Attachment 8 is a First Article Test (Contractor Testing) specification detailing the comprehensive testing requirements for a product sample before full production. The document outlines that the first article must be manufactured using the same processes, procedures, facility, materials, and packaging as intended for regular production, and must be produced by the contractor using the government-provided technical data package.

The first article must undergo extensive inspection and testing against all drawing, specification, and Quality Assurance Provision (QAP) requirements, with some exceptions for previously tested components or tests. The contractor is required to compile a detailed First Article Test Report documenting all inspection results, measurements, test data, and certifications. The Contracting Officer may require additional first article testing if there are major changes to technical data, production lapses over 45 days, or changes in manufacturing process, materials, or performance location. Any costs associated with such additional testing due to process changes will be borne by the contractor.

View the file

Other files for this federal contract opportunity

Other files attached to MJU-76B Pre-solicitation Synopsis, newest first.
File Type Posted
Attachment 24 - Justification for Qualification Requirements MJU-76.pdf PDF
Attachment 23 - Example Request for Order Proposal 5-6-25.pdf PDF
Attachment 16 - Data List for Drawing -MJU 76B 201825310_98747_DL_B.pdf PDF
Attachment 3 - ES7035 Energetic Material Description Sheets.pdf PDF
Attachment 1 - AIR SPEC IM FD2020-24-52553.pdf PDF
Attachment 27 - MJU-76 DD Form 254 Signed.pdf PDF
Attachment 22 - GFP Worksheet Placeholder.docx DOCX document
Attachment 21 - MJU 76 Contract Data Requirements List.pdf PDF
Attachment 20 - RFOP Worksheet - MJU-76.pdf PDF
Attachment 18 - AF Form 260 MJU-76.pdf PDF
Attachment 17 - Interim Hazard Classification Log No 23-208.pdf PDF
Attachment 14 - Performance Specification for MJU 76 Infrared Countermeasure Flare Rev B.pdf PDF
Attachment 13 - Data List for Drawing 201825310.pdf PDF
Attachment 25 - Section L v2 1-29-25.pdf PDF
Attachment 19 - MJU-76 Ordering Procedures.pdf PDF
Attachment 15 - Detail Specification for MJU-76B Infrared Countermeasure Flare.pdf PDF
Attachment 11 - REPSHIP.pdf PDF
Attachment 9 - ES6925 MSE.pdf PDF
Attachment 4 - ES6200 Ammunition Data Cards.pdf PDF
Draft Solicitation - FA821325RB009.pdf PDF
Attachment 26 - Section M v2 1-29-25.pdf PDF
Attachment 12 - SPI 1370015904428.pdf PDF
Attachment 10 - Report of Shipment.pdf PDF
Attachment 7 - Government First Article Testing.pdf PDF
Attachment 6 - ES7650_Oct2000 - MIL-STD-1916.pdf PDF
Attachment 5 - ES7034 Rework and Repair of Non-Conforming Material.pdf PDF
Attachment 2 - USAF Statement of Work - Ammunition Data Cards WARP 4-19-2018.pdf PDF
Interested Vendor Question and Answer.pdf PDF
JQR MJU-76.pdf PDF
JQR MJU-76.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT #8 - FIRST ARTICLE TEST (CONTRACTOR TESTING)

(a) The first article shall consist of:

SEE PRF 201825310 Para 4.3 which shall be examined and tested in accordance with contract requirements, the item specifications, Quality Assurance Provisions (QAPS) and all drawings listed in the Technical Data Package.

(b) The first article shall be representative of items to be manufactured using the same processes and procedures and at the same facility as contract production. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used during regular production. All components, subassemblies, and assemblies in the first article sample shall have been produced by the Contractor (including subcontractors) using the technical data package provided by the Government.

(c) The first article shall be inspected and tested by the contractor for all requirements of the drawing(s), the QAP(s), and specification(s) referenced thereon, except for: None

(1) Inspections and tests contained in material specifications provided that the required inspection and tests have been performed previously and certificates of conformance are submitted with the First Article Test Report.

(2) Inspections and tests for Military Standard (MS) components and parts provided that inspection and tests have been performed previously and certifications for the components and parts are submitted with the First Article Test Report.

(3) Corrosion resistance tests over 10 days in length provided that a test specimen or sample representing the same process has successfully passed the same test within 30 days prior to processing the first article, and results of the tests are submitted with the First Article Test Report.

(4) Life cycle tests over 10 days in length provided that the same or similar items manufactured using the same processes have successfully passed the same test within 1 year prior to processing the first article and results of the tests are submitted with the First Article Test Report.

(5) Onetime qualification tests, which are defined as a onetime on the drawing(s), provided that the same or similar item manufactured using the same processes has successfully passed the tests, and results of the test are on file at the contractor’s facility and certifications are submitted with the First Article Test Report.

(d) Those inspections which are of a destructive nature shall be performed upon additional sample parts selected from the same lot(s) or batch(es) from which the first article was selected.

(e) A First Article Test Report shall be compiled by the contractor documenting the results of all inspections and tests (including supplier’s and Vendor’s inspection records and certifications, when applicable). The First Article Test Report shall include actual inspection and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and QAP requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. The Government Quality Assurance Representative’s (QAR) findings shall be documented on DD Form 1222, Request for and Results of Tests, and attached to the contractor’s test report. Two copies of the First Article Test Report and the DD Form 1222 will be submitted through the Administrative Contracting Officer to the Contracting Officer with an additional information copy furnished to : Not required

(f) Notwithstanding the provisions for waiver of first article, an additional first article sample or portion thereof, may be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of 45 days, or

(iii) Whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply. When conditions (i), (ii), or (iii) above occurs, the Contractor shall notify the Contracting Officer so that a determination can be made concerning the need for the additional first article sample or portion thereof, and instructions provided concerning the submission, inspection, and notification of results. Costs of the first article testing resulting from production process change, change in the place of performance, or material substitution shall be borne by the Contractor.

ATTACHMENT #8 - FIRST ARTICLE TEST (CONTRACTOR TESTING)

File details come from the government source that posted it. Updated .