About this file

This document is an attachment section for a federal facility investment contract, specifically Section J - 1502000, which contains multiple attachments related to facility maintenance and management. The attachments include definitions and acronyms, references and technical documents, facilities description, critical areas requiring Infection Control Risk Assessment (ICRA), anticipated Emergency/Urgent/Routine (E/U/R) work orders, Defense Health Agency (DHA) system descriptions, base systems description, and checklists for aboveground and underground storage tanks.

The attachments provide comprehensive technical documentation for maintaining facilities, with detailed descriptions of equipment categories, maintenance procedures, lifecycle costs, and specific checklists for various systems. Key references include Unified Facilities Criteria (UFC), Naval Facilities (NAVFAC) maintenance manuals, OSHA regulations, and industry standards from organizations like NFPA and ASHRAE. The documents outline maintenance approaches such as the Integrated Maintenance Program (IMP), which emphasizes proactive and preventive maintenance to ensure equipment operational readiness across various facility systems and equipment types.

View the file

Other files

File Type Posted
Solicitation Amendment N6247025R00200011 SF 30.pdf PDF
Annex 1606001 C Water (Overseas) - Amend 0010.pdf PDF
J-1601000 Utility Management - Amend 0010.pdf PDF
Solicitation Amendment N6247025R00200009 SF 30.pdf PDF
Solicitation Amendment N6247025R00200008 SF 30.pdf PDF
J-1602000 Electrical - Amend 0008.pdf PDF
Solicitation Amendment N6247025R00200007.pdf PDF
Annex 1502000 C Facility Investment Amend 0007.pdf PDF
Annex 1503010 C Custodial - Amend 0007.pdf PDF
Annex 1601000 C Utility Management - Amend 0007.pdf PDF
J-12 PPI Responses (Ament 0007).pdf PDF
J-0200000-12 ELINs Sigonella - Amend 0007.xlsx XLSX spreadsheet
J-1606001 Water (Overseas) Amend 0007.pdf PDF
Solicitation Amendment N6247025R00200003.pdf PDF
Annex 0100000 General Information- Amendment 0002.pdf PDF
Solicitation Amendment N6247025R00200001 SF 30.pdf PDF
Section F Deliverables.pdf PDF
J-1 Past Performance Questionnaire (Form PPQ).pdf PDF
Annex 0100000 General Information.pdf PDF
Annex 1401000 Family Housing.pdf PDF
Annex 1402000 Unaccompanied Housing.pdf PDF
Annex 1503010 Custodial.pdf PDF
Annex 1503050 Grounds Maintenance and Landscaping.pdf PDF
Annex 1602000 Electrical.pdf PDF
J-0200000 Management and Adminstration.pdf PDF
J-1401000 Family Housing.pdf PDF
J-1501000 Facility Management.pdf PDF
J-1502000-04 Bldg 273 Critical Areas Requiring ICRA.pdf PDF
J-1502000-07.a POL Fuel Depot Equipment Description.xlsx XLSX spreadsheet
J-1503010-06.b Custodial Inventory and Frequencies.xlsx XLSX spreadsheet
J-1503030-04 Solid Waste Collection Pick-Up Points Maps.pdf PDF
J-1503050 Grounds Maintenance and Landscaping.pdf PDF
J-1503060 Pavement Clearance.pdf PDF
J-1601000-03 Annual Utility Service Order Workload.pdf PDF
1603000 J Natural Gas.pdf PDF
J-1603000-04 Critical Spare Parts Inventory.xlsx XLSX spreadsheet
1604000 J Wastewater.pdf PDF
1700000 J Transportation.pdf PDF
J-1700000-04 Bus Stops Maps.pdf PDF
J-1700000-05 Shuttle Bus Services Satisfaction Survey Sample.pdf PDF
1800000 J Environmental.pdf PDF
J3 Section B Supplies or Services and Prices.pdf PDF
J-5 Pre Proposal Site Visit Sigonella.pdf PDF
Annex 1503030 Integrated Solid Waste Management.pdf PDF
Annex 1503060 Pavement Clearance.pdf PDF
Annex 1601000 Utility Management.pdf PDF
Annex 1800000 Environmental.pdf PDF
J-0200000-10 Oil and Hazardous Substance Spill Response Procedures.pdf PDF
J-1502000-07 Base Systems Description RFP.xlsx XLSX spreadsheet
J-1502000-07.b Critical Spare Parts List.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section J – 1502000 Facility Investment

SECTION J - 1502000

FACILITY INVESTMENT

ATTACHMENT

NUMBER

ATTACHMENT TITLE

J-1502000-01 DEFINITIONS AND ACRONYMS

J-1502000-02 REFERENCES AND TECHNICAL DOCUMENTS

J-1502000-03 Facilities Description J-1502000-04 Critical Areas Requiring ICRA J-1502000-05 Anticipated E_U_R Work Orders

J-1502000-06 DEFENSE HEALTH AGENCY SYSTEMS DESCRIPTION

J-1502000-07 BASE SYSTEMS DESCRIPTION

J-1502000-07.a POL Fuel Depot Equipment Description (See Separate Attachment) J-1502000-07.b Critical Spare Parts List (See Separate Attachment) J-1502000-07.c Aviation Fuel Systems Equipment Description (See Separate Attachment) J-1502000-07.d Vehicle Fueling Station Equipment Description (See Separate Attachment) J-1502000-07.e Periodic Inspections and Maintenance Actions (See Separate Attachment) J-1502000-07.f Ufc_3_460_03_2017_c2 (See Separate Attachment) J-1502000-08.a Monthly and Yearly Checklist for AST – DHA (See Separate Attachment) J-1502000-08.b Monthly UST Checklist – DHA (See Separate Attachment) J-1502000-08.c Yearly UST Checklist – DHA (See Separate Attachment)

ATTACHMENT J-1502000-01

DEFINITIONS AND ACRONYMS

DEFINITION DESCRIPTION

Crane, Category 1 Portal cranes, Hammerhead cranes, Locomotive cranes, Derricks, Floating cranes

(YD), Tower cranes, Container cranes, Mobile cranes (except those indicated as category 4), including truck, cruiser, crawler, warehouse/industrial cranes, and cranes used for dragline, pile driving, clamshell, magnet, bucket work, and Aircraft crash cranes.

Crane, Category 2 & 3 Cranes with rated capacities of 20,000 pounds or greater are category 2. Examples are Overhead traveling cranes, Gantry cranes (rail mounted), Wall cranes, Jib cranes, Pillar cranes, Pillar jib cranes, Monorails and associated hoists, Fixed hoists including chain falls. Pedestal mounted commercial boom assemblies (fixed length, telescoping, and articulating types) attached to stake trucks, trailers, flatbeds, or railcars, or stationary mounted to piers, etc., with OEM rated capacities less than 2,000 pounds.

Crane, Category 4 Commercial truck mounted cranes, Truck mounted articulating boom cranes, Pedestal mounted commercial boom assemblies (fixed length, telescoping, and articulating types) attached to stake trucks, trailers, flatbeds, or railcars, or stationary mounted to piers, etc., with OEM rated capacities of 2,000 pounds and greater. Commercial truck mounted cranes and truck mounted articulating boom cranes with OEM capacities of 2,000 pounds and greater require a licensed operator even if the cranes are down rated below 2,000 pounds capacity for administrative purposes.

Equipment, Collateral Encompasses built-in and large substantially affixed equipment/property that is normally acquired and installed as part of a facility project.

Equipment, Installed Encompasses building-type equipment, built-in equipment, and large, substantially affixed equipment/property, and is normally acquired and installed as part of a facility project. Installed equipment is normally required to make a facility useful and operable. Removing such equipment would impair the usefulness, safety, or environment of the facility or the facility restoration work required after its removal, is substantial.

Equipment, Personal Property

Personal property equipment includes all equipment other than collateral equipment.

Such equipment, when acquired and used in a facility or a test apparatus, can be severed and removed aster erection or installation without substantial loss of value or damage thereto or to the premises where installed.

Facilities Life Cycle A facilities life cycle is divided into four stages, requirements (planning and design), acquisition (construction and acceptance), stewardship (operations, maintenance and repair), and disposal.

Facilities Maintenance Management

The planning, prioritizing, organizing, controlling, reporting, evaluating, and adjusting of facilities maintenance operations to support the CNO/NAVFAC facilities policy and objectives and satisfy customers’ facility needs. Defined by the International Facility Management Association as “the practice of coordinating the physical workplace with the people and work of the organization.”

Infection Control Risk Assessment (ICRA)

A systematic process used in healthcare facilities, particularly during construction and renovation, to identify potential infection risks and implement measures to minimize them, ensuring the safety of patients, staff, and visitors.

Integrated Maintenance Program (IMP)

IMP is a recurring state-of-the-art, reliability-centered inspection, testing, maintenance and repair program that determines best practices for managing the functions and consequences of failures of facilities equipment and system components. IMP encompasses accepted commercial practices, including reactive, preventive, predictive and proactive maintenance, into one optimal program. The IMP approach gives the Contractor full responsibility to maintain systems and equipment and perform repairs whenever necessary to ensure equipment and systems are operational and remain in a constant state of readiness. Emergency, Urgent, and Routine Work Orders will not be issued for accomplishment of repairs on systems and equipment maintained under

IMP.

ATTACHMENT J-1502000-01

DEFINITIONS AND ACRONYMS

DEFINITION DESCRIPTION

Life-Cycle Costs A form of economic analysis that considers the total cost of owning, operating, and maintaining a building or system over its useful life.

Maintenance, Preventive

Maintenance designed to increase the availability of the facilities/equipment by reducing the number of unexpected breakdowns or service interruptions. It is any planned maintenance activity that improves equipment life and avoid any unplanned maintenance requirements.

Management Information Systems- Maintenance

A computerized system that will provide sufficient information for management to evaluate differences between budgets and actual costs and evaluate performance.

Repair Repair is the restoration of facilities or equipment to such a condition that it may be effectively utilized for its designated purposes by overhaul, reconstruction, or replacement of constituent parts or materials which have deteriorated by action of the elements or usage, and which have not been corrected through maintenance. This term also applies to replacement of the entire unit or system if beyond economical repair.

The intent of repair is to have the equipment at normal working condition.

Replacement Replacement, as a distinct work element, is confined to a program of planned replacement of a facility or its components. It may be further limited to major components such as air conditioning compressors, furnaces or hot water heaters.

Replacement is performed when the equipment has reached the end of its useful life;

when it no longer can perform due to degradation of its internal components and repair is no longer cost effective. Included under the replacement would be the major rebuilding of any component, since rebuilding also restores performance.

Restoration Restoration of real property to such a condition that it can be used for its intended purpose. Includes repair or replacement work to restore facilities damaged by inadequate sustainment, excessive age, natural disaster, fire, accident or other causes.

Sustainment Maintenance and repair activities necessary to keep a typical inventory of facilities in “normal working condition”. Sustainment includes regularly scheduled maintenance as well as cyclical major repairs or replacement of components that occur periodically over the expected service life of the facilities.

Weight Handling Equipment (WHE)

Weight handling equipment consists of cranes (e.g., portal cranes, jib cranes), rigging gear (e.g., slings, shackles), and associated equipment (e.g., portable hoists, dynamometers). For purposes of this technical sub-annex, WHE does not include mobile or transportable truck, crawler, and railway mounted locomotive cranes covered in 1700000 BSVE.

ACRONYM TITLE

BPVC Boiler and Pressure Vessel Code HVAC Heating, Ventilation, and Air Conditioning ICAP Infrastructure Condition Assessment Program RPIE Real Property Inventory Equipment SCADA Supervisory Control and Data Acquisition SM Semimonthly SOP Standard Operating Procedures SRM Sustainment, Restoration and Modernization UFC Unified Facilities Criteria UPV Unfired Pressure Vessel VTE Vertical Transportation Equipment

ATTACHMENT J-1502000-02

REFERENCES AND TECHNICAL DOCUMENTS

The Contractor shall adhere to the applicable portions of the following publications and directives in performing the services required under this contract. This list shall not be considered all-inclusive and does not release the Contractor from all obligations that must be fulfilled in the observance and execution of this contract.

When U.S., European and/or Italian directives, instructions and industry standards are applicable to the work to be performed under this contract, the most stringent directives, instructions and industry standards shall govern.

REFERENCE TITLE

DM 1 March 1974 Norme per l'Abilitazione alla Conduzione di Generatori di Vapore DPR 162/99 Norme per l’attuazione delle direttive 95/16/CE e 2006/42/CE (Ascensori e

Montacarichi) CEI EN 50110-1 Operation of Electrical Installations CEI 11-27 Lavori su Impianti Elettrici UFC 3-410-01 Heating, Ventilating, and Air Conditioning Systems UFC 3-410-06 Operation and Maintenance: Central Heating Plants UFC 3-430-07 Operations and Maintenance: Inspection and Certification of Boilers and Unfired

Pressure Vessels UFC 3-550-01 Exterior Electrical Power Distribution UFC 3-560-01 Electrical Safety O&M UFC 3-570-06 Cathodic Protection UFC 3-600-02 Operations and Maintenance: Inspection, Testing, and Maintenance of Fire

Protection Systems NAVMED P-5010-4 Manual of Naval Preventive Medicine OSHA Occupational Safety and Health – Laws and Regulations

Technical Manual (OTM) OSHA Instruction TED 01-00-015, Section III: Chapter 7, Legionnaires’ Disease

UNI EN 81-1 Safety rules for the construction and installation of lifts – Part 1 : Electric lifts UNI EN 81-2 Safety rules for the construction and installation of lifts – Part 2 : Hydraulic lifts SIEMENS O&M Operation and Maintenance of Telemetry Alarm System Manual NAVFAC P-717 Preventive/Recurring Maintenance Handbook NAVFAC MO-114 Building Maintenance NAVFAC MO-115 Systems Maintenance Refrigeration NAVFAC MO-118 Inspection of Vertical Transportation Equipment NAVFAC MO-119 Building Maintenance; Galley Equipment NAVFAC MO-200 Facilities Engineering Electrical Exterior Facilities NAVFAC MO-206 Operation and Maintenance of Air Compressor Plants NAVFAC MO-209 Maintenance of Steam, Hot Water and Compressed Air Distribution Systems NAVFAC MO-210 Maintenance & Operation of Water Supply System, Treatment & Distribution

Systems NAVFAC MO-220 Maintenance and Operation of Gas Systems NAVFAC MO-225 Industrial Water Treatment NAVFAC MO-324 Inspection and Certification of Boilers and Unfired Pressure Vessels NAVFAC MO-912 Standard for Ventilation Control and Fire Protection of Commercial Cooking

Operations NAVFACINST 11300.37 Energy and Utilities Policy Manual NEC National Electrical Code NESC National Electrical Safety Code NFPA National Fire Protection Agency Standards NFPA Standard 25 Standard for the Inspection, Testing, and Maintenance of Water-Based Fire

Protection Systems

ATTACHMENT J-1502000-02

REFERENCES AND TECHNICAL DOCUMENTS

REFERENCE TITLE

NFPA Standard 96 Standard for Ventilation Control and Fire Protection of Commercial Cooking Operations

NFPA Standard 99 Standards for Health Care Facilities ASME BPVC VI 1998 American Society of Mechanical Engineers, Boiler & Pressure Vessel Code MIL-HDBK-1152 Inspection & Certification of Boilers & Unfired Pressure Vessels OPNAVINST 5090.1 Environmental Readiness Program Manual ASHRAE American Society of Heating, Refrigerating and Air Conditioning Engineers

ATTACHMENT J-1502000-03

FACILITIES DESCRIPTION

Facility Description is provided as a separate attachment. Refer to Microsoft Excel attachment “J-1502000-03 Facility Description”.

ATTACHMENT J-1502000-04

CRITICAL AREAS REQUIRING ICRA

Critical Areas Requirement ICRA is provided as a separate attachment. Refer to Microsoft PDF attachment “J- 1502000-04 Bldg 273 Critical Areas Requiring ICRA”.

ATTACHMENT J-1502000-05

ANTICIPATED EMERGENCY, URGENT AND ROUTINE (E/U/R) WORK ORDERS

Anticipated E/U/R Work Orders is provided as a separate attachment. Refer to Microsoft Excel attachment “J- 1502000-05 Anticipated E_U_R Work Orders”.

ATTACHMENT J-1502000-06

DEFENSE HEALTH AGENCY SYSTEM DESCRIPTIONS

The equipment and system description for Defense Health Agency (DHA) is provided as a separate attachment.

Refer to Excel attachment “J-1502000-06_DHASystems_Description”.

ATTACHMENT J-1502000-07

BASE SYSTEMS DESCRIPTION

The equipment description for CNRE and other funding activities are provided as a separate attachment. Refer to Excel attachment “J-1502000-07 Base Systems Description”.

ATTACHMENT J-1502000-08

ABOVEGROUND (AST) AND UNDERGROUND (UST) STORAGE TANKS CHECKLISTS

The Aboveground (AST) and Underground (UST) Storage Tanks checklists are provided as separate attachments.

Refer to attachments:

J-1502000-08.a Monthly and Yearly Checklist for AST - DHA J-1502000-08.b Monthly UST Checklist - DHA J-1502000-08.c Yearly UST Checklist – DHA

File details come from the government source that posted it. Updated .