended description has changed from Limited Depot Maintenance IAW Section C at MCAS
Yuma, AZ (VMFT-401). For Over and Above Limited Depot Maintenance: severe corrosion, modifications, rescue, and RILOP, as tasked. See Note B-2 (O&A Tables). to Limited Depot Maintenance IAW Section C at MCAS
Yuma, AZ (VMFT-401). For Over and Above Limited Depot Maintenance: severe corrosion, modifications and
RILOP, as tasked. See Note B-2 (O&A Tables)..
CLIN 0008
Key West, FL (VFT-111). For Over and Above Limited Depot Maintenance: severe corrosion, modifications, rescue, and RILOP, as tasked. See Note B-2 (O&A Tables). to Limited Depot Maintenance IAW Section C at NAS
Key West, FL (VFT-111). For Over and Above Limited Depot Maintenance: severe corrosion, modifications and
CLIN 0106
Fallon, NV (VFC-13). For Over and Above Limited Depot Maintenance: severe corrosion, modifications, rescue, and RILOP, as tasked. See Note B-2 (O&A Tables). to Limited Depot Maintenance IAW Section C at NAS Fallon, NV (VFC-13). For Over and Above Limited Depot Maintenance: severe corrosion, modifications and RILOP, as
CLIN 0107
Yuma, AZ (VMFT-401). For Over and Above Limited Depot Maintenance: severe corrosion, modifications, rescue, and RILOP, as tasked. See Note B-2 (O&A Tables). to Limited Depot Maintenance IAW Section C at MCAS
Yuma, AZ (VMFT-401). For Over and Above Limited Depot Maintenance: severe corrosion, modifications and
CLIN 0108
Key West, FL (VFC-111). For Over and Above Limited Depot Maintenance: severe corrosion, modifications, rescue, and RILOP, as tasked. See Note B-2 (O&A Tables) to Limited Depot Maintenance IAW Section C at NAS
Key West, FL (VFC-111). For Over and Above Limited Depot Maintenance: severe corrosion, modifications and
RILOP, as tasked. See Note B-2 (O&A Tables).
CLIN 0206
Fallon, NV (VFC-13). For Over and Above Limited Depot Maintenance: severe corrosion, modifications, rescue, and RILOP, as tasked. See Note B-2 (O&A Tables). to Limited Depot Maintenance IAW Section C at NAS Fallon, NV (VFC-13). For Over and Above Limited Depot Maintenance: severe corrosion, modifications and RILOP, as
CLIN 0207
Yuma, AZ (VMFT-401). For Over and Above Limited Depot Maintenance: severe corrosion, modifications, rescue, and RILOP, as tasked. See Note B-2 (O&A Tables). to Limited Depot Maintenance IAW Section C at MCAS
Yuma, AZ (VMFT-401). For Over and Above Limited Depot Maintenance: severe corrosion, modifications and
CLIN 0208
Key West, FL (VFT-111). For Over and Above Limited Depot Maintenance: severe corrosion, modifications, rescue, and RILOP, as tasked. See Note B-2 (O&A Tables). to Limited Depot Maintenance IAW Section C at NAS
Key West, FL (VFT-111). For Over and Above Limited Depot Maintenance: severe corrosion, modifications and
CLIN 0306
Fallon, NV (VFC-13). For Over and Above Limited Depot Maintenance: severe corrosion, modifications, rescue, and RILOP, as tasked. See Note B-2 (O&A Tables). to Limited Depot Maintenance IAW Section C at NAS Fallon, NV (VFC-13). For Over and Above Limited Depot Maintenance: severe corrosion, modifications and RILOP, as
CLIN 0307
Yuma, AZ (VMFT-401). For Over and Above Limited Depot Maintenance: severe corrosion, modifications, rescue, and RILOP, as tasked. See Note B-2 (O&A Tables). to Limited Depot Maintenance IAW Section C at MCAS
Yuma, AZ (VMFT-401). For Over and Above Limited Depot Maintenance: severe corrosion, modifications and
CLIN 0308
Key West, FL (VFT-111). For Over and Above Limited Depot Maintenance: severe corrosion, modifications, rescue, and RILOP, as tasked. See Note B-2 (O&A Tables). to Limited Depot Maintenance IAW Section C at NAS
Key West, FL (VFT-111). For Over and Above Limited Depot Maintenance: severe corrosion, modifications and
CLIN 0406
Fallon, NV (VFC-13). For Over and Above Limited Depot Maintenance: severe corrosion, modifications, rescue, and RILOP, as tasked. See Note B-2 (O&A Tables). to Limited Depot Maintenance IAW Section C at NAS Fallon, NV (VFC-13). For Over and Above Limited Depot Maintenance: severe corrosion, modifications and RILOP, as
CLIN 0407
Yuma, AZ (VMFT-401). For Over and Above Limited Depot Maintenance: severe corrosion, modifications, rescue, and RILOP, as tasked. See Note B-2 (O&A Tables). to Limited Depot Maintenance IAW Section C at MCAS
Yuma, AZ (VMFT-401). For Over and Above Limited Depot Maintenance: severe corrosion, modification and
CLIN 0408
Key West, FL (VFT-111). For Over and Above Limited Depot Maintenance: severe corrosion, modifications, rescue, and RILOP, as tasked. See Note B-2 (O&A Tables). to Limited Depot Maintenance IAW Section C at NAS
Key West, FL (VFT-111). For Over and Above Limited Depot Maintenance: severe corrosion, modifications and
The following have been modified:
O&A TABLES
B-2 The Offeror shall complete the tables listed below for CLINs 0X06 - 0X08 (Limited Depot Maintenance
(O&A)) for all three sites including the base year and 4 option years. The Government is providing the total estimate of direct labor and fringe as a total dollar amount for the anticipated labor categories (Maintenance Supervisor, Aircraft Mechanic, and QA Inspector), for each O&A CLIN, for each site, for evaluation purposes.
The Offeror shall insert their proposed labor burden rates (LESS FEE) using the total dollar amount as identified by the Government in the below set of tables, as the base. The Offeror shall add the Government estimated total labor dollar amount to the Offeror’s proposed indirect labor burden total to come up with a total estimated COST. The
Offeror shall then insert a Fixed Fee Percentage and calculate the Fixed Fee using the totally burdened labor dollar amount as the base (less Cost of Money expense, if applicable).
The Offeror shall then populate the corresponding CLIN in Section B from each table with the following: Cost +
Fixed Fee = CPFF. This will be the estimated Cost and Fixed Fee ‘value’ for use under the contract, if ordered via separate task orders.
All Over and Above effort under Limited Depot Maintenance shall be ordered via task orders on a CPFF basis
(COMPLETION FORM). No TERM FORM task orders for Limited Deport Maintenance will be authorized. In the event the work cannot be completed at the estimated cost, the contractor, if funded, shall perform the work to completion, but no additional fee will be provided.
The Contractor is advised, when preparing proposals for O&A tasking, they must use rates from approved
Collective Bargaining Agreements or AWD, as a minimum. The Contractor shall not begin any O&A performance without a task order signed by the Contracting Officer.
In the event direct labor and fringe benefit rates are changed due to changes in the Collective Bargaining Agreement or Area Wage Determination, as determined by the Department of Labor (DOL), the changes would be incorporated via revised CBA or revised AWD into this basic contract. The Fixed Fee shall remain unchanged.
CLIN 0X06 Fallon Limited Depot Maintenance (O&A):
Table 1: Base Year (CLIN 0006)
Labor
Gov’t Estimated Direct
Labor/Fringe $
Offeror Total Labor
Burden $
Subtotal
Estimated Labor
Cost (less fee)
Total Labor/Fringe $29,400.00 $
Total Estimated Cost $
Fixed Fee ______% $
Total CPFF CLIN 0006 $
Table 2: Option Year I (CLIN 0106)
Offeror Total Labor
Burden $
Subtotal
Estimated Labor
Cost (less fee)
Total Labor/Fringe $29,400.00 $
Total Estimated Cost $
Total CPFF CLIN 0106 $
Table 3: Option Year II (CLIN 0206)
Offeror Total Labor
Burden $
Subtotal
Estimated Labor
Cost (less fee)
Total Labor/Fringe $29,400.00 $
Total Estimated Cost $
Total CPFF CLIN 0206 $
Table 4: Option Year III (CLIN 0306)
Offeror Total Labor
Burden $
Subtotal
Estimated Labor
Cost (less fee)
Total Labor/Fringe $29,400.00 $
Total Estimated Cost $
Total CPFF CLIN 0306 $
Table 5: Option Year IV (CLIN 0406)
Offeror Total Labor
Burden $
Subtotal
Estimated Labor
Cost (less fee)
Total Labor/Fringe $29,400.00 $
Total Estimated Cost $
Total CPFF CLIN 0406 $
CLIN 0X07 Yuma Limited Depot Maintenance (O&A):
Table 6: Base Year (CLIN 0007)
Offeror Total Labor
Burden $
Subtotal
Estimated Labor
Cost (less fee)
Total Labor/Fringe $26,600.00 $
Total Estimated Cost $
Total CPFF CLIN 0007 $
Table 7: Option Year I (CLIN 0107)
Offeror Total Labor
Burden $
Subtotal
Estimated Labor
Cost (less fee)
Total Labor/Fringe $26,600.00 $
Total Estimated Cost $
Total CPFF CLIN 0107 $
Table 8: Option Year II (CLIN 0207)
Offeror Total Labor
Burden $
Subtotal
Estimated Labor
Cost (less fee)
Total Labor/Fringe $26,600.00 $
Total Estimated Cost $
Total CPFF CLIN 0207 $
Table 9: Option Year III (CLIN 0307)
Offeror Total Labor
Burden $
Subtotal
Estimated Labor
Cost (less fee)
Total Labor/Fringe $26,600.00 $
Total Estimated Cost $
Total CPFF CLIN 0307 $
Table 10: Option Year IV (CLIN 0407)
Offeror Total Labor
Burden $
Subtotal
Estimated Labor
Cost (less fee)
Total Labor/Fringe $26,600.00 $
Total Estimated Cost $
Total CPFF CLIN 0407 $
CLIN 0X08 Key West Limited Depot Maintenance (O&A):
Table 11: Base Year (CLIN 0008)
Offeror Total Labor
Burden $
Subtotal
Estimated Labor
Cost (less fee)
Total Labor/Fringe $4,170.00 $
Total Estimated Cost $
Total CPFF CLIN 0008 $
Table 12: Option Year I (CLIN 0108)
Offeror Total Labor
Burden $
Subtotal
Estimated Labor
Cost (less fee)
Total Labor/Fringe $4,170.00 $
Total Estimated Cost $
Total CPFF CLIN 0108 $
Table 13: Option Year II (CLIN 0208)
Offeror Total Labor
Burden $
Subtotal
Estimated Labor
Cost (less fee)
Total Labor/Fringe $4,170.00 $
Total Estimated Cost $
Total CPFF CLIN 0208 $
Table 14: Option Year III (CLIN 0308)
Offeror Total Labor
Burden $
Subtotal
Estimated Labor
Cost (less fee)
Total Labor/Fringe $4,170.00 $
Total Estimated Cost $
Total CPFF CLIN 0308 $
Table 15: Option Year IV (CLIN 0408)
Offeror Total Labor
Burden $
Subtotal
Estimated Labor
Cost (less fee)
Total Labor/Fringe $4,170.00 $
Total Estimated Cost $
Total CPFF CLIN 0408 $
SECTION I - CONTRACT CLAUSES
The following have been added by reference:
252.245-7004 Reporting, Reutilization, and Disposal MAY 2013
The following have been deleted:
252.245-7004 Reporting, Reutilization, and Disposal APR 2012
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
EXHIBITS & ATTACHMENTS
Document Description Pages Date
Exhibit A Contract Data Requirements List 51 23 August 2013
Attachment 1
Addendum 1A
Addendum 1B
Addendum 1C
Performance Work Statement (PWS)
NAS Fallon, NV
MCAS Yuma, AZ
NAS Key West, FL
07 November 2013
07 November 2013
07 November 2013
07 November 2013
Attachment 2 Minimum Manning Chart (To be proposed by offeror in Annex C and will be incorporated at time of award)
TBD TBD
Attachment 3 Over and Above Work Request Form 1 23 July 2013
Attachment 4
Attachment 4A
Attachment 4B
Attachment 4C
Government Furnished Property List
NAS Fallon, NV
MCAS Yuma, AZ
NAS Key West, FL
19 April 2013
Attachment 5
Attachment 5A
Attachment 5B
Service Contract Act (SCA) Department of Labor Area Wage
Determinations (Current)
NAS Fallon, NV- NV, CA 2005-2334 Revision 15
MCAS Yuma, AZ- Yuma, AZ 2005-2028 Revision 16
19 June 2013
19 June 2013
Attachment 5C NAS Key West, FL- Dade, FL 2005-2120 Revision 14 10 19 June 2013
Attachment 6 Approved Key Personnel Listing TBD TBD
Attachment 7 Small Business Subcontracting Plan (To be proposed by offeror in
Annex A and will be Incorporated at time of award)
TBD TBD
Attachment 8 Quality Assurance Surveillance Plan (QASP) 9 2 April 2013
Attachment 9 Contracting Officer Representative (COR) Nomination Appointment
Letter and List of Duties
TBD TBD
Attachment 10
Attachment 10A
Attachment 10B
Collective Bargaining Agreements- Current CBA
Fallon CBA- CWA Local 89118
Yuma CBA- CWA Local 7032
10 Dec 2012 – 11 Dec 2016
30 Sep 2012 – 2 Oct 2016
Attachment 11 Data Assertions TBD TBD
Attachment 12 Locator Form TBD TBD
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
LA-1
LA-1 CONTENT OF PROPOSALS (SERVICES) (OCT 2012) (JUL 2013)
PART A GENERAL INSTRUCTIONS
1.0 GENERAL
Offerors are required to submit sufficient information concerning all evaluation factors to enable Government personnel to fully assess the capabilities of the Offeror to perform all requirements. The proposal must be sufficient in detail and scope to enable evaluation and provide the evaluators a clear understanding of the Offeror’s approach, expertise, experience and capability as required by the solicitation. All proposals must clearly and convincingly demonstrate that the Offeror has a thorough understanding of all requirements and associated risks; is able, willing, and competent to devote the resources necessary to meet all requirements; and has valid and practical solutions for all requirements and potential risk areas. The Offeror shall not alter or rearrange the solicitation. The burden of proof for all substantiation within the proposal rests with the Offeror. Offerors are advised that the Government may incorporate any part of the Offeror’s proposal deemed beneficial to the Government, into the final contract. With the exception of Volume 4 Price, no cost/price should appear in any other volume. Alternate proposals are not acceptable.
In presenting material in the proposal, the Offeror is advised that quality of information is more important than quantity. Clarity, brevity, and logical organization should be emphasized during proposal preparation. It is the responsibility of the Offeror to present enough information to allow the various work efforts, support, and management approaches, as well as cost/price, to be meaningfully evaluated. Unsubstantiated statements that the prospective Offeror understands, can or will comply with the specifications, or paraphrasing the requirements or parts thereof are considered inadequate and may render a rating of unacceptable.
The Offeror must include any data necessary to illustrate the adequacy of the various assumptions, approaches, and solutions to problems. There is no need to repeat information in more than one volume. The detailed information must be included in the most logical place and summarized and referenced in other areas if an overlap exists.
Unnecessarily elaborate brochures or other presentation beyond that sufficient to present a complete and effective proposal is neither necessary nor desired.
Throughout these instructions, Offeror is defined as the prime contractor with its CAGE code identified in Block
15A on Standard Form (SF)-33, Solicitation, Offer, and Award. “Principal Subcontractors” are defined as a subcontractor who provides at least 10% of the proposed total price for the contract. A “Joint Venture” (JV) is a partnership or teaming arrangement that is formed for the purpose of responding to this solicitation when the prime contractor consists of more than one legal entity. “JV Team Members” are the entities that make up a Joint Venture.
“Critical Subcontractors” are subcontractors that perform a critical function, whether technical or financial, in the performance of the resulting contract. The term entity is used to mean any or all of the following: Prime, principal subcontractor, critical subcontractor, JV, and/or each JV team member or other subcontractor.
2.0 PROPOSAL FORMAT AND SUBMISSION
Proposals must be formatted using a Times New Roman 12 point normal font (no reduction permitted), single-spaced with 1-inch margins all around, and formatted for/printed on standard 8.5 x 11 inch paper. All pages should be numbered with volume, paragraph, and page numbers. When fold-out pages are used, they must not exceed 11 x
17 inches and will be counted as 1 page. Drawings may be provided separately and may be any size but should be folded to approximately 8.5 x 11 inch standard size and will count as 1 page. If the Offeror uses graphs to convey information the graphs must show enough detail to easily discern the information described. Graphs and tables shall be presented in no smaller than a 10 pt font. Graphs should contain a grid, which allows values to be read directly from the graph to the same detail that a 10 x 10 to the ½ inch grid provides. Graphic resolution should be consistent with the purpose of the data presented. Text utilized in charts, figures, and graphics shall also be no smaller than a
10 pt font and may use a font type selected by the Offeror. Each volume, book, or annex shall be provided separately in a 3-ring binder. The binders should be of an appropriate thickness for the number of pages it contains
(e.g., a 30-page book shall not be placed in a 2-inch binder).
2.1 Electronic Submission of Proposal
This section is intended to provide information to the Offeror on the electronic format and application software to be used for submitting proposals. Use of the software and procedures described in this section will reduce the amount of time and effort needed to receive and install proposals onto the electronic evaluation system, and will ensure that the proposals received are suitable for reading electronically.
2.1.1 Electronic Proposal Media
The Offeror should submit all volumes of its proposal electronically on CD-ROM(s) compatible with the operating system and applications defined in Section 2.1.2 below. The Offeror should put as much proposal material as possible on each CD-ROM, keeping the portions of the proposal that contain pricing information on separate CD-
ROM(s) from the portions of the proposal that do not contain pricing information. For this solicitation, Annex A
(Small Business Subcontracting Plan) and Table T-1 (Small Business Goals); Volume 4 Cost/Price; and Volume 5
Contract Administration contain price information and should be delivered on separate CD-ROM(s) from the remainder of the proposal. The Offeror should submit two sets of CD-ROMs that contain its proposal. One set of
CD-ROM disks should be marked "Master," the other should be marked "Back-Up." Both sets of CD-ROM disks should be clearly marked with the Offeror's name and address, the point of contact's name and phone number, and proposal volumes contained therein. The Offeror is responsible for ensuring electronic proposals are virus free in accordance with Section 2.1.4.
2.1.2 Operating System and Applications
The proposals will be accessed utilizing the Microsoft XP Professional Operating System. The Offeror shall submit two identical proposals in separate, electronic versions: one version in Portable Document Format (.pdf) and one version in Microsoft Office 2007 Applications (Microsoft Word, Microsoft Excel, Microsoft PowerPoint, and
Microsoft Project). The .pdf document must be fully searchable. The Offeror is responsible for ensuring that the
.pdf and the appropriate Microsoft Office 2007 applications versions contain identical information. The
Government shall have the discretion to use the information in either version, and shall not be responsible for any differences in content between the two proposal formats submitted by the Offeror. Use of other application software for submission of proposals is prohibited except where specific instructions for non- PDF or Office 2007 applications are provided.
2.1.3 Hyperlinks
Offerors may use hyperlinks within and among proposal volumes that do not include price information. However, there shall be no links from any other volume into Volume 4 Price or any portion of the proposal that contains price information.
2.1.4 Virus Free Electronic Submission
Offerors are responsible for ensuring that its electronic proposal is virus free. The Offeror shall certify, in its proposal cover letter, that all electronic proposal information has been checked for viruses, and specify the software, version, and virus definition used to check the data. With each subsequent submission of proposal information (e.g., responses to Evaluation Notices, Final Proposal Revisions, etc.), the Offeror shall ensure and certify that its files are virus free.
2.1.5 Multimedia
The Offeror should not embed sound or video (e.g., MPEG) files within the proposal submission.
2.1.6 Graphics
Large files require greater computer system resources and are discouraged. The Offeror is encouraged to:
a. Simplify the color palette used in creating figures;
b. Minimize size of graphics files; and
c. Avoid scanned images.
2.1.7 Evaluation Hardware
The source selection facility uses the following type workstation computer systems and printers.
ITEM EQUIPMENT
Workstations Intel® Core ™ Duo CPU or better
2.94 GB RAM
19” Monitors
CD-ROM Drive
Windows XP Professional Operating System
Network Printers Xerox Phaser 6350DP PS
2.1.8 File Naming Conventions
There is no limit to the number of files that may be submitted. Valid extensions for files using their associated applications follow:
Type of Application/Files Valid Extensions
Portable Document Files .pdf
Microsoft Word documents .doc:.docx
Microsoft Excel documents .xls:.xlsx
Microsoft Power Point .ppt:.pptx
Microsoft Project .mpp
Files should have the following naming convention ("#" represents the sequential numbering of files and the suffix is for illustration, and may be .pdf, .docx, .xlsx, .pptx, . or .mpp). For electronic file submissions (e.g. proposal volumes, annexes, appendices, enclosures) the Offeror should follow the basic structure of the file naming convention suggested in Table 2.1 “Offeror Electronic File Naming Convention”. Offeror’s shall keep the file name as short as possible (under 40 characters) so that it is accessible on Government share drives. The Offeror shall ensure that the electronically submitted file names are directly traceable to hard copy submittals.
Table 2.1 Offeror Electronic File Naming Convention
Volume
Number
Title File naming convention
1 Executive Summary Vol 1 ES#.pdf and Vol 1
ES#.docx
Table ES-1 Offeror Summary
Table ES-2 Relevant Contract Summary
Vol 1 ES Tables.xlsx and
Vol 1 ES Tables.pdf
2 Technical Vol 2 Tech#.pdf and Vol 2
Tech#.docx
Cross Reference Matrix GenInst Tech CRM.xlsx and GenInst Tech CRM.pdf
3 Past Performance Vol 3 PP#.pdf and Vol 3
PP#.docx
Table PP-1 Past Performance Contract Data Vol 3 PP-1 PP Con
Data.pdf and Vol 3 PP-1 PP
Con Data.xlsx
Release of Adverse Past Performance Authorization Letters;
and/or Past Performance Point of Contact Information for
Subcontractors and Joint Venture Team Members
Rel Ad PP Ltr#.pdf and Rel
Ad PP Ltr #.docx; and/or
PP POC Info#.pdf and PP
POC Info#.docx
4 Price Vol 4 Price#.pdf and Vol 4
Price#.docx
Price Matrix Price Matrix.xlsx
Prime CCS Prime CCS.xlsx
Sub CCS Sub CCS.xlsx
Direct Parts / Material and Travel Vol 4 Direct Parts /
Material and Travel.xlsx
5 Contract Administration Vol 5 CA#.pdf and Vol 5
CA#.docx
Annexes
Annex A Small Business Subcontracting Plan AnnA SB Sub Plan
Annex B Relevant Portions of Final Versions of Previous SOW/PWSs for
Past Performance
AnnB Rel SOW PWSs#.pdf and AnnA Rel SOW PWSs
#.docx
Annex C Manpower Chart AnnC ManChart.xlsx
Annex D Phase In/Transition Plan AnnD Phase In/Transition
Plan.docx
3.0 PROPOSAL CONTENT AND VOLUMES
The Offeror shall present its proposal information in a manner that facilitates a one for one comparison between the information presented and these proposal instructions. Proposal information must be structured such that its paragraph numbers/letters correspond to the proposal instructions paragraph numbers/letters, although the Offeror may add lower tier sub paragraphs.
In addition to the electronic copies requested in paragraph, 2.1, “Electronic Submission of Proposals,” each volume, book, and annex of the proposal shall be submitted as one paper original and additional paper copies as specified in
Table 3.0 Proposal Structure. The Offeror shall submit all paper and electronic copies of the proposal to the address provided in section 4.0. Suggested page counts for each volume, if any, are also specified in Table 3.0 Proposal
Structure (title and table of contents pages are not included in the suggested page count). Annexes do not have suggested page counts. Information submitted as an Annex to a particular proposal volume could include manuals, specifications, plans, procedures, and company policies, as well as other information requested in Section B Specific
Instructions and do not count towards the suggested page count. Additionally, the individual subcontracting reports for the past performance volume are not included in the suggested page count.
Table 3.0 Proposal Structure
Volume
Number/Attachment
Number/Annex Title
Volume Title Suggested page count
Copies
Required
Proposal Cover Letter (Virus Free
Electronic Submission guarantee)
Provided as
Attachment L-1
Cross Reference Matrix *
Volume 1 Executive Summary 25 1 Original/3
Copies
Provided as
Attachment L-2
Table ES-1 Offeror Summary and
Table ES-2 Relevant Contract
Summary
Volume 2 Technical 100 1 Original/3
Copies
Provided as
Attachment L-3
Table T-1 Small Business Goals
Volume 3 Past Performance As Needed 1 Original/3
Copies
Release of Adverse Past
Performance Authorization Letters;
and/or Past Performance Point of
Contact Information for
Subcontractors and Joint Venture
Team Members
Provided as
Attachment L-5
Table PP-1 Past Performance
Contract Data
Volume 4 Price As Needed 1 Original/3
Copies
Provided as
Attachment L-6
Price Matrix As Needed 1 Original/3
Copies
Provided as
Attachment L-7
Prime CCS As Needed 1 Original/3
Copies
Provided as
Attachment L-8
Sub CCS As Needed 1 Original/3
Copies
Provided as
Attachment L-9
Direct Parts / Material and
Travel/Over and Above
As Needed 1 Original/3
Copies
Volume 5 Contract Administration As Needed 1 Original/3
Copies
ANNEXES
Annex A Small Business Subcontracting Plan As needed 1 Original/3
Copies
Annex B Relevant Portions of Final Versions of Previous SOW/PWSs for Past
Performance
As needed 1 Original/3
Copies
Annex C Manpower Chart As Needed 1 Original/3
Copies
Annex D Phase In/Transition Plan As Needed 1 Original/3
Copies
*Not included in the suggested page count
Each binder must contain the following information:
a. Cover and title page;
b. Title of proposal and proposal number as applicable;
c. Offeror’s name, address and POC;
d. Solicitation number;
e. Proposal volume/book/annex number;
f. Copy number;
g. Table of Contents (The table of contents must provide sufficient detail to easily locate important elements). At a minimum it must include the paragraphs identified in the CRM; and
h. Tabs and dividers.
Catalog Card - Each volume must contain an 8 1/2" x 11" Catalog Card containing the information required for the cover and title page. The back of the card must be formatted with three columns entitled "Name", "Date Out", and
"Date In". This card must be removable from the back of each binder.
The following table lists the attachments provided to the Offeror with Section L, to assist with proposal development.
SECTION L LIST OF ATTACHMENTS
Attachment Number Electronic File Title Attachment Name
L-1 GenInst Table 3.2 CRM Table 3.2 Cross Reference Matrix
L-2 Vol 1 ES Tables Table ES-1 Offeror Summary and Table
ES-2 Relevant Contract Summary
L-3 Vol 2 T-1 SB Goals Table T-1 Small Business Goals
L-4 Vol 3 PPQ Past Performance Questionnaire
L-5 Vol 3 PP-1 PP Con Data Table PP-1 Past Performance Contract Data
L-6 Vol 4 Price Matrix Price Matrix 131104
L-7 Vol 4 Prime CCS Prime CCS 131104
L-8 Vol 4 Sub CCS Sub CCS 131010
L-9 Vol 4 Direct Parts / Materials and Travel/Over and Above
Parts Materials Travel O&A 131101
L-10 Vol 2 Manpower Chart Manpower Chart
A Cross Reference Matrix (CRM), Table 3.2, is included to help the Offeror develop its proposal and to ensure traceability of Section L paragraphs to the requirements. An electronic version of Table 3.2 (CRM) is provided as
Attachment L-1. The Offeror’s CRM may be identical to the one provided or revised to add information. For example, the Offeror’s CRM may cross-reference its proposal volumes, paragraph numbers, and pages to specific solicitation requirements identified within the table, as well as other parts of the proposal that contain relevant information.
Table 3.2 Cross Reference Matrix
Section L – Proposal
Instructions
PWS
Section M –
Evaluation Factors
Proposal
Reference
2.0 Vol. 2 Technical
2.1 Phase In/Transition Plan 4.1 II.A
2.2 Staffing and Manning II.A
Levels
2.2.1 Staffing and Manning
at all sites
4, 5,11,12,13 II.A
2.1.1.1 Key Personnel 12 II.A
2.2.2 Training and
Qualification of Safety
Personnel
4.18, 4.23, 3.4.3
II.A
2.2.3 Supporting Multiple
detachments
4.12 II.A
2.3 Maintenance and
Maintenance Management
II.A
2.3.1 Maintenance
Management
3.2,4 II.A
2.3.2 Ready for Tasking
(RFT)
10.1, 10.2 II.A
2.3.3 Aircraft Maintenance 3.2,4,6 II.A
2.3.4 Aircraft Discrepancies 4.22.1,4.22.11
10.3
II.A
2.4 Management Control
Systems
4 II.A
2.5 Material Management 7 II.A
2.5.1 GFP Management &
Tracking
3.3 II.A
2.6 Small Business
Management
II.A
No price information, (e.g., DOLLAR VALUES AND / OR HOURLY RATES) shall be included in any volume other than Annex A (Small Business Subcontracting Plan) and Table T-1 (Small Business Goals); Volume 4 Price, Volume 5 Contract Administration.
4.0 PROPOSAL PACKAGING AND SUBMISSION:
The Offerors shall package the proposal volumes in cartons or equivalent packaging containers in the most efficient manner possible, grouping like volumes to the maximum extent possible. Each box should identify its contents by including a packing slip detailing each volume/book number and title, and copy number. Each carton should be double wrapped. The outside of the carton should be plain and the inside carton shall be stamped or marked “For
Official Use Only; and Source Selection Information – See FAR 2.101 and 3.104,” marked for the intended recipient as identified below, and should only contain those proposals intended for that person. The master set of proposals and set No. 1 copy will be marked for NAVAIR Procuring Contracting Officer (PCO), AIR-2.3.5.1.4. The Master
Set shall include all original proposal volumes, all proposal volumes on CD-ROM, and a complete Model Contract as defined in Volume 5 Contract Administration. Documents which contain price data shall be on a separate CD-
ROM(s).
Clearly mark all packages with the solicitation number. The submission date for all volumes shall be no later than the date and time specified in Block 9 of Standard Form 33 of the solicitation. However it is requested that one hard copy and one electronic copy on a CD-ROM of Volume 3 Past Performance, Table PP-1 (Past Performance Contract
Data); as well as Volume 1 Executive Summary, Table ES-1 (Offeror’s Summary); and Volume 1 Executive
Summary, Table ES-2 (Relevant Contract Summary) be submitted three weeks prior to the submission date/time specified on Standard Form 33 (Block 9). Please indicate any changes made to the information delivered three weeks early in the submission provided on the date and time specified in Block 9 of Standard Form 33 of the solicitation. If no changes are made, please state so at the beginning of Volume 1 Executive Summary and Volume
3 Past Performance.
The method of delivery shall be via United States Postal Service or commercial carrier to the address listed below.
Hand-carried proposals shall be coordinated with the Contract Specialist Ms. Karen Lynch, at 301-757-7057 and karen.d.lynch@navy.mil. Initial and Final Proposal Revisions shall be submitted by mail or by hand. No other method is acceptable.
Naval Air Systems Command
Code: AIR-2.3.5.1.5 (Attn: Ms. Karen Lynch)
Solicitation Number: N00019-13-R-0092
Bldg 442, 1st Floor
21936 Bundy Road, Patuxent River, MD 20670
5.0 CLASSIFIED DATA
All proposals must be UNCLASSIFIED
6.0 CHANGES TO SOLICITATION
All amendments to this solicitation shall be posted at https://www.fbo.gov/
Search the database for the solicitation number N00019-13-R-0092
7.0 - TECHNICAL LIBRARY
A technical library of information directly related to the requirements of this contract is available to all offerors.
The technical library, called the Central Technical Publications Library (CTPL), is physically located at NSAWC, NAS Fallon NV. The POC to arrange access to the CTPL is the Contracting Officers Representative (COR) of the current contract, LCDR Thomas A. Schroeder. The COR is located at VFC 13,(Hangar 5), Floor 2, Room 240 and can be reached by phone at (775) 426-3692, or via email thomas.a.schroeder@navy.mil. The COR will receive all offeror requests for access to the CTPL and will escort offerors to the CTPL where they will be able to view any reference materials applicable to this proposal. The COR shall provide the offeror access to materials as follows:
a. The COR will assign an assistant to the offeror who will allow the offeror access to publications and instructions whether paper or electronic for viewing.
b. The Government will not allow offerors to reproduce publications and instructions, whole or in part.
c. The Government will not allow offerors access to work spaces other than the CTPL.
If the offeror is having problems attaining reference materials, immediately contact the contract specialist Ms. Karen Lynch, at (301) 757-7057 (email karen.d.lynch@navy.mil) and the Procuring Contract
Officer Susan Holmes at (301) 757-7106 (email susan.holmes@navy.mil).
PART B SPECIFIC INSTRUCTIONS
1.0 VOLUME 1 – EXECUTIVE SUMMARY
Note: This volume shall not contain any reference to price aspects of the offer.
The following is a list of Section L Attachments that the Offeror shall utilize to provide information for this volume:
Attachment L-2 Executive Summary Tables
The purpose of the Executive Summary is to provide the Government with an overview of the Offeror’s entire proposal, excluding price. This Volume shall state the proposal validity date of 31 August, 2014. Each section within the Executive Summary shall contain the salient points contained in each of the proposal volumes. In https://www.fbo.gov/ mailto:thomas.a.schroeder@navy.mil mailto:karen.d.lynch@navy.mil addition, this table should be used by the Offeror to identify and highlight significant features of its proposal. The
Executive Summary volume should be divided into the areas outlined below:
a. Offeror Summary Table
(1) The Offeror shall complete Table ES-1 (Offeror Summary), provided in Attachment L-2 (Executive
Summary Tables), according to the instructions within the attachment, and submit it within this section.
(2) The Offeror shall provide a written explanation if multiple CAGE codes/DUNS for the same physical location are provided in Table ES-1 (Offeror Summary). The written explanation shall detail the distinct roles and responsibilities for entities with different CAGE codes/DUNs at the same physical location for where the work is being performed or from where the work is being directed. The description shall include all changes in the organization as a result of a corporate acquisition, reorganization, merger, or other administrative reason.
Note: Place of Performance for this solicitation pertains to the physical location of the prime, all subcontractors, JV and JV team members that are deploying personnel or responsible for the work; not the
Government site where the work is being performed. If work is being performed at a contractor site, then that would also pertain to Place of Performance.
b. Relevant Contract Summary Table
The Offeror shall complete the Table ES-2 (Relevant Contract Summary) provided in Attachment L-2
(Executive Summary Tables), for all contracts proposed as relevant for Past Performance for the Prime, principal subcontractors, critical subcontractors, JV and JV team members. Complete the table according to the instructions within the attachment and submit it within this section and as a separate electronic file. The contract references designated in Table ES-2 (Relevant Contract Summary) shall be used in completing Volume
3 Table PP-1 (Past Performance Contract Data);
c. Technical
The Offeror shall provide a summary of the effort and identify how its approach addresses the requirements of this solicitation as well as the salient features of the Offeror’s management approach;
d. Past Performance
The Offeror shall provide a summary of the Prime’s, principal subcontractors’, critical subcontractors’, JV and
JV team members’ past performance and systemic improvements which pertains to the tasks required by this solicitation;
e. Contract Administration
The Offeror shall provide a summary of any exceptions or deviations, and proposed Section H clauses addressed in Volume 5 Contract Administration.
2.0 VOLUME 2 - TECHNICAL
Note: This volume shall not contain any reference to price aspects of the offer.
The following is a list of Section L Attachments that the Offeror shall utilize to provide information for this volume:
Attachment L-3 Table T-1 Small Business Goals
Attachment L-10 Manpower Chart
Throughout the Technical Volume the Offeror should identify any proposed capability, approach or feature that exceeds a requirement or provides merit associated with a performance or operational benefit to the Government.
The Offeror should also identify any proposed capability, approach or feature that reduces risk inherent in the program. Specifically, explain the benefits to the Government in technical terms and the degree of impact it will have to performance, operations and/or risk. Appreciably exceeding requirements that are expressed as a minimum or threshold requirement can potentially produce performance or operational benefits. Beyond the point where there is no additional performance or operational benefit, risk reduction may be assessed. Additionally, a proposal that provides the Government with a capability, service or resource that is not specifically required, but benefits the
Government can have merit if it appreciably enhances performance and/or operations to benefit the Government.
Offerors are advised that any offer to exceed a requirement or to provide a feature with performance and/or operational benefits may be included in the resulting applicable Contract within the proposed price.
2.1 Phase In/Transition Plan
In Annex D, provide a Phase In Plan that addresses the elements listed in the solicitation, PWS, paragraph 4.1.
Describe the Offeror’s approach to initiating this program and provide a detailed Plan Of Action and Milestones
(POA&M) for actions that will be required to begin performing in accordance with the requirements of this solicitation, including obtaining base access, and leasing of facilities. Identify the major challenges with regard to start-up and provide an approach to mitigate risk. Provide a detailed plan to train personnel during transition, including method for incorporation of lessons learned at previous site transition(s), and formal certification/licensing procedures for personnel. Provide a POA&M for the development of the work instructions, procedures, and planning documents that are needed to begin the program. The Offeror shall submit a detailed time phased manning plan that indicates staffing by site, and function during transition. Indicate an eventual "ramp-up" to achieve full manning levels and performance.
2.2 Staffing and Manning Levels
2.2.1 Staffing and Manning at all sites
In the following section the offeror shall demonstrate the proposed manning, personnel skill levels, expertise, and experience are adequate to perform the work required by this solicitation. Identify the number of people and skill level mix for all periods of performance by site using the three operational tempos described in RFP section B and
CLINs 0X01, 0X02, and 0X03 including the transition phase. Describe how the proposed manning and personnel plan will accomplish the requirements of this program using the three operational tempos described in RFP section
B Provide a staffing plan that includes the following:
a. Manning Chart – Use Attachment L-10 as a template for developing Annex C, a manpower staffing chart.
Include proposals for each site by position, by labor category and by the number of personnel assigned. Explain how the proposed manpower numbers were established. Specifically, provide definition of work year capabilities of the work force (equivalent man hours/year analysis). Identify on-site and off-site personnel.
b. Manning Distribution – Provide the proposed maintenance organizational structure by department. For each department describe the composition, responsibilities, and titles for all on-site and off-site personnel. Identify all indirect labor classifications, titles, responsibilities.
c. Personnel - Describe the processes used in hiring, recruiting, and retaining personnel for each geographical location covered by the proposal. Note that historically sites have experienced challenges in staffing due to either a high cost of living and/or remote location. Describe the approach used to fill all positions required for each labor category and the approach for retention.
d. Training - Provide certification and skill level to fulfill the requirements described in the PWS. Describe how training certifications will be met and kept current.
2.2.1.1 Key Personnel
Provide the key personnel position descriptions and requirements of the key personnel position in each of the functional areas identified below. Describe the experience, skills, education, training, qualifications, and certifications that will be required for each described position. Each position description shall not exceed one page
(one side). Also, provide at least one resume for each of the key personnel proposed for the below positions. Offeror format for the presentation of this information is acceptable.
Program Manager
Contractor Operation Site Manager
Maintenance Supervisor
Material Control Supervisor
QA Supervisor/Manager
2.2.2 Training and Qualification of Safety Personnel
Describe the training, qualifications, and certifications required for System Safety, Industrial Safety, and Aviation
Safety personnel (Include any Ordnance Qualification and Certification as necessary). Describe the re-certification and training programs required to maintain the safety qualifications.
2.2.3 Supporting multiple detachments
Describe the approach for maintenance and logistics support for base operations at Fallon, NV, Yuma AZ, and Key
West FL while simultaneously supporting up to two detachments from each site. Detachment sites may include any combination of sites identified in the PWS Section 4.12.2. Include the following in the description of your approach:
a. Describe the coordination with the Government site operations personnel to ensure operational requirements and commitments are met. Describe how the tailoring of manpower, qualifications and work shifts will provide maintenance and logistics support coverage for any detachments.
b. Explain how the detachment support structure and personnel will interface and integrate with the primary operating sites and the contractor’s home office for supporting the detachments in the following areas:
1. Maintenance support for the detachment
2. Supply and logistics support
3. Support equipment
4. Quality Assurance and quality oversight
5. Technical data support
6. Concurrent support between detachment and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .