About this file

This file contains Section J attachments (J-1607000-01 through J-1607000-09) for a contract related to chiller maintenance services at military facilities in the Marianas Islands. The attachments detail specifications for three operating chillers - one Daikin-McQuay unit (WMC145SBS400DBS) installed in 2010 at Building 24 NBG, and two York units (YVAA0233BSK46BAVSXXX) installed in August 2022 at Building 1440 MCBCB.

The documents include definitions, technical references, equipment inventories, maintenance schedules, temperature/humidity requirements, and monitoring specifications. Key requirements include quarterly, semi-annual and annual preventive maintenance for all chillers, maintaining specific temperature controls (70-76°F depending on room type, with 50% relative humidity for computer rooms), and monitoring flow meters that should maintain 30 GPM normal readings. The attachments also include a degradation index for assessing equipment condition on a 1-10 scale and a comprehensive list of critical spare parts inventory including valves, pumps, and air handling units. All technical work must comply with UFC 3-410-02N and UFC 3-410-02A standards for HVAC systems.

View the file

Other files

File Type Posted
EXE.CONTRACT N4019225D9002, HOMS COMS UH.pdf PDF
JC_1_0200000 C Management and Administration _UH.pdf PDF
JB-2 Labor Fringe Benefit Worksheet -UH.xlsx XLSX spreadsheet
EXE.N4019225R9002_AMD0010.pdf PDF
Att1_J-0200000-13_(NBG)_14(MCBCB)_15(AAFB)_Exhibits_A_through_G_ELINS_for_UH_Rev2_as_of_19FEB25_(AMD0010).xlsx XLSX spreadsheet
EXE.N4019225R9002_AMD0009.pdf PDF
Att1_J-0200000-13 (NBG)_14(MCBCB)_15(AAFB)_Exhibits A through G_ELINS for UH.Rev1 as of 05FEB25 (AMD0008).xlsx XLSX spreadsheet
EXE.N4019225R9002_AMD0008.pdf PDF
Att10_J-1503010-06 UH Divested Units Lite Cleaning Services(AMD0007).pdf PDF
Att8_J-1502000-34 MCBCB BEQ-H (P-459) Electrical System(AMD0007).pdf PDF
Att2_J-1402000-35 Camp Blaz BEQ-H (P-459) FFE Inventory(AMD0007).pdf PDF
Att7_J-1502000-33 MCBCB BEQ-H (P-459) Fire Protection(AMD0007).pdf PDF
Att5_J-1502000-00 TOC.rev_UH(AMD0007).pdf PDF
Att1_J-1402000-00 TOC.rev_UH(AMD0007).pdf PDF
Att11_JC_1_1503020 C Pest Control_UH(AMD0007).pdf PDF
Att6_J-1502000-32 MCBCB BEQ-H (P-459) HVAC(AMD0007).pdf PDF
Att12_JC_1_1607000 C Chiller_UH(AMD0007).pdf PDF
Att3_J-1402000-35 Camp Blaz BEQ-H (P-459) FFE Inventory(AMD0007).xlsx XLSX spreadsheet
Att9_J-1503010-00 TOC.rev_UH(AMD0007).pdf PDF
Att4_J-1402000-36 Camp Blaz BOQ-A (J-023) FFE Inventory(AMD0007).pdf PDF
EXE.N4019225R9002_AMD0007.pdf PDF
EXE.N4019225R9002_AMD0006.pdf PDF
EXE.N4019225R9002_AMD0005.pdf PDF
EXE.N4019225R9002_AMD0004.pdf PDF
Att1_HOMS COMS UH Site Visit Attendees 07Jan25 (AMD 0004).pdf PDF
N40192-25-R-9002_AMD0003.pdf PDF
N40192-25-R-9002_AMD0002.pdf PDF
HOMS COMS UH_PPC Slides_FSC CORE_FINAL.With Map.pdf PDF
N4019225R9002-0001 (AMD 01).pdf PDF
JH_2_Service Contract Act (SCA)_WD_Guam.pdf PDF
JL_4b_Base_Access_Affidavit.pdf PDF
JL_6_CORPORATE EXPERIENCE DATA SHEET.docx DOCX document
JC_1_0100000 C General Information_UH.pdf PDF
SOLICITATION_N4019225R9002_HOMSCOMS UH.pdf PDF
J_0200000-13 (NBG)_14(MCBCB)_15(AAFB)_Exhibits A through G_ELINS for UH.xlsx XLSX spreadsheet
JC_1_1402000 C Unaccompanied Housing.pdf PDF
JC_1_1502000 C Facility Investment_UH.pdf PDF
JC_2_DD254_Instructions.pdf PDF
JL_4c_III_Log_Information___INSERT_COMPANY_NAME.pdf PDF
JL_2_Written_Question_Form.doc DOC document
JH_1_Collective Bargaining Agreement (CBA).pdf PDF
JC_1_1501000 C Facility Management_UH.pdf PDF
JL_4a_CONTRACTOR_LETTER_Memo.docx DOCX document
JL_5_NAVFAC Past Performance Questionnaire (Form PPQ).doc DOC document
JC_1_1503010 C Custodial_UH.pdf PDF
JC_2_DD254_Form.pdf PDF
JL_3b_CNIC_3_page_Access_Registration_Form.pdf PDF
JL_3a_BAR_Cover_Letter.pdf PDF
JB-1 Cost Summary Worksheet - UH.xlsx XLSX spreadsheet
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION J

DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

TABLE OF CONTENTS

ATTACHMENT NUMBER ATTACHMENT TITLE

J-1607000-01 Definitions and Acronyms J-1607000-02 References and Technical Documents J-1607000-03 Chiller Unit Description and Inventory J-1607000-04 Historical Critical Spare Parts Inventory J-1607000-05 Historical Temperature and Humidity Control Requirements J-1607000-06 Chiller Installation, Operation and Maintenance Manual J-1607000-07 Chiller Preventive Maintenance Schedule J-1607000-08 Degradation Index J-1607000-09 Sample Chiller Unit and Hydronic Systems Meter Inventory, Location and Schedule of Reading Report

ATTACHMENT J-1607000-01

DEFINITIONS AND ACRONYMS

Definitions Hydronic Systems The chilled water and condensing water loops used to produce the chilled media. The chilled water and condensing water loops may be closed loops or open loops.

Integrated Maintenance Plan (IMP)

Is a recurring state-of-the-art, reliability-centered inspection, testing, maintenance and repair program that determines best practices for managing the functions and consequences of failures of facilities equipment and system components. IMP encompasses accepted commercial practices, including reactive, preventive, predictive and proactive maintenance, into one optimal program. The IMP approach gives the Contractor full responsibility to maintain systems and equipment and perform repairs whenever necessary to ensure equipment and systems are operational and remain in a constant state of readiness.

Media The substance distributed or used to produce cooling. Normally the cooling media is chilled water.

Acronyms ANSI American National Standards Institute ARI Air-Conditioning and Refrigeration Institute ASHRAE American Society of Heating, Refrigerating and Air-Conditioning Engineers IMP Integrated Maintenance Program OMSI Operation and Maintenance Support Information PM Preventive Maintenance

ATTACHMENT J-1607000-02

REFERENCES AND TECHNICAL DOCUMENTS

Reference Title UFC 3-410-02N Heating, Ventilation, Air Conditioning and Dehumidifying Systems UFC 3-410-02A Heating, Ventilation and Air Conditioning Control Systems

ATTACHMENT J-1607000-03

CHILLER UNIT DESCRIPTION AND INVENTORY

Asset number Description Location Status Manufacturer Model Install date

332830001 CHILLER

BLDG-

24, NBG OPERATING

DAIKIN-

McQUAY

WMC145SBS-

400DBS 17-Nov-2010

SEKM-

043350 CHILLER

BEQ-H

BLDG-

1440, MCBCB OPERATING YORK

YVAA0233BSK

46BAVSXXX 30-Aug-2022

SEKM-

043380 CHILLER

BEQ-H

BLDG-

1440, MCBCB OPERATING YORK

YVAA0233BSK

46BAVSXXX 30-Aug-2022

ATTACHMENT J-1607000-04

HISTORICAL CRITICAL SPARE PARTS INVENTORY

Historical critical spare parts inventory is included for reference only. The Contractor shall develop a separate critical spare parts inventory for submittal to the KO, per section F.

Item Name Quantity Location Building Chilled media shut-off valve 1 Bldg 24, Mechanical Room, NBG Building Chilled media return valve 1 Bldg 24, Mechanical Room, NBG Flow Meter 2 Bldg 24, Mechanical Room, NBG Air Handling Units 2 Bldg 24, Mechanical Room, NBG Energy Recovery Cassette 1 Bldg 24, Mechanical Room, NBG Chilled Water Circulating Pump (P3 & P4)

2 Bldg 24, Mechanical Room, NBG

Sea Water Vertical Turbine Pumps & Motors (P1 & P2)

2 Bldg 24, Mechanical Room, NBG

Injection Pump 1 Bldg 24, Mechanical Room, NBG Chemical Equipment Feeder Tank 1 Bldg 24, Mechanical Room, NBG

Chilled Water Pump 1 1 Bldg 1440, Mechanical Room, MCBCB Chilled Water Pump 2 1 Bldg 1440, Mechanical Room, MCBCB Chilled Water Pump 3 1 Bldg 1440, Mechanical Room, MCBCB

ATTACHMENT J-1607000-05

HISTORICAL TEMPERATURE AND HUMIDITY CONTROL REQUIREMENTS

Insert/tailor table similar to following describing requirements for all facilities served by the Chiller Unit and Distribution System.

FACILITY NUMBER

FACILITY USAGE COOLING REQUIREMENTS

24 Living and Administrative Area (inactive employment)

76 degrees F dry bulb

24 Working Area (active employment)

24 Storage Area

24 Computer Room 70 degrees F dry bulb (plus or minus 1 degree F) and 50 percent relative humidity

24 Recreation Area 74 degrees F dry bulb

1440 Living and Administrative Area

(inactive employment)

1440 Working Area (active employment)

1440 Storage Area

1440 Computer Room 70 degrees F dry bulb (plus or minus 1 degree F) and 50 percent relative humidity

1440 Recreation Area 74 degrees F dry bulb

ATTACHMENT J-1607000-06

CHILLER INSTALLATION, OPERATION AND MAINTENANCE MANUAL

ATTACHMENT J-1607000-07

CHILLER PREVENTIVE MAINTENANCE SCHEDULE

Max Asset # Nomenclature Location Make Model # PM Schedule

332830001 Chiller

BLDG-24,

NBG

DAIKIN-

McQUAY

WMC145SBS-

400DBS

quarterly, semi-annually, annually

SEKM-

043350 Chiller

BEQ-H

BLDG-

1440, MCBCB YORK

YVAA0233BS

K46BAVSXXX

quarterly, semi-annually, annually

SEKM-

043380 Chiller

BEQ-H

BLDG-

1440, MCBCB YORK

YVAA0233BS

K46BAVSXXX

quarterly, semi-annually, annually

ATTACHMENT J-1607000-08

DEGRADATION INDEX

1 No noticeable defects. Some aging or wear may be visible. Fully functional.

2 or 3 Only minor deterioration or defects are evident. Noticeable wear or aging is visible. Fully functional.

4 or 5 Some deterioration or defects are evident. Significant aging or wear is visible. Function is not significantly affected.

6 or 7 Serious deterioration or defects in at least some portion of the asset. Extensive aging or wear is visible. Function is significantly affected.

8 or 9 Extensive deterioration or defects in the asset. Age or wear is beyond repair. Barely functional.

10 General failure or complete failure or major functional component failure. No longer functions.

ATTACHMENT J-1607000-09

SAMPLE CHILLER UNIT AND HYDRONIC SYSTEMS METER INVENTORY, LOCATION AND

SCHEDULE OF READING REPORT

List and identify location and function of all meters associated with the Chiller Unit, Hydronic Systems and Distribution System

Meter Name Location in

Building System Device Function Normal Reading

Flow Meter #1 Bldg. 24, Mechanical Room, NBG

Condenser Water Supply Line to Chiller Condenser No.1

Meter Measure Water Supply from Condenser Water Pump No.1 to Chiller Condenser No. 1

30 GPM

Flow Meter #2 Bldg. 24, Mechanical Room, NBG

Condenser Water Supply Line to Chiller Condenser No.2

Meter Measure Water Supply from Condenser Water Pump No.2 to Chiller Condenser No. 2

30 GPM

Flow Meter #1 Bldg. 1440, Mechanical Room, MCBCB

Condenser Water Supply Line to Chiller Condenser No.1

Meter Measure Water Supply from Condenser Water Pump No.1 to Chiller Condenser No. 1

30 GPM

Flow Meter #2 Bldg. 1440, Mechanical Room, MCBCB

Condenser Water Supply Line to Chiller Condenser No.2

Meter Measure Water Supply from Condenser Water Pump No.2 to Chiller Condenser No. 2

30 GPM

ATTACHMENT NUMBER
FACILITY USAGE
COOLING REQUIREMENTS