JQR MJU-76.pdf

PDF 302 KB Posted

Attached to
MJU-76B Pre-solicitation Synopsis Federal contract opportunity
Solicitation number
FA8213-25-R-B009
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document is a Justification for Qualification Requirements (JQR) for the MJU-76/B Infrared Countermeasure (IRCM) Flare, a critical aerospace countermeasure component for fighters and potentially other aircraft. The document outlines stringent qualification requirements for potential manufacturers, including detailed verification processes for facilities, data, production methods, and testing capabilities. Key requirements include: demonstrating specialized manufacturing equipment, providing comprehensive technical documentation, developing specific test procedures, and conducting production-equivalent testing, with an estimated qualification cost of $200,000.

The qualification process is extensive, requiring potential suppliers to meet multiple technical and procedural standards to ensure product reliability and safety. The government will only consider U.S. suppliers (with possible special exceptions) and requires potential manufacturers to prove their ability to produce flares without functional degradation. The estimated time for qualification is 360 days, and approval does not guarantee a contract award. The solicitation is part of a planned Multiple Award Indefinite Delivery/Indefinite Quantity (IDIQ) contract with a 5-year basic ordering period, anticipated award in July 2025, and aims to procure approximately 500,000 replenishment spare infrared countermeasure flares.

View the file

Other files for this federal contract opportunity

Other files attached to MJU-76B Pre-solicitation Synopsis, newest first.
File Type Posted
Attachment 27 - MJU-76 DD Form 254 Signed.pdf PDF
Attachment 22 - GFP Worksheet Placeholder.docx DOCX document
Attachment 21 - MJU 76 Contract Data Requirements List.pdf PDF
Attachment 20 - RFOP Worksheet - MJU-76.pdf PDF
Attachment 18 - AF Form 260 MJU-76.pdf PDF
Attachment 17 - Interim Hazard Classification Log No 23-208.pdf PDF
Attachment 14 - Performance Specification for MJU 76 Infrared Countermeasure Flare Rev B.pdf PDF
Attachment 13 - Data List for Drawing 201825310.pdf PDF
Attachment 8 - Contractor First Article Testing.pdf PDF
Attachment 24 - Justification for Qualification Requirements MJU-76.pdf PDF
Attachment 23 - Example Request for Order Proposal 5-6-25.pdf PDF
Attachment 16 - Data List for Drawing -MJU 76B 201825310_98747_DL_B.pdf PDF
Attachment 3 - ES7035 Energetic Material Description Sheets.pdf PDF
Attachment 1 - AIR SPEC IM FD2020-24-52553.pdf PDF
Attachment 26 - Section M v2 1-29-25.pdf PDF
Attachment 12 - SPI 1370015904428.pdf PDF
Attachment 10 - Report of Shipment.pdf PDF
Attachment 7 - Government First Article Testing.pdf PDF
Attachment 6 - ES7650_Oct2000 - MIL-STD-1916.pdf PDF
Attachment 5 - ES7034 Rework and Repair of Non-Conforming Material.pdf PDF
Attachment 2 - USAF Statement of Work - Ammunition Data Cards WARP 4-19-2018.pdf PDF
Attachment 25 - Section L v2 1-29-25.pdf PDF
Attachment 19 - MJU-76 Ordering Procedures.pdf PDF
Attachment 15 - Detail Specification for MJU-76B Infrared Countermeasure Flare.pdf PDF
Attachment 11 - REPSHIP.pdf PDF
Attachment 9 - ES6925 MSE.pdf PDF
Attachment 4 - ES6200 Ammunition Data Cards.pdf PDF
Draft Solicitation - FA821325RB009.pdf PDF
Interested Vendor Question and Answer.pdf PDF
JQR MJU-76.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JUSTIFICATION FOR QUALIFICATION REQUIREMENTS

FAR 9.202(a) and DoD 4120.24M (Public Law 98-525, Title 10 USC Section 2319)

DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense and

U.S. DoD contractors only, CTI and Export Controlled, 4 January 2024. Other requests for this document must be referred to AFLCMC.EBHCC.CMFLARES@US.AF.MIL.

Section A: Item Identification

1. Stock Number (NSN): 1370-01-677-6009/ LA88

2. Part Number (P/N): 201825310

3. Noun: MJU-76/B FLARE, COUNTERMEASURE

4. Application: Fighters, possible other Aircraft in the future

Section B: Justification For Establishing a Qualification Requirement and Reason Why

Qualification Requirement Must Be Demonstrated Prior to Any Contract Award.

1. Characteristics associated with the manufacture of these countermeasure flares, if not correct, would result in product functional degradations. This item performs a critical function on the aircraft and special equipment is required for its manufacture and testing.

Special care and attention is required but not limited to finish, processing, assembly, performance, and part interchangeability of this item.

2. The prospective bidder’s ability to interpret engineering drawings and specifications and the execution of the qualification requirements specified herein are necessary to verify the structural and functional integrity and/or form, fit, and function of the item being procured.

3. Failure to procure this item from a fully qualified source could result in failure of the part, degradation of aircraft mission capability, or loss of aircraft and crew.

4. Completion of the specified pre-contract award qualification requirements will assure the government that the offeror is technically capable of producing the item in compliance with the applicable technical specifications and associated drawings and within the schedule and economic constraints of our contracts. To protect the interests of the Air Force, only suppliers in the United States will be considered, with the exception of special permissions.

There are sufficient technical and schedule risks, which can only be minimized by a completion of the requirements prior to contract award.

Section C: Qualification Requirements That Must be Satisfied to Become a Qualified

Source and Qualification Waiver Requirements.

1. Prequalification Notice. The offeror shall notify AFLCMC / EBHCC or, if responding to a solicitation, the contracting officer of intent to qualify as a source for these countermeasure flares.

2. Facilities. The offeror must certify to the design control activity (EBHCC) that the offeror has the required facilities and equipment to manufacture, inspect, test, and package the item, or provisions for their acquisition or utilization from another source. When the offeror proposes to acquire these items, the offeror shall provide documented equipment orders or similar documentation for government inspection. The offeror shall make facilities, equipment, tooling, and personnel available for evaluation and inspection by the government.

3. Data Verification. The offeror shall verify possession of a complete data package by providing a list of applicable drawings (with revision), procedures, and specifications currently in their possession related to the manufacture of the MJU-76/B IRCM Flares. This submitted verification package must be sufficient to show in thorough technical detail how the flares shall be manufactured and tested. In addition the package must contain a qualification test procedure designed to be a final functional checkout of manufactured devices sufficient in detail to ensure all operational functions meet specification. When the offeror proposes to use industry standards during manufacture of the MJU-76/B flares, the offeror shall document the differences between the industry standard and the military standard, and state why those differences do not adversely affect the ability of the flares to pass the final functional checkout. The design control activity shall determine if the industry standard is acceptable for use in the manufacture of the flares.

4. Process Verification. The offeror shall identify sources for materials and standards for internally used processes. The offeror shall further define/provide written procedures for the utilization of any special test or inspection facilities and/or equipment. This documentation shall also include a diagnostic procedure showing the process the flares being produced would undergo. The production process shall show how the offeror shall test, inspect, diagnose, produce and perform a final functional checkout. Development of special test procedures not available from the government is required. The offeror shall develop those procedures for review and approval by the design control activity. The contractor must be capable of locating alternative components to minimize any diminishing manufacturing source and material shortage (DMSMS) problems.

5. Test and Evaluation or Verification. The offeror shall submit to the design control activity an explanation of how they will certify that the test methods and production procedures meet the specifications for the MJU-76/B IRCM Flares. The government retains the option to inspect the offeror’s production and testing facilities. To allow accomplishing this, the offeror’s facilities shall be made available to government inspection during the qualification effort upon ten days written notice of intent to inspect or 60 days written notice if outside the United States. A qualification test procedure per DI-NDTI-81307A and a qualification test report per DI-NDTI-80603A shall be provided to the contracting officer.

Qualification testing must be accomplished IAW PRF 201825310, initial release or latest revision, paragraph 4.3, First Article Sample.

6. Qualification Article. Upon satisfactory compliance with the provisions of paragraphs

1 to 5 above, the offeror shall build and test production equivalent MJU-76/B flares IAW paragraph 4.3 of the item specification to demonstrate production capability. This production and testing shall be done at the offeror’s expense.

Estimated likely costs for testing and evaluation which will be incurred by the potential offeror to become qualified: $200,000.

7. Sensitive Military Technology. Portions of the Technical Data Package for the MJU-

76/B IRCM Flares are classified. Offeror must meet all requirements for the generation of classified data from testing well as handling and storage of classified data related to the flares.

8. Testing and Production Evaluation. The offeror shall be required to submit a complete test report for the production capability demonstration verifying compliance with all performance, environmental, mechanical, and quality assurance requirements identified by the

Technical Data Package. In addition the test report shall contain detailed documentation describing the testing procedures during production. This data shall describe in detail the point(s) in the production process that testing occurred, and if failures were noted, the corrective action taken and the results of the retest. The government retains the option to inspect the production and testing process, including on-site witnessing of any or all production and testing activities. The offeror will provide notification to the government of testing and evaluation 30 days (60 days if outside of US) in advance so that the government can witness, if needed, coordinate needed activities, support, etc.

9. Time Completion Estimate. It is the estimate of the design control activity that completion of this qualification effort should require 360 days. This is based on complexity and hazards associated with the flare and other factors. This is not a deadline but a notification to a potential offeror of the time we believe will be required. Events that occur during the qualification process may cause this time requirement to increase or perhaps decrease, depending on individual circumstances.

10. Time Limitation. An offeror may not be denied the opportunity to submit and have considered, an offer for a contract if the offeror can demonstrate to the satisfaction of the contracting officer and cognizant engineering activity that the offeror (or its product) meets these standards for qualification or can meet them before the date specified for award of the contract. The award will not be delayed to provide the contractor with an opportunity to demonstrate its ability to meet the standard specified in this source qualification statement.

11. Evaluation of Proposals Not Previously Qualified. The offeror must be fully qualified in order to be eligible for a contract award. Therefore, the offeror must fulfill all of the requirements stated, in writing, in this Justification for Qualification Requirements before the date specified for award of the contract. The government reserves the right to award a contract at the time specified for award, to a qualified source even though other sources may not have finished qualifying.

12. Waiver. Any offeror who has had previous experience in the production of the flare or other similar flares (MJU-71/B, MJU-57/B, MJU-68/B) may apply to the design control activity for a waiver of some of the above requirements. The government may qualify previous manufactures of mentioned flares, even without request of a waiver. A waiver will be granted only if the design control activity can establish the qualification of the offeror from previous knowledge/interface or from written inputs from the offeror.

13. Approval. Once the qualification requirements are met, the offeror will be listed as an approved source for this Flare. Approval, however, does not guarantee subsequent contract award.

Section D: Signatures.

Quincy Stevens

AFLCMC/EBHCC Program Engineer

Lynn Thomas

AFLCMC/EBHE Chief Engineer

Andrew Hatch

AFLCMC Contracting OSF AFMC

2024-01-08T13:04:15-0700
STEVENS.QUINCY.PAUL.1554290996
2024-01-12T14:14:22-0700
THOMAS.LYNN.K.1231474494
2024-01-29T13:55:47-0700
HATCH.ANDREW.L.1249736666

File details come from the government source that posted it. Updated .