J5A - SOI_CollinsRoad4.4.24.pdf

PDF 303 KB Posted

Attached to
North Carolina Roads Maintenance/Construction MATOC
Solicitation number
12445224R0008
Issued by

About this file

This document appears to be a Schedule of Items (SOI) for a federal road maintenance and construction project on the National Forests in North Carolina. The SOI provides a detailed breakdown of the estimated quantities and unit costs for various construction and maintenance activities across multiple culvert sites along Collins Road. Key items include clearing and grubbing, structure excavation, pipe replacement, aggregate surface course, and rip rap.

The related federal contract opportunity is for a 5-year Multiple Award Task Order Contract (MATOC) for road maintenance, construction, and minor engineering services on National Forest lands in North Carolina and surrounding states. The MATOC will result in multiple contract awards for each of four Forest Zones, with contractors submitting price proposals for individual task orders issued over the contract period.

View the file

Other files

File Type Posted
CoverLetterPisZoneBlackMountainTH.docx DOCX document
SF_30_12445224R0008_0002_jh.pdf PDF
RFIs and Answers.docx DOCX document
SF_30_12445224R0008_0001_jh.pdf PDF
RFP 12445224R0008 NC Rd Maintenance Construction IDIQ MA.pdf PDF
J7C - Schedule C Wolf Ford.docx DOCX document
J6B - FSSS Little Yellow Mountain Combined.pdf PDF
J7L - BMTI Dwgs 2024.04.03Rev.pdf PDF
J7M - BMTI Statement of Work 2024.04.03Rev.pdf PDF
J6E - NCMATOC_CoverLetterNanZoneLittleYellowMountain.docx DOCX document
J6D - LittleYellowMtnFillSlopeRepair.pdf PDF
J6G - Requisition_Checklist Little Yellow Mountain Combined.pdf PDF
J5C - PERFORMANCE STANDARDS.docx DOCX document
J1F - Past Performance Relevant Experience Questionaire.doc DOC document
J7A - FSSS Wolf Ford.docx DOCX document
J1E - RevSource Selection Plan_04.15.24.docx DOCX document
J9B - NCMATOC_CoverLetterUwhZoneHuntCamp.docx DOCX document
J1C - Attachment1_NC_MATOC_MaintPerformanceSpecs10.31.23.doc DOC document
J8A - SOI Combined Little Yellow Mountain.pdf PDF
J1G - APPENDIX C_Source Selection Plan_12.13.23.docx DOCX document
J5B - NCMATOC_CoverLetterCroZoneRoadMaint146A.docx DOCX document
J8E - NCMATOC_CoverLetterNanZoneLittleYellowMountain.docx DOCX document
J8F - NCNantahalaRDMap.pdf PDF
J7B - NCMATOC_CoverLetterPisZoneWolfFord.docx DOCX document
J7N - BMTI SOI 2024.04.03Rev.pdf PDF
J1B - SoW_NFsNC_Roads MATOC_11.22.23.docx DOCX document
J8C - Little Yellow Mountain Culvert Final Plan Set 11x17 4-2-24.pdf PDF
J12 - APPENDIX C_Source Selection.docx DOCX document
J7E - Wolf Ford Final Plan Set 11x17 10-10-23.pdf PDF
J8B - FSSS Little Yellow Mountain Combined.pdf PDF
J8G - Schedule C Little Yellow Mountain Combined.pdf PDF
J9E - Uwharrie Hunt Camp SOW.pdf PDF
J7D - SOI Wolf Ford.pdf PDF
J8D - LittleYellowMtnFillSlopeRepair10.08.23.pdf PDF
J6H - Schedule C Little Yellow Mountain Combined.pdf PDF
J7 - NCPisgahRDMap.pdf PDF
J1D - Attachment3_NC_MATOC_ZoneMap.pdf PDF
J6F - NCNantahalaRDMap.pdf PDF
J70 - BMTI FP14 SupplSpecs2024.04.03Rev.pdf PDF
J1A - Attachmen4 CoverLetterNC_ MATOC.docx DOCX document
J6C - Little Yellow Mountain Culvert Final Plan Set 11x17 4-2-24.pdf PDF
J9C - SOI_HuntCamp12.06.23.pdf PDF
J6I - SOI Combined Little Yellow Mountain.pdf PDF
J9D - Uwharrie Hunt Camp SOW.docx DOCX document
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CULVERT 0.569

PROJECT TOTAL COST

CULVERT 0.034

CULVERT 0.172

CULVERT 0.268

CULVERTS CULVERTS TOTAL COST

Project Schedule of Items Collins

Road

SCHEDULE OF ALL ITEMS

ROAD ROAD TOTAL COST

15100 MOBILIZATION LS 1

15200 CONSTRUCTION SURVEY AND STAKING EA 1

20100 CLEARING AND GRUBBING, DISPOSAL METHOD SCATTERING AC 1

20400 CLEAN CULVERTS AND TAIL DITCHES MILE 1.7

30100

AGGREGATE SURFACE COURSE, GRADING F, COMPACTION

METHOD A.

TON 1000

30303D DITCH RECONDITIONING; DEEP-DITCHES MILE 1.7

3030405 SHOULDER RECONDITIONING MILE 1.7

30600 AGGREGATE SURFACE RECONDITIONING MILE 0.85

63500 TEMPORARY TRAFFIC CONTROL LS 1

Sub Total

SCHEDULE OF ITEMS

ROAD MAINTENANCE

Collins Road, NFSR 146A

UNIT COST

EXTENDED

COST

ITEM

NO.

DESCRIPTION PAY UNIT EST. QTY.

ITEM NO. DESCRIPTION

PAY

UNIT

EST.

QTY.

UNIT COST EXTENDED COST

20100 CLEARING AND GRUBBING, DISPOSAL METHOD SCATTERING AC 0.1

20900 STRUCTURE EXCAVATION CY 36

20900 6" NO.4 BALLAST FOR PIPE BEDDING (WITH FILTER FABRIC) TON 5

29000 STRUCTURE BACKFILL COMPACTION METHOD B CY 48

30100 AGGREGATE SURFACE COURSE, GRADING F, COMPACTION METHOD A. TON 5

70500 CLASS 3 RIP RAP, MACHINE-ASSISTED PLACEMENT TO PROTECT INLET/OUTLET TON 5

70700 12 GA ALUMINUM ALLOY CORRUGATED PIPE (24"dia) LF 30

71700 SIGN HARDWARE VANDAL-PROOF HIGH-STRENGTH, GALVANIZED SET 1

71800 TYPE 2 OBJECT MARKER EA 2

SUMMARY OF ITEMS CR-0.034

SUB TOTAL

UNIT

EST.

QTY.

UNIT COST EXTENDED COST

20100 CLEARING AND GRUBBING, DISPOSAL METHOD SCATTERING AC 0.1

20900 STRUCTURE EXCAVATION CY 36

20900 6" NO.4 BALLAST FOR PIPE BEDDING (WITH FILTER FABRIC) TON 5

29000 STRUCTURE BACKFILL COMPACTION METHOD B CY 48

30100 AGGREGATE SURFACE COURSE, GRADING F, COMPACTION METHOD A. TON 5

70500 CLASS 3 RIP RAP, MACHINE-ASSISTED PLACEMENT TO PROTECT INLET/OUTLET TON 5

70700 12 GA ALUMINUM ALLOY CORRUGATED PIPE (24"dia) LF 30

71700 SIGN HARDWARE VANDAL-PROOF HIGH-STRENGTH, GALVANIZED SET 1

71800 TYPE 2 OBJECT MARKER EA 2

SUMMARY OF ITEMS

CR-0.172

UNIT

EST.

QTY.

UNIT COST EXTENDED COST

20100 CLEARING AND GRUBBING, DISPOSAL METHOD SCATTERING AC 0.1

20900 STRUCTURE EXCAVATION CY 290

20900 6" NO.4 BALLAST FOR PIPE BEDDING (WITH FILTER FABRIC) TON 20

29000 STRUCTURE BACKFILL COMPACTION METHOD B CY 330

30100 AGGREGATE SURFACE COURSE, GRADING F, COMPACTION METHOD A. TON 18

70500 CLASS 3 RIP RAP, MACHINE-ASSISTED PLACEMENT TO PROTECT INLET/OUTLET TON 20

70700 12 GA ALUMINUM ALLOY CORRUGATED PIPE (72"dia) LF 90

71700 SIGN HARDWARE VANDAL-PROOF HIGH-STRENGTH, GALVANIZED SET 1

71800 TYPE 2 OBJECT MARKER EA 2

SUMMARY OF ITEMS

CR-0.268

UNIT

EST.

QTY.

UNIT COST EXTENDED COST

20100 CLEARING AND GRUBBING, DISPOSAL METHOD SCATTERING AC 0.1

20900 STRUCTURE EXCAVATION CY 36

20900 6" NO.4 BALLAST FOR PIPE BEDDING (WITH FILTER FABRIC) TON 5

29000 STRUCTURE BACKFILL COMPACTION METHOD B CY 48

30100 AGGREGATE SURFACE COURSE, GRADING F, COMPACTION METHOD A. TON 5

70500 CLASS 3 RIP RAP, MACHINE-ASSISTED PLACEMENT TO PROTECT INLET/OUTLET TON 5

70700 12 GA ALUMINUM ALLOY CORRUGATED PIPE (36"dia) LF 30

71700 SIGN HARDWARE VANDAL-PROOF HIGH-STRENGTH, GALVANIZED SET 1

71800 TYPE 2 OBJECT MARKER EA 2

SUMMARY OF ITEMS

CR-0.569

TOTAL_SOI
ITEMS Road
CR-0.034
CR-0.172
CR-0.268
CR-0.569