These structural design drawings are for the Kautz Road Substation Replacement project at Fermilab, dated June 19, 2025. The documents detail the structural engineering plans for replacing an existing substation building, including demolition of existing structures, foundations, basement wall modifications, and installation of a new prefabricated building. Key elements include drilled shaft foundations, concrete pads, steel embedments, wall penetrations, and connections for electrical equipment such as transformers, cable bus, and a new firewall structure. The design incorporates careful considerations for integrating the new building with existing basement walls, ensuring lateral load resistance, and maintaining site infrastructure.
The structural drawings specify technical requirements for concrete and steel construction, including reinforcement details, welding specifications, post-installed anchors, and construction sequencing. The project involves extensive coordination with electrical systems, existing site conditions, and a prefabricated building manufacturer. Critical design parameters include wind and seismic loads, concrete strengths, steel grades, and foundation design pending final geotechnical report recommendations. The design follows multiple building codes and standards, with a focus on maintaining structural integrity and compatibility with existing Fermilab infrastructure.
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LEVEL
SYMBOL
CAMBER
NUMBER OF STUDS
TOP ELEVATION OF STRUCTURAL ELEMENT
STEEL BEAM
STEEL JOIST
BRACE, BRACE FRAME STARTS AT THIS LEVEL
MOMENT CONNECTION
DRAG CONNECTION
BRACE, BRACE FRAME BELOW THIS LEVEL
PLATE CONNECTION
STIFFENER PLATE CONNECTION
COLUMN STARTS ON THIS LEVEL
COLUMN FINISHES BELOW THIS LEVEL
COLUMN HANGER
COLUMN POST
SLOPED COLUMN STARTS ON THIS LEVEL
SLOPED COLUMN FINISHES BELOW THIS LEVEL
SLOPED COLUMN CONTINUES THROUGH THIS LEVEL
SLAB DROP
SLAB SLOPE
CHANGE IN SLAB THICKNESS
GROUND
ONE WAY SPANNING SLAB
TWO WAY SPANNING SLAB
TOP OF SLAB ELEVATION
WELD TYPE
CONCRETE WALL (PLAN VIEW)
CONCRETE BEAM (PLAN VIEW )
SETTING OUT POINT/WORK POINT
LEVEL
DESCRIPTION
SYMBOLS
SPLICE
FFL FINISH FLOOR LEVEL
EMBEDMENTEMB
XS
XXS
EXTRA STRONG (PIPE)
DOUBLE EXTRA STRONG (PIPE)
IF INSIDE FACE
INTERIOR
JOINT
INT
JT
INSIDE DIAMETERID
INCHIN
TS STRUCTURAL STEEL TUBE
STRUCT STRUCTURAL
SSL SHORT SLOTTED (BOLT HOLE)
SOG SLAB ON GRADE
REBAR REINFORCING BAR
PARTIAL PENETRATION (WELD)PP
PERP PERPENDICULAR
OVS OVERSIZE (BOLT HOLE)
ON CENTEROC
NORMAL WEIGHTNW
NOMINALNOM
NEAR FACENF
MOMENT FORCEM
LW LIGHT WEIGHT
LIGHTLT
LONG SLOTTED (BOLT HOLE)LSL
POUNDLB
L LENGTH
HSS HOLLOW STRUCTURAL SECTION
HEIGHTHT
HEXAGON, HEXAGONALHEX
GRADEGR
YIELD STRESSFY
FAR FACEFF
EXISTINGE
DIAGONALDIAG
DEPTH, DEEP, DECKD
COMPLETE JOINT PENETRATION (WELD)CJP
CONSTRUCTIONCONST
COVERPLATE
CONTINUOUS
CPL
CONT
CONNECTION
CONCRETE
COLUMN
CONN
CONC
COL
CLEAR
CENTERLINE
CLR
CL
CTRL JT CONTROL JOINT
CHANNELC
BOTH FACESBF
STEELST
TOP & BOTTOM
VERIFY IN FIELD
WITH
TYP TYPICAL
WORK POINT
WELDED WIRE FABRICWWF
WP
WITHOUT
UNLESS OTHERWISE NOTED
VERTICAL (FORCE)
W/O
VIF
W/
UON
VERT, V
T/COL TOP OF COLUMN
TOP OF SLAB
TOP OF STEEL
TOP OF WALL
TOPPING
T/ST
T/WALL
T/SL
TOPG
THICKTHK
T&B
STIFFENER
SQUARE FOOT
SQUARE INCH
STANDARD
STAINLESS STEEL
STIFF
STD
SQ FT
SQ IN
SS
SIMILAR
SLAB
SIM
SL
REVISION
REINFORCE(ING)
POINT
RADIUS
REINF
REV
R
PT
POUNDS PER CUBIC FOOT
PLATE
POUNDS PER SQUARE FOOT
POUNDS PER SQUARE INCH
PL
PSF
PSI
PCF
OUTSIDE FACE
OPENING
DESCRIPTION
ABBREVIATIONS
ABV.
OD OUTSIDE DIAMETER
OPPOSITE HAND
OPPOSITE
OPNG
OPP
OF
OH
GAUGEGA
ALT ALTERNATE
ABV.
ABBREVIATIONS
DESCRIPTION
BM
BLDG
BET
BEAM
BUILDING
BETWEEN
BOT
BPL
B/FTG
BS
BASE PLATE
BOTTOM
BOTH SIDES
BOTTOM OF FOOTING
CANT
CJ CONSTRUCTION JOINT
CANTILEVER
DEMO DEMOLITION
DIA
DIM
DO
DL
DIAMETER
DITTO
DEAD LOAD
DIMENSION
DETAILDET
EF
EA
EL
EJ
EQ
EACH FACE
EACH
EQUAL
EXIST
EW
FT
EXT
EXP
FEET
EXTERIOR
EXPANSION
EXISTING
EACH WAY
DRAWINGDWG
ELEVATION
EXPANSION JOINT
FIN
FDN
FL FLOOR
FINISHED
FOUNDATION
FS
FTG FOOTING
FAR SIDE
GALV GALVANISED
HORIZ
HSB
HP
HIGH-STRENGTH BOLT
HIGH POINT
HORIZONTAL
KSF
K
KIPS PER SQUARE FOOT
KIP = 1000 LBS
LIN
LL
LP
LLV
LLH
LOW POINT
LONG LEG VERTICAL
LONG LEG HORIZONTAL
LIVE LOAD
LINEAR OR LINEAL
LONGLG
NIC
NO
NOT IN CONTRACT
NUMBER
NS
NTS
NEAR SIDE
NOT TO SCALE
MOMENT FRAMEMF
T/D TOP OF METAL DECK
SLABS
METAL DECKMD
AXIAL FORCE, SEE PH
SHEAR FORCEV
AXIAL FORCEP
BRACE FRAME
T/SL = X'-XX"
ISOLATION JOINTIJ
MOVEMENT JOINTMJ
DJ DOWEL JOINT
H
P
S
S
SS
B/ST BOTTOM OF STEEL
T/CONC TOP OF CONCRETE
MINIMUMMIN
MAXIMUMMAX
35 East Wacker Drive Suite 1800 Chicago IL 60601 USA t: +1 312 849 5610 www.arup.com
REVISIONS
DESCRIPTIONSDATEREV.
PROJECT NO.
SHEET NO.
REVISION NO.
DESIGNED
DRAWN
CHECKED
APPROVED
CONCEPT
DISCIPLINE REVIEW
ENG. REVIEWED
ISD APPROVED
SUBMITTED
A/E CONSULTANT DATE FERMILAB DATE
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
Arup US, Inc.
UIP - SUBPROJECT 2
KAUTZ ROAD SUBSTATION REPLACEMENT
JU
N
E
, 2
:0 :1
P M
STRUCTURAL
DRAWING LIST, SYMBOLS &
ABBREVIATIONS
S-001
JULIAN SAFAR
BRIAN RAINE
ARIF OZKAN
SYLVIA RICHARDSON 06/19/25
06/19/25
06/19/25
06/19/25
3-5-207
Sheet List
Sheet Number Sheet Name
S-001 STRUCTURAL DRAWING LIST, SYMBOLS & ABBREVIATIONS
S-002 STRUCTURAL GENERAL NOTES
S-100 STRUCTURAL SITE PLAN
S-200 STRUCTURAL DEMOLITION OVERALL PLAN
S-200A STRUCTURAL DEMOLITION PLAN WEST
S-200B STRUCTURAL DEMOLITION PLAN EAST
S-210 STRUCTURAL GROUND LEVEL PLAN
S-220 STRUCTURAL SUPERSTRUCTURE PLAN
S-400 STRUCTURAL ELEVATIONS
S-500 STRUCTURAL TYPICAL REINFORCEMENT DETAILS
S-501 STRUCTURAL TYPICAL CONCRETE DETAILS
S-502 STRUCTURAL TYPICAL CONCRETE DETAILS
S-510 STRUCTURAL TYPICAL STEEL DETAILS
S-550 STRUCTURAL REFERENCED SECTIONS & DETAILS
S-551 STRUCTURAL REFERENCED SECTIONS & DETAILS
1 06/19/25 90% FINAL DESIGN
http://www.arup.com
35 East Wacker Drive Suite 1800 Chicago IL 60601 USA t: +1 312 849 5610 www.arup.com
REVISIONS
DESCRIPTIONSDATEREV.
PROJECT NO.
SHEET NO.
REVISION NO.
DESIGNED
DRAWN
CHECKED
APPROVED
CONCEPT
DISCIPLINE REVIEW
ENG. REVIEWED
ISD APPROVED
SUBMITTED
A/E CONSULTANT DATE FERMILAB DATE
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
Arup US, Inc.
UIP - SUBPROJECT 2
KAUTZ ROAD SUBSTATION REPLACEMENT
JU
N
E
, 2
:0 :1
P M
STRUCTURAL
GENERAL NOTES S-002
JULIAN SAFAR
BRIAN RAINE
ARIF OZKAN
SYLVIA RICHARDSON 06/19/25
06/19/25
06/19/25
06/19/25
3-5-207
DESIGN BASIS
1. SUPERIMPOSED DEAD LOADS: CONTROL BUILDING GROUND LEVEL = 25 PSF
2. LIVE LOADS: CONTROL BUILDING GROUND LEVEL = 125 PSF
3. WIND LOADS:
PARAMETER VALUE
BASIC WIND SPEED, V 107 MPH
WIND IMPORTANCE FACTOR, I 1.00
WIND EXPOSURE CATEGORY C
RISK CATEGORY II
GUST FACTOR, G = 0.85 0.85
DIRECTIONALITY FACTOR, Kd = 0.85 0.85
4. SEISMIC LOADS:
PARAMETER VALUE
SEISMIC IMPORTANCE FACTOR, I 1.0
SITE CLASS D
SHORT PERIOD SITE COEFFICIENT, Fa 1 SEC PERIOD SITE COEFFICIENT, Fv SHORT PERIOD SPECTRAL RESPONSE ACCELERATION, Ss 0.136
1 SEC PERIOD SPECTRAL RESPONSE ACCELERATION, S1 0.066
Sms Sm1 Sds Sd1
RISK CATEGORY II
SEISMIC DESIGN CATEGORY B
SEISMIC FORCE-RESISTING SYSTEM STEEL SYSTEM NOT
SPECIFICALLY DETAILED
RESPONSE MODIFICATION COEFFICIENT, R
SEISMIC RESPONSE COEFFICIENT, Cs
DESIGN BASE SHEAR, V
SYSTEM OVERSTRENGTH FACTOR, Ω0
DEFLECTION AMPLIFICATION FACTOR, Cd
ANALYSIS PROCEDURE
1. REFER TO ASCE 7-16 FIGURE 30.3-2B FOR EXTENT OF ROOF ZONES.
NOTES:
3r > 500 21.2 -41.9
3r 200 22.4 -53.4
3r 50 25.0 -80.0
3r <= 2 25.0 -80.0
3e > 500 19.8 -25.0 3e 200 21.2 -37.0 3e 50 25.0 -67.3
3e <= 2 25 -67.3
2r > 500 19.8 -25.0
2r 200 21.2 -37.0
2r 50 25.0 -67.3
2r <= 2 25.0 -67.3
2n > 500 19.8 -25.0
2n 200 21.2 -37.0
2n 50 25.0 -67.3
2n <= 2 25.0 -67.3
2e > 500 21.2 -14.4
2e 200 22.4 -28.1
2e 50 23.9 -46.2
2e <= 2 25.0 -46.2
1 > 500 21.2 -14.4
1 200 22.4 -28.1
1 50 23.9 -46.2
1 <= 2 25.0 -46.2
ZONE TRIBUTARY WIND
AREA (FT^2)
ULTIMATE WIND
PRESSURE
(PSF)
ULTIMATE WIND
SUCTION
(PSF)
GABLED ROOFS
3. THE DIMENSION 'a' IS 10 PERCENT OF THE LEAST HORIZONTAL DIMENSION, BUT NOT LESS THAN 3 FT
2. ZONE 4 IS THE PORTION OF WALL BOUNDED BY ZONES 5. REFER TO ASCE 7-16 FIGURE 28.3-1.
REFER TO ASCE 7-16 FIGURE 28.3-1.
1. ZONE 5 IS THE WALL EDGE ZONE, WHICH EXTENDS A DISTANCE 'a' FROM THE BLDG EDGE.
NOTES:
5 > 500 18.6 -20.8
5 200 20.1 -23.7
5 50 22.4 -28.2
5 <= 10 25.0 -33.5
4 > 500 18.6 -20.8
4 200 20.1 -22.2
4 50 22.4 -24.5
4 <= 10 25.0 -27.1
ZONE TRIBUTARY WIND
AREA (FT^2)
ULTIMATE WIND
PRESSURE
(PSF)
ULTIMATE WIND
SUCTION
(PSF)
WALLS
REINFORCING STEEL AND FIBERGLASS FOR CONCRETE AND MASONRY
1. REINFORCEMENT BARS SHALL BE AS FOLLOWS:
A. DEFORMED BARS CONFORMING TO ASTM A615 GRADE 60 UNO.
B. DEFORMED BARS CONFORMING TO ASTM A706 GRADE 60 FOR BARS TO BE WELDED AND WHERE NOTED ON DRAWINGS.
C. DEFORMED BARS CONFORMING TO ASTM A970 FOR HEADED BARS.
D. ASTM A185 FOR WELDED WIRE REINFORCEMENT (WELDED WIRE FABRIC). USE FLAT SHEETS ONLY.
E. FIBERGLASS BARS CONFORMING TO ASTM D7957/D7957M-17
2. MECHANICAL SPLICES SHALL BE TYPE 2 COUPLERS (UON) WITH A CURRENT ICC APPROVAL.
3. MINIMUM LAP OF WELDED WIRE REINFORCEMENT SHALL BE 6" OR ONE FULL MESH PLUS 2", WHICHEVER IS GREATER.
4. REINFORCING BARS SHALL BE LAP SPLICED PER THE LAP SPLICE LENGTH SCHEDULE. LAP SPLICES SHALL BE SECURELY TIED
AT ALL SIDE AND END LAPS.
5. REINFORCING BARS MARKED AS “CONTINUOUS” SHALL BE LAP SPLICED PER LAP SPLICE LENGTH SCHEDULE.
6. REINFORCING BAR SPLICES SHALL BE MADE ONLY WHERE INDICATED ON THE DRAWINGS. WHERE SPLICE LOCATIONS ARE NOT SHOWN ON THE DRAWINGS, THE CONTRACTOR SHALL SHOW THEIR PROPOSED SPLICE LOCATIONS ON THE SHOP
DRAWINGS.
7. ALL BARS AT NON-CONTINUOUS ENDS SHALL HAVE A STANDARD HOOK.
8. WELDING OF REINFORCING STEEL BARS SHALL BE IN ACCORDANCE WITH AWS D1.4. WELD REINFORCING BARS ONLY WHERE INDICATED ON THE DRAWINGS. TACK WELDING OR WELDING OF BARS TO PLATES, TEMPLATES, ETC. IS PROHIBITED, UNLESS
SPECIFICALLY SHOWN ON THE STRUCTURAL DRAWINGS.
9. DOWELS CONNECTING WALLS OR COLUMNS TO FOUNDATIONS SHALL BE THE SAME GRADE, SIZE AND SPACING AS THE
VERTICAL REINFORCING BARS IN THE WALLS OR COLUMNS, UNLESS NOTED OTHERWISE.
10. ALL DOWELS SHALL BE FULLY DEVELOPED IN TENSION UNLESS NOTED OTHERWISE.
11. ADDITIONAL REINFORCEMENT SHALL BE PROVIDED AROUND ALL SLAB AND WALL OPENINGS AS SHOWN ON THE TYPICAL
DETAILS UNLESS NOTED OTHERWISE.
12. WHERE VERTICAL DOWELS FROM FOUNDATION INTERFERE WITH STEEL COLUMN BASE PLATE, THE CONTRACTOR SHALL
RELOCATE THESE DOWELS THREE (3) INCHES FROM EDGE OF BASE PLATE.
13. ALL WALLS SHALL BE INTERCONNECTED AT CORNERS AND INTERSECTIONS WITH DOWELS MATCHING HORIZONTAL
REINFORCEMENT PER TYPICAL DETAILS UNLESS NOTED OTHERWISE.
14. ALL FOUNDATION AND GRADE BEAM REINFORCEMENT SHALL BE CONTINUOUS THROUGH INTERSECTING FOUNDATIONS AND
GRADE BEAMS UNLESS NOTED OTHERWISE.
15. BARS SHALL NOT BE BENT OR TWISTED IN THE FIELD, UNLESS SPECIFICALLY DETAILED ON THE STRUCTURAL DRAWINGS.
16. ALL REINFORCING BARS, INSERTS, EMBEDS ETC. SHALL BE SECURELY HELD IN PLACE TO MAINTAIN THEIR POSITIONS WHILE CONCRETE IS POURED. PROVIDE SUITABLE CHAIRS, TIES, SPACERS, ADDITIONAL BARS AND STIRRUPS AS REQUIRED.
STRUCTURAL STEEL WELDING
1. ALL WELDING SHALL BE DONE BY AWS CERTIFIED WELDERS.
2. SHOP DRAWINGS SHALL SHOW ALL WELDING WITH AWS A2.4 SYMBOLS.
3. WELDS SHALL BE MADE USING LOW-HYDROGEN ELECTRODES WITH MINIMUM TENSILE STRENGTH OF 70 KSI (E70XX
ELECTRODES) UNLESS NOTED OTHERWISE.
4. WELD LENGTHS CALLED FOR ON DRAWINGS ARE THE NET EFFECTIVE LENGTH REQUIRED. WHERE LENGTH OF WELD IS NOT
SHOWN IT SHALL BE THE FULL LENGTH OF JOINT.
5. WELDS THAT HAVE BEEN DEFINED ON THE DRAWINGS AS “DEMAND CRITICAL WELD” (DCW) REQUIRE HIGHER STANDARDS
FOR WELDING, TESTING AND INSPECTION PER AISC 341.
6. ALL GROOVE AND BUTT WELDS SHALL BE COMPLETE JOINT PENETRATION (CJP) WELDS UNLESS NOTED OTHERWISE.
7. ALL PARTIAL PENETRATION GROOVE WELD SIZES SHOWN ON THE DRAWINGS REFER TO THE EFFECTIVE THROAT
THICKNESS.
8. FILLET WELD SIZES SHOWN ON DRAWINGS ARE MINIMUM SIZES. INCREASE WELD SIZE TO AWS MINIMUM SIZES BASED ON
PLATE THICKNESSES. THE MINIMUM FILLET WELD SIZE SHALL BE 3/16”.
9. PROJECT SPECIFIC WELDING PROCEDURE SPECIFICATION (WPS) FOR ALL SHOP AND FIELD WELDS ON THE PROJECT SHALL BE SUBMITTED FOR REVIEW AND ACCEPTANCE PRIOR TO STARTING FABRICATION OR ERECTION. THE WPS SHALL BE SUBMITTED TO OWNER’S TESTING LAB FOR REVIEW AND ACCEPTANCE PRIOR TO BEING SUBMITTED TO THE ARCHITECT.
10. THE CONTRACTOR SHALL DETERMINE THE SEQUENCE AND PROCEDURES OF WELDING TO MINIMIZE THE EFFECT WELD
SHRINKAGE, RESIDUAL STRESSES AND TO MAINTAIN ERECTION TOLERANCES.
11. ALL STEEL EXPOSED TO WEATHER SHALL HAVE ADDITIONAL SEAL WELDING TO PROTECT THE MEMBERS (PIPES, TUBES, BUILT-UPS) AND THE CONNECTIONS FROM MOISTURE INFILTRATION. THESE ADDITIONAL SEAL WELDS SHALL BE SHOWN ON
SHOP DRAWINGS.
STRUCTURAL STEEL
1. STRUCTURAL STEEL MEMBERS SHALL CONFORM TO THE FOLLOWING UNLESS NOTED OTHERWISE:
SHAPE GRADE YIELD STRENGTH Fy (KSI)
WIDE FLANGE SHAPES ASTM A992 50
TEES ASTM A992 50
CHANNELS ASTM A36 36
ANGLES ASTM A36 36
PLATES ASTM A572 GRADE 50 50
BARS ASTM A500 GRADE 50 50
SQUARE & RECTANGULAR HSS ASTM A500 GRADE C 50
ROUND HSS ASTM A500 GRADE C 46
STEEL PIPE ASTM A53 GRADE B 36
2. HIGH-STRENGTH BOLTS SHALL CONFORM TO THE FOLLOWING UNLESS NOTED OTHERWISE:
BOLT TYPE REMARKS
ASTM A325 WHERE NOTED ON DRAWINGS
ASTM A490 WHERE NOTED ON DRAWINGS
ASTM A307 GRADE A MACHINE BOLTS WHERE NOTED ON DRAWINGS
3. WHERE NON-SLIP CRITICAL BOLTS ARE SPECIFIED, THEY SHALL BE TIGHTENED TO A SNUG TIGHT CONDITION. SEE DETAILS
AND SCHEDULES FOR BOLT DIAMETERS AND SCHEDULES.
4. ALL BOLT HOLES SHALL BE STANDARD SIZE HOLES (1/16” LARGER IN DIAMETER THAN THE DIAMETER OF THE BOLT)
UNLESS NOTED OTHERWISE.
5. ALL BOLTS SPECIFIED AS SLIP CRITICAL BOLTS (A325-SC OR A490-SC) SHALL HAVE CLASS A FAYING SURFACES UNLESS
NOTED OTHERWISE.
6. AT ALL SLIP CRITICAL CONNECTIONS SLIP IS CHECKED AT THE FACTORED LOAD LEVEL UNLESS NOTED OTHERWISE.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING:
A. ALL ERECTION AIDS.
B. STEELWORK ERECTION SEQUENCE. IN DETERMINING THE ERECTION SEQUENCE THE CONTRACTOR SHALL TAKE
NECESSARY MEASURES TO MINIMIZE THE EFFECTS OF TEMPERATURE CHANGES AND DIFFERENTIAL TEMPERATURE EFFECTS (SUCH AS EXPOSURE TO STRONG SUN ON ONE SIDE OF THE BUILDING) WHILE MEETING AISC ACCEPTABLE
ERECTION TOLERANCES.
8. THE CONTRACTOR SHALL SUBMIT DETAILED, COORDINATED AND CHECKED SHOP DRAWINGS FOR ALL STRUCTURAL STEEL MEMBERS AND CONNECTIONS TO THE ARCHITECT FOR REVIEW PRIOR TO THE START OF FABRICATION AND ERECTION.
9. STRUCTURAL AND ARCHITECTURAL STEEL PERMANENTLY EXPOSED TO WEATHER SHALL BE CORROSION PROTECTED BY BEING HOT-DIPPED GALVANIZED AND/OR SUITABLY PRIMED AND PAINTED AS SHOWN ON ARCHITECTURAL DRAWINGS AND PER PROJECT SPECIFICATIONS. STEEL ELEMENTS EMBEDDED IN CONCRETE OR MASONRY SHALL BE LEFT UNPAINTED.
10. THE CONTRACTOR SHALL PROVIDE MINIMUM 4” CONCRETE COVER AROUND ALL STEEL MEMBERS OR COMPONENTS ADJACENT TO AND EXPOSED TO SOIL. MINIMUM REINFORCEMENT IN COVER CONCRETE SHALL BE #3 AT 12” ON CENTERS
EACH WAY.
11. ALL STEEL MEMBERS FRAMING INTO CONCRETE WALLS/COLUMNS/BEAMS SHALL BE DETAILED TO SUIT CONCRETE FIELD TOLERANCES. COORDINATE WITH CONCRETE CONTRACTOR AND/OR CONDUCT FIELD SURVEYS AS NECESSARY PRIOR TO
STEEL FABRICATION.
12. CUTTING AND DRILLING OF STRUCTURAL STEEL MEMBERS IN THE FIELD IS NOT PERMITTED.
13. NO OPENINGS AND/OR PENETRATIONS SHALL BE PLACED IN STEEL MEMBERS UNLESS SPECIFICALLY SHOWN AND
DETAILED ON THE STRUCTURAL DRAWINGS.
14. ALL STEEL MEMBERS RELATED TO ELEVATORS SHALL BE COORDINATED WITH THE ELEVATOR CONTRACTOR PRIOR TO
FABRICATION.
15. SEE ARCHITECTURAL DRAWINGS FOR LOCATIONS OF ALL ARCHITECTURALLY EXPOSED STRUCTURAL STEEL (AESS).
FABRICATION, WELDING AND ERECTION OF AESS SHALL COMPLY WITH THE LATEST EDITION OF AISC CODE OF STANDARD
PRACTICE FOR STEEL BUILDINGS AND BRIDGES.
16. ALL EXPOSED STRUCTURAL STEEL SHALL BE HOT-DIPPED GALVANIZED UON.
METAL DECK AND GRATING
1. METAL DECK TYPES SHALL BE AS INDICATED IN THE METAL DECK SCHEDULE (SEE TYPICAL METAL DECK DETAILS) OR
EQUAL. ALL METAL DECK TYPES SHALL HAVE A CURRENT ICC CERTIFICATION.
2. MATERIALS FOR METAL DECK AND ACCESSORIES SHALL BE GALVANIZED STEEL CONFORMING TO ASTM A653-SS WITH GRADE AS INDICATED IN THE METAL DECK SCHEDULE AND ZINC COATING CONFORMING TO ASTM A653, G60 UNLESS
NOTED OTHERWISE.
3. METAL DECK ACCESSORIES SHALL BE THE SAME GAGE AS DECKING UNLESS NOTED OTHERWISE.
4. WELDING SHALL BE PER AWS D1.3 AND PERFORMED BY AWS CERTIFIED WELDERS.
5. DECK UNITS, WHETHER PARALLEL OR PERPENDICULAR TO SUPPORTS, SHALL BEAR A MINIMUM OF 2 INCHES ON
SUPPORTING MEMBERS.
6. DECK UNITS SHALL BE CONTINUOUS OVER THREE OR MORE SPANS, EXCEPT WHERE THE FRAMING DOES NOT PERMIT.
7. ATTACHMENT OF DECK UNITS SHALL BE AS INDICATED IN THE TYPICAL DETAILS.
8. THE CONTRACTOR SHALL DESIGN AND PROVIDE EDGE FORMS, FLASHING AND CLOSURE PLATES AT ENDS OF ALL UNITS, AROUND COLUMNS AND AT ALL PERIMETER LOCATIONS REQUIRING CLOSURE FOR GRAVEL OR CONCRETE. COORDINATE ALL CLOSURES WITH ELEVATOR, STAIR AND OTHER ARCHITECTURAL DETAILS. COMPOSITE DECK INSTALLATION, WHEN COMPLETE, SHALL BE READY TO RECEIVE CONCRETE FILL AS SHOWN ON THE DRAWINGS WITHOUT LEAKING.
1.6 2.4
0.217 0.158 0.145 0.105
0.048
10 KIPS
ELFP
TEMPORARY WORK
1. ALL TEMPORARY WORK, INCLUDING TEMPORARY WALL BRACING, SHALL BE DESIGNED, INSTALLED AND CARRIED OUT BY
THE CONTRACTOR IN ACCORDANCE WITH THE REQUIREMENTS OF THE PROJECT GOVERNING CODE(S).
2. THE DRAWINGS INDICATE THE COMPLETED STRUCTURE. THE CONTRACTOR IS FULLY RESPONSIBLE FOR ALL TEMPORARY
MEASURES NECESSARY FOR ERECTION.
3. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE PROPER SHORING AND BRACING WHEREVER NECESSARY. ALL TEMPORARY SHORING/BRACING SHALL BE DESIGNED BY A CIVIL AND/OR STRUCTURAL ENGINEER REGISTERED IN ILLINOIS.
4. THE CONTRACTOR IS RESPONSIBLE FOR SUBMITTING THE SHORING DRAWINGS AND CALCULATIONS TO THE AUTHORITY
HAVING JURISDICTION AS REQUIRED.
5. CONSTRUCTION LOADS SHALL NOT EXCEED THE DESIGN LIVE LOADS PER SQUARE FOOT AS SHOWN ON THE DRAWINGS.
PROVIDE SHORING AND/OR BRACING WHERE THE STRUCTURE HAS NOT ATTAINED ITS DESIGN STRENGTH.
CODES AND STANDARDS
1. ALL WORK, INCLUDING THE PREFABRICATED BUILDING STRUCTURE, SHALL CONFORM TO THE REQUIREMENTS OF 2021
INTERNATIONAL BUILDING CODE (IBC) INCLUDING REFERENCE STANDARDS, ADDENDA AND APPENDICES.
2. IN ADDITION, THE FOLLOWING CODES, STANDARDS AND SPECIFICATIONS SHALL APPLY WHERE MORE STRINGENT AND AS
MODIFIED BY THE BUILDING CODE:
A. ACI 318-19: BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE AND COMMENTARY.
B. AISC: STEEL CONSTRUCTION MANUAL, 15TH EDITION.
C. AISC 303-16: CODE OF STANDARD PRACTICE FOR STRUCTURAL STEEL BUILDINGS AND BRIDGES.
D. ANSI/AISC 341-16: SEISMIC PROVISIONS FOR STRUCTURAL STEEL BUILDINGS.
E. ANSI/AISC 358-16 WITH ANSI/AISC 358S1-18: PREQUALIFIED CONNECTIONS FOR SPECIAL AND INTERMEDIATE STEEL
MOMENT FRAMES FOR SEISMIC APPLICATIONS.
F. ANSI/AISC 360-16: SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS.
G. AISI S100-16: NORTH AMERICAN SPECIFICATION FOR THE DESIGN OF COLD-FORMED STEEL STRUCTURAL MEMBERS.
H. ASCE 7-16: MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES.
I. AWS D1.1/D1.1M:2015: STRUCTURAL WELDING CODE - STEEL.
J. AWS D1.3/D1.3M:2008: STRUCTURAL WELDING CODE - SHEET STEEL.
K. AWS D1.4/D1.4M:2011: STRUCTURAL WELDING CODE - REINFORCING STEEL.
L. AWS D1.8/D1.8M:2009: STRUCTURAL WELDING CODE - SEISMIC SUPPLEMENT.
M. ACI 530-11: BUILDING CODE REQUIREMENTS FOR MASONRY STRUCTURES.
N. RCSC-2009: SPECIFICATION FOR STRUCTURAL JOINTS USING HIGH-STRENGTH BOLTS.
O. ANSI/SDI RB-2017: STANDARD FOR STEEL ROOF DECK
3. THE ASTM STANDARDS REFERRED TO IN THE DRAWINGS AND SPECIFICATIONS AND USED IN DESIGN ARE THOSE INCLUDED AS REFERENCED STANDARDS TO THE PROJECT GOVERNING CODE(S). WHERE AN ASTM STANDARD HAS SUBSEQUENTLY BEEN REVISED, CONSTRUCTION SHALL COMPLY WITH BOTH THE LATEST EDITION OF THAT STANDARD AND THE EDITION OF THAT STANDARD REFERENCED IN DESIGN. WHERE IT IS NOT POSSIBLE TO SATISFY THE REQUIREMENTS OF BOTH EDITIONS OF THE STANDARDS DUE TO A CONFLICT BETWEEN THEM, NOTIFY THE ARCHITECT
AND ENGINEER BEFORE PROCEEDING.
NOTE: SEISMIC PARAMETERS MAY CHANGE BASED ON FUTURE BORINGS AND SITE CLASS DETERMINATION.
5. SNOW LOADS:
A. GROUND SNOW LOAD: Pg = 30 PSF
B. IMPORTANCE FACTOR: Is = 1.0
C. SNOW EXPOSURE FACTOR: Ce = 1.0
D. THERMAL FACTOR: Ct = 1.0
COMPONENTS AND CLADDING WIND LOADS:
SHEAR STUDS AND DEFORMED BAR ANCHORS
1. SHEAR STUDS SHALL BE AWS D1.1 "TYPE B" HEADED STUDS CONFORMING TO ASTM A108 WITH MINIMUM YIELD STRENGTH OF 51
KSI AND TENSIL STRENGTH OF 65 KSI
2. WELDED DEFORMED BAR ANCHORS (DBA) SHALL BE NELSON D2L OR EQUAL CONFORMING TO ASTM A496 WITH A MINIMUM TIELD
STRENGTH OF 70 KSI.
3. STUDS AND DEFORMED BAR ANCHORS SHALL BE AUTOMATICALLY END WELDED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS IN SUCH A MANNER AS TO PROVIDE COMPLETE FUSION BETWEEN THE END OF THE STUD AND THE STRUCTURAL MEMBER. THERE SHOULD BE NO POROSITY OR EVIDENCE OF LACK OF FUSION BETWEEN THE WELDED END OF THE STUD OR DBA AND THESTRUCTURAL MEMEBR. WELDING SHALL BE DONE ONLY BY QUALIFIED WELDERS APPROVED BY THE
WELDING INSPECTOR.
4. STUD AND DBA LENGTHS INDICATED ON THE DRAWINGS ARE LENGTHS AFTER WELDING
5. THE TYPE AND CAPACITY OF THE WELDING EQUIPMENT SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S
RECOMMENDATIONS AND SHALL BE CHECKED BY THE INDEPENDENT TESTING AGENCY
STRUCTURAL MOVEMENTS
1. THE BUILDINGS ARE DESIGNED FOR THE SERVICEABILITY LIMITS INDICATED IN THE
TABLE BELOW:
STRUCTURAL DEFLECTION LIMITS
GRAVITY LOADS
FLOOR BEAMS TOTAL LOAD
LIVE LOAD
SPAN / 240
SPAN / 360
LATERAL LOADS
WIND GIRTS COMPONENTS AND CLADDING WIND LOAD SPAN / 400
STORY DRIFT
MWFRS WIND LOAD
SEISMIC LOAD
H / 400 H / 500
*WHERE H IS STORY HEIGHT
POST-INSTALLED ANCHORS
PA-1. POST-INSTALLED ANCHORS SHALL BE AS FOLLOWS OR APPROVED EQUAL, UNLESS OTHERWISE NOTED:
TYPE MANUFACTURER -
PRODUCT APPROVALS ACCEPTABLE ALTERNATIVE
PRODUCT
EXPANSION ANCHOR
IN CONCRETE
HILTI KWIK BOLT TZ2 ICC ESR-4266 DEWALT POWER-STUD+SD1
(ICC ESR-2818)
EXPANSION ANCHOR
IN MASONRY
HILTI KWIK BOLT TZ2
MASONRY ANCHOR ICC ESR-4561 DEWALT POWER-STUD+SD1
(ICC ESR-2966)
ADHESIVE ANCHOR HILTI HIT-RE 500 V3 ICC ESR-3814 DEWALT PURE110+
(ICC ESR-3298)
PA-2. IN CASE THE SPECIFIED ANCHOR IS NOT AVAILABLE, PROVIDE ANCHOR (WITH CURRENT ICC-ESR
REPORT) WITH THE SAME DIAMETER AND EQUAL OR GREATER TENSION AND SHEAR STRENGTH.
EMBEDMENT SHALL BE EQUAL OR GREATER THAN SPECIFIED.
PA-3. ALL ANCHORS SHALL MEET THE MINIMUM EMBEDMENT, SPACING, EDGE DISTANCE AND SLAB
THICKNESS CRITERIA ESTABLISHED BY THEIR ICC REPORT.
PA-4. CONCRETE SHALL ATTAIN THE MINIMUM DESIGN STRENGTH PRIOR TO INSTALLATION OF THE
ANCHORS.
PA-5. INSTALL ANCHORS IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS AND
INSTRUCTIONS AND THE ICC REPORT.
PA-6. PRIOR TO DRILLING FOR POST-INSTALLED ANCHORS IN CONCRETE OR MASONRY, THE CONTRACTOR
SHALL LOCATE EXISTING REINFORCEMENT BY NON-DESTRUCTIVE METHODS. NO REINFORCEMENT
SHALL BE DAMAGED AND/OR CUT BY DRILLING OPERATIONS. MAINTAIN A MINIMUM CLEARANCE OF 1"
BETWEEN THE REINFORCEMENT AND THE DRILLED-IN ANCHORS.
PA-7. UNLESS NOTED OTHERWISE, ALL EXPANSION ANCHORS SHALL BE:
A. CARBON STEEL FOR INTERIOR CONDITIONS
B. STAINLESS STEEL FOR EXTERIOR CONDITIONS
PA-8. TESTING OF ANCHORS SHALL BE PER THE PROJECT CODE REQUIREMENTS.
HOISTRAILS
1. HOIST RAILS ARE DELEGATED DESIGN BY OTHERS.
2. HOIST RAILS SHALL BE DESIGNED AND CONSTRUCTED IN ACCORDANCE WITH ASME B30-11-2017 AS HUNG CRANE MONORAILS.
3. HOIST RAILS SHALL BE INSTALLED LEVEL TO WITHIN A TOLERANCE OF +/- 1/8".
4. HOIST RAILS FITTED WITH TROLLEY TO HAVE END STOPS FITTED TO BEAM ENDS.
5. HOIST RAILS SHALL BE FINISHED PAINTED A GOLDEN YELLOW IN ADDITION TO THE COATING SPECIFICATION.
6. PAINT SIGN ON BOTH SIDES OF EACH HOIST RAILS WEB INDICATING RATED CAPACITY - (EG 1/4 TON WORKING LOAD LIMIT) IN BLACK LETTERS 4" MINIMUM HIGH, IN A POSITION LEGIBLE FROM THE CONTROL BUILDING FLOOR.
7. HOIST RAILS SHALL BE DESIGNED FOR 100% WORKING LOAD LIMIT VERTICALLY, 20% LATERAL, AND 10% LONGITUDINAL LOADS
APPLIED AT BOTTOM FLANGE OF HOIST RAIL.
GENERAL NOTES
1. WHERE DRAWINGS, DIVISION 1 SPECIFICATIONS, AND TECHNICAL SPECIFICATIONS REFER TO “CONTRACTOR” OR “GENERAL
CONTRACTOR”, THESE ARE USED INTERCHANGEABLY AMD ARE BOTH DEEMED TO MEAN THE COMPANY SUBCONTRACTED BY FERMIFORWARD TO CONSTRUCT AND MANAGE CONSTRUCTION. FERMILAB RESPONSIBILITIES ARE DESCRIBED AS
“FERMILAB”, “FERMIFORWARD”, AND/OR “THE OWNER”.
2. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE FOLLOWING:
A. PROJECT GOVERNING CODE(S) AND STANDARDS.
B. DRAWINGS.
C. SPECIFICATIONS.
3. THE STRUCTURAL DRAWINGS ARE INTENDED TO WORK WITH AND BE COMPLEMENTARY TO THE PROJECT SPECIFICATIONS.
REFER TO THE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
4. IN THE EVENT THAT CERTAIN DETAILS OF THE CONSTRUCTION ARE NOT FULLY SHOWN OR NOTED ON DRAWINGS, THEIR CONSTRUCTION SHALL BE OF THE SAME TYPE AS FOR SIMILAR CONDITIONS THAT ARE SHOWN OR NOTED, SUBJECT TO THE
STRUCTURAL ENGINEER’S APPROVAL.
5. ALL ELEVATIONS ARE RELATIVE TO REFERENCE DATUM OF 745’-0” UNLESS NOTED OTHERWISE.
6. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS BEFORE COMMENCING WITH THE WORK AND NOTIFY THE ARCHITECT AND ENGINEER OF ANY DISCREPANCIES WITH THE INFORMATION SHOWN ON THE DRAWINGS.
7. THE CONTRACTOR SHALL USE STRUCTURAL DRAWINGS IN CONJUNCTION WITH ARCHITECTURAL, MECHANICAL, ELECTRICAL, PLUMBING, FIRE PROTECTION AND ALL OTHER RELEVANT CONSULTANT DRAWINGS.
8. SEE ARCHITECTURAL DRAWINGS FOR THE FOLLOWING:
A. SIZE AND LOCATION OF ALL DOOR AND WINDOW OPENINGS, EXCEPT AS NOTED.
B. SIZE AND LOCATION OF ALL INTERIOR AND EXTERIOR NON-BEARING PARTITIONS, FAÇADE, LOUVERS ETC., EXCEPT AS
NOTED.
C. SIZE AND LOCATION OF ALL CONCRETE CURBS, FLOOR DRAINS, SLOPES, DEPRESSED AREAS, CHANGE IN LEVEL, CHAMFERS, GROOVES, INSERTS, ETC., EXCEPT AS SHOWN.
D. SIZE AND LOCATION OF ALL FLOOR AND ROOF OPENINGS EXCEPT AS SHOWN.
E. FLOOR AND ROOF FINISHES.
F. EDGE OF SLAB LOCATIONS AROUND THE PERIMETER AND AT INTERIOR OPENINGS, EXCEPT AS SHOWN.
G. DIMENSIONS NOT SHOWN ON THE STRUCTURAL DRAWINGS.
H. STAIRS EXCEPT AS SHOWN.
I. FIREPROOFING.
J. WATERPROOFING.
K. MISCELLANEOUS STEEL REQUIRED FOR SUPPORT OF ARCHITECTURAL ELEMENTS.
9. SEE MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS FOR THE FOLLOWING:
A. PIPE RUNS, SLEEVES, HANGERS, TRENCHES EXCEPT AS SHOWN OR NOTED.
B. ELECTRICAL CONDUIT RUNS, BOXES, OUTLETS IN WALLS AND SLABS. CONDUITS SHALL NOT BE CAST IN CONCRETE
MEMBERS UNLESS SPECIFICALLY INDICATED ON THE STRUCTURAL DRAWINGS.
C. CONCRETE INSERTS FOR ELECTRICAL, MECHANICAL, OR PLUMBING FIXTURES.
D. SIZE AND LOCATION OF EQUIPMENT PADS AND EQUIPMENT ANCHORAGE EXCEPT AS SHOWN OR NOTED.
E. ALL LIGHTNING PROTECTION AND/OR GROUND/EARTHING REQUIREMENTS INCLUDING ANY ASSOCIATED ITEMS
EMBEDDED IN OR ATTACHED TO STRUCTURE.
F. VERIFY AND COORDINATE ALL OPENINGS, EQUIPMENT PADS, SLEEVES AND INSERTS WITH REVIEWED SUBMITTALS, AND
NOTIFY THE STRUCTURAL ENGINEER USING HIGHLIGHTED DRAWINGS PRODUCED TO SCALE WHERE THESE DEVIATE IN
SIZE OR LOCATION FROM THE STRUCTURAL DRAWINGS.
10. OPENINGS, POCKETS, ETC., LARGER THAN 6" SHALL NOT BE PLACED IN CONCRETE SLABS, DECKS, WALLS, UNLESS SPECIFICALLY DETAILED ON THE STRUCTURAL DRAWINGS. NOTIFY THE STRUCTURAL ENGINEER WHEN DRAWINGS BY OTHERS SHOW OPENINGS, POCKETS, ETC. LARGER THAN 6" WHICH ARE NOT SHOWN ON THE STRUCTURAL DRAWINGS BUT
WHICH ARE LOCATED IN STRUCTURAL MEMBERS.
11. DEPRESSIONS IN SLABS SHALL NOT BE PLACED UNLESS SPECIFICALLY SHOWN ON THE STRUCTURAL DRAWINGS. NOTIFY THE STRUCTURAL ENGINEER WHEN DRAWINGS BY OTHERS SHOW DEPRESSIONS WHICH ARE NOT SHOWN ON THE STRUCTURAL
DRAWINGS BUT WHICH ARE LOCATED IN STRUCTURAL SLABS.
12. ALL SUSPENDED LOADS (MEP SYSTEMS, ETC.) EXCEEDING 200 POUNDS SHALL BE REVIEWED BY THE STRUCTURAL ENGINEER PRIOR TO INSTALLATION UNLESS SPECIFICALLY DETAILED ON THE DRAWINGS. THE CONTRACTOR SHALL SUBMIT ONE COMPOSITE PLAN PER FLOOR LEVEL WHICH INCLUDES ALL POINT LOADS OF ALL TRADES. ALL LOADS EXCEEDING 200
POUNDS SHALL BE INCLUDED IN THOSE PLANS.
13. THE INFORMATION SHOWN FOR NON-STRUCTURAL ELEMENTS/FINISHES IS GIVEN FOR REFERENCE ONLY, THE CONTRACTOR
SHALL REFER TO ARCHITECTURAL DRAWINGS FOR THIS INFORMATION.
14. SCALES NOTED ON STRUCTURAL DRAWINGS ARE FOR REFERENCE ONLY. NO DIMENSIONAL INFORMATION SHALL BE OBTAINED BY SCALING FROM THE DRAWINGS. THE CONTRACTOR SHALL VERIFY DIMENSIONS NOT NOTED WITH THE
ARCHITECT PRIOR TO PROCEEDING WITH WORK.
15. CLADDING/FAÇADE/STAIR CONNECTIONS TO THE STRUCTURE SHALL NOT INTRODUCE TORSION AND UNACCEPTABLE LOAD ECCENTRICITIES TO STRUCTURAL MEMBERS. SUCH CONDITIONS SHOULD BE BROUGHT TO THE ATTENTION OF THE STRUCTURAL ENGINEER WHO MAY REQUIRE ADDITIONAL BRACING TO BE PROVIDED BY THE CLADDING/FAÇADE
CONTRACTOR AT NO ADDITIONAL COST TO THE CONTRACT.
16. THE STYROFOAM INDICATED ON DRAWINGS (FOR INSTANCE UNDER EQUIPMENT PADS) SHALL CONFORM TO ASTM C578, TYPE
VII, UNLESS NOTED OTHERWISE.
EXISTING STRUCTURAL SYSTEM
1. THE BASE BUILDING STRUCTURE HAS BEEN DESIGNED BY DANIEL URBAHN SEELY & FULLER - ARCHITECTURE, ENGINEERING
AND CONSULTING MANAGEMENT. THE DRAWINGS ARE DATED 02/01/1974. ADDITIONAL INFORMATION AND SUBSEQUENT
ADDITIONS WERE RECEIVED FROM FERMILAB ON AN AS-BUILT STRUCTURAL DRAWINGS SET.
2. TYPICAL STEEL AND CONCRETE PROPERTIES FOR EXISTING STRUCTURE ARE AS FOLLOWS:
- STRUCTURAL STEEL W SHAPES: ASTM A36, FY=36KSI
- CONCRETE: F’C = 3,000 PSI (NORMAL WEIGHT CONCRETE AND LIGHTWEIGHT CONCRETE)
3. THE CONTRACTOR IS TO INSPECT THE AS-BUILT EXISTING DRAWINGS ALONG THE CURRENT DRAWINGS SET AS NEEDED TO
COMPLETE THE WORKS.
4. CONTRACTOR SHALL FIELD VERIFY THE SIZE, LOCATION AND DIMENSIONAL CONTROL OF ALL EXISTING STRUCTURAL
ELEMENTS THAT ARE ADJACENT TO THE NEW STRUCTURE.
5. CONTRACTOR SHALL NOT DAMAGE EXISTING BELOW-GRADE CONDUITS, OR UTILITIES DURING NEW FOUNDATION
CONSTRUCTION, UNLESS EXPLICITLY NOTED ON THE ELECTRICAL OR CIVIL DRAWINGS.
FOUNDATIONS
1. FOUNDATION DESIGN SHOWN FOR REFERENCE ONLY. NO SITE-SPECIFIC GEOTECHNICAL INVESTIGATIONS (GI) HAVE
BEEN UNDERTAKEN TO DATE. FINAL FOUNDATION DESIGN IS PENDING FINAL GEOTECHNICAL REPORT INFORMATION AND
RECOMMENDATIONS. CURRENT INFORMATION SHOWN IS SUBJECT TO CHANGE.
2. THE FOLLOWING PARAMETERS WERE USED IN THE DESIGN OF FOUNDATIONS:
PARAMETER VALUE
ALLOWABLE BEARING PRESSURE FOR SPREAD FOOTINGS 3500 PSF
SUBGRADE MODULUS FOR SPREAD FOOTINGS 60 KIPS/FT3
3. THE FOLLOWING PARAMETERS WERE USED IN THE DESIGN OF WALLS RETAINING EARTH:
A. WALLS RESTRAINED AT THE TOP:
PARAMETER VALUE
HORIZONTAL EARTH PRESSURE COEFFICIENT 0.50
SOIL DENSITY 130 PCF
B. CANTILEVER RETAINING WALLS:
PARAMETER VALUE
HORIZONTAL EARTH PRESSURE COEFFICIENT 0.33
SOIL DENSITY 130PCF
4. REFER TO THE GEOTECHNICAL REPORT FOR INFORMATION ON GENERAL SUBSURFACE PROFILES, SOIL PROPERTIES, EXISTING SITE FEATURES AND ALL OTHER CONDITIONS AFFECTING FOUNDATION INSTALLATION.
5. REFER TO THE GEOTECHNICAL REPORT FOR REQUIREMENTS FOR EXCAVATIONS, GRADING, COMPACTION AND
BACKFILLING BEHIND WALLS RETAINING EARTH.
6. BACKFILLING AGAINST RETAINING/BASEMENT WALLS WHERE THERE IS GRADE ON BOTH SIDES OF THE WALL SHALL BE CARRIED OUT IN SUCH A MANNER THAT THE DIFFERENCE IN SOIL LEVEL IS NEVER MORE THAN 3.0 FEET. DO NOT PLACE BACKFILL BEHIND WALLS RETAINING EARTH BEFORE CONCRETE HAS ATTAINED FULL DESIGN STRENGTH UNLESS
TEMPORARY BRACING IS PROVIDED.
7. BACKFILL SHALL NOT BE PLACED AGAINST WALLS RETAINING EARTH (OTHER THAN CANTILEVER WALLS) UNTIL THE ATTACHING FLOORS/SLABS (AT TOP AND BOTTOM OF THE WALL) ARE COMPLETELY IN PLACE AND HAVE ATTAINED FULL
DESIGN STRENGTH.
8. NEW FOOTINGS WHICH ARE LOCATED IMMEDIATELY ADJACENT TO EXISTING FOOTINGS SHALL BE FOUNDED AT THE SAME ELEVATION AS THE EXISTING FOOTINGS UNLESS NOTED OTHERWISE. EXISTING ADJACENT FOOTINGS SHALL NOT BE
UNDERMINED BY EXCAVATION OR NEW CONSTRUCTION.
9. WATER SHALL NOT BE ALLOWED TO STAND IN TRENCHES BEFORE OR AFTER CONCRETE IS PLACED. IF TRENCHES BECOME SOFTENED DUE TO RAIN OR OTHER WATER BEFORE THE FOOTINGS ARE CAST, THE GEOTECHNICAL ENGINEER SHALL REVIEW THE CONDITIONS AND PROVIDE THE NECESSARY MITIGATION REQUIREMENTS TO THE CONTRACTOR.
10. ALL EXCAVATIONS, COMPACTIONS AND BACKFILLING SHALL BE INSPECTED AND APPROVED BY THE GEOTECHNICAL
ENGINEER BEFORE PLACEMENT OF CONCRETE.
11. REFER TO PLUMBING AND/OR CIVIL DRAWINGS FOR UNDER-FLOOR AND PERIMETER WALL DRAINAGE SYSTEMS AND
SPECIAL GRANULAR FILL MATERIALS FOR SUCH DRAINAGE.
SUBMITTALS
1. PREFABRICATED BUILDING IS A DELEGATED DESIGN ITEM BY OTHERS. FINAL DESIGN OF STRUCTURAL MEMBERS
SUPPORTING THE PREFABRICATED BUILDING IS PENDING THE REACTIONS PROVIDED BY THE PREFABRICATED BUILDING
MANUFACTURER.
2. FOR DELEGATED DESIGN ITEMS THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND CALCULATIONS WITH BOTH SIGNED AND STAMPED BY A PROFESSIONAL ENGINEER AS REQUIRED BY THE SPECIFICATIONS AND PLAN CHECK AUTHORITY.
3. ONLY SHOP DRAWINGS MARKED "NO EXCEPTIONS TAKEN", AND "MAKE CORRECTIONS NOTED, RESUBMITTAL NOT REQUIRED" MAY BE USED BY CONTRACTOR IN THE WORK. SHOP DRAWINGS MARKED "REJECTED" OR "REVISE AND RESUBMIT" SHALL BE CORRECTED AND COMPLETED AS REQUIRED AND RESUBMITTED TO THE ARCHITECT BEFORE THEY ARE USED IN THE WORK.
4. CONTRACTOR SHALL PREPARE AND MAINTAIN A SCHEDULE OF ALL SUBMITTALS INCLUDING INTENDED DATES OF
SUBMISSION AND NUMBER OF DRAWINGS TO BE SUBMITTED EACH WEEK.
5. THE CONTRACTOR SHALL BE AWARE THAT SUBMITTALS WILL BE REVIEWED IN THE ORDER IN WHICH THEY ARE RECEIVED.
THE CONTRACTOR SHALL PLAN ACCORDINGLY.
6. SUBMIT ALL ITEMS IN ACCORDANCE WITH THE SPECIFICATIONS. THE ENGINEER RESERVES THE RIGHT TO NOT REVIEW ANY
OTHER ITEMS.
7. CONTRACTOR SHALL DEVELOP AND SUBMIT AN INSTRUMENTATION AND MONITORING PLAN PER THE PROJECT
SPECIFICATIONS.
CONCRETE
1. STRUCTURAL CONCRETE STRENGTHS AND TYPES USED IN THIS PROJECT SHALL BE AS FOLLOWS:
LOCATION IN STRUCTURE f'c DENSITY EXPOSURE
CLASS
SHRINKAGE
LIMIT
FOUNDATIONS INCLUDING BUT NOT LIMITED TO
FOOTINGS, FOUNDATION PILASTERS, AND PILES 5000 PSI 150 PCF F2, S0, W1, C1 0.045
WALLS 5000 PSI 150 PCF F2, S0, W1, C1 0.045
EQUIPMENT PADS, CURBS, ETC. 5000 PSI 150 PCF F2, S0, W1, C1 0.045
ALL OTHER CONCRETE 5000 PSI 150 PCF F2, S0, W1, C1 0.045
f'c IS THE 28-DAY COMPRESSIVE STRENGTH AS DEFINED IN ACI 318.
2. ALL CONSTRUCTION JOINTS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE TYPICAL CONSTRUCTION JOINT DETAILS
SHOWN ON THE STRUCTURAL AND ARCHITECTURAL DRAWINGS.
3. CLEAN AND ROUGHEN TO 1/4" AMPLITUDE ALL CONCRETE CONSTRUCTION JOINT SURFACES AGAINST WHICH CONCRETE IS TO BE PLACED. ALL CONSTRUCTION JOINTS SHALL BE WETTED AND STANDING WATER SHALL BE REMOVED IMMEDIATELY BEFORE NEW CONCRETE IS PLACED. PROVIDE CLASS "B" SPLICE AT ALL REINFORCEMENT CROSSING CONSTRUCTION
JOINTS, TYPICAL UNLESS NOTED OTHERWISE.
4. PROVIDE SLEEVES FOR PLUMBING AND ELECTRICAL OPENINGS IN CONCRETE WALLS/SLABS BEFORE PLACING CONCRETE.
DO NOT CUT ANY REINFORCING WHICH MAY CONFLICT. PIPES AND/OR CONDUITS SHALL NOT PASS-THROUGH COLUMNS AND
BEAMS UNLESS SPECIFICALLY DETAILED ON THE STRUCTURAL DRAWINGS.
5. CORING OF CONCRETE AFTER PLACEMENT IS NOT PERMITTED.
6. CLEAR COVER OF CONCRETE OVER OUTER REINFORCING BARS SHALL BE AS FOLLOWS. ALL REINFORCEMENT INCLUDING
WWF SHALL BE CHAIRED UP.
LOCATION IN STRUCTURE FACES CLEAR COVER
WALLS (NOT CAST AGAINST EARTH) INTERIOR FACES
EXPOSED TO EARTH OR WEATHER
3/4”
1 1/2” (#5 OR SMALLER)
2” (#6 OR LARGER)
BEAMS, COLUMNS, PILASTERS (PRIMARY
REINF., TIES, OR STIRRUPS)
INTERIOR FACES
EXPOSED TO EARTH OR WEATHER
1 1/2”
1 1/2” (#5 OR SMALLER)
2” (#6 OR LARGER)
FOOTINGS, PILE CAPS, GRADE BEAMS TOP BARS
BOTTOM BARS & SIDE BARS
2" 3"
SLAB ON GRADE INTERIOR FACES
EXPOSED TO EARTH OR WEATHER
1 1/2” FROM TOP (INTERIOR SLAB)
2” FROM TOP (EXTERIOR SLAB U.N.O.)
FORMED SLABS INTERIOR FACES
EXPOSED TO EARTH OR WEATHER
3/4”
1 1/2” (#5 OR SMALLER) 2” (#6 OR
LARGER)
ALL CONCRETE CAST AGAINST EARTH ALL FACES 3”
7. COORDINATE EXPOSED COLD JOINTS WITH ARCHITECTURAL DRAWINGS.
8. ALL CONCRETE MIXES SHALL COMPLY WITH THE REQUIREMENTS OF THE PROJECT GOVERNING CODE(S). PREPARE AND SUBMIT MIX DESIGNS FOR EACH TYPE AND STRENGTH. COCNRETE MIX DESIGNS SHALL BE SEALED AND SIGNED BY A CIVIL
ENGINEER REGISTERED IN ILLINOIS AND HIRED BY THE CONTRACTOR.
9. ALL TRANSIT-MIXED CONCRETE SHALL BE PROVIDED BY A CONCRETE PLANT WHICH COMPLIES FULLY WITH THE REQUIREMENTS OF PROJECT GOVERNING CODE(S) AND HAS BEEN CERTIFIED BY AN AGENCY ACCEPTABLE TO THE BUILDING
DEPARTMENT SO THAT BATCH PLANT INSPECTION MAY BE WAIVED.
10. ARCHITECTURAL TOPPING SLABS SHALL BE PLACED AFTER CONCRETE FRAMING AND/OR CONCRETE FILL ON METAL DECK
HAS REACHED THE DESIGN COMPRESSIVE STRENGTH.
11. THE PROJECTING CORNERS OF COLUMNS, BEAMS, WALLS, ETC. SHALL BE FORMED WITH 3/4” CHAMFER, UNLESS NOTED
OTHERWISE ON ARCHITECTURAL DRAWINGS.
12. ALL CONCRETE ELEMENTS SHALL BE REINFORCED SINCE NO PLAIN CONCRETE IS PERMITTED. ALL CONCRETE ELEMENTS SHALL BE REINFORCED WITH A MINIMUM STEEL AREA OF 0.0018 TIMES THE CROSS-SECTIONAL AREA OF CONCRETE
ELEMENT CONTINUOUS IN EACH DIRECTION, TYPICAL UNLESS NOTED OTHERWISE.
13. THE CONTRACTOR SHALL NOTIFY THE TESTING AGENCY AND OWNER 48 HOURS BEFORE POURING OF CONCRETE FOR INSPECTION OF REINFORCEMENT LAYOUT. NO CONCRETE SHALL BE POURED UNLESS ALL REINFORCEMENT AND
INSTALLATIONS HAVE BEEN INSPECTED AND APPROVED BY THE TESTING AGENCEY.
14. LOCATION OF CONSTRUCTION JOINTS SHALL BE AS INDICATED ON STRUCTURAL DRAWINGS.
15. CONCRETE CAST ON SLOPED SURFACES SHALL BEGIN AT THE LOWEST ELEVATION AND CONTINUE MONOLITHICALLY
TOWARD THE HIGHER ELEVATION UNTIL THE INTENDED CAST IS COMPLETED.
16. THE DEPTH OF REVEALS IN CONCRETE WALLS SHALL NOT BE GREATER THAN 3/8”. WHERE REVEALS OCCUR IN CONCRETE
WALLS, ADD 3/8” TO THE CLEAR COVER TO REINFORCEMENT BARS SHOWN ABOVE.
17. NO ALUMINUM SHALL BE CAST IN CONCRETE.
18. REFER TO ARCHITECTURAL DRAWINGS FOR FINISHING OF ALL EXPOSED CONCRETE SURFACES.
P
OBJ
OBJ
T
PIPELINE
BRUSH BRUSH
BRUSH
BRUSH
84+00
86+00
85+00
87+00
88+00
Y:
Y:
X:102750
X:103000
X:103250
X:103500
Y: 96490.00 X:103346.52
740.25
739.50
739.50
Y=96490.00 X=103642.20
X:103843.09 Y: 96242.84
739.50
739.50
X:103175.37 Y: 96350.89
.5
SLOPE SLOPE
.5
SLOPESLOPE
X:103750
X:104000
X:103532.69 Y: 95990.55
X:103421.04 Y: 96048.64
3'-0" MANGATE
739.50
739.50
T-87 T-88 T-86
SWITCHGEAR
BUILDING
T-85
HARMONIC FILTER FND'S.
45° BEND
'R
(T
YP
BRUSH
BRUSH
BRUSH
KAUTZ
738.1
740.4
740.6
739.1
739.2
739.8
739.2
740.4
736.5 736.4
738.8
738.7
738.1
738.3
738.3
738.2
738.5
738.5
738.6
738.7
738.5
738.2
738.5
738.6
739.7
739.4
739.6
737.6
737.4
737.6
737.9
737.6
737.9
737.9
737.8
737.4
737.8 737.1
737.4 738.4
737.9
736.4
735.9
735.6
736.5
736.8
739.1
740.9738.7
739.9739.8
740.4
739.5
739.7
738.5
739.9
739.9
739.5
739.8
740.7
741.2
741.4
741.6
741.3
740.4
740.4
740.1
740.1
740.9
739.5
740.6
740.7
740.3
740.1
739.4
751.4
752.3
752.5
751.7
741.4
741.3
740.3
739.4
739.3
1.5
738.7
738.7
739.6
739.3
739.5
739.9
739.7
739.2
739.1
739.5 739.6
738.4
738.6
738.9
738.8
738.4
738.7
737.7
738.9
738.4
738.5
738.1
738.3
737.7
737.6
739.3
739.6
738.7
739.7
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
C
X
X
X
X X
X
BOUNDARY OF STRUCTURAL SCOPE
SEE 3/S-210 FOR NEW CONCRETE PAD
FOR PERMANENT PREFABRICATED
STRUCTURE FOR FERMILAB SUPPLIED
PATCH PANEL FOR TERMINATION OF THE
FERMILAB AND CITY OF BATAVIA FIBER.
SEE 1/S-210 FOR GROUND LEVEL PLAN
AND 1/S-220 FOR SUPERSTRUCTURE PLAN
SEE 2/S-210 FOR HARMONIC FILTER PADS
35 East Wacker Drive Suite 1800 Chicago IL 60601 USA t: +1 312 849 5610 www.arup.com
REVISIONS
DESCRIPTIONSDATEREV.
PROJECT NO.
SHEET NO.
REVISION NO.
DESIGNED
DRAWN
CHECKED
APPROVED
CONCEPT
DISCIPLINE REVIEW
ENG. REVIEWED
ISD APPROVED
SUBMITTED
A/E CONSULTANT DATE FERMILAB DATE
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
Arup US, Inc.
UIP - SUBPROJECT 2
KAUTZ ROAD SUBSTATION REPLACEMENT
TRUE
NORTH
E
S
W
JU
N
E
, 2
5N
:0 :1
P M
STRUCTURAL
SITE PLAN S-100
JULIAN SAFAR
BRIAN RAINE
ARIF OZKAN
SYLVIA RICHARDSON 06/19/25
06/19/25
06/19/25
06/19/25
3-5-207
1112 10 9 8 7 6 5 4 3 2 1
A
B
D
C
FOR CONTINUATION SEE SHEET S-200A
FOR CONTINUATION SEE SHEET S-200B
S-200A
S-200A
SHEET NOTES:
1. REFER TO SHEETS S-001 TO S-002 TO SYMBOLS, ABBREVIATIONS, AND GENERAL NOTES.
2. REFER TO SHEETS S-500 TO S502 FOR TYPICAL CONCRETE DETAILS.
3. REFER TO SHEET S-510 FOR TYPICAL STEEL DETAILS.
4. REFER TO SHEETS S-550 TO S-551 FOR REFERENCED DETAILS.
5. CONTRACTOR TO COORDINATE WITH MECHANICAL, ELECTRICAL, AND PLUMBING FOR ALL SLAB AND WALL PENETRATIONS.
35 East Wacker Drive Suite 1800 Chicago IL 60601 USA t: +1 312 849 5610 www.arup.com
REVISIONS
DESCRIPTIONSDATEREV.
PROJECT NO.
SHEET NO.
REVISION NO.
DESIGNED
DRAWN
CHECKED
APPROVED
CONCEPT
DISCIPLINE REVIEW
ENG. REVIEWED
ISD APPROVED
SUBMITTED
A/E CONSULTANT DATE FERMILAB DATE
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
Arup US, Inc.
UIP - SUBPROJECT 2
KAUTZ ROAD SUBSTATION REPLACEMENT
TRUE
NORTH
E
S
W
JU
N
E
, 2
5N
:0 :1
P M
STRUCTURAL
DEMOLITION OVERALL PLAN S-200
JULIAN SAFAR
BRIAN RAINE
ARIF OZKAN
SYLVIA RICHARDSON 06/19/25
06/19/25
06/19/25
06/19/25
3-5-207
3/64" = 1'-0"
DEMOLITION OVERALL PLAN1
CONTRACTOR TO DESIGN AND PROVIDE
TEMPORARY SHORING TO RESTRAIN THE FULL
PERIMETER OF THE BASEMENT WALL BEFORE
REMOVAL OF EXISTING FLOOR. EXISTING STEEL
BASEMENT COLUMNS AND W8 SUPPORT BEAMS
TO BE EITHER REMOVED AND REPLACED OR
REUSED IF SHOWN TO HAVE ADEQUATE
CAPACITY. REPLACE WITH PREFABRICATED
BUILDING STRUCTURE BY PREFABRICATED
BUILDING MANUFACTURER.
DEMO EXISTING
CONCRETE LANDING
EXISTING MANHOLE RELOCATION
REQUIRED. REF CIVIL
1112 10 9 8 7 6 5 4 3 2 1
A
B
D
C
FOR CONTINUATION SEE SHEET S-200B
REMOVE EXISTING LIGHTING AND STATIC POLE.
REINSTALL AT LOCATION SPECIFIED ON 1/S-210
EXISTING BUS DUCT TO BE DEMOLISHED TYP.
EXISTING BUS DUCT STEEL STRUCTURE AND FOUNDATIONS TO BE REUSED IF SHOWN TO
HAVE ADEQUATE CAPACITY FOR NEW CABLE BUS PER FINAL GEOTECHNICAL REPORT, TYP.
FOR CABLE BUS ROUTING, REFER TO ELECTRICAL DRAWINGS, E-200 AND E-218. BASED ON
THE EXISTING STRUCTURAL DRAWINGS, 3-6-17 SC-2 REV 7, DATED 4/23/97, 2'-6" DIA X 12'-0" LG
PIER DESIGN CAPACITY IS 5 K HORIZ AND 60 K-FT MOMENT. THE REACTIONS SHALL BE
PROVIDED BY THE CABLE BUS MANUFACTURER FOR REVIEW PRIOR TO INSTALLATION.
THE CABLE BUS MANUFACTURER SHALL VERIFY AND VALIDATE THAT THE EXISTING SUPPORT
STRUCTURE, CONNECTIONS, AND ANCHORAGE ARE ADEQUATE FOR THE NEW CABLE BUS. IF
NECESSARY, THE MANUFACTURER SHALL DESIGN AND PROVIDE ANY UPGRADES TO THE
EXISTING SUPPORT STRUCTURE, INCLUDING FOUNDATIONS, TO SUPPORT THE NEW CABLE
BUS. THE CABLE BUS MANUFACTURER SHALL SUBMIT STRUCTURAL CALCULATIONS SIGNED
AND SEALED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF ILLINOIS. SEE
SPECIFICATION 260513.1 MEDIUM VOLTAGE CABLE BUS.
SEE NOTE ON S-210 AND S-220.
GROUND LEVEL UNDER PROPOSED NEW BUILDING.
REMOVE EXCESS SOIL FROM SITE PER CIVIL DRAWINGS
AND FINAL GEOTECHNICAL REPORT.
REMOVE AND REPLACE GRAVEL FILL IN TRANSFORMER PITS
TO ELEVATION SHOWN ON CIVIL DRAWINGS. CONTRACTOR
SHALL DESIGN AND INSTALL TEMPORARY BRACING FOR
THE CONTAINMENT PIT WALLS WHENEVER ADJACENT
BACKFILL MATERIAL IS REMOVED.
REF FOR HARMONIC FILTER
PADS PARTIAL DEMOLITION PLAN
2/S-200A
(E) SWITCH PAD TO BE DEMO
REMOVE THIS SECTION OF THE (E) OIL CONTAINMENT WALLREMOVE THIS SECTION OF (E) OIL CONTAINMENT WALL
EXISTING BUS DUCT AND STEEL STRUCTURE ASSUMED
TO BE REMOVED AND FOUNDATIONS ABANDONED IN
PLACE FOR T88 REPLACEMENT BY OTHERS.
EXISTING BUS DUCT TO BE DEMOLISHED.
STEEL STRUCTURE TO BE REMOVED.
FOUNDATIONS TO BE ABANDONED IN PLACE.
(E) GENERATOR PAD TO BE DEMO
SEE ELECTRICAL DRAWINGS FOR LOCATION
DEMO EXISTING 50'-0" x 28'-0" HARMONIC FILTER PAD CUT TOP OF CONCRETE PILE TO AT LEAST
6' - 0" BELOW GRADE. REMOVE EXISTING
LIGHTING AND STATIC POLE. REINSTALL
AT LOCATION SPECIFIED ON 1/S-210
SHEET NOTES:
1. REFER TO SHEETS S-001 TO S-002 TO SYMBOLS, ABBREVIATIONS, AND GENERAL NOTES.
2. REFER TO SHEETS S-500 TO S502 FOR TYPICAL CONCRETE DETAILS.
3. REFER TO SHEET S-510 FOR TYPICAL STEEL DETAILS.
4. REFER TO SHEETS S-550 TO S-551 FOR REFERENCED DETAILS.
5. CONTRACTOR TO COORDINATE WITH MECHANICAL, ELECTRICAL, AND PLUMBING FOR ALL SLAB AND WALL PENETRATIONS.
35 East Wacker Drive Suite 1800 Chicago IL 60601 USA t: +1 312 849 5610 www.arup.com
REVISIONS
DESCRIPTIONSDATEREV.
PROJECT NO.
SHEET NO.
REVISION NO.
DESIGNED
DRAWN
CHECKED
APPROVED
CONCEPT
DISCIPLINE REVIEW
ENG. REVIEWED
ISD APPROVED
SUBMITTED
A/E CONSULTANT DATE FERMILAB DATE
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
Arup US, Inc.
UIP - SUBPROJECT 2
KAUTZ ROAD SUBSTATION REPLACEMENT
TRUE
NORTH
E
S
W
JU
N
E
, 2
5N
:0 :1
P M
STRUCTURAL
DEMOLITION PLAN WEST S-200A
JULIAN SAFAR
BRIAN RAINE
ARIF OZKAN
SYLVIA RICHARDSON 06/19/25
06/19/25
06/19/25
06/19/25
3-5-207
3/32" = 1'-0"
DEMOLITION PLAN - WEST1
3/32" = 1'-0"2 DEMOLITION PLAN - HARMONIC FILTER PADS
FOR CONTINUATION SEE SHEET S-200A
EXISTING MOTOR OPERATED DISCONNECT
STRUCTURES TO BE REPLACED BY CONTRACTOR.
NEW MOTOR OPERATED DISCONNECT STRUCTURE
ASSUMED TO BE INSTALLED AND SUPPORTED BY THE
EXISTING FOUNDATION WITH NO CHANGE IN LOADING.
NEW MOTOR OPERATED DISCONNECT STRUCTURE
ASSUMED TO BE INSTALLED AND SUPPORTED BY THE
EXISTING FOUNDATION WITH NO CHANGE IN LOADING.
BASED ON THE EXISTING STRUCTURAL DRAWINGS,
3-6-17 SC-2 REV 7, DATED 4/23/97, 3'-0" DIA X 14'-0" LG
PIER DESIGN CAPACITY IS 5 K HORIZ AND 80 K-FT
MOMENT. EXISTING FOUNDATIONS TO BE REUSED IF
SHOWN TO HAVE ADEQUATE CAPACITY PER FINAL
GEOTECHNICAL ENGINEERING REPORT.
SHEET NOTES:
1. REFER TO SHEETS S-001 TO S-002 TO SYMBOLS, ABBREVIATIONS, AND GENERAL NOTES.
2. REFER TO SHEETS S-500 TO S502 FOR TYPICAL CONCRETE DETAILS.
3. REFER TO SHEET S-510 FOR TYPICAL STEEL DETAILS.
4. REFER TO SHEETS S-550 TO S-551 FOR REFERENCED DETAILS.
5. CONTRACTOR TO COORDINATE WITH MECHANICAL, ELECTRICAL, AND PLUMBING FOR ALL SLAB AND WALL PENETRATIONS.
35 East Wacker Drive Suite 1800 Chicago IL 60601 USA t: +1 312 849 5610 www.arup.com
REVISIONS
DESCRIPTIONSDATEREV.
PROJECT NO.
SHEET NO.
REVISION NO.
DESIGNED
DRAWN
CHECKED
APPROVED
CONCEPT
DISCIPLINE REVIEW
ENG. REVIEWED
ISD APPROVED
SUBMITTED
A/E CONSULTANT DATE FERMILAB DATE
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
Arup US, Inc.
UIP - SUBPROJECT 2
KAUTZ ROAD SUBSTATION REPLACEMENT
TRUE
NORTH
E
S
W
JU
N
E
, 2
5N
:0 :1
P M
STRUCTURAL
DEMOLITION PLAN EAST S-200B
JULIAN SAFAR
BRIAN RAINE
ARIF OZKAN
SYLVIA RICHARDSON 06/19/25
06/19/25
06/19/25
06/19/25
3-5-207
3/32" = 1'-0"
DEMOLITION PLAN - EAST1
S-400
S-400
S-400
S-400
EXISTING TRANSFORMER PAD, TYP
EXISTING OIL CONTAINMENT
WALL, TYP
WALL PENETRATIONS. REF
ELECTRICAL DRAWINGS
FOR LOCATION.
S-550
S-550
TYP
S-551
TYP
TYP WALL FOUNDATION
T.O. CONCRETE = 3'-0" MIN
BELOW ADJACENT GRADE
P1 P1
(E) BASEMENT COLUMNS AND BEAMS MAY BE UTILIZED FOR SUPPORT OF NEW
PREFAB BLDG FLOOR STUCTURE. PREFABRICATED BUILDING REACTIONS ON
COLUMNS SHALL NOT EXCEED A FACTORED COMPRESSIVE LOAD OF 28.8 KIPS.
THE PREFABRICATED BUILDING REACTIONS SHALL BE PROVIDED BY THE
PREFABRICATED BUILDING MANUFACTURER FOR REVIEW PRIOR TO INSTALLATION.
1112 10 9 8 7 6 5 4 3 2 1
A
B
D
C
S-550
ELECTRICAL DUCT BANK. REF
FOR STRUCTURAL DETAILS. REF
ELECTRICAL FOR LOCATION AND
ADD'L INFORMATION.
1/S-502
EXISTING OIL CONTAINMENT
WALL, TYP
6' - 0 5/8" 11' - 5" 11' - 5" 11' - 5" 12' - 6" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0"
P3
EL
EC
T R
EF
REF ELECT
NEW LIGHTING AND STATIC POLE FOUNDATION.
SEE . REUSE EXISTING SUPERSTRUCTURE
FROM EXISTING POLE TO THE NORTH. IF
NECESSARY, THE CONTRACTOR SHALL DESIGN
AND PROVIDE ANY UPGRADES TO THE EXISTING
LIGHTING AND STATIC POLE STRUCTURE.
LIGHTING AND STATIC POLE IS ASSUMED TO BE
INSTALLED AND SUPPORTED BY THE NEW
FOUNDATION WITH NO CHANGE IN LOADING.
REF 1/S-200A
F1
F1
PILASTER, TYP
SEE DETAIL
(E) BUS DUCT FOUNDATIONS, TYP. TO BE REUSED IF SHOWN TO HAVE
ADEQUATE CAPACITY FOR NEW CABLE BUS PER FINAL GEOTECH REPORT.
BASED ON THE EXISTING STRUCTURAL DRAWINGS, 3-6-17 SC-2 REV 7,
DATED 4/23/97, 2'-6" DIA X 12'-0" LG PIER DESIGN CAPACITY IS 5 K HORIZ AND
60 K-FT MOMENT. THE REACTIONS SHALL BE PROVIDED BY THE CABLE BUS
MANUFACTURER FOR REVIEW. SEE SPECIFICATION 260513.1 MEDIUM
VOLTAGE CABLE BUS.
SEE NOTE ON S-200A AND S-220
MOTOR OPERATED DISCONNECT
STRUCTURES BY CONTRACTOR.
BASED ON THE EXISTING STRUCTURAL
DRAWINGS, 3-6-17 SC-2 REV 7, DATED 4/23/97,
3'-0" DIA X 14'-0" LG PIER DESIGN CAPACITY IS
5 K HORIZ AND 80 K-FT MOMENT. EXISTING
FOUNDATIONS TO BE REUSED IF SHOWN TO
HAVE ADEQUATE CAPACITY PER FINAL
GEOTECHNICAL ENGINEERING REPORT.
1/S-501
W8x21 W8x21 (E) W8 (E) W8
(E) W8 (E) W8
(E) W8 (E) W8
(E) W8 (E) W8
(E) W8 (E) W8
(E) W8
(E) HSS4x4x3/16 TYP
BASEMENT ACCESS HATCH AND DETAILS BY
PREFABRICATED BUILDING MANUFACTURER. PROVIDE
HOIST BEAM ABOVE. COORDINATE WITH PREFABRICATED
BUILDING LEVEL 1 FRAMING. REF ARCH FOR LOCATION.
GROUND LEVEL PREFAB FLOOR SHALL LATERALLY SUPPORT TOP OF BASEMENT
WALL AND RESIST THE RESULTANT LOAD DUE TO SOIL PRESSURE BY THE WALL,
EQUAL TO AN FACTORED LINE LOAD AT TOP OF WALL OF 6 KIPS/FT MINIMUM.
CONCRETE LANDING
PAD, REF CIVIL
CONCRETE LANDING
PAD, REF CIVIL
CONCRETE LANDING PAD, REF CIVIL4
S-550
S-550
(E) W8
PERIMETER WALL, TYP PER
REINF CONT
THROUGH PILASTERS
4/S-501
S-501
F1
F1
S-501
TYP
12" PERIMETER WALL
DOWEL WALL AND FTG
HORIZ REBAR PER 8/S-501
7'
0"
3' - 0"
CL PIER AND COLUMN
CL
CLPIER AND COLUMN CL (E) CONCRETE WALL =
OF NEW CONCRETE WALL
STEP FOOTING
SEE NOTE 7.
STEP FOOTING
SEE NOTE 7.
NEW PERIMETER DRAIN TO CONNECT TO
EXISTING PERIMETER DRAIN REF CIVIL
P1
9'
0"
NEW OIL CONTAINMENT WALL, TYP
CL (E) CONCRETE WALL =
OF NEW CONCRETE WALL
9'
0"
NEW OIL CONTAINMENT WALL,
TYP
CL
3' - 0"
7'
0"
P1
S-501
SimSIM
S-551
S-551
S-551
SIM
S-551
S-551
SIM
S-551 3
S-551
24' - 1"
1' - 0"14' - 2"14' - 2"14' - 2"14' - 2"12' - 2"16' - 2"1' - 0" 1' - 0"15' - 3"15' - 3"15' - 0"15' - 0"12' - 3"12' - 3"1' - 0"
24' - 5"
8'
0"
8'
0"
P2 P2 P2 P2 P2
P2 P2 P2 P2 P2
P1
P2P2
FIREWALL AND FIREWALL
SUPPORT BY FIREWALL
MANUFACTURER
PIER AND COL.
FIREWALL AND FIREWALL
SUPPORT BY FIREWALL
MANUFACTURER
PIER AND COL.
P2 P2
P1
FIREWALL AND FIREWALL
SUPPORT BY FIREWALL
MANUFACTURER
(E) AUX TX PAD TO SUPPORT
NEW TRANSFORMER
(E) BUS DUCT FOUNDATIONS, TYP.
CONTRACTOR TO PROTECT BUS DUCT
FOUNDATIONS FOR INSTALLATION OF
NEW FOOTINGS. SEE NOTE 6.
BASEMENT ACCESS STAIRS BY OTHERS.
REF ARCH FOR LOCATION AND DETAILS.
BASEMENT ACCESS STAIRS BY OTHERS.
REF ARCH FOR LOCATION AND DETAILS.
FOUNDATION DESIGN SHOWN FOR REFERENCE ONLY. NO SITE
SPECIFIC GEOTECHNICAL INVESTIGATIONS (GI) HAVE BEEN
UNDERTAKEN TO DATE. FINAL FOUNDATION DESIGN IS PENDING
FINAL GEOTECHNICAL REPORT INFORMATION AND
RECOMMENDATIONS. CURRENT INFORMATION SHOWN IS
SUBJECT TO CHANGE.
TYP PILASTER FOUNDATION
T.O. CONCRETE = 1' - 0" MIN.
BELOW ADJACENT GRADE
3/S-502
NEW FIREWALL FOUNDATION, TYP.
SEE 3/S-502.
EXISTING TRANSFORMER PAD, TYP
PROVIDE NEW POST-INSTALLED ANCHORAGE FOR
NEW TRANSFORMERS PER MANUFACTURER
NEW PILE LOCATION SHALL BE COORDINATED WITH THE
EXISTING PILES AND COORDINATED WITH FINAL GEOTECHNICAL
REPORT RECOMMENDATIONS WHEN AVAILABLE.
NEW FIREWALL FOUNDATION, TYP.
SEE 3/S-502.
DOWEL WALL AND FTG
HORIZ REBAR PER 7/S-501
ASSUMED (E) BUS DUCT FOUNDATIONS
FOR T88 REPLACEMENT. CONTRACTOR
TO VIF.
(N) 12" THK MIN CONCRETE PAD, SEE 5/S-501
FOR NEW GENERATOR. SEE ELECTRICAL
DRAWINGS FOR LOCATION.
5'
5"
12' - 11"
53' - 0"
NEW 12" THK MIN HARMONIC FILTER FOUNDATION PAD W/
3/8" FIBERGLASS REINF AT 6" OC EW. REF ELECT FOR
LOCATION AND PENETRATIONS. COORDINATE ALL REQUIRED
PENETRATIONS PRIOR TO POURING CONCRETE. FINAL
DESIGN OF FOUNDATION PAD IS PENDING COORDINATION
WITH THE HARMONIC FILTER MANUFACTURER.
(E) HARMONIC FILTER FOUNDATION PADS
S-502
S-502
S-502
S-502
NEW LIGHTING AND STATIC POLE FOUNDATION. SEE
REUSE EXISTING SUPERSTRUCTURE FROM EXISTING
POLE TO THE NORTH. REF
IF NECESSARY, THE CONTRACTOR SHALL DESIGN
AND PROVIDE ANY UPGRADES TO THE EXISTING
LIGHTING AND STATIC POLE STRUCTURE. LIGHTING
AND STATIC POLE IS ASSUMED TO BE INSTALLED
AND SUPPORTED BY THE NEW FOUNDATION WITH
NO CHANGE IN LOADING.
REF ELEC
P3
1/S-200A
3/S-502
R
EF
E
LE
C
SHEET NOTES:
1. REFER TO SHEETS S-001 TO S-002 TO SYMBOLS, ABBREVIATIONS, AND GENERAL NOTES.
2. REFER TO SHEETS S-500 TO S502 FOR TYPICAL CONCRETE DETAILS.
3. REFER TO SHEET S-510 FOR TYPICAL STEEL DETAILS.
4. REFER TO SHEETS S-550 TO S-551 FOR REFERENCED DETAILS.
5. CONTRACTOR TO COORDINATE WITH MECHANICAL, ELECTRICAL, AND PLUMBING FOR ALL SLAB AND WALL PENETRATIONS.
6. DURING CONSTRUCTION OF THE NEW FOUNDATIONS, THE CONTRACTOR SHALL PROVIDE PROPER SHORING AND BRACING AS NECESSARY TO PROTECT
THE EXISTING FOUNDATIONS. THE FOLLOWING CONSTRUCTION SEQUENCING IS ASSUMED:
A. DEMOLISH EXISTING PREFABRICATED BUILDING. EXISTING BUILDING FOUNDATIONS TO REMAIN.
B. DEMOLISH EXISTING BUS DUCT. BUS DUCT FOUNDATIONS TO REMAIN.
C. EXCAVATION AND FOUNDATION WORKS FOR NEW BUILDING EXTENSION.
D. FOUNDATION WORKS FOR NEW FIREWALL STRUCTURE.
E. INSTALLATION OF NEW PREFABRICATED BUILDING AND FIREWALL.
F. INSTALLATION OF NEW CABLE BUS.
7. NEW FOUNDATION FOR EXTENDED CONTROL BUILDING IS PENDING FINAL GEOTECHNICAL REPORT RECOMMENDATIONS TO EVALUATE AND REDUCE ANY IMPACTS OF SURCHARGE LOADING ON EXISTING BASEMENT WALL. DEEP FOUNDATIONS (PILES) MAY BE AN APPROPRIATE BASELINE OPTION TO REDUCE IMPACT OF SURCHARGE LOADING ON EXISTING BASEMENT WALL PER PENDING GEOTECHNICAL REPORT RECOMMENDATIONS.
NEW 12" THK MIN CONCRETE PAD, SEE 5/S-501
FOR PERMANENT PREFABRICATED STRUCTURE.
PREFABRICATED BUILDING STRUCTURE FOR FERMILAB SUPPLIED PATCH PANEL
FOR TERMINATION OF THE FERMILAB AND CITY OF…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .