J.027A-2 Technical Approach, Factor 3, Installation Proposal Form.pdf

PDF 209 KB Posted

Attached to
CRITICAL POWER SYSTEMS INSTALLATION SERVICES Federal contract opportunity
Solicitation number
6973GH-24-R-00177
Issued by
Department of Transportation Federal Aviation Administration Franchise Acquisition Services

About this file

The provided document is an Attachment J.27A-2 Technical Approach - Factor 3, Installation Proposal Form related to a federal contract opportunity. It requires the offeror to provide details on their installation capabilities and project complexity for the Critical Power Systems (CPS) project. The form requests information such as project titles, locations, dates of completion, customer names, and the offeror's company role (prime contractor, designer/engineering company, subcontractors). It also asks for details on project category types, active construction periods, site/project addresses, contract numbers, issuing offices, and periods of performance. This information is requested to demonstrate the offeror's relevant experience and qualifications for the installation work required under the overall CPS contract opportunity.

View the file

Other files for this federal contract opportunity

Other files attached to CRITICAL POWER SYSTEMS INSTALLATION SERVICES, newest first.
File Type Posted
J.024 Price Proposal Critical Power Systems Cost Worksheet 10-11-24.xlsx.xlsx XLSX spreadsheet
6973GH-24-R-00177 REVISED SIR.pdf PDF
6973GH-24-R-00177 Amendment P00001.pdf PDF
CPS SIR 6973GH-24-R-00177 Questions and Answers 10.16.24.xlsx XLSX spreadsheet
J.001 Critical Power Systems Statement of Work (SOW) Rev 1. 10-16-2024.docx DOCX document
6973GH-24-R-00177 as of 9-17-2024.pdf PDF
J.004 Government Furnished Equipment (GFE).pdf PDF
J.009 Pre-Construction Installation EOSH Checklist - FAA Form 3900-18.pdf PDF
J.012 FAA-C-1391e INSTALLATION, TERMINATION, SPLICING, AND TRANSIENTSURGE PROTECTION OF UNDERGROUND ELECTRICAL DISTRIBUTION SYSTEM POWER CABLES.pdf PDF
J.016 FAA Order JO 3900.64A - Air Traffic Organization Electrical SafetyProgram.pdf PDF
J.024 Price Proposal Critical Power Systems Cost Worksheet.xlsx XLSX spreadsheet
J.025 Phase I, Volume II - Relevant Corporate Experience Form.docx DOCX document
J.007 Performance Bond - FAA Form Number FAA 4400-63.pdf PDF
J.008 Payment Bond - FAA Form Number 4400-61.pdf PDF
J.014 FAA Order 1050.10D - Environmental Pollution Control and Abatement at FAA Facilities.pdf PDF
J.26 Past Performance Questionnaire 5-31-24.docx DOCX document
J.027A-1 Phase 2 Volume 2, Technical Approach - Factor 2 Category 2 CPS Design Proposal Form.pdf PDF
J.018 FAA Order JO 1050.17B - Environmental Compliance at Air Traffic Organization Facilities.pdf PDF
J.019 FAA Order JO 6950.2F Electrical Power Policy lmplementation at NationalAirspace System Facilities.pdf PDF
J.022 Contractor Release - DOT FORM 4220.4.pdf PDF
J.001 Critical Power Systems Statement of Work (SOW).docx DOCX document
J.002 Contract Data Requirements List (CDRL).pdf PDF
J.003 Data Item Description (DID).pdf PDF
J.005 Contractor Acceptance Inspection (CAI) FAA Form 6010-5.pdf PDF
J.006 Travel Authorization Form.xlsx XLSX spreadsheet
J.010 Pre-Construction Agenda and Checklist - DOT Form F4220.3.doc DOC document
J.011 FAA-C-1217H Construction Specification - ELECTRICAL WORK, PREMISES WIRING.pdf PDF
J.013 FAA-STD-002H Standard Engineering Drawing Preparation & Support.pdf PDF
J.015 FAA Order JO 3900.57A CHG 1 - EOSH Requirements in the Planning & Execution of Construction & Maintenance Activities at NAS Facilities.pdf PDF
J.017 FAA Order JO 6950.27B - Power System Studies.pdf PDF
J.020 Fuel Storage Tank Guidelines.pdf PDF
J.021 FST Program Specifications for Construction.pdf PDF
J.023 FAA Order 1370.121B - FAA Information Security and Privacy Policy.pdf PDF
J.028 Technical Approach Evaluation Worksheets rev2 06-04-24.docx DOCX document
J.029 FAA cleanup schedule - ACEPS support.pdf PDF
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment J.27A-2 Technical Approach- Factor 3, Installation Proposal

Offeror must submit this form, addressing the following fields for Factor 3, Installa�on Proposal.

Factor 3 – Installa�on Proposal Sub-factor 3.1 Capabilities

CPS Project A. Project Title:

B. Loca�on:

C. Date of Comple�on:

D. Customer Name:

E. Company Role E.1 Name of Prime/General Contractor:

E.2 Name of Designer/Engineering Company:

E.3 Name of subcontractor(s) (If applicable):

A.

B.

C.

D.

E.

E.1 E.2 E.3

OR

EG Project A. Project Title:

B. Loca�on:

C. Date of Comple�on:

D. Customer Name:

E. Company Role E.1 Name of Prime/General Contractor:

E.2 Name of Designer/Engineering Company:

E.3 Name of subcontractor(s) (If applicable) :

A.

B.

C.

D.

E.

E.1 E.2 E.3

UPS Project A. Project Title:

B. Loca�on:

C. Date of Comple�on:

D. Customer Name:

E. Company Role E.1 Name of Prime/General Contractor:

E.2 Name of Designer/Engineering Company:

E.3 Name of subcontractor(s) (If applicable) :

A.

B.

C.

D.

E.

E.1 E.2 E.3

FST Project A. Project Title:

B. Loca�on:

C. Date of Comple�on D. Customer Name E. Company Role E.1 Name of Prime/General Contractor E.2 Name of Designer/Engineering Company E.3 Name of subcontractor(s) (If applicable)

A.

B.

C.

D.

E.

E.1 E.2 E.3

Atachment J.27A-2 Technical Approach- Factor 3, Installation Proposal

Factor 3 – Installa�on Proposal Sub-factor 3.2 Complexity

Project 1 A. Category Type (1 or 2):

B. Ac�ve Construc�on Period:

(Month/Day/Year – Month/Day/Year) C. Site/Project Physical Address:

D. Contract Number(s):

E. Issuing Office:

F. Period of Performance:

A.

B.

C.

D.

E.

F.

Project 2 A. Category Type (1 or 2):

B. Ac�ve Construc�on Period:

(Month/Day/Year – Month/Day/Year) C. Site/Project Physical Address:

D. Contract Number(s):

E. Issuing Office:

F. Period of Performance:

A.

B.

C.

D.

E.

F.

Project 3 A. Category Type (1 or 2):

B. Ac�ve Construc�on Period:

(Month/Day/Year – Month/Day/Year) C. Site/Project Physical Address:

D. Contract Number(s):

E. Issuing Office:

F. Period of Performance:

A.

B.

C.

D.

E.

F.

10 CPS Section J attachment J.Technical Approach Cover Sheet 2
10 CPS Section J attachment J.Technical Approach Cover Sheet 3

File details come from the government source that posted it. Updated .