CPS SIR 6973GH-24-R-00177 Questions and Answers 10.16.24.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
CRITICAL POWER SYSTEMS INSTALLATION SERVICES
Solicitation number
6973GH-24-R-00177
Issued by

About this file

This document is a set of Questions and Answers related to a Request for Proposals (RFP) for a Critical Power Systems Installation Services contract with the Federal Aviation Administration (FAA).

The key details are: This is a multiple award, Indefinite Delivery/Indefinite Quantity (ID/IQ) contract seeking project management, design, and installation/construction services for power systems and equipment at FAA facilities nationwide. There is no incumbent provider, and the estimated contract ceiling is $1,300,000,000. Proposals are due October 18, 2024 by 6pm CST. Relevant corporate experience requirements are provided, including installations of large engine generators or uninterruptible power systems configured in parallel. Various technical and administrative questions are answered, including clarification on licensing/certification requirements, site survey information, equipment documentation, and proposal formatting guidelines.

View the file

Other files

File Type Posted
J.001 Critical Power Systems Statement of Work (SOW) Rev 1. 10-16-2024.docx DOCX document
J.024 Price Proposal Critical Power Systems Cost Worksheet 10-11-24.xlsx.xlsx XLSX spreadsheet
6973GH-24-R-00177 REVISED SIR.pdf PDF
6973GH-24-R-00177 Amendment P00001.pdf PDF
J.025 Phase I, Volume II - Relevant Corporate Experience Form.docx DOCX document
J.006 Travel Authorization Form.xlsx XLSX spreadsheet
J.017 FAA Order JO 6950.27B - Power System Studies.pdf PDF
J.023 FAA Order 1370.121B - FAA Information Security and Privacy Policy.pdf PDF
6973GH-24-R-00177 as of 9-17-2024.pdf PDF
J.014 FAA Order 1050.10D - Environmental Pollution Control and Abatement at FAA Facilities.pdf PDF
J.002 Contract Data Requirements List (CDRL).pdf PDF
J.005 Contractor Acceptance Inspection (CAI) FAA Form 6010-5.pdf PDF
J.013 FAA-STD-002H Standard Engineering Drawing Preparation & Support.pdf PDF
J.015 FAA Order JO 3900.57A CHG 1 - EOSH Requirements in the Planning & Execution of Construction & Maintenance Activities at NAS Facilities.pdf PDF
J.020 Fuel Storage Tank Guidelines.pdf PDF
J.004 Government Furnished Equipment (GFE).pdf PDF
J.016 FAA Order JO 3900.64A - Air Traffic Organization Electrical SafetyProgram.pdf PDF
J.010 Pre-Construction Agenda and Checklist - DOT Form F4220.3.doc DOC document
J.011 FAA-C-1217H Construction Specification - ELECTRICAL WORK, PREMISES WIRING.pdf PDF
J.024 Price Proposal Critical Power Systems Cost Worksheet.xlsx XLSX spreadsheet
J.012 FAA-C-1391e INSTALLATION, TERMINATION, SPLICING, AND TRANSIENTSURGE PROTECTION OF UNDERGROUND ELECTRICAL DISTRIBUTION SYSTEM POWER CABLES.pdf PDF
J.009 Pre-Construction Installation EOSH Checklist - FAA Form 3900-18.pdf PDF
J.027A-2 Technical Approach, Factor 3, Installation Proposal Form.pdf PDF
J.26 Past Performance Questionnaire 5-31-24.docx DOCX document
J.007 Performance Bond - FAA Form Number FAA 4400-63.pdf PDF
J.008 Payment Bond - FAA Form Number 4400-61.pdf PDF
J.027A-1 Phase 2 Volume 2, Technical Approach - Factor 2 Category 2 CPS Design Proposal Form.pdf PDF
J.021 FST Program Specifications for Construction.pdf PDF
J.028 Technical Approach Evaluation Worksheets rev2 06-04-24.docx DOCX document
J.001 Critical Power Systems Statement of Work (SOW).docx DOCX document
J.003 Data Item Description (DID).pdf PDF
J.029 FAA cleanup schedule - ACEPS support.pdf PDF
J.019 FAA Order JO 6950.2F Electrical Power Policy lmplementation at NationalAirspace System Facilities.pdf PDF
J.018 FAA Order JO 1050.17B - Environmental Compliance at Air Traffic Organization Facilities.pdf PDF
J.022 Contractor Release - DOT FORM 4220.4.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A

#ReferenceQuestion or Clarification:Answer:
1[J.024] and [SOW C.3.2.6.3.1]For CLIN engineering wages, are these assumed to be licensed professional engineers or unlicensed engineers?CLIN engineering wages are assumed to be for unlicensed engineers. If a PE is required on a specific task order the contractor can quote the difference.
2J.024Please define "Project Management Professionals".The term has been revised to "Project Manager". Please see updated J.024 Attachment
3[Solicitation, E, Paragraph 3 - page 25] and [J.005]Please confirm and clarify, the installation contractor is to sign the CAI? Form 6010-5 instructions do not state that the contractor should sign the CAI, nor does the form have any spot for the contractor's signature.Per Section E, Paragraph 3 "Before the installation contractor

demobilizes, their site superintendent must review the CAI and sign the form. Their signature on the CAI indicates that the installation contractor acknowledges if any punch list items remain." The IDIQ site superintendent's review and signature on the CAI is required per Section E.

4[Solicitation L.4.1.3.3 - page 132] and [Solicitation clause 3.2.2.3-20 - page 135] and [Solicitation M.1.2.2 - page 140]Will Phase II require hard copy binder submittals in addition to electronic upload, or just electronic upload?All submittals will be electronically uploaded.
5[Solicitation M.3.2.1 - page 141]In the event the offeror does not have an installation with such large EGs or UPS configured in parallel, shall the offeror submit Corporate Experience that may include design of these items or installation of other similar complexity?As stated in M.3.2.1 The Offeror must provide at least one installation project of the two (2) following classifications,

1. Engine Generators (EGs), each 1000 kW or larger, configured in parallel;

OR

2. Uninterruptible Power Systems (UPS), each 200 kVA or larger, configured in parallel to meet the requirements for relevant corporate experience.

6[J.025] and [Solicitation L.3 - page 127]J.025 instructions indicate the Relevant Corporate Experience form can not be modified in anyway and that you can not use more space than provided. However, the solicitation indicates there is no page limit for Relevant Corporate Experience. Please advise.Offerors response to Volume 2 Factor 1 must be limited to the completed Form J.025 without additional attachments. Offerors must complete Form J.025 per the given instructions. As stated, Offeror must not use more space than provided and must not modify the form in anyway.
7[SOW C.3.2.6.5.4]When the site survey contractor is the same as the design contractor, all locations of new equipment and all locations of existing impacted may not be known at the time of the site survey. Should hazardous materials testing be done before completing the 100% design drawings in lieu of during the site visit, the same as when survey and design are awarded separately?Please see updated SOW, Section C.3.2.6.5.4
8[SOW C.3.2.7.6] and [SOW C.3.2.8.6]Will the 3/30/2012 Supremacy Clause letter from FAA Attorney Bruce Hinchey be applied to this CPS Contract, regarding state and local licensures and certifications?The supremacy clause applies to all FAA government contracts. If an issue arises in which the IDIQ contractor is receiving push back from another authority, the IDIQ contractor is required to contact the Contracting Officer/Specialist concerning the issue. The CO/CS will reference the supremacy clause with legal and provide that authority with a supremacy clause letter.
9[SOW C.3.2.5.1] and [SOW C.3.2.5.2]Will site survey items a through c be provided by the FAA to the contractor prior to the site visit?Existing items a through c, under SOW C.3.2.5.1 and SOW C.3.2.5.2, will be provided to the contractor prior to the site survey visit.
10[SOW C.3.2.6.7.4]Will the contractor be required to gather Mechanical/Electrical Equipment Oriented Instruction Book information on only CFE, or both CFE and GFE?Only CFE
11[SOW C.3.2.6.8.1]This section references FAA Order 6950.27A. Please confirm if this order is to be used or if order 6950.27B will take precedence.* FAA Order JO 6950.27B supersedes FAA Order 6950.27A. The Contractor will follow FAA Order JO 6950.27B.

* See SIR attachment J.017 FAA Order JO 6950.27B - Power System Studies document if needed.

12Is there an official set aside for the project?no set aside for this SIR.
13Is there an estimated ceiling value for the multiple award IDIQ?Ceiling value is approximately $1,300,000,000.00
14Is there a Task Order Range?Contract is a Indefinite Delivery/ Indefinite Quantity with a Min of 1 task order, the range is unknown.
15Please confirm that 10-point Times New Roman font is acceptable for tables and graphics.Font size must be 12, in Times New Roman font
16Please confirm that 10-point Times New Roman font is acceptable for headers and footers.Font size must be 12, in Times New Roman font
17Please confirm that a font size larger than 12 is acceptable for headings and cover page text.Font size must be 12, in Times New Roman font
18Please confirm that text in headers and footers can be within the required 1-inch margin.all margins equal to 1.0 inch
19Section L 3.2.2.3-15 should this be completed for the submission.Yes
20Do the margins for SF-33 need to be 1” and font 12? If so, can you provide a word document.No
21Section k AC4560 MMAC EMS & OSHMS documents- can you provide.AC4560 references AC0090. See AC0090 on page 42 of the SIR
22For the subcontracting plan how should we determine the estimated contract value? Total SIR divided by 4 for the installation CLIN by base year and each option?Use estimated contract/ceiling value of $1,300,000,000
23Do we submit the entire SIR or sections I and K only with the SF 33, if yes to #1 then submit L also if not all sections?The bidder is required to complete the entire SIR, including the clauses in section L.
24J..025 and Relevant Corporate Experience for Phase I* Is submission of two projects required, or can one project be submitted?
* Do we need to identify installation of parallel EGs as well as installation of parallel UPS, or just one or the other?The offeror may provide up to (2) projects but only (1) is required. Either an E/G project OR a UPS project as described in M.3.2.1 is required. It is NOT required to submit both an E/G project and a UPS project.
25Will the government please clarify if there is an incumbent providing service on this contract or is this level of effort a new need? If there is an incumbent, can the government please provide the most recent contract award number & contract value?This is a new requirement. There is no incumbent providing service on this effort.