J.005 Contractor Acceptance Inspection (CAI) FAA Form 6010-5.pdf

PDF 517 KB Posted

Attached to
CRITICAL POWER SYSTEMS INSTALLATION SERVICES Federal contract opportunity
Solicitation number
6973GH-24-R-00177
Issued by
Department of Transportation Federal Aviation Administration Franchise Acquisition Services

About this file

This document is a Contractor Acceptance Inspection (CAI) Cover Sheet, FAA Form 6010-5, used by the Federal Aviation Administration (FAA) to document the acceptance of completed work under a federal contract. The form captures key details such as the CAI number, date of inspection, job control number, related job order numbers, project implementer, location information, project title, contractor, contract number and date, and a description of the work and real property assets accepted. It also includes sections for the FAA representative performing the inspection to provide remarks and indicate if a punch list was completed. This form is used as part of the FAA's process to formally accept contracted work from the contractor.

View the file

Other files for this federal contract opportunity

Other files attached to CRITICAL POWER SYSTEMS INSTALLATION SERVICES, newest first.
File Type Posted
J.024 Price Proposal Critical Power Systems Cost Worksheet 10-11-24.xlsx.xlsx XLSX spreadsheet
6973GH-24-R-00177 Amendment P00001.pdf PDF
6973GH-24-R-00177 REVISED SIR.pdf PDF
CPS SIR 6973GH-24-R-00177 Questions and Answers 10.16.24.xlsx XLSX spreadsheet
J.001 Critical Power Systems Statement of Work (SOW) Rev 1. 10-16-2024.docx DOCX document
6973GH-24-R-00177 as of 9-17-2024.pdf PDF
J.004 Government Furnished Equipment (GFE).pdf PDF
J.009 Pre-Construction Installation EOSH Checklist - FAA Form 3900-18.pdf PDF
J.012 FAA-C-1391e INSTALLATION, TERMINATION, SPLICING, AND TRANSIENTSURGE PROTECTION OF UNDERGROUND ELECTRICAL DISTRIBUTION SYSTEM POWER CABLES.pdf PDF
J.016 FAA Order JO 3900.64A - Air Traffic Organization Electrical SafetyProgram.pdf PDF
J.024 Price Proposal Critical Power Systems Cost Worksheet.xlsx XLSX spreadsheet
J.025 Phase I, Volume II - Relevant Corporate Experience Form.docx DOCX document
J.027A-2 Technical Approach, Factor 3, Installation Proposal Form.pdf PDF
J.018 FAA Order JO 1050.17B - Environmental Compliance at Air Traffic Organization Facilities.pdf PDF
J.019 FAA Order JO 6950.2F Electrical Power Policy lmplementation at NationalAirspace System Facilities.pdf PDF
J.022 Contractor Release - DOT FORM 4220.4.pdf PDF
J.007 Performance Bond - FAA Form Number FAA 4400-63.pdf PDF
J.008 Payment Bond - FAA Form Number 4400-61.pdf PDF
J.014 FAA Order 1050.10D - Environmental Pollution Control and Abatement at FAA Facilities.pdf PDF
J.26 Past Performance Questionnaire 5-31-24.docx DOCX document
J.027A-1 Phase 2 Volume 2, Technical Approach - Factor 2 Category 2 CPS Design Proposal Form.pdf PDF
J.001 Critical Power Systems Statement of Work (SOW).docx DOCX document
J.002 Contract Data Requirements List (CDRL).pdf PDF
J.003 Data Item Description (DID).pdf PDF
J.006 Travel Authorization Form.xlsx XLSX spreadsheet
J.010 Pre-Construction Agenda and Checklist - DOT Form F4220.3.doc DOC document
J.011 FAA-C-1217H Construction Specification - ELECTRICAL WORK, PREMISES WIRING.pdf PDF
J.013 FAA-STD-002H Standard Engineering Drawing Preparation & Support.pdf PDF
J.015 FAA Order JO 3900.57A CHG 1 - EOSH Requirements in the Planning & Execution of Construction & Maintenance Activities at NAS Facilities.pdf PDF
J.017 FAA Order JO 6950.27B - Power System Studies.pdf PDF
J.020 Fuel Storage Tank Guidelines.pdf PDF
J.021 FST Program Specifications for Construction.pdf PDF
J.023 FAA Order 1370.121B - FAA Information Security and Privacy Policy.pdf PDF
J.028 Technical Approach Evaluation Worksheets rev2 06-04-24.docx DOCX document
J.029 FAA cleanup schedule - ACEPS support.pdf PDF
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FAA Form 6010-5 (10/16) Page 1 of 3

Contractor Acceptance Inspection (CAI) Cover Sheet

INSTRUCTIONS FOR COMPLETING FAA FORM 6010-5

Form Block

Description

1 CAI number. Electronically assigned by national database: The first character represents the Service Area, the next two characters represent the calendar year that the CAI was performed; then a dash followed by the letter ‘C’, which designates CAI; and the last five characters are sequentially assigned.

2 Date of Inspection. The date the JAI checklist was completed.

3 Job Control Number (JCN). Service Area unique number assigned to specific projects.

4 Related Job Order Number(s) (JONs). Budgetary Control Number.

5 Project Implementer. The entity implementing the project.

6 District. The affected District identifier.

7 SSC. The affected Systems Service Center identifier.

8 Cost Center Code. The cost center of the affected facility, system, or equipment.

9 Location Identifier. Alpha Numeric location identifier (LOCID) where the facility, system, or equipment is physically located (can be found in FSEP).

10 FSEP Facility Type. The Facility Type published in the FSEP.

11 City. Full name of the location where the facility, system, or equipment is actually located.

12 State. The two-letter abbreviation of the State where facility, system, or equipment is actually located.

13 Facility Ident Code. From the FSEP, lists the facility, system, or equipment features and capabilities in a six-digit code. The digits are broken out below:

S = System C = Category F = Facility T = Type M = Model C = Class

14 Runway number. If applicable, list of the runway impacted by this JAI. Typically, if the Facility Ident Code System Code (S) is a ‘3’, then a runway must be listed here.

15 Project Title. Short title of project.

16 Contractor. The business name of the contractor performing the work.

17 Contract Number. The number of the contract that authorized the expenditure of funds required to complete this work.

18 Contract Date. The date that the contract was awarded.

19 Description of Project. Describes the work accomplished by the project.

20 Description of Real Property Assets. Describes each real property asset that was accepted from the contractor.

pxantus Typewritten Text Electronic Version (PDF) pxantus Typewritten Text

FAA Form 6010-5 (10/16) Page 2 of 3

21 PI Representative Performing the Inspection or Acceptance. The PI Representative or COTR that performed the inspection must be an FAA employee. The PI Representative or COTR signs and dates the CAI Cover Sheet.

22 Remarks. Any comments or discrepancies necessary to clarify the CAI.

23 Punch List. The appropriate box is checked to indicate if a punch list was completed. Also lists the date that any punch list items will be completed.

Electronic Version (PDF)

FAA Form 6010-5 (10/16) Page 3 of 3

CONTRACTOR ACCEPTANCE

INSPECTION REPORT

CAI COVER

SHEET

CAI Number Date of Inspection

Job Control Number (JCN) Related Job Order Number(s) (JONs) Project Implementer District SSC

Cost Center Code

Location Identifier

Facility Type

(FSEP)

Physical Location Facility Ident. Code Runway City State S C F T M C

Project Title:

Contractor: Contract Number: Contract Date:

Description of Project:

Description of Real Property Assets (List each asset separately):

Name and Title of Person Performing the Inspection or Acceptance:

Print Name and Title Signature Date

Remarks:

Punch List Attached. Recommended Date of Completion for Punch List Items:

No Punch List. All Contract Deliverables Received by the FAA.

FAA Form 6010-5 (07/08)

Electronic Version (PDF)

Rectangle

Job Control Number JCNRow1:
Related Job Order Numbers JONsRow1:
Project ImplementerRow1:
DistrictRow1:
SSCRow1:
Cost Center CodeRow1:
Location IdentifierRow1:
Facility Type FSEPRow1:
CityRow1:
StateRow1:
SRow1:
CRow1:
FRow1:
TRow1:
MRow1:
CRow1_2:
RunwayRow1:
Project Title:
ContractorRow1:
Contract NumberRow1:
Contract DateRow1:
Description of Project:
Description of Real Property Assets List each asset separately:
Print Name and Title:
Date:
Remarks:
Punch List Attached Recommended Date of Completion for Punch List Items: Off
No Punch List All Contract Deliverables Received by the FAA: Off
undefined:
Text1:
0:
1:

File details come from the government source that posted it. Updated .