J-1502000-07 Base Systems Description RFP.xlsx
XLSX spreadsheet 677 KB Posted
- Solicitation number
- N6247025R0020
About this file
This document is an extensive Attachment J-1502000-07 detailing Base Operations Support (BOS) maintenance requirements for Naval Air Station Sigonella in Sicily, Italy. The attachment comprehensively lists preventive maintenance specifications for multiple complex systems across various facilities, including interior and exterior lighting systems, vertical transportation equipment, compressed air systems, auxiliary generators, uninterruptible power supply systems, fire protection systems, HVAC and refrigeration systems, solar panel systems, and numerous other critical infrastructure components.
The maintenance specifications cover an extensive range of equipment and systems across multiple buildings and locations, including NAS I, NAS II, Global Hawk facilities, and the Niscemi Transmitter Facility. Each system specification outlines detailed maintenance responsibilities, including developing and implementing preventive maintenance programs, cleaning, re-lamping, making repairs, and maintaining all mechanically and electrically interconnected components. The document provides granular details such as specific equipment quantities, manufacturers, locations, installation dates, and maintenance frequencies, serving as a comprehensive technical guide for maintaining the base's critical infrastructure and support systems.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDEX
| ATTACHMENT J-1502000-07 | |
| INDEX | |
| Preventive Maintenance (PM) | |
| Spec Item | Asset Type |
| 3.3.1 | Interior and Exterior Lighting Systems |
| 3.3.2 | Lightning Arrestors and Grounding Devices |
| 3.3.3 | Vertical Transportation Equipment (VTE) |
| 3.3.4 | Compressed Air Systems |
| 3.3.5 | Auxiliary Generators |
| 3.3.6 | Uninterruptable Power Supply Systems (UPS) |
| 3.3.12 | Swimming Pools |
| 3.3.12 | Swimming Pools Operational Hours |
| 3.3.13 | Facility Electric Systems |
| 3.3.15 | Aboveground (AST) and Underground (UST) Storage Tanks |
| 3.3.16 | Overhead and Roll-Up Doors |
| 3.3.17 | Hangar Door |
| 3.3.18 | Drinking Fountains/Water Coolers |
| 3.3.19 | Airfield Light Tower |
| 3.3.20 | Emergency Eye Wash Station |
| 3.3.21 | Irrigation System |
| 3.3.22 | POL Fuel Depot Facilities and Distribution Systems |
| 3.3.22 | Critical Spare Parts List |
| 3.3.23 | Aviation Fuel Support Systems |
| 3.3.24 | Vehicle Fueling Station Systems |
| 3.3.25 | Vehicle Arrestor Systems |
| 3.3.26 | Flood Gate |
| Integrated Maintenance Program (IMP) | |
| Spec Item | Asset Type |
| 3.4.1 | HVAC and Refrigeration Systems |
| 3.4.2 | Fire Protection Systems |
| 3.4.3 | Boilers and UPVs |
| Other Recurring Services Program | |
| Spec Item | Asset Type |
| 3.6.1 | Exhaust Hoods and Ducts |
| 3.6.4 | Solar Panel Systems Maintenance |
| 3.6.5 | Gutter and Roof Inspections |
| 3.6.6 | Gutter Maintenance |
| 3.6.7 | Magnetic Key Card System Maintenance |
| 3.6.8 | Roof Drain Cleaning |
| 3.6.9 | Vehicle Lift Maintenance |
| 3.6.10 | Swimming Pool Water Testing and Treatment Services |
| 3.6.13 | Oil-Water Separator and Grease Traps Maintenance |
| 3.6.14 | Car Wash Water Treatment System |
| 3.6.15 | Fire Extinguisher Inspection and Maintenance |
| 3.6.16 | Lift Station Maintenance |
SYSTEM DESCRIPTION
| ATTACHMENT J-1502000-07 | ||
| SYSTEM DESCRIPTIONS | ||
| Preventive Maintenance (PM) | ||
| 3.3.1 | Interior and Exterior Lighting Systems | Interior and Exterior Lighting Systems commence at, and includes the utility isolation point of connection. The Contractor shall develop and implement a Lighting Systems Preventive Maintenance (PM) Program to clean, re-lamp, and make all necessary repairs to the Interior and Exterior Lighting Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the Lighting Systems, such as: replacement of defective bulbs, batteries, lamps, tubes, ballasts, fuses, starters, switches, diffusers, covers, reflectors, photocells, controls, etc. |
| 3.3.2 | Lightning Arrestors and Grounding Devices | Lightning Arresting and Grounding Systems commence at, and includes the utility isolation point of connection and terminate at foundation. The Contractor shall develop and implement a Preventive Maintenance (PM) Program for the Weight Handling Equipment and Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the Weight Handling Equipment and Systems, such as: brakes, cables, circuit breakers, frequency drives, hoist, hooks, inverters, latches, surge suppressors, trackage, transformers, motors, wiring, monitoring and controls systems, etc |
| 3.3.3 | Vertical Transportation Equipment (VTE) | Vertical Transportation Equipment Systems commence at and include the utility isolation point of connection. The Contractor shall develop and implement a Preventive Maintenance (PM) program for the Vertical Transportation Equipment Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the Vertical Transportation Equipment Systems, such as: doors, cars, tracks, lighting, rails, guides, governors, motors, cables, pulleys, switches, hydraulic cylinders, piping, pumps, tanks, weights, monitoring and control systems, electrical disconnects, etc. |
| 3.3.4 | Compressed Air Systems | Compressed Air Systems commence at and includes the utility isolation point of connection and terminate at the compressed air point of delivery. The Contractor shall develop and implement a PM program for the Compressed Air Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the Compressed Air Systems, such as: compressors, regulators, unfired pressure vessels, air drying systems, distribution systems, air supply connectors, monitoring and control systems, electrical disconnects, etc. |
| 3.3.5 | Auxiliary Generators | Auxiliary Generator Systems commence at and include the utility isolation point of connection. The Contractor shall develop and implement a PM program for the Auxiliary Generator Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the Auxiliary Generator Systems, such as: batteries, fuel tanks, generator, inverters, rectifiers, regulators, prime mover, pumps, piping, transfer switches, switchgear, meters, monitoring and control systems, uninterruptible power supply, wiring, etc. |
| 3.3.6 | Uninterruptable Power Supply Systems (UPS) | The Uninterruptible Power Supply (UPS) System commences at and includes the utility isolation point of connection and terminates at the UPS-protected electrical load. The Contractor shall develop and implement a PM program for the UPS System and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: UPS units, batteries, inverters, rectifiers, bypass switches, cooling systems, monitoring and control systems, electrical disconnects, and associated wiring. |
| 3.3.12 | Swimming Pool Maintenance | The Swimming Pool System commences at and includes the water supply and filtration system and terminates at the pool circulation outlets. The Contractor shall develop and implement a PM program for the Swimming Pool System and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: pumps, filters, chemical dosing systems, heaters, drains, circulation piping, skimmers, monitoring and control systems, and associated electrical components. |
| 3.3.13 | Facility Electric Systems | The Facility Electric System commences at and includes the utility isolation point of connection and terminates at the electrical outlets, fixtures, and connected loads. The Contractor shall develop and implement a PM program for the Facility Electric System and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: transformers, switchgear, circuit breakers, distribution panels, wiring, receptacles, grounding systems, surge protection devices, monitoring and control systems, and electrical disconnects. |
| 3.3.15 | Aboveground (AST) and Underground (UST) Storage Tanks | The Above Ground (AST) and Underground (UST) Storage Tank Systems commence at and include the fill and vent connections and terminate at the distribution outlet. The Contractor shall develop and implement a PM program for the AST and UST Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: tanks, pumps, valves, piping, leak detection systems, cathodic protection, monitoring and control systems, spill containment systems, and associated electrical components. |
| 3.3.16 | Overhead and Roll-Up Doors | The Overhead and Roll-Up Door System commence at and include the power and control source and terminate at the door assemblies. The Contractor shall develop and implement a PM program for the Automatic, Fire, and Roll-Up Door Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: door operators, motors, guide rails, counterweights, limit switches, control panels, emergency release mechanisms, monitoring and control systems, electrical disconnects, and associated hardware. |
| 3.3.17 | Hangar Door | The Hangar Door System commences at and includes the power and control source and terminates at the door assemblies. The Contractor shall develop and implement a PM program for the Hangar Door System and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: door panels, track systems, motors, drive mechanisms, limit switches, control panels, emergency release mechanisms, monitoring and control systems, electrical disconnects, and associated hardware. |
| 3.3.18 | Drinking Fountains/Water Coolers | The Drinking Fountain and Water Cooler Systems commence at and include the water supply connection and terminate at the fixture discharge point. The Contractor shall develop and implement a PM program for the Drinking Fountain and Water Cooler Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: chillers, filters, water dispensers, pressure regulators, monitoring and control systems, and associated plumbing and electrical connections. |
| 3.3.19 | Airfield Light Tower | The Airfield Light Tower System commences at and includes the power supply connection and terminates at the light fixtures. The Contractor shall develop and implement a PM program for the Airfield Light Tower System and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: light fixtures, lamps, ballasts, control panels, monitoring and control systems, electrical disconnects, mounting structures, and associated wiring. |
| 3.3.20 | Emergency Eye Wash Station | The Emergency Eyewash System commences at and includes the water supply connection and terminates at the eyewash station outlet. The Contractor shall develop and implement a PM program for the Emergency Eyewash System and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: eyewash stations, safety showers, flow control valves, pressure regulators, monitoring and control systems, and associated plumbing components. |
| 3.3.21 | Irrigation System | The Irrigation System commences at and includes the water supply connection and terminates at the irrigation distribution outlets. The Contractor shall develop and implement a PM program for the Irrigation System and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: pumps, valves, sprinkler heads, drip irrigation lines, pressure regulators, backflow preventers, monitoring and control systems, and associated piping. |
| 3.3.25 | Vehicle Arrestor System | The Vehicle Arrestor System commences at and includes all energy-absorbing barriers, mechanical or hydraulic arrestor units, control panels, and associated safety interlock components. The Contractor shall develop and implement a PM program for the Vehicle Arrestor System and all interlocked ancillary parts, including motors, cables, tensioning systems, sensors, limit switches, control systems, electrical disconnects, and structural foundations. The program shall ensure proper operation during emergency and routine use, in accordance with UFC 4-022-02 and manufacturer guidance. |
| 3.3.26 | Flood Gate | The Flood Gate System commences at and includes the structural gate components, actuators, seals, hydraulic or electric operators, and associated control and monitoring systems. The Contractor shall develop and implement a PM program for the Flood Gate System to ensure functionality during high water or flooding events. The program shall cover inspection, cleaning, lubrication, testing of actuators, and seal integrity checks in accordance with applicable UFCs, NAVFAC criteria, and OEM recommendations. |
| Integrated Maintenance Program (IMP) | ||
| 3.4.1 | HVAC and Refrigeration Systems | The HVAC and Refrigeration Systems commence at and include the power and utility connections and terminate at the conditioned air distribution or refrigeration points. The Contractor shall develop and implement an IMP for the HVAC and Refrigeration Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: air handling units, chillers, condensers, compressors, evaporators, cooling towers, heat exchangers, ductwork, dampers, fans, filters, thermostats, monitoring and control systems, electrical disconnects, and associated piping. |
| 3.4.2 | Fire Protection Systems | The Fire Protection Systems commence at and include the water supply or power connection and terminate at the fire suppression or alarm notification devices. The Contractor shall develop and implement an IMP for the Fire Protection Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as fire pumps, sprinkler heads, standpipes, risers, valves, deluge systems, fire suppression agtents, fire alarms, smoke detectors, control panels, monitoring and control systems, and associated electrical and plumbing components. |
| 3.4.3 | Boilers and UPVs | The Boiler and Unfired Pressure Vessel (UPV) Systems commence at and include the utility supply connections and terminate at the distribution points. The Contractor shall develop and implement an IMP for the Boiler and UPV Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: boilers, pressure vessels, burners, heat exchangers, pumps, valves, regulators, expansion tanks, safety relief devices, monitoring and control systems, electrical disconnects, and associated piping. |
| Other Recurring Services Program | ||
| 3.6.1 | Exhaust Hoods and Ducts | The Exhaust Hood and Duct Systems commence at the appliance connection and terminate at the exhaust outlet. The Contractor shall inspect, clean, and service hoods, ducts, grease filters, and exhaust fans in accordance with NFPA 96 and manufacturer recommendations. Services shall ensure safe operation, reduce fire risk, and maintain compliance with health and safety codes. |
| 3.6.4 | Solar Panel Maintenance | The Solar Panel System begins at the photovoltaic array and includes inverters, wiring, battery banks (if applicable), and control equipment. |
| 3.6.5 | Gutter and Roof Inspections | The Gutter and Roof Inspection scope includes all accessible roof surfaces, drainage components, flashing, and gutter systems. The Contractor shall perform periodic inspections to identify deterioration, damage, or blockages that could affect structural integrity or water runoff. Findings shall be documented, and recommended corrective actions submitted to the Government for review. Inspections shall align with NAVFAC criteria and UFC 1-200-01. |
| 3.6.6 | Gutter Maintenance | The Gutter System includes roof gutters, downspouts, splash blocks, and fastening hardware. The Contractor shall inspect, clean, and repair gutters to ensure unobstructed water flow and prevent roof or foundation damage. Preventive maintenance shall include removal of debris, realignment of sagging sections, and sealing of leaks |
| 3.6.7 | Magnetic Key Card System Maintenance | The Magnetic Key Card System includes all readers, access control panels, magnetic locking hardware, associated wiring, and control software. The Contractor shall implement a PM program to ensure system functionality, including software updates, card reader calibration, hardware inspection, and integration testing with security systems. |
| 3.6.8 | Roof Drain Cleaning | The Roof Drain System includes drains, scuppers, strainers, downspouts, and related flashing. The Contractor shall inspect and clean all roof drainage components to ensure unobstructed water flow, prevent ponding, and minimize roof damage. Work shall comply with applicable stormwater management practices. |
| 3.6.9 | Vehicle Lift Maintenance | Vehicle Lift Systems include hydraulic or mechanical lifting equipment, safety locks, control panels, and structural anchors. The Contractor shall inspect, lubricate, test, and maintain lift systems in accordance with manufacturer recommendations and applicable OSHA/ANSI safety standards. |
| 3.6.10 | Swimming Pool Water Testing and Treatment Services | The Swimming Pool System includes water treatment equipment, filtration systems, pumps, chemical feeders, and monitoring devices. The Contractor shall test and treat water for pH, chlorine/bromine levels, and other indicators, maintaining compliance with Navy and public health standards. |
| 3.6.13 | Oil-Water Separator and Grease Traps Maintenance | The Oil-Water Separator and Grease Trap Systems include tanks, separation chambers, piping, sensors, and alarms. The Contractor shall clean, inspect, and service all components to maintain proper separation function and prevent environmental discharge violations in accordance with local regulations. |
| 3.6.14 | Car Wash Water Treatment System | This system includes sedimentation tanks, filtration units, oil-water separation components, chemical dosing systems, and associated piping. The Contractor shall perform preventive maintenance to ensure proper operation, including inspection, cleaning, and replacement of filters and treatment media as required. |
| 3.6.15 | Fire Extinguisher Inspection and Maintenance | The Fire Extinguisher Program covers all portable extinguishers and associated equipment. The Contractor shall perform inspections, hydrostatic testing, refilling, tagging, and replacement in compliance with NFPA 10 and local fire codes. Records of all maintenance activities shall be maintained. |
| 3.6.16 | Lift Station Maintenance | The Lift Station System includes wet wells, pumps, floats, valves, control panels, and alarm systems. The Contractor shall inspect, clean, and test all components, ensuring proper wastewater conveyance. PM shall be performed in accordance with UFCs, NAVFAC standards, and manufacturer guidelines. |
3.3.1 INTERIOR EXTERIOR LIGHT
| ATTACHMENT J-1502000-07 |
| INTERIOR AND EXTERIOR LIGHTING DESCRIPTION |
| Funding Activity | Bldg | Location | Equipment Description | Quantity |
| Global Hawk | 510 / 404 | NAS II | Fluorescent light fixtures exposed below ceiling | 41 |
| Global Hawk | 510 / 404 | NAS II | Fluorescent light fixtures recessed in ceiling | 96 |
| Global Hawk | 510 / 404 | NAS II | Exterior Floodlights & Wall Mounted Fixtures in the Mechanical Yard | 25 |
| Global Hawk | 510 / 404 | NAS II | Hangar Bay Light Fixtures (10 mt above floor) | 102 |
| Global Hawk | 413 | NAS II | LED light fixtures recessed in ceiling | 80 |
| Global Hawk | 413 | NAS II | LED light fixtures exposed in ceiling | 26 |
| Global Hawk | 413 | NAS II | Exterior Lights | 12 |
| Global Hawk | 413 | NAS II | Hangar Bay Light Fixtures (10 mt above floor) | 28 |
&P of &N
3.3.2 LIGHTING ARREST AND GROUN
| ATTACHMENT J-1502000-07 |
| LIGHTING ARRESTORS AND GROUNDING DEVICES DESCRIPTION |
| Funding Activity | Location | Bldg / Facility | Remarks |
| CNRE | NAS II | 608 | 16 ea. Grounding Points |
| CNRE | NAS II | 609 | 4 ea. Grounding Points |
| CNRE | NAS II | 827 | |
| CNRE | NAS II | 828 | |
| CNRE | NAS II | 847 | |
| CNRE | NAS II | 848 | |
| CNRE | NAS II | 849 | |
| CNRE | NAS II | 856 | |
| CNRE | NAS II | 861 | |
| CNRE | NAS II | 862 | |
| CNRE | NAS II | 863 | |
| CNRE | NAS II | 864 | |
| CNRE | NAS II | 866 | |
| CNRE | NAS II | 881 | |
| CNRE | NAS II | 882 | |
| CNRE | NAS II | 887 | |
| CNRE | NAS II | 897 Open Storage Pad | Pad |
| CNRE | NAS II | 897 Open Storage Pad | 6 Each Portable Magazines |
| CNRE | NAS II | Gates & Posts | 6 Sets |
| CNRE | NAS II | Portable Magazines | 10 Each |
| CNRE | NAS II | 408 - P655 | 17ea Inspectable grounding points + 23ea not inspectable grounding points + 6ea aircraft grounding points |
| CNRE | NAS II | 410 | Inspectable grounding points + not inspectable grounding points + 12ea aircraft grounding points |
| CNRE | NAS II | 408 - P655 | 17ea Inspectable grounding points + 23ea not inspectable grounding points + 6ea aircraft grounding points |
| CNRE | NAS II | 410 | Inspectable grounding points + not inspectable grounding points + 12ea aircraft grounding points |
| CNRE | NAS II | 608 | 16 ea. Grounding Points |
| CNRE | NAS II | 609 | 4 ea. Grounding Points |
| CNRE | NAS II | 827 | |
| CNRE | NAS II | 828 | |
| CNRE | NAS II | 847 | |
| CNRE | NAS II | 848 | |
| CNRE | NAS II | 849 | |
| CNRE | NAS II | 856 | |
| CNRE | NAS II | 861 | |
| CNRE | NAS II | 862 | |
| CNRE | NAS II | 863 | |
| CNRE | NAS II | 864 | |
| CNRE | NAS II | 866 | |
| CNRE | NAS II | 881 | |
| CNRE | NAS II | 882 | |
| CNRE | NAS II | 887 | |
| CNRE | NAS II | 897 Open Storage Pad | Pad |
| CNRE | NAS II | 897 Open Storage Pad | 6 Each Portable Magazines |
| CNRE | NAS II | Gates & Posts | 6 Sets |
| CNRE | NAS II | Portable Magazines | 10 Each |
| Global Hawk | NAS II | ATOC Ramp | 77 ea. Grounding Points |
| Global Hawk | NAS II | 426 | |
| Global Hawk | NAS II | 630 | |
| Global Hawk | NAS II | A/C Washrack | |
| Global Hawk | NAS II | Primary Red Label Area | 39 ea. Grounding Points |
| Global Hawk | NAS II | Ramp 3 (Secondary Red Label Area) | 250 ea. Grounding Points |
| Global Hawk | NAS II | Hangar Bay / Apron Aircraft | Grounding Points: 26 |
| Global Hawk | NAS II | 510 | Lighting Protection System: 48 Connections - 15 Drops - 9 Ground Pits |
| Global Hawk | NAS II | 510 | Grounding Points, 26 each |
| Global Hawk | NAS II | 413 | Lightining Protection System: n. 30 Connections - 4 Drops - 4 Ground Pits. 1 Grounding Point |
| Global Hawk | NAS II | 413 | Grounding Points, 1 each |
| Global Hawk | NAS II | 3873 | Grounding Points: 97 |
| NAVSUP Fuels & DLA Energy | NAS II | POL Fuel Depot Area | |
| NAVSUP Fuels & DLA Energy | NAS II | Aviation Fuels Systems Area | |
| NAVSUP Fuels & DLA Energy | NAS II | Vehicle Fueling Station |
&P of &N
3.3.3 VTE
| ATTACHMENT J-1502000-07 |
| VERTICAL TRANSPORATION EQUIPMENT (VTE) DESCRIPTION |
| Funding Activity | Location | Bldg / Facility | Type | Capacity | |
| (KG) | Manufacturer | Year | |||
| Installed | Speed | ||||
| (m / sec) | Door | ||||
| Type | # | ||||
| Stops | 3Y | ||||
| Insp. | 5Y |
Insp.
| CNRE | NAS II | 465 | Passenger Hydraulic Elevator (PHE) | 1600 | Di Francesco | 2003 | 0.63 | Power | 2 | Jan-16 | Jan-17 |
| CNRE | NAS II | 537 | Passenger Hydraulic Elevator (PHE) | 1345 | Schindler | 1982 | 0.4 | Power | 3 | Jan-16 | Jan-17 |
| CNRE | NAS II | 408 | Passenger Hydraulic Elevator (PHE) | 2450 - 1600 (21 people) | Thyssenkrupp | 2021 | 0.74 | Power | 2 | ||
| CNRE | NAS II | 410 | Passenger Hydraulic Elevator (PHE) | 2450 - 1600 (21 people) | Thyssenkrupp | 2023 | 0.74 | Power | 2 | ||
| CNRE | NAS II | 555 | Passenger Hydraulic Elevator (PHE) | 1600 | Di Francesco | 2006 | 1.8 | Power | 5 | 2018 | |
| CNRE | NAS II | 555 | Passenger Hydraulic Elevator (PHE) | 1600 | Di Francesco | 2006 | 1.8 | Power | 5 | 2018 | |
| CNRE | NAS II | 557 | Passenger Hydraulic Elevator (PHE) | 1250 | Maspero | 2001 | 0.6 | Power | 4 | Jan-16 | Jan-17 |
| CNRE | NAS II | 557 | Passenger Hydraulic Elevator (PHE) | 1250 | Maspero | 2001 | 0.6 | Power | 4 | Jan-16 | Jan-17 |
| CNRE | NAS II | 562 | Passenger Hydraulic Elevator (PHE) | 1250 | Kone | 1999 | 0.57 | Power | 4 | Jan-16 | Jan-17 |
| CNRE | NAS II | 606 | Passenger Hydraulic Elevator (PHE) | 900 | Otis | 1988 | 0.6 | Power | 2 | Jan-16 | Jan-17 |
| CNRE | NAS II | 618 | Passenger Hydraulic Elevator (PHE) | 1600 | Di Francesco | 2009 | 0.63 | Power | 2 | ||
| CNRE | NAS II | 623 | Passenger Hydraulic Elevator (PHE) | 1250 | Kone | 1998 | 0.58 | Power | 4 | Jan-16 | Jan-17 |
| CNRE | NAS II | 623 | Passenger Hydraulic Elevator (PHE) | 1250 | Kone | 1998 | 0.58 | Power | 4 | Mar-17 | Mar-18 |
| CNRE | NAS II | 639 | Passenger Hydraulic Elevator (PHE) | 2700 | Schindler | 1998 | 0.5 | Power | 2 | Jan-16 | Jan-17 |
| CNRE | NAS II | 724 | Passenger Hydraulic Elevator (PHE) | 1600 | Di Francesco | 2003 | 0.63 | Power | 2 | Jan-16 | Jan-17 |
| CNRE | NAS I | 157 | Passenger Hydraulic Elevator (PHE) | 1600 | Maspero | 2003 | 0.62 | Power | 2 | Feb-16 | Feb-17 |
| CNRE | NAS I | 170 | Passenger Hydraulic Elevator (PHE) | 1250 | Kone | 1999 | 0.62 | Power | 4 | Feb-16 | Feb-17 |
| CNRE | NAS I | 170 | Passenger Hydraulic Elevator (PHE) | 1250 | Kone | 1999 | 0.62 | Power | 4 | Jan-16 | Jan-17 |
| CNRE | NAS I | 313 | Passenger Hydraulic Elevator (PHE) | 1250 | Schindler | 1995 | 0.5 | Power | 3 | ||
| CNRE | NAS I | 317 | Passenger Hydraulic Elevator (PHE) | 1600 | Maspero | 2003 | 0.62 | Power | 2 | Oct-17 | Oct-14 |
| CNRE | NAS I | 318 | Passenger Hydraulic Elevator (PHE) | 1600 | Maspero | 2003 | 0.62 | Power | 3 | Mar-17 | Mar-18 |
| CNRE | NAS I | 319 | Passenger Hydraulic Elevator (PHE) | 1600 | Maspero | 2003 | 0.62 | Power | 2 | Oct-17 | Oct-14 |
| CNRE | NAS I | 175 | Passenger Hydraulic Elevator (PHE) | 1600 | Maspero | 2005 | 0.63 | Power | 2 | Jul-17 | Jul-15 |
| CNRE | NAS I | 175 | Passenger Hydraulic Elevator (PHE) | 1600 | Maspero | 2005 | 0.63 | Power | 2 | Jul-17 | Jul-15 |
| DECA | NAS I | 225 | Passenger Hydraulic Elevator (PHE) | 1000 | Maspero | 2001 | 0.6 | Power | 2 | Jan-16 | Jan-17 |
| Funding Activity | Bldg | Location | Asset No. | Quantity | Comments |
| DLA Dist. | 452 | NAS II | TBD | 4 | Certification Not Required. |
Quarterly cleaning of the ramp pit to be included in PM DLA Dist. 452 NAS II TBD 2 Certification Not Required.
Quarterly cleaning of the ramp pit to be included in PM DLA Dist. 722 NAS II TBD 1 Certification Not Required.
Quarterly cleaning of the ramp pit to be included in PM DLA Dist. 723 NAS II TBD 1 Certification Not Required.
Quarterly cleaning of the ramp pit to be included in PM
&P of &N
3.3.4 COMPRESSED AIR SYSTEMS
| ATTACHMENT J-1502000-07 |
| COMPRESSED AIR SYSTEMS DESCRIPTION |
| Funding Activity | Location | Bldg / Facility | Description | Qty |
| Global Hawk | NAS II | 510 | Compressed Air System (includes Air Dryer) | 1 |
| Global Hawk | NAS II | 413 | Compressed Air System (includes Air Dryer) | 1 |
&P of &N
3.3.5 AUXILIARY GENERATORS
| ATTACHMENT J-1502000-07 |
| AUXILIARY GENERATORS DESCRIPTION |
| Funding Activity | Site | Bldg / Facility | Year | kW | Voltage | Hz | Phase | Fuel | Quantity | Location |
| CNRE | Niscemi | 2100 | 5 | 230 | 50 | 1 | Diesel | 5 | ||
| CNRE | Niscemi | 2100 | 6 | 240/120 | 60/50 | 1 | Diesel | 4 | ||
| Global Hawk | NAS II | 510 | 130 | Diesel | 1 | |||||
| Global Hawk | NAS II | 510 | 105 | Diesel | 1 | |||||
| Global Hawk | NAS II | 510 | 1 | |||||||
| Global Hawk | NAS II | 413 | 500 | Diesel | 1 | |||||
| Global Hawk | NAS II | 3873 | 350 | Diesel | 3 | |||||
| SPACE FORCE | NAS II | 423 | 2018 | 182 | 400 | 50 | 3 | Diesel | 1 |
&P of &N
3.3.6 UPS
| ATTACHMENT J-1502000-07 |
| UNINTERRUPTABLE POWER SUPPLY SYSTEMS (UPS) DESCRIPTION |
| Funding Activity | Bldg | Location | Equipment Description | Quantity |
| Global Hawk | 413 | NAS II | UPS Unit - above 39 kVA 60HZ | 2 |
| Global Hawk | 413 | NAS II | Batteries Cabinet | 2 |
| Global Hawk | 510 | NAS II | UPS Unit - above 59 kVA 60HZ | 1 |
| Global Hawk | 510 | NAS II | Batteries Cabinet for UPS-001 | 1 |
| Global Hawk | 510 | NAS II | UPS Unit - above 779 kVA | 1 |
&P of &N
3.3.12 SWIMMING POOLS
| ATTACHMENT J-1502000-07 |
| SWIMMING POOLS EQUIPMENT DESCRIPTION |
| Funding Activity | Location | Bldg / Facility | Room | Equipment Description | Qty | Manufacturer | Model # | Capacity | Year Installed | Remarks |
| CNRE | NAS I | 157 | Mechanical | Boiler | 1 | FER | Marks RS 820 | 820 KW | 2008 | |
| CNRE | NAS I | 157 | Mechanical | Burner | 1 | UNIGAS | P72 | 300/1200 KW | 2008 | |
| CNRE | NAS I | 157 | Mechanical | Hot Water Circulating Pumps | 2 | KSB | Trialine | 50000 LT/Hr 10 MT | 2008 | |
| CNRE | NAS I | 157 | Mechanical | Temperature Controllers | 2 | Coster | DTR 628 | 2008 | ||
| CNRE | NAS I | 157 | Mechanical | Temperature Sensors | 2 | Coster | SIH 010 | 2008 | ||
| CNRE | NAS I | 157 | Mechanical | Three Way Valves | 1 | Coster | VRG 332 | 1 inch | 2008 | |
| CNRE | NAS I | 157 | Mechanical | Three Way Valves | 1 | Coster | VF 365 | 2 ½ inch | 2008 | |
| CNRE | NAS I | 157 | Mechanical | On-Off Gas Valve | 1 | Caleffi | 54109 | 2 inch | 2008 | |
| CNRE | NAS I | 157 | Mechanical | Air Separator | 2 | Caleffi | 551102 | DN 100 | 2008 | |
| CNRE | NAS I | 157 | Mechanical | Water Filling Valves | 1 | Caleffi | 553640 | ½ inch | 2008 | |
| CNRE | NAS I | 157 | Mechanical | Backflow Preventer | 1 | Caleffi | 574004 | ½ inch | 2008 | |
| CNRE | NAS I | 157 | Mechanical | Sand Filter | 2 | Cillichemie | BFP 30 A | 2008 | ||
| CNRE | NAS I | 157 | Mechanical | Sand Filter | 1 | Cillichemie | 5020832 | 2008 | ||
| CNRE | NAS I | 157 | Vert. Strainers / Filters | Chemical Co (?) | AST (?) | SMFN 7000 | 2008 | |||
| CNRE | NAS I | 157 | Mechanical | Electric Motor | 8 | |||||
| CNRE | NAS I | 157 | Mechanical | Circulating Pumps | 3 | |||||
| CNRE | NAS I | 157 | Mechanical | Manifold System | ||||||
| CNRE | NAS I | 157 | Mechanical | Check Valve (main) | 1 | |||||
| CNRE | NAS I | 157 | Mechanical | Gate Valve (main) | 1 | 2012 | ||||
| CNRE | NAS I | 157 | Mechanical | Surge Tank | 1 | |||||
| CNRE | NAS I | 157 | Mechanical | Chemical Analyzer | ||||||
| CNRE | NAS I | 157 | Mechanical | Chemical Metering Pumps | ||||||
| CNRE | NAS I | 157 | Mechanical | Pool Control Panel | ||||||
| CNRE | NAS I | 157 | Mechanical | Chemical Feed Tanks | ||||||
| CNRE | NAS I | 157 | Mechanical | Chemical Feed Piping | ||||||
| CNRE | NAS I | 157 | Mechanical | Pool Chlorinator | ||||||
| CNRE | NAS I | 157 | Mechanical | Pool Filter Control | ||||||
| CNRE | NAS I | 157 | Mechanical | Pool Filter | ||||||
| CNRE | NAS I | 157 | Mechanical | Pool Sump Pumps | ||||||
| CNRE | NAS I | 157 | Mechanical | Pool Supply and Return | ||||||
| CNRE | NAS I | 157 | Mechanical | Pump Pit Piping and Pumps | ||||||
| CNRE | NAS I | 157 | Mechanical | Recirculation Pumps | 3 | |||||
| CNRE | NAS I | 157 | Mechanical | Pump Disconnect Switches | ||||||
| CNRE | NAS I | 157 | Mechanical | Pool Discharge Valves | ||||||
| CNRE | NAS II | 543 | Mechanical | Chemical Controller | 1 | Culligan | MTC1/07 | 2013 | Wrk Hrs 0730 - 1600 | |
| CNRE | NAS II | 543 | Chemical Store | Chemical Pump (Chlorine) | 2 | Culligan | Prop-2 | 2013 | Wrk Hrs 0730 - 1600 | |
| CNRE | NAS II | 543 | Chemical Store | Chemical Pump (Ph) | 2 | Culligan | Prop-2 | 2013 | Wrk Hrs 0730 - 1600 | |
| CNRE | NAS II | 543 | Mechanical | Pool Pumps | 3 | Saer Elettropompe | IRXP4100 | 1000kw | 2013 | Wrk Hrs 0730 - 1600 |
| CNRE | NAS II | 543 | Mechanical | Sand Filter | 2 | Culligan | SWF A 120 | 2013 | Wrk Hrs 0730 - 1600 | |
| CNRE | NAS II | 543 | Mechanical | Stainless Steel Pre Filter | 3 | Fam Pfp | 370 | 4” | 2013 | Wrk Hrs 0730 - 1600 |
| CNRE | NAS II | 543 | Mechanical | Back Flow Preventer | 1 | Febco | RP9811161400 | 4” | Wrk Hrs 0730 - 1600 | |
| CNRE | NAS II | 543 | Mechanical | Back Flow Preventer | 1 | Watts Rp | RP663379 | 1” | 2103 | Wrk Hrs 0730 - 1600 |
| NOTES: |
(1) Above swimming pool equipment inventory outlines major system components. The Contractor shall be responsible for maintaining all valves, fittings and other interconnected components necessary for the pool to remain operational.
(2) The Contractor shall be responsible for two daily operational and water quality check and proper calibration of all measuring equipment. The recurring maintenance of the boiler and associated equipment in Bldg 548 are maintained under a separate program. During daily operational checks, the Contractor shall ensure pool temperatures are within specified norms and shall be able to investigate and troubleshoot all equipment associated with the pool. The Contractor will not be liable for repairs to pool related equipment in the Bldg 548 mechanical room under the Preventative Maintenance Program specification.
&P of &N
3.3.12 SWIMMING POOLS OPS HOURS
| ATTACHMENT J-1502000-07 |
| SWIMMING POOLS OPERATIONAL HOURS* |
| Location | Bldg | Season | Operating Hours | |||
| M - F | Operating Hours | |||||
| Weekends | Function | |||||
| NAS I | 175 | June 1 – August 31 | 0530 - 0800 | None | Lap Swim | |
| 0900 - 1100 | None | Swim Lessons | ||||
| 1100 - 1800 | 1200 - 1800 | Family Swim/Lap Swim | ||||
| September 1 – May 31 | 0530 - 0800 | None | Lap Swim | |||
| 1100 - 1300 | None | Swim Lessons | ||||
| 1430 - 1800 | None | Family Swim/Lap Swim | ||||
| NAS II | 543 | 365 days / year | Varies | Varies | Lap Swim | |
| Dive Pool | ||||||
| *Operational hours are subject to change on customer request. |
&P of &N
3.3.13 FACILITY ELECTRICAL SYS
| ATTACHMENT J-1502000-07 |
| FACILITY ELECTRIC SYSTEMS DESCRIPTION |
| Funding Activity | Bldg | Location | Equipment Description | Quantity |
| Global Hawk | 510 | NAS II | Static Frequency Converter - 100 kVA | 1 |
| Global Hawk | 510 | NAS II | Electric Panel LSH 200A - 60Hz | 1 |
| Global Hawk | 510 | NAS II | Electric Panel LRE 125A - 60Hz | 1 |
| Global Hawk | 510 / 404 | NAS II | Frequency Converter Electric Panel | 1 |
| Global Hawk | 510 / 404 | NAS II | Automatic Transfer Switch / ATS-001 for EPG-001 | 1 |
| Global Hawk | 510 / 404 | NAS II | Automatic Transfer Switch / ATS-002 for EPG-002 | 1 |
| Global Hawk | 510 | NAS II | Automatic Transfer Switch | 1 |
| Global Hawk | 510 | NAS II | Electrical Panel QM2 -Main breaker | 1 |
| Global Hawk | 510 | NAS II | Electrical Panel - A1 | 1 |
| Global Hawk | 510 | NAS II | Electrical Panel - A2 | 1 |
| Global Hawk | 510 | NAS II | Electrical Panel - QM3 | 1 |
| Global Hawk | 510 | NAS II | Electrical Panel - QB1 | 1 |
| Global Hawk | 510 | NAS II | Electrical Panel - QMDP | 1 |
| Global Hawk | 510 | NAS II | Electrical Panel - QMD1 | 1 |
| Global Hawk | 510 | NAS II | Electrical Panel - QUPS1 | 1 |
| Global Hawk | 510 | NAS II | Transformers | 2 |
| Global Hawk | 510 | NAS II | Static Converter | 1 |
| Space Force | 423 | NAS II | Power Transformers | 2 |
| Space Force | 423 | NAS II | Frequency Converter | 2 |
| Space Force | 423 | NAS II | Emergency Generator Remote Control Panel | 1 |
| Global Hawk | 413 | NAS II | Transformers (with same characteristics), 200-kVA | 2 |
| Global Hawk | 413 | NAS II | Static Frequency Converter | 2 |
| Global Hawk | 413 | NAS II | Electric Panel MDP (400/230V, 50Hz) | 1 |
| Global Hawk | 413 | NAS II | Electric Panel MDP-A (208/120V, 60Hz) | 1 |
| Global Hawk | 413 | NAS II | Electric Panel UPS (208/120V, 60Hz) | 1 |
| Global Hawk | 413 | NAS II | Electric Panel CP (208/120V, 60Hz) | 1 |
| Global Hawk | 413 | NAS II | Electric Panel MP-NT (400/230V, 50Hz) | 1 |
| Global Hawk | 413 | NAS II | Electric Panel DP-NT-1 (400/230V, 50Hz) | 1 |
| Global Hawk | 413 | NAS II | Electric Panel HLP-NT-1 (400/230V, 50Hz) | 1 |
| Global Hawk | 413 | NAS II | Electric Panel HP-T1 (400/230V, 50Hz) | 1 |
| Global Hawk | 413 | NAS II | Electric Panel HP-T3 (400/230V, 50Hz) | 1 |
| Global Hawk | 413 | NAS II | Electric Panel HP-T2 (208/120V, 60Hz) | 1 |
| Global Hawk | 413 | NAS II | Electric Panel HP-T4 (208/120V, 60Hz) | 1 |
| Global Hawk | 413 | NAS II | Electric Panel HP-T5 (208/120V, 60Hz) | 1 |
| Global Hawk | 413 | NAS II | Electric Panel FMP-3 (208/120V, 60Hz) | 1 |
| Global Hawk | 413 | NAS II | Electric Panel SP-C (208/120V, 60Hz) | 1 |
| Global Hawk | 413 | NAS II | Electric Panel HP-C (208/120V, 60Hz) | 1 |
| Global Hawk | 413 | NAS II | Electric Panel FMP-C (208/120V, 60Hz) | 1 |
| Global Hawk | 413 | NAS II | Electric Panel CP-C (208/120V, 60Hz) | 1 |
| Global Hawk | 413 | NAS II | Electric Panel RP-C (208/120V, 60Hz) | 1 |
| Global Hawk | 3873 | NAS II | Main distribution electrical panels - EMSWBD (400/230V, 50Hz) | 1 |
| Global Hawk | 3873 | NAS II | Main distribution electrical panels - ESSWBD (400/230V, 50Hz) | 1 |
| Global Hawk | 3873 | NAS II | Main distribution electrical panels - SWBD-UPS-1 (208/120V, 60Hz) | 1 |
| Global Hawk | 3873 | NAS II | Main distribution electrical panels - SWBD-UPS-2 (208/120V, 60Hz) | 1 |
| Global Hawk | 3873 | NAS II | Antennas electric panels - RAD 1-16 (400/230V, 50Hz) | 16 |
| Global Hawk | 3873 | NAS II | Antennas electric panels - RAD T1-T4 (400/230V, 50Hz) | 4 |
| Global Hawk | 3873 | NAS II | Antennas electric panels - SAT T1-T4 (208/120V, 60Hz) | 4 |
| Global Hawk | 3873 | NAS II | Antennas electric panels - SAT 1-16 (208/120V, 60Hz) | 16 |
| Global Hawk | 3873 | NAS II | Local distribution electrical panels - EH1-8 (400/230V, 50Hz) | 8 |
| Global Hawk | 3873 | NAS II | Local distribution electrical panels - ES1 (400/230V, 50Hz) | 1 |
| Global Hawk | 3873 | NAS II | Local distribution electrical panels - G1 (400/230V, 50Hz) | 1 |
| Global Hawk | 3873 | NAS II | Local distribution electrical panels - ATS-1 (400/230V, 50Hz) | 1 |
| Global Hawk | 3873 | NAS II | Local distribution electrical panels - ES2 (400/230V, 50Hz) | 1 |
| Global Hawk | 3873 | NAS II | Local distribution electrical panels - M1 (400/230V, 50Hz) | 1 |
| Global Hawk | 3873 | NAS II | Local distribution electrical panels - B1 (400/230V, 50Hz) | 1 |
| Global Hawk | 3873 | NAS II | Local distribution electrical panels - EL1 (208/120V, 60Hz) | 1 |
| Global Hawk | 3873 | NAS II | Local distribution electrical panels - EL8 (208/120V, 60Hz) | 1 |
| Global Hawk | 3873 | NAS II | Local distribution electrical panels - UPSP1 (208/120V, 60Hz) | 1 |
| Global Hawk | 3873 | NAS II | Local distribution electrical panels - UPSP2-1 (208/120V, 60Hz) | 1 |
| Global Hawk | 3873 | NAS II | Local distribution electrical panels - UPSP2-2 (208/120V, 60Hz) | 1 |
| Global Hawk | 3873 | NAS II | Local distribution electrical panels - UPSP2-3 (208/120V, 60Hz) | 1 |
| Global Hawk | 3873 | NAS II | Local distribution electrical panels - UPSP3-1 (208/120V, 60Hz) | 1 |
| Global Hawk | 3873 | NAS II | Local distribution electrical panels - UPSP3-2 (208/120V, 60Hz) | 1 |
| Global Hawk | 3873 | NAS II | Local distribution electrical panels - UPSP3-3A (208/120V, 60Hz) | 1 |
| Global Hawk | 3873 | NAS II | Local distribution electrical panels - UPSP3-3B (208/120V, 60Hz) | 1 |
&P of &N
3.3.15 AST AND UST
| ATTACHMENT J-1502000-07 |
| ABOVEGROUND (AST) AND UNDERGROUND (UST) STORAGE TANKS DESCRIPTION |
| Funding Activity | Tank Number | Capacity (gal) | Type of Tank | Current Use | Contents | Facility | |
| Active Regulated ASTs (STI) | |||||||
| CNRE | 53-A | 500 | AST- Cont. Solu | Generator | Includes Diesel, Used Oil and JP-5 | NAS II | |
| CNRE | 156-A | 3,000 | AST-double wall | Heating | NAS I | ||
| CNRE | 183-Gen | 1,000 | AST-w/dike | Generator | NAS 1 | ||
| CNRE | 204-A | 300 | AST(italian) | Generator/ | |||
| Fire Suppression | NAS I | ||||||
| AFN | 212-A | 2,000 | AST - Convault | Generator | NAS I | ||
| DODEA | 216-A | 100 | AST-w/dike | Emergency Generator/ | |||
| Fire Suppression | NAS I | ||||||
| CNRE | 225-A | 396 | AST-w/dike | Fire Suppression | NAS I | ||
| CNRE | 225-D | 280 | AST-w/dike | Heating | NAS I | ||
| CNRE | 202-NW | 125 | AST-w/dike | Fire Suppression | NAS I | ||
| CNRE | 315-A | 3,000 | AST - Convault | Heating | NAS I | ||
| CNRE | 320-A | 2,000 | AST-w/dike | Generator | NAS I | ||
| CNRE | 403-A | 211 | AST | Generator | NAS II | ||
| CNRE | 405-A | 2000 | AST – Convault | Heating | NAS II | ||
| CNRE | 408-E | 9000 | AST-double wall | Generator | NAS II | ||
| CNRE | 409-A | 211 | AST | Generator | NAS II | ||
| CNRE | 410-NW | 9,000 | AST-double wall | Generator | NAS II | ||
| GLOBAL HAWK | 413-Gen | 850 | AST | Generator | NAS II | ||
| CNRE | 419-A | 330 | AST-w/dike | Generator | NAS II | ||
| CNRE | 419-B | 330 | AST-w/dike | Generator | NAS II | ||
| CNRE | 419-C | 330 | AST-w/dike | Generator | NAS II | ||
| CNRE | 419-D | 330 | AST-w/dike | Generator | NAS II | ||
| CNRE | 420-A | 1,000 | AST-Supervault | Generator | NAS II | ||
| CNRE | 420-B | 250 | AST-Supervault | Heating | NAS II | ||
| SPACE FORCE | 423-Gen | 500 | AST | Heating | NAS II | ||
| CNRE | 426-B | 2,000 | AST-w/dike | Heating | NAS II | ||
| CNRE | 435-A | 793 | AST-w/dike | Generator | NAS II | ||
| CNRE | 438-W | 500 | AST-MOIME | Fuels vehicles | NAS II | ||
| NAVSUP Fuels & DLA Energy | 449-A | 2,000 | AST - Convault | Generator | NAS II | ||
| CNRE | 463-S | 1,145 | AST-w/dike | Generator | NAS II | ||
| CNRE | 463-Gen | 126 | AST | Generator | NAS II | ||
| CNRE | 463-2(Well) | 250 | AST-w/dike | Generator | Offsite Well | ||
| FUELS | 464-N | 2,000 | AST - Convault | Generator | NAS II | ||
| NAVSUP Fuels & DLA Energy | 464-A | 500 | AST-Margen | Generator | NAS II | ||
| CNRE | 465-SE | 500 | AST-Contain.Solu | Generator | NAS II | ||
| NAVSUP Fuels & DLA Energy | 466-E | 500 | AST-Leb | Generator | NAS II | ||
| CNRE | 488-S | 500 | AST | Generator | NAS II | ||
| CNRE | 496-Gen | 745 | AST | Generator | NAS II | ||
| GLOBAL HAWK | 510-N-1 | 3,000 | AST-Supervault | Heating | NAS II | ||
| GLOBAL HAWK | 510-N-2 | 3,000 | AST-Supervault | Generator | NAS II | ||
| CNRE | 522-A | 745 | AST | Used Oil | NAS II | ||
| CNRE | 522-B | 745 | AST | Used Oil | NAS II | ||
| NGIS | 545-B | 500 | AST | Heating | NAS II | ||
| CNRE | 548-E | 2,000 | AST – Convault | Generator | NAS II | ||
| CNRE | 553-A | 500 | AST | Generator | NAS II | ||
| NGIS | 559-A | 374 | AST-SW/dike | Fire Suppression | NAS II | ||
| CNRE | 560-E | 1,700 | AST | Generator | NAS II | ||
| CNRE | 563-A | 374 | AST-SW/dike | Fire Suppression | NAS II | ||
| CNRE | 564-A | 2,000 | AST – Convault | Heating | NAS II | ||
| CNRE | 585-S-DT1 | 175 | AST | Generator | NAS II | ||
| CNRE | 585-S-DT2 | 175 | AST | Generator | NAS II | ||
| NAVSUP Fuels & DLA Energy | 605-A | 2,500 | AST | Drain Tank | NAS II | ||
| CNRE | 618-N | 2,000 | AST - Convault | Heating | NAS II | ||
| CNRE | 619-N | 745 | AST | Used Oil Container | NAS II | ||
| CNRE | 620-W | 3,000 | AST – Convault | Heating | NAS II | ||
| CNRE | 622-SE | 3,000 | AST – Convault | Heating | NAS II | ||
| CNRE | 624 | 300 | AST | Fire Suppression | NAS II | ||
| CNRE | 630-E | 745 | AST | Used Oil Container | NAS II | ||
| CNRE | 639-A | 3,000 | AST | Generator | NAS II | ||
| CNRE | 641-Gen | 100 | AST | Generator | NAS II | ||
| CNRE | 697-Gen | 500 | AST | Generator | NAS II | ||
| DLA Distribution | 721-B | 396 | AST | Fire Suppression | NAS II | ||
| CNRE | 723-B | 396 | AST | Generator | NAS II | ||
| CNRE | 747(Well) | 250 | AST | Generator | Offsite Well | ||
| CNRE | 1012 | 117 | AST | Fire Suppression | NAS II | ||
| CNRE | 1020-W | 2,000 | AST - Convault | Heating | NAS II | ||
| NAVSUP Fuels & DLA Energy | 1030-A | 800 | AST - Supervault | Generator | NAS II | ||
| NAVSUP Fuels & DLA Energy | 1042-B | 27,612 | AST | Bulk Fuels | NAS II | ||
| NAVSUP Fuels & DLA Energy | 1043-C | 27,598 | AST | Bulk Fuels | NAS II | ||
| NAVSUP Fuels & DLA Energy | 1044-D | 27,550 | AST | Bulk Fuels | NAS II | ||
| CNRE | 2100-A | 12,000 | AST - Convault | Generator | NISCEMI | ||
| CNRE | 2100-B | 12,000 | AST - Convault | Generator | NISCEMI | ||
| CNRE | 2100-C | 12,000 | AST - Convault | Generator | NISCEMI | ||
| CNRE | 2100-D | 12,000 | AST - Convault | Generator | NISCEMI | ||
| CNRE | 2100-E | 12,000 | AST - Convault | Generator | NISCEMI | ||
| CNRE | 2100-F | 250 | AST | Generator | NISCEMI | ||
| CNRE | 2100-H | 250 | AST | Generator | NISCEMI | ||
| CNRE | 2100-I | 250 | AST | Generator | NISCEMI | ||
| CNRE | 2100-L | 250 | AST | Generator | NISCEMI | ||
| CNRE | 2112-1 | 6,000 | AST | Generator | NISCEMI | ||
| CNRE | 2112-2 | 6,000 | AST | Generator | NISCEMI | ||
| CNRE | 2112-3 | 6,000 | AST | Generator | NISCEMI | ||
| GLOBAL HAWK | 3873-A | 2,000 | AST-Convault | Generator | NAS II | ||
| GLOBAL HAWK | 3873-1 Gen | 500 | AST | Generator | NAS II | ||
| GLOBAL HAWK | 3873-2 Gen | 500 | AST | Generator | NAS II | ||
| GLOBAL HAWK | 3873-3 Gen | 500 | AST | Generator | NAS II | ||
| CNRE | 6183-B | 120 | AST | Generator | NAS II | ||
| Active Regulated USTs | |||||||
| CNRE | 537-A | 2,642 | UST | Heating | NAS II | ||
| CNRE | 563-B | 2,500 | UST | Heating | NAS II | ||
| Small Day Tanks | |||||||
| CNRE | 53-gen | 60 | AST | Generator | NAS II | ||
| CNRE | 403-gen | 60 | AST | Generator | NAS II |
&P of &N
3.3.16 OVERHEAD ROLL-UP DOORS
| ATTACHMENT J-1502000-07 |
| OVERHEAD AND ROLL-UP DOORS DESCRIPTION |
| Funding Activity | Bldg | Location | Equipment Description | Asset No. | Quantity |
| CNRE | 183 | NAS I | Electric Roll-up Door | 6-183-RLD-C03 | 5 |
| CNRE | 494 | NAS II | Hydaraulic Folding Doors | 6-494-RLD-C03 | 6 |
| CNRE | 618 | NAS II | Hydaraulic Folding Doors | 6-618-RLD-C01/02 | 13 |
| CNRE | 619 | NAS II | Hydaraulic Folding Doors | 6-619-RLD-C01/02 | 23 |
| CNRE | 621 | NAS II | Hydaraulic Folding Doors | 6-621-RLD-001 thru 004 | 4 |
| CNRE | 622 | NAS II | Hydaraulic Folding Doors | 6-622-RLD-001 thru 004 | 4 |
| CNRE | 1010 | NAS II | Hydaraulic Folding Doors | 1-1010-RLD-001/002 | 2 |
| CNRE | 1020 | NAS II | Hydaraulic Folding Doors | 1-1020-RLD-001 thru 006 | 6 |
| Global Hawk | 510 | NAS II | Electric Roll-up Door | 6-510-RLD-002 | 1 |
| Global Hawk | 510 | NAS II | Electric Roll-up Door | 6-510-RLD-003 | 1 |
| Global Hawk | 510 | NAS II | Electric Roll-up Door | 6-510-RLD-004 | 1 |
| Global Hawk | 510 | NAS II | Electric Folding Door | 6-510-SLD-001 | 1 |
| Global Hawk | 510 | NAS II | Electric Folding Door | 6-510-SLD-002 | 1 |
| Global Hawk | 413 | NAS II | Electric Folding Door | 6-510-BOI-002 | 3 |
| Global Hawk | 3873 | NAS II | Electric Roll-up Door | 1 |
&P of &N
3.3.17 HANGAR DOORS
| ATTACHMENT J-1502000-07 |
| HANGAR DOORS DESCRIPTION |
| Funding Activity | Bldg | Location | Equipment Description | Asset No. | Quantity |
| CNRE | 408 | NAS II | Hangar Bay Door | 6-408-LFT-002/7 | 2 |
| CNRE | 410 | NAS II | Hangar Bay Door | 6-410-LFT-002/7 | 2 |
| Global Hawk | 510 | NAS II | Hangar Bay Door | 2 | |
| Global Hawk | 413 | NAS II | Hangar Bay Door | 2 |
&P of &N
3.3.18 DRINK FOUNT & WATER COOL
| ATTACHMENT J-1502000-07 |
| DRINKING FOUNTAINS AND WATER COOLERS DESCRIPTION |
| Funding Activity | Bldg | Location | Equipment Description | Quantity |
| CNRE | 157 | NAS I | Drinking Fountain | 2 |
| CNRE | 170 | NAS I | Drinking Fountain | 2 |
| CNRE | 175 | NAS I | Drinking Fountain | 17 |
| CNRE | 317 | NAS I | Drinking Fountain | 2 |
| CNRE | 318 | NAS I | Drinking Fountain | 2 |
| CNRE | 319 | NAS I | Drinking Fountain | 4 |
| Global Hawk | 412 | NAS II | Drinking Fountain | 1 |
| SPACE FORCE | 423 | NAS II | Drinking Fountain | 1 |
| CNRE | 436 | NAS II | Drinking Fountain | 1 |
| CNRE | 471 | NAS II | Drinking Fountain | 1 |
| Global Hawk | 510 | NAS II | Drinking Fountain / 6-510-DRF-001 | 1 |
| Global Hawk | 510 | NAS II | Drinking Fountain / 6-510-DRF-002 | 1 |
| Global Hawk | 510 | NAS II | Drinking Fountain / 6-510-DRF-C01 | 2 |
| Global Hawk | 510 | NAS II | Drinking Fountain | 3 |
| CNRE | 618 | NAS II | Drinking Fountain | 4 |
| CNRE | 619 | NAS II | Drinking Fountain | 2 |
| CNRE | 720 | NAS II | Drinking Fountain | 2 |
| CNRE | 724 | NAS II | Drinking Fountain | 2 |
| CNRE | 1020 | NAS II | Drinking Fountain | 2 |
| Global Hawk | 3873 | NAS II | Drinking Fountain | 2 |
| Global Hawk | 510 | NAS II | Drinking Fountain / 6-510-DRF-002 | 1 |
| Global Hawk | 510 | NAS II | Drinking Fountain / 6-510-DRF-C01 | 2 |
&P of &N
3.3.19 AIRFIELD LIGHT TOWERS
| ATTACHMENT J-1502000-07 |
| AIRFIELD LIGHT TOWERS DESCRIPTION |
| FUNDING ACTIVITY | SITE | LOCATION | EQUIPMENT DESCRIPTION |
| CNRE | NAS II | 8119 | Mobile Light Tower |
| CNRE | NAS II | 8119 | Mobile Light Tower |
| CNRE | NAS II | 8119 | Mobile Light Tower |
| CNRE | NAS II | 8119 | Mobile Light Tower |
| CNRE | NAS II | 8119 | Mobile Light Tower |
Page &P of &N
3.3.20 EMERGENCY EYEWASH STAT
| ATTACHMENT J-1502000-07 |
| EMERGENCY EYEWASH STATIONS DESCRIPTION |
| FUNDING ACTIVITY | SITE | LOCATION | EQUIPMENT DESCRIPTION | ASSET NO. | Qty |
| Global Hawk | NAS II | 413 | Emergency Eyewash | 6-510-BOI-001 | 3 |
| Global Hawk | NAS II | 510 | Emergency Eyewash | 6-510-PLMB-001 | 6 |
Page &P of &N
3.3.21 IRRIGATION SYSTEMS
| ATTACHMENT J-1502000-07 |
| IRRIGATION SYSTEMS DESCRIPTION |
| Funding Activity: CNRE | |||||
| Location: NAS I | |||||
| Proximity | Type (Automated/ Manual) | Control Valve Box | Electrical Connection Box | Timer | Remarks |
| Bldg. 157 | Automated | 4 | 1 |
Bldg. 170 Manual 5
Bldg. 175 Automated 10 1
Bldg. 202 Automated 3 1
| Bldg. 212 | Automated / Manual | Automated: 2 | 1 |
| Manual: 2 | |||
| Bldg. 303 | Manual | 2 |
Bldg. 308 Automated 2 1
Bldg. 313 Manual 2
| Bldg. 314 | Automated / Manual | Automated: 4 | 2 | 1 | Manual control valves are located at the back of Bldg. 314. Automated control valves are located at the front of Bldg. 314. Main electrical control panel is located exterior right side of Bldg. 314 |
| Manual: 4 | |||||
| Bldg. 315 | Automated | 1 | 1 |
Bldg. 317 Automated 3 2 1
Bldg. 318 Automated 11 2 1 Control valves and electrical connection boxes are located at the back of Bldg 318
Bldg. 319 Automated 5 1
Bldg. 320 Automated 5 1
| Playgrounds | Automated | 5 | 1 | Main electrical control panel and timer are located inside the playground |
| NOTE: | ||||
| 1) Main electrical control panel, timer, and water pumps for NAS I automated irrigation system are located in Bldg. 183 (Water Treatment Plant). | ||||
| 2) Total irrigated grounds for Region at NAS I are approximately 58762 sq. meters. |
| Location: NAS II | |||||
| Proximity | Type (Automated/ Manual) | Control Valve Box | Electrical Connection Box | Timer | Remarks |
| Bldg. 405 | Manual | 1 | 1 |
| Across Road from Bldg. 523 | Manual | 1 | |
| Across Road from Bldg. 407 | Manual | 1 | |
| Bldg. 414 | Manual | 2 | 2 |
Bldg. 418 Manual 8 5
| From Bldg. 424 | Manual | 27 | 9 |
| Bldg. 436 | Manual | 1 | 1 |
Bldg. 476 Manual 3
| Area Near Front Gate (Ex Bldg. 477) | Manual | 2 | |
| Bldg. 542 | Manual | 1 | |
| Bldg. 546 | Manual | 3 | 3 |
Bldg. 549 Manual 1 1
Bldg. 562 Manual 1
Bldg. 564 Manual 1
| Across Road from Bldg. 606 | Manual | ||||
| Bldg. 608 and Bldg. 609 | Automated | 25 | 1 | 1 | |
| Bldg. 618 | Automated / Manual | Automated: 15 | 5 | Manual valve located near parking area | |
| Manual: 1 | |||||
| Bldgs. 618/619/620 | Automated | 10 | 4 | 1 | Main electrical control panel and timer are located at NAVFAC/ Seabees Compound rear east side |
| Bldg. 622 | Manual | 4 | 4 |
Bldg. 623 Manual 8 Includes a ground area requiring irrigation with portable equipment
Bldg. 624 Manual 1 Includes a ground area requiring irrigation with portable equipment
| Manual | 9 | 3 | |||
| Bldg. 628 to Bldg. 456 | |||||
| Bldg. 722 to Bldg. 436 | Manual | 9 | 3 | ||
| Bldg. 1010 | Automated | 8 | 1 | 1 | Timer controls entire Hazmat Compound grounds |
Bldg. 1014 Automated 2 1
Bldg. 1015 Automated 2 1
Bldg. 1017 Automated 1 1
Bldg. 1020 Automated 7 2 1
| Bldg. 612 | Manual | Ground areas require irrigation with portable equipment |
| NOTE: | ||
| 1) Currently most of the irrigation system at NAS II is not functional. Manual irrigation is required. Portable irrigation system shall be provided by Contractor. | ||
| 2) Total irrigated grounds for Region at NAS II are approximately 40000 sq. meters. | ||
| 3) Total irrigated grounds for NAVFAC/Seabees Compound is approximately 2306 sq. meters. |
| Funding Activity: CNRE | |||||
| Location: Marinai Housing Complex | |||||
| Proximity | Type (Automated/Manual) | Control Valve Boxes | Electrical Connection Boxes | Timers | Remarks |
| Bldg. 2569 | Automated | 1 | 12 | 1 |
| Funding Activity: Billeted Housing | ||||||
| Location: NAS I (Hill Drive) | ||||||
| Zone | Unit | Proximity | Type | Control Valve Box | Pop-Up Type | Remarks |
| (Automated/ Manual) | ||||||
| 1-5 | 101 | Back Yard / Back Yard Common Area Next Garage | Automated | 5 | Dynamic |
| 6 | 101 | Front Yard / Front Yard Common Area | Automated | 1 | Static |
| 45850 | 102 | Front Yard / Front Yard Common Area / Front Door | Automated | 4 | Static |
| 13-14 | 102 | Back Yard | Automated | 2 | Dynamic |
| 15-17/ 19 / 21 | 103 | Front Yard / Front Yard Common Area | Automated | 2 | Static & Dynamic |
| 18 / 20 | 103 | Back Yard | Automated | 1 | Dynamic |
| 23-27 | 104 | Front Yard / Right Side / Front Side / Front Yard Common Area | Automated | 2 | Static |
| 22 | 104 | Back Yard | Automated | 1 | Dynamic |
| 28 | 105 | Back Yard | Automated | 2 | Dynamic |
| 29-32 | 105 | Front Yard / Front Yard Common Area / Partial Back Yard Right Side | Automated | 1 | Static & Dynamic |
| 33- 36 | 106 | Front Yard / Front Yard Common Area / Front Yard Right Side / Front Door | Automated | 2 | Static |
| 37 | 106 | Back Yard | Automated | 1 | Dynamic |
| 38 | 107 | Back Yard | Automated | 2 | Dynamic |
| 39-40 | 107 | Front Yard / Right-Left Side | Automated | 1 | Static & Dynamic |
| 42-46 | 108 | Front Yard / Front & Next to Wooden Fence Common Area / Front Door / | Automated | 2 | Static |
| 47 | Front of 101/102 | Common Area Round About | Automated | 1 | Static |
| NOTE: | |||||
| 1) Main electrical control panel and timer are located road across from Unit 104, Substation 221. | |||||
| 2) Total irrigated grounds for Billeted Housing are approximately 11000 sq. meters. | |||||
| 3) Current Billeted Housing Hill Drive irrigation system schedule is provided in J-1503050-06.a |
3.3.22 POL FUEL & DISTRIBUTION
| ATTACHMENT J-1502000-07.a |
| POL FUEL DEPOT FACILITES AND DISTRIBUTION SYSTEMS DESCRIPTION |
| Funding Activity: NAVSUP FUELS - DLA ENERGY FUNDED |
| Reference to Excel file “J-1502000-07.a POL Fuel Depot Facilities and Distribution Systems Description". |
3.3.22 CRITICAL SPARE PARTS
| ATTACHMENT J-1502000-07.b |
| CRITICAL SPARE PARTS INVENTORY FOR POL, AVIATION AND MOGAS SYSTEMS |
| Funding Activity: NAVSUP FUELS - DLA ENERGY FUNDED |
| Reference to Excel file “ J-1502000-07.b Critical Spare Parts List”. |
3.3.23 AVIATION SUPPORT SYS
| ATTACHMENT J-1502000-07.c |
| AVIATION FUEL SUPPORT SYSTEMS DESCRIPTION |
| Funding Activity: NAVSUP FUELS - DLA ENERGY FUNDED |
| Reference to Excel file “J-1502000-07.c Aviation Fuel Systems Equipment Description”. |
3.3.24 VEHICLES FUEL STATION
| ATTACHMENT J-1502000-07.d |
| VEHICLE FUELING STATION SYSTEM DESCRIPTION |
| Funding Activity: NAVSUP FUELS - DLA ENERGY FUNDED |
| Reference to Excel file “J-1502000-06.d Vehicle Fueling Station Equipment Description”. |
3.3.25 VEHICLE ARRESTOR SYS
| ATTACHMENT J-1502000-07 |
| VEHICLE ARRESTOR SYSTEM DESCRIPTION |
| FUNDING ACTIVITY | SITE | BUILDING | MANUFACTURER | MODEL | QUANTITY |
| GLOBAL HAWK | NAS II | 3873 | O&O | GRIZZLY-N 275-800/12 | 16 |
3.3.26 FLOOD GATES
| ATTACHMENT J-1502000-07 |
| FLOOD GATES DESCRIPTION |
| FUNDING ACTIVITY | SITE | BUILDING | MANUFACTURER | MODEL | QUANTITY |
| GLOBAL HAWK | NAS II | 3873 | FLOODBREAK | AUTOMATIC FLOOD GATES | 2 |
3.4.1 HVAC AND REFRIGERATION
| ATTACHMENT J-1502000-07 |
| HVAC AND REFRIGERATION SYSTEMS DESCRIPTION |
| Funding Activity | Bldg / Facility | Location | Air Cooled Chiller | AHU | Fan Coil | Centr. Pump | Water Softener | Chilled / Hot Water System | Chiller Unit | Condensing Unit 2 - 25 Ton | Condensing Unit >25 Ton | Heat Exch. | Exhaust Fans | Cap. (Tons) | HVAC Seasonal Startup / Shutdown | Notes |
| CNRE | 2100 | Niscemi | 4 | 8 | 8 | 7 | 1 | 1 | 6 | Yes | ||||||
| Family Housing | 101 | NAS I | 1 | 2 | 2 | 3 | ||||||||||
| Family Housing | 102 | NAS I | 1 | 2 | 2 | 3 | ||||||||||
| Family Housing | 103 | NAS I | 1 | 2 | 2 | 3 | ||||||||||
| Family Housing | 104 | NAS I | 1 | 2 | 2 | 3 | ||||||||||
| Family Housing | 105 | NAS I | 1 | 2 | 2 | 3 | ||||||||||
| Family Housing | 106 | NAS I | 1 | 2 | 2 | 3 | ||||||||||
| Family Housing | 107 | NAS I | 1 | 2 | 2 | 3 | ||||||||||
| Family Housing | 108 | NAS I | 1 | 2 | 2 | 3 | ||||||||||
| Funding Activity | Bldg / Facility | Location | Equipment Description | Quantity | Equipment Number | Notes | ||||||||||
| Global Hawk | 510 | NAS II | A/C Split Unit | 1 | 6-510-A/C-001 | |||||||||||
| Global Hawk | 510 | NAS II | A/C Split Unit | 1 | 6-510-A/C-002 | |||||||||||
| Global Hawk | 510 | NAS II | A/C Split Unit | 1 | 6-510-A/C-003 | |||||||||||
| Global Hawk | 510 | NAS II | A/C Split Unit | 1 | ||||||||||||
| Global Hawk | 510 | NAS II | A/C Split Unit | 1 | ||||||||||||
| Global Hawk | 510 | NAS II | Air Handling Unit (AHU) | 1 | 6-510-AHU-001 | 38, 84 Ton | ||||||||||
| Global Hawk | 510 | NAS II | Air Handling Unit (AHU) | 1 | 6-510-AHU-002 | 44, 44 Ton | ||||||||||
| Global Hawk | 510 | NAS II | Air Handling Unit (AHU) | 1 | 6-510-AHU-003 | 44, 44 Ton | ||||||||||
| Global Hawk | 510 | NAS II | Air Handling Unit (AHU) | 1 | 6-510-AHU-004 | 44, 44 Ton | ||||||||||
| Global Hawk | 510 | NAS II | Air Handling Unit (AHU) | 1 | 6-510-AHU-005 | 44, 44 Ton | ||||||||||
| Global Hawk | 510 | NAS II | DDC Trend | 1 | LS | |||||||||||
| Global Hawk | 510 | NAS II | Water Chiller - Reciprocating Chiller Air Cooled | 1 | 6-510-CHL-001 | 43 Ton | ||||||||||
| Global Hawk | 510 | NAS II | Water Chiller - Reciprocating Chiller Air Cooled | 1 | 6-510-CHL-002 | 50 Ton | ||||||||||
| Global Hawk | 510 | NAS II | Water Chiller - Reciprocating Chiller Air Cooled | 1 | 6-510-CHL-003 | 50 Ton | ||||||||||
| Global Hawk | 510 | NAS II | Water Chiller - Reciprocating Chiller Air Cooled | 1 | 6-510-CHL-004 | 50 Ton | ||||||||||
| Global Hawk | 510 | NAS II | Water Chiller - Reciprocating Chiller Air Cooled | 1 | 6-510-CHL-005 | 50 Ton | ||||||||||
| Global Hawk | 510 | NAS II | Exhaust Fan - EF / 1.1 | 1 | 6-510-EXF-001 | |||||||||||
| Global Hawk | 510 | NAS II | Exhaust Fan - EF / 1.2 | 1 | 6-510-EXF-002 | |||||||||||
| Global Hawk | 510 | NAS II | Expansion Tank | 1 | 6-510-EXT-001 | 300 Lt | ||||||||||
| Global Hawk | 510 | NAS II | Expansion Tank | 1 | 6-510-EXT-002 | 250 Lt | ||||||||||
| Global Hawk | 510 | NAS II | Expansion Tank | 1 | 6-510-EXT-003 | 500 Lt | ||||||||||
| Global Hawk | 510 | NAS II | Expansion Tank | 1 | 6-510-EXT-004 | 150 Lt | ||||||||||
| Global Hawk | 510 | NAS II | Supply Fan - SF / 6 | 1 | 6-510-FAN-001 | |||||||||||
| Global Hawk | 510 | NAS II | Air Dryer | 2 | 6-510-HMD-001 | |||||||||||
| Global Hawk | 510 | NAS II | Domestic Water Booster Pumps | 2 | 6-510-PMP-002 | |||||||||||
| Global Hawk | 510 | NAS II | Water Circulation Pump | 2 | 6-510-PMP-003 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .