Attachment 3 - ES7035 Energetic Material Description Sheets.pdf

PDF 45 KB Posted

Attached to
MJU-76B Pre-solicitation Synopsis Federal contract opportunity
Solicitation number
FA8213-25-R-B009
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Attachment 3 is a clause document (ES7035) detailing requirements for Energetic Material Description Sheets and Propellant Loading Authorization Sheets in accordance with MIL-STD-1171B. The document mandates that contractors prepare these sheets when required by the Contract Data Requirements List (CDRL) and utilize the Worldwide Ammunition-data Repository Program (WARP) for data storage, accessing the system through the Munitions History Program (MHP) network.

The clause specifies that the requirements apply to contractors, suppliers, vendors, and subcontractors, with the contractor responsible for on-screen data entry into the WARP system. A key provision states that a contractor's typed signature carries the same legal weight as a handwritten signature, with the signatory certifying the accuracy and truthfulness of the information submitted. The document emphasizes the legal and procedural requirements for documenting and storing energetic material and propellant loading information.

View the file

Other files for this federal contract opportunity

Other files attached to MJU-76B Pre-solicitation Synopsis, newest first.
File Type Posted
Attachment 27 - MJU-76 DD Form 254 Signed.pdf PDF
Attachment 22 - GFP Worksheet Placeholder.docx DOCX document
Attachment 21 - MJU 76 Contract Data Requirements List.pdf PDF
Attachment 20 - RFOP Worksheet - MJU-76.pdf PDF
Attachment 18 - AF Form 260 MJU-76.pdf PDF
Attachment 17 - Interim Hazard Classification Log No 23-208.pdf PDF
Attachment 14 - Performance Specification for MJU 76 Infrared Countermeasure Flare Rev B.pdf PDF
Attachment 13 - Data List for Drawing 201825310.pdf PDF
Attachment 8 - Contractor First Article Testing.pdf PDF
Attachment 25 - Section L v2 1-29-25.pdf PDF
Attachment 19 - MJU-76 Ordering Procedures.pdf PDF
Attachment 15 - Detail Specification for MJU-76B Infrared Countermeasure Flare.pdf PDF
Attachment 11 - REPSHIP.pdf PDF
Attachment 9 - ES6925 MSE.pdf PDF
Attachment 4 - ES6200 Ammunition Data Cards.pdf PDF
Draft Solicitation - FA821325RB009.pdf PDF
Attachment 24 - Justification for Qualification Requirements MJU-76.pdf PDF
Attachment 23 - Example Request for Order Proposal 5-6-25.pdf PDF
Attachment 16 - Data List for Drawing -MJU 76B 201825310_98747_DL_B.pdf PDF
Attachment 1 - AIR SPEC IM FD2020-24-52553.pdf PDF
Attachment 26 - Section M v2 1-29-25.pdf PDF
Attachment 12 - SPI 1370015904428.pdf PDF
Attachment 10 - Report of Shipment.pdf PDF
Attachment 7 - Government First Article Testing.pdf PDF
Attachment 6 - ES7650_Oct2000 - MIL-STD-1916.pdf PDF
Attachment 5 - ES7034 Rework and Repair of Non-Conforming Material.pdf PDF
Attachment 2 - USAF Statement of Work - Ammunition Data Cards WARP 4-19-2018.pdf PDF
Interested Vendor Question and Answer.pdf PDF
JQR MJU-76.pdf PDF
JQR MJU-76.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 3

ES7035

MIL-STD-1171B, ENERGETIC MATERIAL DESCRIPTION SHEETS AND PROPELLANT LOADING

AUTHORIZATION SHEETS

(a) The contractor shall prepare Energetic Material Description Sheets and Propellant Loading Authorization Sheets in accordance with MIL-STD-1171B when mandated by the Contract Data Requirements List (CDRL). The Worldwide Ammunition-data Repository Program (WARP) shall be utilized to store the data sheets required by MIL-STD-1171B. The Munitions History Program (MHP) network located at https://mhp.redstone.army.mil/ must be used to gain access to

WARP.

(b) The requirements of MIL-STD 1171B specified in the CDRL is a flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.

(c) The contractor is responsible for on-screen entry of the data sheets into the appropriate Description Sheets and Loading Authorizations module located in the WARP system.

(d) The presence of the contractor’s typed signature has the same legal effect and consequences of a handwritten signature. The signatory of the data sheets has the authority to sign for the contractor and certifies the information contained on the data sheets is truthful and accurate as evidenced by release of the typed signature.

(End of clause)

ES7035

File details come from the government source that posted it. Updated .