About this file

This document is an electrical single-line diagram for a 345/13.8kV substation replacement project at Fermilab, specifically the Kautz Road Substation Replacement (UIP - Subproject 2). The detailed technical drawing shows a complex electrical system with multiple transformers (T-85, T-86, T-87), circuit breakers, disconnect switches, and bus configurations across different voltage levels. Key specifications include 40/53/66.6MVA transformers, 345kV and 13.8kV bus systems, current transformers rated at 4000/5A, and specialized requirements such as remote SCADA operation, kirk key interlocking for safety, and power quality metering for specific feeders. The project involves replacing existing electrical infrastructure with new switchgear, reconfiguring cable routes, and ensuring comprehensive electrical system integration with advanced safety and monitoring features.

View the file

Other files

File Type Posted
Amend 05 to RFP KRS-369604-JK.pdf PDF
Amend 04 to RFP KRS-369604-JK.pdf PDF
MC4.pdf PDF
FermiForward-Approved Color Palette.pdf PDF
Questions on E-House RFP_R5_2025_1003.xlsx XLSX spreadsheet
MC1.pdf PDF
E-B2.PDF PDF
KRS Site Construction - Structural Drawings.pdf PDF
ComEd Battery and Fermilab Battery Monitoring System Specifications.pdf PDF
REVISED Attachment 10-PUR-466_Proposal Certifications_r4_09.24.25.pdf PDF
Hollow Metal Door - Rated Hardware Schedule.pdf PDF
Card Reader Details.pdf PDF
MC3.pdf PDF
E-339.pdf PDF
E-338.pdf PDF
E-3.pdf PDF
2025 - Security and Access Control r2.docx DOCX document
MC2.pdf PDF
E-337.pdf PDF
KRS Site Construction - Civil Drawings.pdf PDF
KRS Geotechnical Data Report.pdf PDF
REVISED Attachment 13-SARC_Subcontractor Annual RepsCerts Rev 5.pdf PDF
Amend 03 to RFP KRS-369604-JK.pdf PDF
E-Control House Site Visit-Sign-in Sheet.pdf PDF
Fermilab Site Map-Kautz Road Substation.pdf PDF
E-House_QandA_Amend02.pdf PDF
Amend 02 to RFP KRS-369604-JK.pdf PDF
Business Visitor Registration Instructions and Directions.pdf PDF
Amend 01 to RFP KRS-369604-JK.pdf PDF
REVISED Attachment 13-SARC_Subcontractor Annual RepsCerts Rev 4.pdf PDF
Attachment 12 - PUR-568_Cost Accounting Standard Notices and Certification.pdf PDF
Attachment 2 - 010010_General_Requirements_3_2025 FFDG_.pdf PDF
Attachment 4 - 013300 Submittals FermiForward (3).pdf PDF
Attachment 6 -017900 - DEMONSTRATION AND TESTING.pdf PDF
Attachment 11 - 2025 Onsite NonProfessional Services Insurance Requirements.pdf PDF
Attachment 3 - 013100_ESH_Requirements_04-2025 FFDG.pdf PDF
Attachment 5 - 014100 Quality Requirements - March 2025 FermiForward.pdf PDF
Attachment 7-2 Pages 63-113 from 3-5-207C Dwg IFBr2.pdf PDF
Attachment 8 - 5-207C Control House Specs IFBr2.pdf PDF
Attachment 10 - PUR-466_Proposal Certifications_r3_06.23.25.pdf PDF
Attachment 13 -SARC_Subcontractor Annual RepsCerts Rev 3.pdf PDF
Attachment 14 SMALL BUSINESS SUBCONTRACTING PLAN template Far 52.219-9.pdf PDF
1. RFP for E-House.pdf PDF
Attachment 1 - Sample Subcontract .pdf PDF
Attachment 7-1 Pages 1-62 from 3-5-207C Dwg IFBr2.pdf PDF
Attachment 9 - FFDG General Terms and Conditions for Commercial Products and Commercial Services (01.2025).pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

535246B 46B 45 45

33 3

52 52

NC

1600A 1600A

NO

NC

61A 62A61B 62B

52 52

3 3

NC

64 63B63A

52 52

48 48

MOCT 3

3 33 33 3 3 3 3 33

S.A.

EOVT

K K K

ComEd

METER

L.A.

3 3

3 3

71A 71B 72A 72B 73A 73B

3 3 3 3

H1

X1

3METER

3 33 3

S.A.

L.A.

H1

X1

S.A.

TRANSFORMER T-85

40/53/66.6MVA

ONAN/ONAF/ONAF

345-13.8kV

(CONVENTIONAL)

Z=8.5%, Dyn1

MOD 85

1600A

600/5A (250A)

C800

1200/5A (1200A)

C800

3000/5A (3000A)

4000/5A (3000A)

C800

4000/5A (3000A)

C800

15kV MV CABLE (133% Insulation) 4x-1C-750kCMIL PER PHASE CU CONDUCTOR

O/H CABLE BUS. CABLE BUS WILL BE

POSITIONED ABOVE GROUND USING THE

EXISTING STRUCTURE AS WHERE EVER

POSSIBLE.

3000/5A

CB 85-1

3000A

NC/NRI/AR

4000/5A (4000A)

345KV BUS 2000A

TRANSFORMER T-86

40/53/66.6MVA

OA/FA/FA

345-13.8kV Z=8.5%, Dyn1

(PULSED)

3000/5A (3000A)

MOD 86

1600A

CB 86-1

3000A

NC/NRI/MR

4000/5A (4000A)

CCVT 119-2

199,000-115/66.4V

CCVT 119-1

199,000-115/66.4V

MOD 119-3

1600A

MOD 119-1

1600A

MOD 119-2

1600A CB 119

2000A

Com Ed 345kV

TRANSMISSION LINE

11120

ALTERNATE

Com Ed 345kV

TRANSMISSION LINE

14419

PREFERRED

/5 A

(4

A)

/5

A

SPARE

(UN)

/5 A

(4

A)

/5

A

SPARE

(UN)

/5 A

(4

A)

/5

A

MAIN INJECTOR

RING

CONV. POWER

B FEEDER

/5 A

(4

A)

/5

A

CB 52

1200A

MAIN INJECTOR

RING

CONV. POWER

A FEEDER

/5 A

/5 A

/5 A

NO

CB 56/46B

1200A

NO

CB 57/48

1200A

NO

CB 58/45

1200A

/5 A

(8

A)

/5 A

(8

A)

/5 A

(8

A)

MAIN RING

COMPRESSORS

BACKFEED

MAIN RING

RF & PBAR

BACKFEED

MAIN RING

CONVENTIONAL POWER

& F17 KICKER

BLDG BACKFEED

/5 A

(8

A)

/5 A

(8

A)

/5 A

(8

A)

CB 61

1200A

CB 62

1200A

CB 63

1200A

/5 A

/5 A

/5 A

MI-30

SERV BLDG

QUAD/DIPOLE

MI-40

SERV BLDG

QUAD/DIPOLE

MI-50

SERV BLDG

QUAD/DIPOLE

CB 64

1200A

/5 A

(4

A)

/5

A

HARM FILTER

TRANSF. T-86

BUS 6-1

CONTINUED ON

DWG. E-4

13.8KV BUS 6-1 3000A, 3PH, 3W, 40kA

/5 A

/5 A

/5 A

/5 A

NO/NRO/MR

BT6-1:7-1

3000A

S.A.

/5 A

/5 A

/5 A

/5 A

CB 71

1200A

CB 72

1200A

CB 73

1200A

CB 74

1200A

/5 A

(8

A)

/5 A

(8

A)

/5 A

(8

A)

/5 A

(4

A)

MI-60

SERV BLDG

QUAD/DIPOLE

MI-10

SERV BLDG

QUAD/DIPOLE

MI-20

SERV BLDG

QUAD/DIPOLE

HARM FILTER

TRANSF. T-87

BUS 7-1

CONTINUED ON

DWG. E-4

4000/5A (4000A)

4000/5A (4000A)

15kV MV, 3000A, ARC RESISTANCE SWITCHGEAR

K K

13.8KV BUS 7-1 3000A, 3PH, 3W, 40kA

52 5252

/5 A

(4

A)

/5

A

CB 51

1200A

NOTE 1

PT-7-1

8337/120V

PT-6-1

8337/120V

33 3

/5 A

/5 A

/5 A

/5 A

NO/NRO/AR

BT5-2:5-1

3000A

PT-5-2

8337/120V

NOTE 6

13.8KV BUS 5-2 3000A, 3PH, 3W, 40kA 3

33 3

/5 A

/5 A

/5 A

/5 A

NRO/NO/MR

BT T85:T86

3000A

PT-5-1

8337/120V

PT-86

8337/120V

/5 A

(1

A)

/5

A

CB XX

1200A52

/5 A

(1

A)

/5

A

TR-KRS-1

13.8-0.48/0.277kV

300 kVA

CONTINUED ON

DWG. E-4

13.8KV BUS 5-1 3000A, 3PH, 3W, 40kA

/5 A

/5 A

(4

A)

SCL

CONVENTIONAL

(UN)

/5 A

SCL CRYO

(UN)

23-423-3 23-3

/5 A

(4

A)

/5

A

SPARE

(UN)

/5 A

SPARE

(UN)

52 CB XX

1200A

CB XX

1200A

CB XX

1200A

CB 23-3

1200A

CB 23-4

1200A

CB XX

1200A

CB 51

1200A

CB 53

1200A

/5 A

/5 A

(4

A)

52CB XX

1200A

SPARE

(UN)

A

B

C

D

E

CONTINUE

ON E-3

CONTINUE

ON E-3

CONTINUE

ON E-3

CONTINUE

ON E-3

CONTINUE

ON E-3

33 3

/5 A

/5 A

/5 A

/5 A

NC/NRI/MR

BT 5-1:T85

3000A

PT-85

8337/120V

UN. 5L

UN. 5U

UN. 6L UN. 7UUN. 6U

UN. 3

UN. 8

UN. 11UUN. 10LUN. 10UUN. 9L

UN. 9U

/5 A

(4

A)

/5

A

52 UN. 45L

UN. 1

UN. 2U

/5 A

(4

A)

/5

A

SPARE

(UN)

52 UN. 2LUN. 36U UN. 37U UN. 37L UN. 38U UN. 38L UN. 40U UN. 40L UN. 41U UN. 41L UN. 42U UN. 42L UN. 43U UN. 43L UN. 44U UN. 44L

UN. 46UN. 39

UN. 45UUN. 36L

UN. 47

UN. 48L

/5 A

SPARE

(UN)

52CB XX

1200A UN. 48U

600/5A (250A)

C800

3000/5A (3000A)

TO RELAYS

TO RELAYS

NOTE 6

NOTE 6

NOTE 6 NOTE 6 NOTE 6

52 CB 119-2

2000A

SEL 735

K

K

#18197

#18196

L.C

L.O

15kV MV CABLE (133% Insulation) 4x-1C-750kCMIL PER PHASE CU CONDUCTOR

O/H CABLE BUS. CABLE BUS WILL BE

POSITIONED ABOVE GROUND USING THE

EXISTING STRUCTURE AS WHERE EVER

POSSIBLE.

NC

MOS 86

3000A

NOTE 1

UN. 4

2000/5A

2000/5A

2000/5A

2000/5A3

(1200A)

(800A)

(2000A)

(1600A)

NC

Com Ed

SUBSTATION

KRS

SUBSTATION

4000/5A (4000A)

4000/5A (4000A)

MM

M

M

M

1600/5A Hot spot

3METER 3000/5ASEL 735

57B57A

LBNF

FEEDER #2

SPACE (UN.4B)

LBNF FEEDER #1

56A 56B SPARE

(UN)

600/5A (250A)

C400

1200/5A (1200A)

C800

4000/5A (3000A)

C800

13.8KV BUS T85 3000A, 3PH, 3W, 40kA 13.8KV BUS T86 3000A, 3PH, 3W, 40kA

CB XX

1200A

/5 A

(4

A)

35 East Wacker Drive Suite 1800 Chicago IL 60601 USA t: +1 312 849 5610 www.arup.com

SCALE:

REVISIONS PROJECT NO.

SHEET NO.

REVISION NO.

DESIGNED

DRAWN

CHECKED

APPROVED

CONCEPT

DISCIPLINE REVIEW

ENG. REVIEWED

ISD APPROVED

SUBMITTED

A/E CONSULTANT FERMILAB DATE

N O

T

FO

R C

O N

ST

R

U C

TI

O

N

Arup US, Inc.

UIP - SUBPROJECT 2

KAUTZ ROAD SUBSTATION REPLACEMENT

DESCRIPTIONS

DATE

DATEREV.

Se p

, 2

- 7 :2

1A M

A ut oD es k D oc s:

\A R

U P\

-0

Fe rm iL ab C am pu s In fra st ru ct ur e\

Pr oj ec t F ile s\

_W

IP

M od el s\ E

- E le ct ric al \S he et s\ E-

2.

dw g

90% FINAL DESIGN06/19/250 06/19/25

06/19/25

06/19/25

06/19/25

D. GURALCHUK

H. LOBO

R. SIERRA

R. TANDEL

NTS

3-5-207

ELECTRICAL

0 J U

N E

E-2345/13.8kV SINGLE LINE

NOTES:

1. THE BUS TIE DISCONNECT SWITCH MOS-86, MOS-87, MOS-88 AND MOS 85 WILL BE

EITHER A 3000A DISCONNECT SWITCH WITH A VISIBLE WINDOW TO VALIDATE

PHYSICAL ISOLATION OR A 3000A CIRCUIT BREAKER WITH REMOTE

RACK-IN/RACK-OUT FACILITIES. THE BUS TIE (DISCONNECT DEVICE), WHETHER A

SWITCH OR CIRCUIT BREAKER MUST HAVE MECHANICAL KIRK KEY PROVISIONS

FOR BOTH THE OPEN AND CLOSE POSITIONS. THE KEY CORRESPONDING TO THE

STATUS OF THE DEVICE SHOULD BE REMOVABLE. THE DEVICE SHOULD NOT BE

ABLE TO CHANGE STATUS UNLESS BOTH KEYS ARE ENGAGED.

1.1. CIRCUIT BREAKER (CB) OR DISCONNECT SWITCH (DS) SHALL BE REMOTELY

OPERATED VIA SCADA HMI AND POSITION OF THE CB OR DS SHALL BE

VISIBLE FROM OUTSIDE WITHOUT OPENING THE DOOR TO VALIDATE THE

PHYSICAL ISOLATION OF CB OR DS.

1.1.1. LOCATION SHOULD BE AGREED UPON BY ALL INTERESTED PARTIES

1.2. THIS IS A LIFE SAFETY SYSTEM

1.2.1. BREAKER/DISCONNECT SWITCHES CANNOT OPERATE WITHOUT KIRK

KEY INSERTED, TURNED, AND HELD CAPTIVE

1.2.2. STORED ENERGY IS NOT ALLOWED WHEN KEY REMOVED (CAPACITOR,

SPRING, ETC.)

1.2.3. CONTROL POWER MUST BE REMOVED WHEN KEY REMOVED

2. CTS ON BUS 6,7,9 SHOULD BE RATED FOR PQ

2.1. THESE FEEDERS SHOULD HAVE ADVANCED SEL735

3. PULSED BUS ON ONE SIDE OF AISLE, AND CONVENTIONAL BUS ON THE OTHER

(Unit 1-22 are pulse, Unit 23-48 are conventional)

4. AR : BREAKER WITH REMOTE RACK IN

MR: BREAKER WITH MANUAL RACK IN

NC: NORMALLY CLOSED

NRI: NORMALLY RACKED IN

NO: NORMALLY OPEN

NRO: NORMALLY RACKED OUT

5. ALL BUS PTS ARE 3 PH, OPEN DELTA IS NOT ACCEPTABLE.

6. SEL 735 (POWER QUALITY VARIANT) SHALL BE INSTALLED AT THE FACTORY FOR

THE FOLLOWING FEEDERS: 23-1, 23-2, 61, 62, 63, 64, 71, 72, 73, 74, 82, 85, 86, 94, 95, 96, 97. SPARE UNITS ON BUS 6-1, 7-1, AND 9-1 SHOULD INCLUDE POWER QUALITY

METERS AS WELL.

7. ALL 13.8kV FEEDERS SHALL BE REMOVED BACK TO NEAREST UPSTREAM SPLICE

OR TERMINATION POINT OUTSIDE OF EXISTING CONTROL BUILDING AND MADE

SAFE PRIOR TO CONSTRUCTION. UPON INSTALLATION OF NEW CONTROL

BUILDING AND SWITCHGEAR, ALL FEEDERS SHALL BE EXTENDED WITH NEW

CABLE TO THEIR NEW TERMINATION LOCATIONS IN THE NEW SWITCHGEAR.

7.1 ALL REPLACED FEEDER SEGMENTS SHALL FOLLOW SAME DUCTBANK PATHWAYS

BACK TO KRS CABLE VAULT AS EXISTING CONDITION, WITH EXCEPTION OF

FEEDER 53. EXISTING FEEDER 53 SHALL BE PULLED BACK TO MANHOLE 50-2,

AND BROUGHT BACK TO KRS CABLE VAULT VIA MANHOLES KRS-4 AND KRS-2.

7.2 ALL 13.8kV FEEDER CABLE SHALL BE 3-1/C 750MCM, 15kV, ALUMINUM, 13

CONCENTRIC NEUTRAL, (OVERALL JACKET) TRIPLEXED, UNLESS NOTED

OTHERWISE

7.3 REFER TO PROJECT NO. 3-5-207C FOR REPLACEMENT OF FEEDER LENGTHS

BEYOND FIRST SPLICE POINT FOR FEEDERS 52, 53, 61A, 61B, 62A, 62B, 71A, 71B,

72A, 72B, 73A, 73B, 82, 85, 94, 95, 96, 97.

7.4 REFER TO PROJECT NO. 3-5-207D FOR INSTALLATION OF NEW FEEDERS 23-1, 23-2,

23-3, 23-4.

7.5 REFER TO PROJECT NO. 6-5-11 FOR INSTALLATION OF LBNF FEEDERS 56A, 56B,

65A, 65B. AS PART OF PROJECT 3-5-207, THESE FEEDER SHALL BE EXTENDED

FROM LAST MANHOLE IN PROJECT 6-5-11 SCOPE TO FINAL TERMINATION ON

NEW SWITCHGEAR IN KRS.

8. ALL 13.8kV DIFFERENTIAL CTs ARE 4000/5A with C400 PROTECTION CLASS.

SWITCHGEAR VENDOR TO PROVIDE THE CT SATURATION CALCULATION AND

CONFIRM THAT CT WILL NOT SATURATE FOR THROUGH FAULT CLOSE IN FAULT.

LIGHTNING ARRESTOR

KIRK KEY INTERLOCK

CIRCUIT BREAKER - ELECTRICALLY OPERATED

COUPLING CAPACITOR VOLTAGE TRANSFORMER

345KV & 13.8KV BUS SURGE ARRESTOR

POWER TRANSFORMER

DISCONNECT SWITCH

TRANSFORMER BUSHING

LIMITS

LEGEND

CURRENT TRANSFORMER

POTENTIAL TRANSFORMER

CIRCUIT BREAKER

FUSE

DEVICE

CCVT

K

DESCRIPTION

BUSHING CURRENT TRANSFORMER CABLE TERMINATION

MOTOR OPERATED

DISCONNECT SWITCH

M

DRAWOUT TYPE

CIRCUIT BREAKER52

CCVT

L.A.

S.A.

UN. #U/L

UNIT

NUMBER

SWITCHGEAR LINEUP

UPPER

LOWER

Sheets and Views
E-2

File details come from the government source that posted it. Updated .