About this file

This document is an electrical engineering technical drawing (Sheet E-337) for the Marshalling Cabinet No. MC1 Wiring at the Kautz Road Substation Replacement project for Fermilab. The detailed schematic shows comprehensive wiring connections for multiple electrical components including current transformers (CT), voltage transformers, bus differential circuits, alarm systems, and various monitoring points across different transformer units (T85, T86, T87, T88). The drawing includes specific technical details such as wire gauge, color coding (white, red, green, black), connection types, and references to multiple engineering drawings (E-114, E-115, E-116, E-117, E-118). The document is dated June 19, 2025, and was prepared by Arup US, Inc. for the UIP - Subproject 2 located at 35 East Wacker Drive in Chicago, Illinois.

View the file

Other files

File Type Posted
Amend 05 to RFP KRS-369604-JK.pdf PDF
Questions on E-House RFP_R5_2025_1003.xlsx XLSX spreadsheet
MC1.pdf PDF
E-B2.PDF PDF
KRS Site Construction - Structural Drawings.pdf PDF
ComEd Battery and Fermilab Battery Monitoring System Specifications.pdf PDF
REVISED Attachment 10-PUR-466_Proposal Certifications_r4_09.24.25.pdf PDF
Hollow Metal Door - Rated Hardware Schedule.pdf PDF
Card Reader Details.pdf PDF
MC3.pdf PDF
E-339.pdf PDF
E-338.pdf PDF
E-3.pdf PDF
2025 - Security and Access Control r2.docx DOCX document
MC2.pdf PDF
KRS Site Construction - Civil Drawings.pdf PDF
KRS Geotechnical Data Report.pdf PDF
REVISED Attachment 13-SARC_Subcontractor Annual RepsCerts Rev 5.pdf PDF
Amend 04 to RFP KRS-369604-JK.pdf PDF
MC4.pdf PDF
E-2.pdf PDF
FermiForward-Approved Color Palette.pdf PDF
Amend 03 to RFP KRS-369604-JK.pdf PDF
E-Control House Site Visit-Sign-in Sheet.pdf PDF
Fermilab Site Map-Kautz Road Substation.pdf PDF
E-House_QandA_Amend02.pdf PDF
Amend 02 to RFP KRS-369604-JK.pdf PDF
Business Visitor Registration Instructions and Directions.pdf PDF
REVISED Attachment 13-SARC_Subcontractor Annual RepsCerts Rev 4.pdf PDF
Amend 01 to RFP KRS-369604-JK.pdf PDF
Attachment 2 - 010010_General_Requirements_3_2025 FFDG_.pdf PDF
Attachment 4 - 013300 Submittals FermiForward (3).pdf PDF
Attachment 6 -017900 - DEMONSTRATION AND TESTING.pdf PDF
Attachment 11 - 2025 Onsite NonProfessional Services Insurance Requirements.pdf PDF
Attachment 3 - 013100_ESH_Requirements_04-2025 FFDG.pdf PDF
Attachment 5 - 014100 Quality Requirements - March 2025 FermiForward.pdf PDF
Attachment 7-2 Pages 63-113 from 3-5-207C Dwg IFBr2.pdf PDF
Attachment 8 - 5-207C Control House Specs IFBr2.pdf PDF
Attachment 10 - PUR-466_Proposal Certifications_r3_06.23.25.pdf PDF
Attachment 13 -SARC_Subcontractor Annual RepsCerts Rev 3.pdf PDF
Attachment 14 SMALL BUSINESS SUBCONTRACTING PLAN template Far 52.219-9.pdf PDF
1. RFP for E-House.pdf PDF
Attachment 1 - Sample Subcontract .pdf PDF
Attachment 7-1 Pages 1-62 from 3-5-207C Dwg IFBr2.pdf PDF
Attachment 9 - FFDG General Terms and Conditions for Commercial Products and Commercial Services (01.2025).pdf PDF
Attachment 12 - PUR-568_Cost Accounting Standard Notices and Certification.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 T87C1H1X1

2 T87C1H2X1 3 T87C1H3X1 4 T87C1H123X5

T87C4X7X16 T87C4X8X17 T87C4X9X18

10 SHLD

T87-MC1-C1BLK

WHT

RED

GRN

1 T87C2H4X1 2 T87C2H5X1 3 T87C2H6X1 4 T87C2H456X5

T87C3X10X16 T87C3X10X57

SHLD

3 T8797T1 4 T8797T2

1 +

2 - 3 1 4 2 5 +(3) 6 4 7 + 8 - 9 5

10 SPARE

12 6

1 T85DCP

2 T85DCN

3 SPARE

T88C1H1X1 T88C1H2X1 T88C1H3X1

T88C1H123X5

T88C47X1 T88C48X1 T88C49X1

T88C4789X3

SHLD

T87-MC1-C2BLK

WHT

RED

GRN

T88-MC1-C1BLK

WHT

RED

GRN

T88-MC1-C2BLK

WHT

RED

GRN

T86-MC1-C1

T86-MC1-C2BLK

WHT

RED

GRN

T88C2H4X1 T88C2H5X1 T88C2H6X1

T88C2H456X5

T88C3X10X1 T88C3X10X5

SHLD

T86C1H1X1 T86C1H2X1 T86C1H3X1

T86C1H123X5

T86C4X8X1 T86C4X9X1 T86C4X10X1

T86C4X8910X3

SHLD

T86C2H4X1 T86C2H5X1 T86C2H6X1

SHLD

T85C1A3 T85C1B3 T85C1C3 T85C14

T85C5A1 T85C5B1 T85C5C1 T85C53

SHLD

T85-MC1-C1BLK

WHT

RED

GRN

T85-MC1-C2T85C2A4

T85C2B4 T85C2C4 T85C25

T85C4D1 T85C4D4

SHLD

TRANSF. DIFF. PRIM. CT ØA

TRANSF. DIFF. PRIM. CT ØB

TRANSF. DIFF. PRIM. CT ØC

TRANSF. DIFF. PRIM. CT NEUTRAL

TRANSF. DIFF. PRIM. CT ØA

TRANSF. DIFF. PRIM. CT ØB

TRANSF. DIFF. PRIM. CT ØC

TRANSF. DIFF. PRIM. CT NEUTRAL

TRANSF. DIFF. SEC. CT ØA

TRANSF. DIFF. SEC. CT ØB

TRANSF. DIFF. SEC. CT ØC

TRANSF. DIFF. SEC. CT NEUTRAL

TRANSF. DIFF. PRIM. CT ØA

TRANSF. DIFF. PRIM. CT ØB

TRANSF. DIFF. PRIM. CT ØC

TRANSF. DIFF. PRIM. CT NEUTRAL

TRANSF. DIFF. SEC. CT ØA

TRANSF. DIFF. SEC. CT ØB

TRANSF. DIFF. SEC. CT ØC

TRANSF. DIFF. SEC. CT NEUTRAL

TRANSF. DIFF. PRIM. CT ØA

TRANSF. DIFF. PRIM. CT ØB

TRANSF. DIFF. PRIM. CT ØC

TRANSF. DIFF. PRIM. CT NEUTRAL

TRANSF. DIFF. SEC. CT ØA

TRANSF. DIFF. SEC. CT ØB

TRANSF. DIFF. SEC. CT ØC

TRANSF. DIFF. SEC. CT NEUTRAL

BUS DIFF. CT ØA

BUS DIFF. CT ØB

BUS DIFF. CT ØC

BUS DIFF. CT NEUTRAL

51 NEUTRAL CT

51 NEUTRAL CT

BUS DIFF. CT ØA

BUS DIFF. CT ØB

BUS DIFF. CT ØC

BUS DIFF. CT NEUTRAL

51 NEUTRAL CT

51 NEUTRAL CT

BUS DIFF. CT ØA

BUS DIFF. CT ØB

BUS DIFF. CT ØC

BUS DIFF. CT NEUTRAL

51 NEUTRAL CT

51 NEUTRAL CT

BUS DIFF. CT ØA

BUS DIFF. CT ØB

BUS DIFF. CT ØC

BUS DIFF. CT NEUTRAL

T51 NEUTRAL CT

T51 NEUTRAL CT

CCVT1192AX1

CCVT1192BX1

CCVT1192CX1

CCVT1192AX0

CCVT1192-MC1-C1BLK

WHT

RED

GRN

SHLD

SHLD

SHLD

T87-MC1-C5BLK

WHT

RED

GRN

ORG

T88-MC1-C5BLK

WHT

RED

GRN

ORG

T86-MC1-C5BLK

WHT

RED

GRN

ORG

T85-MC1-C7BLK

WHT

RED

GRN

ORG

T87-MC1-C6BLK

WHT

RED

GRN

BLK

WHT

RED

GRN

T86-MC1-C6BLK

WHT

RED

GRN

T85-MC1-C8BLK

WHT

RED

GRN

ANN. ALARM POS.

BUCHOLZ ALARM

FORCED COOLING SYS. FAIL

OIL/WINDING TEMP. ALARM

OIL LEVEL ALARM

T87ANP

T8763P

T81FCSF

T87OTA

T87OLA

4/C- #10

(DWG. E-114)

4/C- #10

(DWG. E-114)

7/C- #14

(DWG. E-116)

7/C- #12

(DWG. E-116)

7/C- #14

(DWG. E-117)

7/C- #12

7/C- #14

(DWG. E-115)

7/C- #12

(DWG. E-115)

7/C- #114

(DWG. E-114)

7/C- #12

(DWG. E-114)

4/C- #10

(DWG. E-118)

9/C- #10

(DWG. E-115)

4/C- #10

(DWG. E-115)

4/C- #10

(DWG. E-117)

4/C- #10

(DWG. E-117)

4/C- #10

(DWG. E-116)

4/C- #10

(DWG. E-116)

T86C2H456X5

T86C3X7X1 T86C3X7X4

SPARE

7 SPARE

BLU

WHT/BLK

ORG

BLU

WHT/BLK

BLU

WHT/BLK

ORG

BLU

WHT/BLK

BLU

WHT/BLK

ORG

BLU

WHT/BLK

ORG

BLU

WHT/BLK

BLU

WHT/BLK

WINDING TEMP ALARM T87WTA

SHLD

ANN. ALARM POS.

PRESSURE RELIEF

FORCED COOLING SYS. FAIL

OIL/WINDING TEMP. ALARM

OIL LEVEL ALARM

T88ANP

T88P63P

T88FCSF

T88OWT

T88OLA

NITROGEN LEVEL ALARM T88NLA

T88DCP

T88DCN

T88SPT1

T88SPT2

T88SPR2

SHLD

SPARE

T88SPR1

T88-MC1-C6

SHLD

ANN. ALARM POS.

BUCHOLZ ALARM

FORCED COOLING SYS. FAIL

OIL TEMP. ALARM

T86ANP

T8663B

T86FCSF

T86OTA

T86OLA

SPARE

T86DCP

T86DCN

T86SPT1

T86SPT2

T86SPR2

SHLD

SPARE

T86SPR1

SHLD

ANN. ALARM POS.

PRESSURE RELIEF

FORCED COOLING SYS. FAIL

OIL/WINDING TEMP. ALARM

OIL LEVEL ALARM

T85ANP

T8563P

T85FCSF

T85OWT

T85OLA

T85NLA

T85DCP

T85DCN

T85SPT1

T85SPT2

T85SPR2

SHLD

SPARE

T85SPR1

BUCKHOLZ RELAY TRIP

SUDDEN PRESSURE TRIP

SUDDEN PRESSURE READY

DC POS.

DC NEG.

SUDDEN PRESSURE TRIP

SUDDEN PRESSURE READY

OIL LEVEL ALARM

WINDING TEMP ALARM

NITROGEN LEVEL ALARM

T85-MC1-C9

7/C- #12

(DWG. E-114)

SPARE

SPARE

SPARE

SPARE

SHLD

T87-MC1-C7

7/C- #12

(DWG. E-116)

BLK

WHT

RED

GRN

ORG

BLU

WHT/BLK

BLK

WHT

RED

GRN

ORG

BLU

WHT/BLK

SPARE

SPARE

SPARE

SPARE

SPARE

SHLD

SPARE

SPARE

T88-MC1-C7

7/C- #12

(DWG. E-117)

BLK

WHT

RED

GRN

ORG

BLU

WHT/BLK

SPARE

SPARE

SPARE

SPARE

SPARE

SHLD

SPARE

SPARE

T86-MC1-C7

7/C- #12

(DWG. E-115)

BLK

WHT

RED

GRN

ORG

BLU

WHT/BLK

SPARE

SPARE

SPARE

SPARE

SPARE

SHLD

SPARE

SPARE

T83LTCL1

T83LTCN

T83-MC1-RVBLK

WHT

T84LTCL1

T84LTCN

T87-MC1-RVBLK

WHT

SPARE

SPARE

SPARE

SPARE

SHLD 2/C- #12

(DWG. E-50) SHLD 2/C- #12

(DWG. E-114)

SPARE

SPARE

T86WTA

SPARE

TRANSF. DIFF. SEC. CT ØA

TRANSF. DIFF. SEC. CT ØB

TRANSF. DIFF. SEC. CT ØC

TRANSF. DIFF. SEC. CT NEUTRAL T87C4X789X5

SEE DWG.

RP7 SH1

SEE DWG.

RP4 SH1

SEE DWG.

RP7 SH1

SEE DWG.

RP8 SH1

SEE DWG.

RP4 SH1

SEE DWG.

RP8 SH1

SEE DWG.

RP6 SH1

SEE DWG.

RP4 SH1

SEE DWG.

RP6 SH1

SEE DWG.

RP3 SH1

SEE DWG.

MP2 SH1

SEE DWG.

RP5 SH1

SEE DWG.

RP5 SH1

SEE DWG.

RP5 SH1

SEE

DWG. E-29

SEE

DWG. E-29

SEE

DWG. E-30

SEE DWG.

RP8 SH2

TAP CHANGER

SEE DWG.

1VAL164812M0801

TAP CHANGER

SEE DWG.

1VAL164811M3701

SEE

DWG. E-28

DCP-MSS-2

CKT 3

SEE DWG. E-18

SEE

DWG. E-28

SEE

DWG. E-27

DCP-KRS-1

CKT. 25

SEE DWG. E-76

SUDDEN PRESSURE TRIP

SUDDEN PRESSURE READY

SEE

DWG. RP5- SH2

CCVT1192AY1

CCVT1192BY1

CCVT1192CY1

CCVT1192AY0

T85-MC1-C3

4/C- #10

(DWG. E-114)

TRANSF. DIFF. PRIM. CT ØA

TRANSF. DIFF. PRIM. CT ØB

TRANSF. DIFF. PRIM. CT ØC

TRANSF. DIFF. PRIM. CT NEUTRAL

SEE DWG.

RP4 SH1

T85C3A5 T85C3B5 T85C3C5 T85C36

T85C7AX

T85C7BX

T85C7CX

T85C7X

SHLD

BLK

WHT

RED

GRN

CCVT1192-MC1-C2

4/C- #10

(DWG. E-118)

SHLD

SHLD

T85-MC1-C5BLK

WHT

RED

GRN

4/C- #10

(DWG. E-114)

BLK

WHT

RED

GRN

BLK

WHT

T85-MC1-C4

2/C- #10

(DWG. E-114)

SHLD

BLK

WHT

RED

GRN

BLK

WHT

RED

GRN

T85-MC1-C6

4/C- #10

(DWG. E-114)

SHLD

BLK

WHT

RED

GRN

BLK

WHT

RED

GRN

T86-MC1-C4

4/C- #10

(DWG. E-115)

SHLD

T87-MC1-C4BLK

WHT

RED

GRN

4/C- #10

(DWG. E-116)

SHLD

T87-MC1-C3BLK

WHT 2/C- #10

(DWG. E-116)

SHLD

T88-MC1-C4BLK

WHT

RED

GRN

4/C- #10

(DWG. E-117)

SHLD

T88-MC1-C3

4/C- #10

(DWG. E-117)

BLK

WHT

SHLD

CCVT1191AX1

CCVT1191BX1

CCVT1191CX1

CCVT1191AX0

CCVT1191-MC1-C1BLK

WHT

RED

GRN

SHLD

4/C- #10

(DWG. E-118)

SEE DWG.

RP3 SH1

CCVT1191AY1

CCVT1191BY1

CCVT1191CY1

CCVT1191Y0

BLK

WHT

RED

GRN

CCVT1191-MC1-C2

4/C- #10

(DWG. E-118)

SHLD

SHLD

T86-MC1-C3BLK

WHT 9/C- #10

(DWG. E-115)

SEE DWG.

MP3 SH2

(DWG. E-117)

Se p

, 2

- 7 :3

6A M

A ut oD es k D oc s:

\A R

U P\

-0

Fe rm iL ab C am pu s In fra st ru ct ur e\

Pr oj ec t F ile s\

_W

IP

M od el s\ E

- E le ct ric al \S he et s\ E-

7.

dw g

90% FINAL DESIGN06/19/250 06/19/25

06/19/25

06/19/25

06/19/25

D. GURALCHUK

H. LOBO

K. CEPEDA

R. TANDEL

NTS

3-5-207

ELECTRICAL

JU

N

E

, 2

E-337MARSHALLING CABINET

NO. MC1 WIRING

35 East Wacker Drive Suite 1800 Chicago IL 60601 USA t: +1 312 849 5610 www.arup.com

SCALE:

REVISIONS PROJECT NO.

SHEET NO.

REVISION NO.

DESIGNED

DRAWN

CHECKED

APPROVED

CONCEPT

DISCIPLINE REVIEW

ENG. REVIEWED

ISD APPROVED

SUBMITTED

A/E CONSULTANT FERMILAB DATE

N O

T

FO

R C

O N

ST

R

U C

TI

O

N

Arup US, Inc.

UIP - SUBPROJECT 2

KAUTZ ROAD SUBSTATION REPLACEMENT

DESCRIPTIONS

DATE

DATEREV.

Sheets and Views
Layout1

File details come from the government source that posted it. Updated .