J.027A-2 Technical Approach, Factor 3, Installation Proposal Form.pdf
PDF 209 KB Posted
- Attached to
- CRITICAL POWER SYSTEMS INSTALLATION SERVICES Federal contract opportunity
- Solicitation number
- 6973GH-24-R-00177
About this file
The provided document is an Attachment J.27A-2 Technical Approach - Factor 3, Installation Proposal Form related to a federal contract opportunity. It requires the offeror to provide details on their installation capabilities and project complexity for the Critical Power Systems (CPS) project. The form requests information such as project titles, locations, dates of completion, customer names, and the offeror's company role (prime contractor, designer/engineering company, subcontractors). It also asks for details on project category types, active construction periods, site/project addresses, contract numbers, issuing offices, and periods of performance. This information is requested to demonstrate the offeror's relevant experience and qualifications for the installation work required under the overall CPS contract opportunity.
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment J.27A-2 Technical Approach- Factor 3, Installation Proposal
Offeror must submit this form, addressing the following fields for Factor 3, Installa�on Proposal.
Factor 3 – Installa�on Proposal Sub-factor 3.1 Capabilities
CPS Project A. Project Title:
B. Loca�on:
C. Date of Comple�on:
D. Customer Name:
E. Company Role E.1 Name of Prime/General Contractor:
E.2 Name of Designer/Engineering Company:
E.3 Name of subcontractor(s) (If applicable):
A.
B.
C.
D.
E.
E.1 E.2 E.3
OR
EG Project A. Project Title:
B. Loca�on:
C. Date of Comple�on:
D. Customer Name:
E. Company Role E.1 Name of Prime/General Contractor:
E.2 Name of Designer/Engineering Company:
E.3 Name of subcontractor(s) (If applicable) :
A.
B.
C.
D.
E.
E.1 E.2 E.3
UPS Project A. Project Title:
B. Loca�on:
C. Date of Comple�on:
D. Customer Name:
E. Company Role E.1 Name of Prime/General Contractor:
E.2 Name of Designer/Engineering Company:
E.3 Name of subcontractor(s) (If applicable) :
A.
B.
C.
D.
E.
E.1 E.2 E.3
FST Project A. Project Title:
B. Loca�on:
C. Date of Comple�on D. Customer Name E. Company Role E.1 Name of Prime/General Contractor E.2 Name of Designer/Engineering Company E.3 Name of subcontractor(s) (If applicable)
A.
B.
C.
D.
E.
E.1 E.2 E.3
Atachment J.27A-2 Technical Approach- Factor 3, Installation Proposal
Factor 3 – Installa�on Proposal Sub-factor 3.2 Complexity
Project 1 A. Category Type (1 or 2):
B. Ac�ve Construc�on Period:
(Month/Day/Year – Month/Day/Year) C. Site/Project Physical Address:
D. Contract Number(s):
E. Issuing Office:
F. Period of Performance:
A.
B.
C.
D.
E.
F.
Project 2 A. Category Type (1 or 2):
B. Ac�ve Construc�on Period:
(Month/Day/Year – Month/Day/Year) C. Site/Project Physical Address:
D. Contract Number(s):
E. Issuing Office:
F. Period of Performance:
A.
B.
C.
D.
E.
F.
Project 3 A. Category Type (1 or 2):
B. Ac�ve Construc�on Period:
(Month/Day/Year – Month/Day/Year) C. Site/Project Physical Address:
D. Contract Number(s):
E. Issuing Office:
F. Period of Performance:
A.
B.
C.
D.
E.
F.
| 10 CPS Section J attachment J.Technical Approach Cover Sheet 2 |
| 10 CPS Section J attachment J.Technical Approach Cover Sheet 3 |
File details come from the government source that posted it. Updated .