J.004 Government Furnished Equipment (GFE).pdf

PDF 35 KB Posted

Attached to
CRITICAL POWER SYSTEMS INSTALLATION SERVICES Federal contract opportunity
Solicitation number
6973GH-24-R-00177
Issued by
Department of Transportation Federal Aviation Administration Franchise Acquisition Services

About this file

This document is an attachment titled "Government Furnished Equipment (GFE)" that lists the types of electrical power distribution equipment, engine generators, automatic transfer switches, and uninterruptible power supply systems that may be provided as government-furnished equipment for a federal contract opportunity.

The related federal contract opportunity is for "CRITICAL POWER SYSTEMS INSTALLATION SERVICES" for the Federal Aviation Administration. The contract will be a firm-fixed-price, multiple award, Indefinite Delivery/Indefinite Quantity contract. Proposals are due on October 18, 2024 by 6:00 pm CST. The contract will require project management, design services, and installation/construction work for power systems and power system ancillary equipment and structures supporting the FAA Facility Power Systems programs at National Airspace System facilities throughout the United States and its territories.

View the file

Other files for this federal contract opportunity

Other files attached to CRITICAL POWER SYSTEMS INSTALLATION SERVICES, newest first.
File Type Posted
6973GH-24-R-00177 Amendment P00001.pdf PDF
CPS SIR 6973GH-24-R-00177 Questions and Answers 10.16.24.xlsx XLSX spreadsheet
J.001 Critical Power Systems Statement of Work (SOW) Rev 1. 10-16-2024.docx DOCX document
J.024 Price Proposal Critical Power Systems Cost Worksheet 10-11-24.xlsx.xlsx XLSX spreadsheet
6973GH-24-R-00177 REVISED SIR.pdf PDF
J.018 FAA Order JO 1050.17B - Environmental Compliance at Air Traffic Organization Facilities.pdf PDF
J.019 FAA Order JO 6950.2F Electrical Power Policy lmplementation at NationalAirspace System Facilities.pdf PDF
J.022 Contractor Release - DOT FORM 4220.4.pdf PDF
J.001 Critical Power Systems Statement of Work (SOW).docx DOCX document
J.002 Contract Data Requirements List (CDRL).pdf PDF
J.003 Data Item Description (DID).pdf PDF
J.005 Contractor Acceptance Inspection (CAI) FAA Form 6010-5.pdf PDF
J.006 Travel Authorization Form.xlsx XLSX spreadsheet
J.010 Pre-Construction Agenda and Checklist - DOT Form F4220.3.doc DOC document
J.011 FAA-C-1217H Construction Specification - ELECTRICAL WORK, PREMISES WIRING.pdf PDF
J.013 FAA-STD-002H Standard Engineering Drawing Preparation & Support.pdf PDF
J.015 FAA Order JO 3900.57A CHG 1 - EOSH Requirements in the Planning & Execution of Construction & Maintenance Activities at NAS Facilities.pdf PDF
J.017 FAA Order JO 6950.27B - Power System Studies.pdf PDF
J.020 Fuel Storage Tank Guidelines.pdf PDF
J.021 FST Program Specifications for Construction.pdf PDF
J.023 FAA Order 1370.121B - FAA Information Security and Privacy Policy.pdf PDF
J.028 Technical Approach Evaluation Worksheets rev2 06-04-24.docx DOCX document
J.029 FAA cleanup schedule - ACEPS support.pdf PDF
6973GH-24-R-00177 as of 9-17-2024.pdf PDF
J.009 Pre-Construction Installation EOSH Checklist - FAA Form 3900-18.pdf PDF
J.012 FAA-C-1391e INSTALLATION, TERMINATION, SPLICING, AND TRANSIENTSURGE PROTECTION OF UNDERGROUND ELECTRICAL DISTRIBUTION SYSTEM POWER CABLES.pdf PDF
J.016 FAA Order JO 3900.64A - Air Traffic Organization Electrical SafetyProgram.pdf PDF
J.024 Price Proposal Critical Power Systems Cost Worksheet.xlsx XLSX spreadsheet
J.025 Phase I, Volume II - Relevant Corporate Experience Form.docx DOCX document
J.027A-2 Technical Approach, Factor 3, Installation Proposal Form.pdf PDF
J.007 Performance Bond - FAA Form Number FAA 4400-63.pdf PDF
J.008 Payment Bond - FAA Form Number 4400-61.pdf PDF
J.014 FAA Order 1050.10D - Environmental Pollution Control and Abatement at FAA Facilities.pdf PDF
J.26 Past Performance Questionnaire 5-31-24.docx DOCX document
J.027A-1 Phase 2 Volume 2, Technical Approach - Factor 2 Category 2 CPS Design Proposal Form.pdf PDF
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment J.04

POWER SERVICES GROUP GOVERNMENT FURNISHED EQUIPMENT (GFE)

In support of the requirements of the Statement of Work and contract, below is a sample list of equipment that may be provided as GFE:

ELECTRICAL POWER DISTRIBUTION EQUIPMENT (EDE)

Vendor: Schneider Electric/Square D

Equipment: Switchboards, Switchgear, Panel boards, Circuit Breakers, Transformers, and Monitoring

Software and Hardware

Lead-time: Large Switchboards 4-5 months, Panel boards 1-3 months, Transformers 1-3 months

Switchgear 6-9 months

ENGINE GENERATOR (EG)

Vendor:

Equipment:

TBD

Propane engine generators 20 kW to 100 kW

Diesel engine generators 15 kW to 1.5 MW

Automatic Transfer Switches, Load Banks, Day Tanks/Sub-Base Tanks and Mufflers

Voltages 480, 208, 240 three phase, 240 single phase

Lead-Time: 6-months

STATIC AUTOMATIC TRANSFER SWITCH (STS)

Vendor:

Equipment: 480 volt, 200 amp to 600 amp

208 volt, 3 or 4-pole, 150 amp to 600 amp

Lead-Time: 158 - 365 days

UNINTERRUPTIBLE POWER SUPPLY (UPS)

Vendor: Eaton Electric

Equipment: 480 volt 30 KVA to 825 KVA

208 volt 10 KVA to 160 kVA

Battery strings, battery monitors, and bypass panels.

Lead-Time: small to medium UPSs and associated equipment 12-weeks

DIRECT CURRENT BACK-UP SYSTEM (DC BUS)

Vendor: Oceus

Equipment: 24 volt DC BUS, UXTM, ERMS, batteries, battery rack and strings

Lead-Time: 60-90 days

Note: Some equipment may have longer lead times than listed above.