About this file

This document is an electrical engineering design drawing for Marshalling Cabinet #2, part of the Fermilab UIP - Subproject 2 Kautz Road Substation Replacement project. The detailed technical drawing, dated June 19, 2025, specifies a cabinet with specific dimensional views (front, side, top) and interior configuration, featuring multiple components including:

Key specifications include an exterior finish in satin ANSI 61 gray and interior finish in gloss white. The Bill of Materials details various electrical components such as 60 concentric terminal blocks (30TB04DR), 38 terminal block markers (30TBM-BLANK), and 18 Marathon power stud blocks (1422122). The cabinet includes multiple Panduit wireways and is designed with precise measurements and mounting details. The drawing is marked "NOT FOR CONSTRUCTION" and appears to be a concept review document prepared by Arup US, Inc., located in Chicago, Illinois.

View the file

Other files

File Type Posted
Amend 05 to RFP KRS-369604-JK.pdf PDF
Questions on E-House RFP_R5_2025_1003.xlsx XLSX spreadsheet
MC1.pdf PDF
E-B2.PDF PDF
KRS Site Construction - Structural Drawings.pdf PDF
ComEd Battery and Fermilab Battery Monitoring System Specifications.pdf PDF
REVISED Attachment 10-PUR-466_Proposal Certifications_r4_09.24.25.pdf PDF
Hollow Metal Door - Rated Hardware Schedule.pdf PDF
Card Reader Details.pdf PDF
MC3.pdf PDF
E-339.pdf PDF
E-338.pdf PDF
E-3.pdf PDF
2025 - Security and Access Control r2.docx DOCX document
E-337.pdf PDF
KRS Site Construction - Civil Drawings.pdf PDF
KRS Geotechnical Data Report.pdf PDF
REVISED Attachment 13-SARC_Subcontractor Annual RepsCerts Rev 5.pdf PDF
Amend 04 to RFP KRS-369604-JK.pdf PDF
MC4.pdf PDF
E-2.pdf PDF
FermiForward-Approved Color Palette.pdf PDF
Amend 03 to RFP KRS-369604-JK.pdf PDF
E-Control House Site Visit-Sign-in Sheet.pdf PDF
Fermilab Site Map-Kautz Road Substation.pdf PDF
E-House_QandA_Amend02.pdf PDF
Amend 02 to RFP KRS-369604-JK.pdf PDF
Business Visitor Registration Instructions and Directions.pdf PDF
REVISED Attachment 13-SARC_Subcontractor Annual RepsCerts Rev 4.pdf PDF
Amend 01 to RFP KRS-369604-JK.pdf PDF
Attachment 2 - 010010_General_Requirements_3_2025 FFDG_.pdf PDF
Attachment 4 - 013300 Submittals FermiForward (3).pdf PDF
Attachment 6 -017900 - DEMONSTRATION AND TESTING.pdf PDF
Attachment 11 - 2025 Onsite NonProfessional Services Insurance Requirements.pdf PDF
Attachment 3 - 013100_ESH_Requirements_04-2025 FFDG.pdf PDF
Attachment 5 - 014100 Quality Requirements - March 2025 FermiForward.pdf PDF
Attachment 7-2 Pages 63-113 from 3-5-207C Dwg IFBr2.pdf PDF
Attachment 8 - 5-207C Control House Specs IFBr2.pdf PDF
Attachment 10 - PUR-466_Proposal Certifications_r3_06.23.25.pdf PDF
Attachment 13 -SARC_Subcontractor Annual RepsCerts Rev 3.pdf PDF
Attachment 14 SMALL BUSINESS SUBCONTRACTING PLAN template Far 52.219-9.pdf PDF
1. RFP for E-House.pdf PDF
Attachment 1 - Sample Subcontract .pdf PDF
Attachment 7-1 Pages 1-62 from 3-5-207C Dwg IFBr2.pdf PDF
Attachment 9 - FFDG General Terms and Conditions for Commercial Products and Commercial Services (01.2025).pdf PDF
Attachment 12 - PUR-568_Cost Accounting Standard Notices and Certification.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A C

30.000

28.250

DOOR

85.674

83.375

DOOR

44.751

0.313 24.065

4.813

79.251

1401 (QTY 10)

SECTION A-A

FRONT VIEW

SECTION C-CSECTION B-B

TOP VIEW

D D

N1

SECTION D-D

6.000

1401 (QTY 24)

PA

N

D U

IT

W

IR

EW

AY

X4

PA

N

D U

IT

W

IR

EW

AY

X4

PA

N

D U

IT

W

IR

EW

AY

X4

PA

N

D U

IT

W

IR

EW

AY

X4

PA

N

D U

IT

W

IR

EW

AY

X4

69.000 TY

L-HANDLE

GROUND BUS W/

CUTOUTS IN SIDE

PANEL FOR INTER

PANEL CONNECTION REAR WALL RIGHT SIDE VIEWLEFT SIDE VIEW

B B

1401 (QTY 26)

241221

1403 (12)

1403 (26)

1404 (18)

Se p

, 2

- 7 :3

7A M

A ut oD es k D oc s:

\A R

U P\

-0

Fe rm iL ab C am pu s In fra st ru ct ur e\

Pr oj ec t F ile s\

_W

IP

M od el s\ E

- E le ct ric al \S he et s\ M

C #2

.d w g

90% FINAL DESIGN06/19/250 06/19/25

06/19/25

06/19/25

06/19/25

D. GURALCHUK

H. LOBO

R. SIERRA

R. TANDEL

NTS

3-5-207

ELECTRICAL

0 J U

N E

MC#2MARSHALLING CABINET #2

2) INTERIOR FINISH TO BE - GLOSS WHITE

EXTERIOR FINISH TO BE - SATIN ANSI 61 GRAY

UNLESS OTHERWISE NOTED:

1) ALL DIMENSIONS ARE IN INCHES.

BILL OF MATERIALS

ITEM DEVICE STYLE NUMBER QTY MFR DESCRIPTION

N1

NAMEPLATE LIST

NO. TEXT

3/8

SIZE

2X6

THIRD LINESECOND LINE

CABINET #2

FIRST LINE

TERMINATION

UNLESS OTHERWISE NOTED: -NAMEPLATE MOUNTING SHALL BE VIA S/S PAN HEAD SCREWS.

-COLOR SHALL BE WHITE WITH BLACK TEXT.

1401 30TB04DR 60 CONCENTRICTERMINAL BLOCK, 4 POLE, 600V, 30A, DIN RAIL, MARKED 1

TO 8.

1402 30TB06DR 0 CONCENTRICTERMINAL BLOCK, 6 POLE, 600V, 30A, DIN RAIL, MARKED 1

TO 6.

1403 30TBM-BLANK 38 CONCENTRICTERMINAL BLOCK MARKER

1404 1422122 18 MARATHON CONN; POWER STUD BLOCK; 200A; 600V; 2 POLES; 1 INPUT;

1 OUTPUT

35 East Wacker Drive Suite 1800 Chicago IL 60601 USA t: +1 312 849 5610 www.arup.com

SCALE:

REVISIONS PROJECT NO.

SHEET NO.

REVISION NO.

DESIGNED

DRAWN

CHECKED

APPROVED

CONCEPT

DISCIPLINE REVIEW

ENG. REVIEWED

ISD APPROVED

SUBMITTED

A/E CONSULTANT FERMILAB DATE

N O

T

FO

R C

O N

ST

R

U C

TI

O

N

Arup US, Inc.

UIP - SUBPROJECT 2

KAUTZ ROAD SUBSTATION REPLACEMENT

DESCRIPTIONS

DATE

DATEREV.

Sheets and Views
Layout1

File details come from the government source that posted it. Updated .