J-1502000-07 Base Systems Description RFP.xlsx

XLSX spreadsheet 677 KB Posted

Attached to
Base Operations Support (BOS) Services at U. S. Naval Air Station (NAS) Sigonella and its outlying support activities, Sicily, Italy
Solicitation number
N6247025R0020
Issued by

About this file

This document is an extensive Attachment J-1502000-07 detailing Base Operations Support (BOS) maintenance requirements for Naval Air Station Sigonella in Sicily, Italy. The attachment comprehensively lists preventive maintenance specifications for multiple complex systems across various facilities, including interior and exterior lighting systems, vertical transportation equipment, compressed air systems, auxiliary generators, uninterruptible power supply systems, fire protection systems, HVAC and refrigeration systems, solar panel systems, and numerous other critical infrastructure components.

The maintenance specifications cover an extensive range of equipment and systems across multiple buildings and locations, including NAS I, NAS II, Global Hawk facilities, and the Niscemi Transmitter Facility. Each system specification outlines detailed maintenance responsibilities, including developing and implementing preventive maintenance programs, cleaning, re-lamping, making repairs, and maintaining all mechanically and electrically interconnected components. The document provides granular details such as specific equipment quantities, manufacturers, locations, installation dates, and maintenance frequencies, serving as a comprehensive technical guide for maintaining the base's critical infrastructure and support systems.

View the file

Other files

File Type Posted
Solicitation Amendment N6247025R00200012 SF 30.pdf PDF
J-14 PPI Responses (Ament 0010).pdf PDF
J-1606001-03 Water System Description and Inventory - Amend 0010.xlsx XLSX spreadsheet
Annex 1601000 C Utility Management - Amend 0008.pdf PDF
Annex 1602000 C Electrical - Amend 0008.pdf PDF
J-13 PPI Responses (Ament 0008).pdf PDF
J-10 Pre-Proposal Site Visit Sign-In Sheet (Amend 0007).pdf PDF
J-11 Pre-Proposal Conference Presentation Sigonella BOS (Amend 0007).pdf PDF
J-1502000-05 Base Systems Description RFP - Amend 0007.xlsx XLSX spreadsheet
J-1503030-06 Solid Waste Containers Inventory - Amend 0007.xlsx XLSX spreadsheet
J-1606001-03 Water System Description and Inventory Amend 0007.xlsx XLSX spreadsheet
Solicitation Amendment N6247025R00200005 SF 30.pdf PDF
Attachment J-9- PPI Responses.pdf PDF
J-4 Pre-Award Inquiry Form (AMD 0001).xlsx XLSX spreadsheet
J-2 Corporate Experience Project Data Sheet.pdf PDF
J-4 Pre-Award Inquiry Form.xlsx XLSX spreadsheet
J-7 Communicazione Antimafia self-cert form.pdf PDF
J-8 Informazione Antimafia self-cert form.pdf PDF
Annex 1503020 Pest Control.pdf PDF
Annex 1604000 Wastewater.pdf PDF
Annex 1606001 Water (Overseas).pdf PDF
Annex 1700000 Transportation.pdf PDF
J-0200000-06.a - ASSET SPECIFICATION.xlsx XLSX spreadsheet
J-0200000 -12 ELINs Sigonella.xlsx XLSX spreadsheet
J-1402000 Unaccompanied Housing.pdf PDF
J-1502000-06 DHA Systems Descriptions.xlsx XLSX spreadsheet
J-1502000-07.d Vehicle Fueling Station Equipment Description.xlsx XLSX spreadsheet
J-1503010-06.a Custodial Inventory and Frequencies.xlsx XLSX spreadsheet
J-1503020-04 Sigonella IPMP 2024.pdf PDF
J-1503050-02.b Eucalyptus Trees Inventory.xlsx XLSX spreadsheet
J-1503050-06 BASH Requirements and Site Map.pdf PDF
J-1503050-07 NASSIG WHA.pdf PDF
J-1503050-08 Exterior Containers Inventory.xlsx XLSX spreadsheet
J-1601000-08 Utility Asset Inventory.xlsx XLSX spreadsheet
J-1604000-03 Wastewater Systems Description and Inventory.xlsx XLSX spreadsheet
J-1606001-04 Historical Critical Spare Parts Inventory.xlsx XLSX spreadsheet
J-1606001-06 Unidirectional Flushing Plan NAS I.pdf PDF
Section F Deliverables.pdf PDF
J-1 Past Performance Questionnaire (Form PPQ).pdf PDF
Annex 0100000 General Information.pdf PDF
Annex 1401000 Family Housing.pdf PDF
Annex 1402000 Unaccompanied Housing.pdf PDF
Annex 1503010 Custodial.pdf PDF
Annex 1503050 Grounds Maintenance and Landscaping.pdf PDF
Annex 1602000 Electrical.pdf PDF
J-0200000 Management and Adminstration.pdf PDF
J-1401000 Family Housing.pdf PDF
J-1501000 Facility Management.pdf PDF
J-1502000 Facility Investment.pdf PDF
J-1502000-04 Bldg 273 Critical Areas Requiring ICRA.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDEX

ATTACHMENT J-1502000-07
INDEX
Preventive Maintenance (PM)
Spec ItemAsset Type
3.3.1Interior and Exterior Lighting Systems
3.3.2Lightning Arrestors and Grounding Devices
3.3.3Vertical Transportation Equipment (VTE)
3.3.4Compressed Air Systems
3.3.5Auxiliary Generators
3.3.6Uninterruptable Power Supply Systems (UPS)
3.3.12Swimming Pools
3.3.12Swimming Pools Operational Hours
3.3.13Facility Electric Systems
3.3.15Aboveground (AST) and Underground (UST) Storage Tanks
3.3.16Overhead and Roll-Up Doors
3.3.17Hangar Door
3.3.18Drinking Fountains/Water Coolers
3.3.19Airfield Light Tower
3.3.20Emergency Eye Wash Station
3.3.21Irrigation System
3.3.22POL Fuel Depot Facilities and Distribution Systems
3.3.22Critical Spare Parts List
3.3.23Aviation Fuel Support Systems
3.3.24Vehicle Fueling Station Systems
3.3.25Vehicle Arrestor Systems
3.3.26Flood Gate
Integrated Maintenance Program (IMP)
Spec ItemAsset Type
3.4.1HVAC and Refrigeration Systems
3.4.2Fire Protection Systems
3.4.3Boilers and UPVs
Other Recurring Services Program
Spec ItemAsset Type
3.6.1Exhaust Hoods and Ducts
3.6.4Solar Panel Systems Maintenance
3.6.5Gutter and Roof Inspections
3.6.6Gutter Maintenance
3.6.7Magnetic Key Card System Maintenance
3.6.8Roof Drain Cleaning
3.6.9Vehicle Lift Maintenance
3.6.10Swimming Pool Water Testing and Treatment Services
3.6.13Oil-Water Separator and Grease Traps Maintenance
3.6.14Car Wash Water Treatment System
3.6.15Fire Extinguisher Inspection and Maintenance
3.6.16Lift Station Maintenance

SYSTEM DESCRIPTION

ATTACHMENT J-1502000-07
SYSTEM DESCRIPTIONS
Preventive Maintenance (PM)
3.3.1Interior and Exterior Lighting SystemsInterior and Exterior Lighting Systems commence at, and includes the utility isolation point of connection. The Contractor shall develop and implement a Lighting Systems Preventive Maintenance (PM) Program to clean, re-lamp, and make all necessary repairs to the Interior and Exterior Lighting Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the Lighting Systems, such as: replacement of defective bulbs, batteries, lamps, tubes, ballasts, fuses, starters, switches, diffusers, covers, reflectors, photocells, controls, etc.
3.3.2Lightning Arrestors and Grounding DevicesLightning Arresting and Grounding Systems commence at, and includes the utility isolation point of connection and terminate at foundation. The Contractor shall develop and implement a Preventive Maintenance (PM) Program for the Weight Handling Equipment and Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the Weight Handling Equipment and Systems, such as: brakes, cables, circuit breakers, frequency drives, hoist, hooks, inverters, latches, surge suppressors, trackage, transformers, motors, wiring, monitoring and controls systems, etc
3.3.3Vertical Transportation Equipment (VTE)Vertical Transportation Equipment Systems commence at and include the utility isolation point of connection. The Contractor shall develop and implement a Preventive Maintenance (PM) program for the Vertical Transportation Equipment Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the Vertical Transportation Equipment Systems, such as: doors, cars, tracks, lighting, rails, guides, governors, motors, cables, pulleys, switches, hydraulic cylinders, piping, pumps, tanks, weights, monitoring and control systems, electrical disconnects, etc.
3.3.4Compressed Air SystemsCompressed Air Systems commence at and includes the utility isolation point of connection and terminate at the compressed air point of delivery. The Contractor shall develop and implement a PM program for the Compressed Air Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the Compressed Air Systems, such as: compressors, regulators, unfired pressure vessels, air drying systems, distribution systems, air supply connectors, monitoring and control systems, electrical disconnects, etc.
3.3.5Auxiliary GeneratorsAuxiliary Generator Systems commence at and include the utility isolation point of connection. The Contractor shall develop and implement a PM program for the Auxiliary Generator Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components of the Auxiliary Generator Systems, such as: batteries, fuel tanks, generator, inverters, rectifiers, regulators, prime mover, pumps, piping, transfer switches, switchgear, meters, monitoring and control systems, uninterruptible power supply, wiring, etc.
3.3.6Uninterruptable Power Supply Systems (UPS)The Uninterruptible Power Supply (UPS) System commences at and includes the utility isolation point of connection and terminates at the UPS-protected electrical load. The Contractor shall develop and implement a PM program for the UPS System and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: UPS units, batteries, inverters, rectifiers, bypass switches, cooling systems, monitoring and control systems, electrical disconnects, and associated wiring.
3.3.12Swimming Pool MaintenanceThe Swimming Pool System commences at and includes the water supply and filtration system and terminates at the pool circulation outlets. The Contractor shall develop and implement a PM program for the Swimming Pool System and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: pumps, filters, chemical dosing systems, heaters, drains, circulation piping, skimmers, monitoring and control systems, and associated electrical components.
3.3.13Facility Electric SystemsThe Facility Electric System commences at and includes the utility isolation point of connection and terminates at the electrical outlets, fixtures, and connected loads. The Contractor shall develop and implement a PM program for the Facility Electric System and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: transformers, switchgear, circuit breakers, distribution panels, wiring, receptacles, grounding systems, surge protection devices, monitoring and control systems, and electrical disconnects.
3.3.15Aboveground (AST) and Underground (UST) Storage TanksThe Above Ground (AST) and Underground (UST) Storage Tank Systems commence at and include the fill and vent connections and terminate at the distribution outlet. The Contractor shall develop and implement a PM program for the AST and UST Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: tanks, pumps, valves, piping, leak detection systems, cathodic protection, monitoring and control systems, spill containment systems, and associated electrical components.
3.3.16Overhead and Roll-Up DoorsThe Overhead and Roll-Up Door System commence at and include the power and control source and terminate at the door assemblies. The Contractor shall develop and implement a PM program for the Automatic, Fire, and Roll-Up Door Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: door operators, motors, guide rails, counterweights, limit switches, control panels, emergency release mechanisms, monitoring and control systems, electrical disconnects, and associated hardware.
3.3.17Hangar DoorThe Hangar Door System commences at and includes the power and control source and terminates at the door assemblies. The Contractor shall develop and implement a PM program for the Hangar Door System and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: door panels, track systems, motors, drive mechanisms, limit switches, control panels, emergency release mechanisms, monitoring and control systems, electrical disconnects, and associated hardware.
3.3.18Drinking Fountains/Water CoolersThe Drinking Fountain and Water Cooler Systems commence at and include the water supply connection and terminate at the fixture discharge point. The Contractor shall develop and implement a PM program for the Drinking Fountain and Water Cooler Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: chillers, filters, water dispensers, pressure regulators, monitoring and control systems, and associated plumbing and electrical connections.
3.3.19Airfield Light TowerThe Airfield Light Tower System commences at and includes the power supply connection and terminates at the light fixtures. The Contractor shall develop and implement a PM program for the Airfield Light Tower System and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: light fixtures, lamps, ballasts, control panels, monitoring and control systems, electrical disconnects, mounting structures, and associated wiring.
3.3.20Emergency Eye Wash StationThe Emergency Eyewash System commences at and includes the water supply connection and terminates at the eyewash station outlet. The Contractor shall develop and implement a PM program for the Emergency Eyewash System and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: eyewash stations, safety showers, flow control valves, pressure regulators, monitoring and control systems, and associated plumbing components.
3.3.21Irrigation SystemThe Irrigation System commences at and includes the water supply connection and terminates at the irrigation distribution outlets. The Contractor shall develop and implement a PM program for the Irrigation System and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: pumps, valves, sprinkler heads, drip irrigation lines, pressure regulators, backflow preventers, monitoring and control systems, and associated piping.
3.3.25Vehicle Arrestor SystemThe Vehicle Arrestor System commences at and includes all energy-absorbing barriers, mechanical or hydraulic arrestor units, control panels, and associated safety interlock components. The Contractor shall develop and implement a PM program for the Vehicle Arrestor System and all interlocked ancillary parts, including motors, cables, tensioning systems, sensors, limit switches, control systems, electrical disconnects, and structural foundations. The program shall ensure proper operation during emergency and routine use, in accordance with UFC 4-022-02 and manufacturer guidance.
3.3.26Flood GateThe Flood Gate System commences at and includes the structural gate components, actuators, seals, hydraulic or electric operators, and associated control and monitoring systems. The Contractor shall develop and implement a PM program for the Flood Gate System to ensure functionality during high water or flooding events. The program shall cover inspection, cleaning, lubrication, testing of actuators, and seal integrity checks in accordance with applicable UFCs, NAVFAC criteria, and OEM recommendations.
Integrated Maintenance Program (IMP)
3.4.1HVAC and Refrigeration SystemsThe HVAC and Refrigeration Systems commence at and include the power and utility connections and terminate at the conditioned air distribution or refrigeration points. The Contractor shall develop and implement an IMP for the HVAC and Refrigeration Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: air handling units, chillers, condensers, compressors, evaporators, cooling towers, heat exchangers, ductwork, dampers, fans, filters, thermostats, monitoring and control systems, electrical disconnects, and associated piping.
3.4.2Fire Protection SystemsThe Fire Protection Systems commence at and include the water supply or power connection and terminate at the fire suppression or alarm notification devices. The Contractor shall develop and implement an IMP for the Fire Protection Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as fire pumps, sprinkler heads, standpipes, risers, valves, deluge systems, fire suppression agtents, fire alarms, smoke detectors, control panels, monitoring and control systems, and associated electrical and plumbing components.
3.4.3Boilers and UPVsThe Boiler and Unfired Pressure Vessel (UPV) Systems commence at and include the utility supply connections and terminate at the distribution points. The Contractor shall develop and implement an IMP for the Boiler and UPV Systems and all mechanically and electrically interlocked ancillary parts, equipment, and components, such as: boilers, pressure vessels, burners, heat exchangers, pumps, valves, regulators, expansion tanks, safety relief devices, monitoring and control systems, electrical disconnects, and associated piping.
Other Recurring Services Program
3.6.1Exhaust Hoods and DuctsThe Exhaust Hood and Duct Systems commence at the appliance connection and terminate at the exhaust outlet. The Contractor shall inspect, clean, and service hoods, ducts, grease filters, and exhaust fans in accordance with NFPA 96 and manufacturer recommendations. Services shall ensure safe operation, reduce fire risk, and maintain compliance with health and safety codes.
3.6.4Solar Panel MaintenanceThe Solar Panel System begins at the photovoltaic array and includes inverters, wiring, battery banks (if applicable), and control equipment.
3.6.5Gutter and Roof InspectionsThe Gutter and Roof Inspection scope includes all accessible roof surfaces, drainage components, flashing, and gutter systems. The Contractor shall perform periodic inspections to identify deterioration, damage, or blockages that could affect structural integrity or water runoff. Findings shall be documented, and recommended corrective actions submitted to the Government for review. Inspections shall align with NAVFAC criteria and UFC 1-200-01.
3.6.6Gutter MaintenanceThe Gutter System includes roof gutters, downspouts, splash blocks, and fastening hardware. The Contractor shall inspect, clean, and repair gutters to ensure unobstructed water flow and prevent roof or foundation damage. Preventive maintenance shall include removal of debris, realignment of sagging sections, and sealing of leaks
3.6.7Magnetic Key Card System MaintenanceThe Magnetic Key Card System includes all readers, access control panels, magnetic locking hardware, associated wiring, and control software. The Contractor shall implement a PM program to ensure system functionality, including software updates, card reader calibration, hardware inspection, and integration testing with security systems.
3.6.8Roof Drain CleaningThe Roof Drain System includes drains, scuppers, strainers, downspouts, and related flashing. The Contractor shall inspect and clean all roof drainage components to ensure unobstructed water flow, prevent ponding, and minimize roof damage. Work shall comply with applicable stormwater management practices.
3.6.9Vehicle Lift MaintenanceVehicle Lift Systems include hydraulic or mechanical lifting equipment, safety locks, control panels, and structural anchors. The Contractor shall inspect, lubricate, test, and maintain lift systems in accordance with manufacturer recommendations and applicable OSHA/ANSI safety standards.
3.6.10Swimming Pool Water Testing and Treatment ServicesThe Swimming Pool System includes water treatment equipment, filtration systems, pumps, chemical feeders, and monitoring devices. The Contractor shall test and treat water for pH, chlorine/bromine levels, and other indicators, maintaining compliance with Navy and public health standards.
3.6.13Oil-Water Separator and Grease Traps MaintenanceThe Oil-Water Separator and Grease Trap Systems include tanks, separation chambers, piping, sensors, and alarms. The Contractor shall clean, inspect, and service all components to maintain proper separation function and prevent environmental discharge violations in accordance with local regulations.
3.6.14Car Wash Water Treatment SystemThis system includes sedimentation tanks, filtration units, oil-water separation components, chemical dosing systems, and associated piping. The Contractor shall perform preventive maintenance to ensure proper operation, including inspection, cleaning, and replacement of filters and treatment media as required.
3.6.15Fire Extinguisher Inspection and MaintenanceThe Fire Extinguisher Program covers all portable extinguishers and associated equipment. The Contractor shall perform inspections, hydrostatic testing, refilling, tagging, and replacement in compliance with NFPA 10 and local fire codes. Records of all maintenance activities shall be maintained.
3.6.16Lift Station MaintenanceThe Lift Station System includes wet wells, pumps, floats, valves, control panels, and alarm systems. The Contractor shall inspect, clean, and test all components, ensuring proper wastewater conveyance. PM shall be performed in accordance with UFCs, NAVFAC standards, and manufacturer guidelines.

3.3.1 INTERIOR EXTERIOR LIGHT

ATTACHMENT J-1502000-07
INTERIOR AND EXTERIOR LIGHTING DESCRIPTION
Funding ActivityBldgLocationEquipment DescriptionQuantity
Global Hawk510 / 404NAS IIFluorescent light fixtures exposed below ceiling41
Global Hawk510 / 404NAS IIFluorescent light fixtures recessed in ceiling96
Global Hawk510 / 404NAS IIExterior Floodlights & Wall Mounted Fixtures in the Mechanical Yard25
Global Hawk510 / 404NAS IIHangar Bay Light Fixtures (10 mt above floor)102
Global Hawk413NAS IILED light fixtures recessed in ceiling80
Global Hawk413NAS IILED light fixtures exposed in ceiling26
Global Hawk413NAS IIExterior Lights12
Global Hawk413NAS IIHangar Bay Light Fixtures (10 mt above floor)28

&P of &N

3.3.2 LIGHTING ARREST AND GROUN

ATTACHMENT J-1502000-07
LIGHTING ARRESTORS AND GROUNDING DEVICES DESCRIPTION
Funding ActivityLocationBldg / FacilityRemarks
CNRENAS II60816 ea. Grounding Points
CNRENAS II6094 ea. Grounding Points
CNRENAS II827
CNRENAS II828
CNRENAS II847
CNRENAS II848
CNRENAS II849
CNRENAS II856
CNRENAS II861
CNRENAS II862
CNRENAS II863
CNRENAS II864
CNRENAS II866
CNRENAS II881
CNRENAS II882
CNRENAS II887
CNRENAS II897 Open Storage PadPad
CNRENAS II897 Open Storage Pad6 Each Portable Magazines
CNRENAS IIGates & Posts6 Sets
CNRENAS IIPortable Magazines10 Each
CNRENAS II408 - P65517ea Inspectable grounding points + 23ea not inspectable grounding points + 6ea aircraft grounding points
CNRENAS II410Inspectable grounding points + not inspectable grounding points + 12ea aircraft grounding points
CNRENAS II408 - P65517ea Inspectable grounding points + 23ea not inspectable grounding points + 6ea aircraft grounding points
CNRENAS II410Inspectable grounding points + not inspectable grounding points + 12ea aircraft grounding points
CNRENAS II60816 ea. Grounding Points
CNRENAS II6094 ea. Grounding Points
CNRENAS II827
CNRENAS II828
CNRENAS II847
CNRENAS II848
CNRENAS II849
CNRENAS II856
CNRENAS II861
CNRENAS II862
CNRENAS II863
CNRENAS II864
CNRENAS II866
CNRENAS II881
CNRENAS II882
CNRENAS II887
CNRENAS II897 Open Storage PadPad
CNRENAS II897 Open Storage Pad6 Each Portable Magazines
CNRENAS IIGates & Posts6 Sets
CNRENAS IIPortable Magazines10 Each
Global HawkNAS IIATOC Ramp77 ea. Grounding Points
Global HawkNAS II426
Global HawkNAS II630
Global HawkNAS IIA/C Washrack
Global HawkNAS IIPrimary Red Label Area39 ea. Grounding Points
Global HawkNAS IIRamp 3 (Secondary Red Label Area)250 ea. Grounding Points
Global HawkNAS IIHangar Bay / Apron AircraftGrounding Points: 26
Global HawkNAS II510Lighting Protection System: 48 Connections - 15 Drops - 9 Ground Pits
Global HawkNAS II510Grounding Points, 26 each
Global HawkNAS II413Lightining Protection System: n. 30 Connections - 4 Drops - 4 Ground Pits. 1 Grounding Point
Global HawkNAS II413Grounding Points, 1 each
Global HawkNAS II3873Grounding Points: 97
NAVSUP Fuels & DLA EnergyNAS IIPOL Fuel Depot Area
NAVSUP Fuels & DLA EnergyNAS IIAviation Fuels Systems Area
NAVSUP Fuels & DLA EnergyNAS IIVehicle Fueling Station

&P of &N

3.3.3 VTE

ATTACHMENT J-1502000-07
VERTICAL TRANSPORATION EQUIPMENT (VTE) DESCRIPTION
Funding ActivityLocationBldg / FacilityTypeCapacity
(KG)ManufacturerYear
InstalledSpeed
(m / sec)Door
Type#
Stops3Y
Insp.5Y

Insp.

CNRENAS II465Passenger Hydraulic Elevator (PHE)1600Di Francesco20030.63Power2Jan-16Jan-17
CNRENAS II537Passenger Hydraulic Elevator (PHE)1345Schindler19820.4Power3Jan-16Jan-17
CNRENAS II408Passenger Hydraulic Elevator (PHE)2450 - 1600 (21 people)Thyssenkrupp20210.74Power2
CNRENAS II410Passenger Hydraulic Elevator (PHE)2450 - 1600 (21 people)Thyssenkrupp20230.74Power2
CNRENAS II555Passenger Hydraulic Elevator (PHE)1600Di Francesco20061.8Power52018
CNRENAS II555Passenger Hydraulic Elevator (PHE)1600Di Francesco20061.8Power52018
CNRENAS II557Passenger Hydraulic Elevator (PHE)1250Maspero20010.6Power4Jan-16Jan-17
CNRENAS II557Passenger Hydraulic Elevator (PHE)1250Maspero20010.6Power4Jan-16Jan-17
CNRENAS II562Passenger Hydraulic Elevator (PHE)1250Kone19990.57Power4Jan-16Jan-17
CNRENAS II606Passenger Hydraulic Elevator (PHE)900Otis19880.6Power2Jan-16Jan-17
CNRENAS II618Passenger Hydraulic Elevator (PHE)1600Di Francesco20090.63Power2
CNRENAS II623Passenger Hydraulic Elevator (PHE)1250Kone19980.58Power4Jan-16Jan-17
CNRENAS II623Passenger Hydraulic Elevator (PHE)1250Kone19980.58Power4Mar-17Mar-18
CNRENAS II639Passenger Hydraulic Elevator (PHE)2700Schindler19980.5Power2Jan-16Jan-17
CNRENAS II724Passenger Hydraulic Elevator (PHE)1600Di Francesco20030.63Power2Jan-16Jan-17
CNRENAS I157Passenger Hydraulic Elevator (PHE)1600Maspero20030.62Power2Feb-16Feb-17
CNRENAS I170Passenger Hydraulic Elevator (PHE)1250Kone19990.62Power4Feb-16Feb-17
CNRENAS I170Passenger Hydraulic Elevator (PHE)1250Kone19990.62Power4Jan-16Jan-17
CNRENAS I313Passenger Hydraulic Elevator (PHE)1250Schindler19950.5Power3
CNRENAS I317Passenger Hydraulic Elevator (PHE)1600Maspero20030.62Power2Oct-17Oct-14
CNRENAS I318Passenger Hydraulic Elevator (PHE)1600Maspero20030.62Power3Mar-17Mar-18
CNRENAS I319Passenger Hydraulic Elevator (PHE)1600Maspero20030.62Power2Oct-17Oct-14
CNRENAS I175Passenger Hydraulic Elevator (PHE)1600Maspero20050.63Power2Jul-17Jul-15
CNRENAS I175Passenger Hydraulic Elevator (PHE)1600Maspero20050.63Power2Jul-17Jul-15
DECANAS I225Passenger Hydraulic Elevator (PHE)1000Maspero20010.6Power2Jan-16Jan-17
Funding ActivityBldgLocationAsset No.QuantityComments
DLA Dist.452NAS IITBD4Certification Not Required.

Quarterly cleaning of the ramp pit to be included in PM DLA Dist. 452 NAS II TBD 2 Certification Not Required.

Quarterly cleaning of the ramp pit to be included in PM DLA Dist. 722 NAS II TBD 1 Certification Not Required.

Quarterly cleaning of the ramp pit to be included in PM DLA Dist. 723 NAS II TBD 1 Certification Not Required.

Quarterly cleaning of the ramp pit to be included in PM

&P of &N

3.3.4 COMPRESSED AIR SYSTEMS

ATTACHMENT J-1502000-07
COMPRESSED AIR SYSTEMS DESCRIPTION
Funding ActivityLocationBldg / FacilityDescriptionQty
Global HawkNAS II510Compressed Air System (includes Air Dryer)1
Global HawkNAS II413Compressed Air System (includes Air Dryer)1

&P of &N

3.3.5 AUXILIARY GENERATORS

ATTACHMENT J-1502000-07
AUXILIARY GENERATORS DESCRIPTION
Funding ActivitySiteBldg / FacilityYearkWVoltageHzPhaseFuelQuantityLocation
CNRENiscemi21005230501Diesel5
CNRENiscemi21006240/12060/501Diesel4
Global HawkNAS II510130Diesel1
Global HawkNAS II510105Diesel1
Global HawkNAS II5101
Global HawkNAS II413500Diesel1
Global HawkNAS II3873350Diesel3
SPACE FORCENAS II4232018182400503Diesel1

&P of &N

3.3.6 UPS

ATTACHMENT J-1502000-07
UNINTERRUPTABLE POWER SUPPLY SYSTEMS (UPS) DESCRIPTION
Funding ActivityBldgLocationEquipment DescriptionQuantity
Global Hawk413NAS IIUPS Unit - above 39 kVA 60HZ2
Global Hawk413NAS IIBatteries Cabinet2
Global Hawk510NAS IIUPS Unit - above 59 kVA 60HZ1
Global Hawk510NAS IIBatteries Cabinet for UPS-0011
Global Hawk510NAS IIUPS Unit - above 779 kVA1

&P of &N

3.3.12 SWIMMING POOLS

ATTACHMENT J-1502000-07
SWIMMING POOLS EQUIPMENT DESCRIPTION
Funding ActivityLocationBldg / FacilityRoomEquipment DescriptionQtyManufacturerModel #CapacityYear InstalledRemarks
CNRENAS I157MechanicalBoiler1FERMarks RS 820820 KW2008
CNRENAS I157MechanicalBurner1UNIGASP72300/1200 KW2008
CNRENAS I157MechanicalHot Water Circulating Pumps2KSBTrialine50000 LT/Hr 10 MT2008
CNRENAS I157MechanicalTemperature Controllers2CosterDTR 6282008
CNRENAS I157MechanicalTemperature Sensors2CosterSIH 0102008
CNRENAS I157MechanicalThree Way Valves1CosterVRG 3321 inch2008
CNRENAS I157MechanicalThree Way Valves1CosterVF 3652 ½ inch2008
CNRENAS I157MechanicalOn-Off Gas Valve1Caleffi541092 inch2008
CNRENAS I157MechanicalAir Separator2Caleffi551102DN 1002008
CNRENAS I157MechanicalWater Filling Valves1Caleffi553640½ inch2008
CNRENAS I157MechanicalBackflow Preventer1Caleffi574004½ inch2008
CNRENAS I157MechanicalSand Filter2CillichemieBFP 30 A2008
CNRENAS I157MechanicalSand Filter1Cillichemie50208322008
CNRENAS I157Vert. Strainers / FiltersChemical Co (?)AST (?)SMFN 70002008
CNRENAS I157MechanicalElectric Motor8
CNRENAS I157MechanicalCirculating Pumps3
CNRENAS I157MechanicalManifold System
CNRENAS I157MechanicalCheck Valve (main)1
CNRENAS I157MechanicalGate Valve (main)12012
CNRENAS I157MechanicalSurge Tank1
CNRENAS I157MechanicalChemical Analyzer
CNRENAS I157MechanicalChemical Metering Pumps
CNRENAS I157MechanicalPool Control Panel
CNRENAS I157MechanicalChemical Feed Tanks
CNRENAS I157MechanicalChemical Feed Piping
CNRENAS I157MechanicalPool Chlorinator
CNRENAS I157MechanicalPool Filter Control
CNRENAS I157MechanicalPool Filter
CNRENAS I157MechanicalPool Sump Pumps
CNRENAS I157MechanicalPool Supply and Return
CNRENAS I157MechanicalPump Pit Piping and Pumps
CNRENAS I157MechanicalRecirculation Pumps3
CNRENAS I157MechanicalPump Disconnect Switches
CNRENAS I157MechanicalPool Discharge Valves
CNRENAS II543MechanicalChemical Controller1CulliganMTC1/072013Wrk Hrs 0730 - 1600
CNRENAS II543Chemical StoreChemical Pump (Chlorine)2CulliganProp-22013Wrk Hrs 0730 - 1600
CNRENAS II543Chemical StoreChemical Pump (Ph)2CulliganProp-22013Wrk Hrs 0730 - 1600
CNRENAS II543MechanicalPool Pumps3Saer ElettropompeIRXP41001000kw2013Wrk Hrs 0730 - 1600
CNRENAS II543MechanicalSand Filter2CulliganSWF A 1202013Wrk Hrs 0730 - 1600
CNRENAS II543MechanicalStainless Steel Pre Filter3Fam Pfp3704”2013Wrk Hrs 0730 - 1600
CNRENAS II543MechanicalBack Flow Preventer1FebcoRP98111614004”Wrk Hrs 0730 - 1600
CNRENAS II543MechanicalBack Flow Preventer1Watts RpRP6633791”2103Wrk Hrs 0730 - 1600
NOTES:

(1) Above swimming pool equipment inventory outlines major system components. The Contractor shall be responsible for maintaining all valves, fittings and other interconnected components necessary for the pool to remain operational.

(2) The Contractor shall be responsible for two daily operational and water quality check and proper calibration of all measuring equipment. The recurring maintenance of the boiler and associated equipment in Bldg 548 are maintained under a separate program. During daily operational checks, the Contractor shall ensure pool temperatures are within specified norms and shall be able to investigate and troubleshoot all equipment associated with the pool. The Contractor will not be liable for repairs to pool related equipment in the Bldg 548 mechanical room under the Preventative Maintenance Program specification.

&P of &N

3.3.12 SWIMMING POOLS OPS HOURS

ATTACHMENT J-1502000-07
SWIMMING POOLS OPERATIONAL HOURS*
LocationBldgSeasonOperating Hours
M - FOperating Hours
WeekendsFunction
NAS I175June 1 – August 310530 - 0800NoneLap Swim
0900 - 1100NoneSwim Lessons
1100 - 18001200 - 1800Family Swim/Lap Swim
September 1 – May 310530 - 0800NoneLap Swim
1100 - 1300NoneSwim Lessons
1430 - 1800NoneFamily Swim/Lap Swim
NAS II543365 days / yearVariesVariesLap Swim
Dive Pool
*Operational hours are subject to change on customer request.

&P of &N

3.3.13 FACILITY ELECTRICAL SYS

ATTACHMENT J-1502000-07
FACILITY ELECTRIC SYSTEMS DESCRIPTION
Funding ActivityBldgLocationEquipment DescriptionQuantity
Global Hawk510NAS IIStatic Frequency Converter - 100 kVA1
Global Hawk510NAS IIElectric Panel LSH 200A - 60Hz1
Global Hawk510NAS IIElectric Panel LRE 125A - 60Hz1
Global Hawk510 / 404NAS IIFrequency Converter Electric Panel1
Global Hawk510 / 404NAS IIAutomatic Transfer Switch / ATS-001 for EPG-0011
Global Hawk510 / 404NAS IIAutomatic Transfer Switch / ATS-002 for EPG-0021
Global Hawk510NAS IIAutomatic Transfer Switch1
Global Hawk510NAS IIElectrical Panel QM2 -Main breaker1
Global Hawk510NAS IIElectrical Panel - A11
Global Hawk510NAS IIElectrical Panel - A21
Global Hawk510NAS IIElectrical Panel - QM31
Global Hawk510NAS IIElectrical Panel - QB11
Global Hawk510NAS IIElectrical Panel - QMDP1
Global Hawk510NAS IIElectrical Panel - QMD11
Global Hawk510NAS IIElectrical Panel - QUPS11
Global Hawk510NAS IITransformers2
Global Hawk510NAS IIStatic Converter1
Space Force423NAS IIPower Transformers2
Space Force423NAS IIFrequency Converter2
Space Force423NAS IIEmergency Generator Remote Control Panel1
Global Hawk413NAS IITransformers (with same characteristics), 200-kVA2
Global Hawk413NAS IIStatic Frequency Converter2
Global Hawk413NAS IIElectric Panel MDP (400/230V, 50Hz)1
Global Hawk413NAS IIElectric Panel MDP-A (208/120V, 60Hz)1
Global Hawk413NAS IIElectric Panel UPS (208/120V, 60Hz)1
Global Hawk413NAS IIElectric Panel CP (208/120V, 60Hz)1
Global Hawk413NAS IIElectric Panel MP-NT (400/230V, 50Hz)1
Global Hawk413NAS IIElectric Panel DP-NT-1 (400/230V, 50Hz)1
Global Hawk413NAS IIElectric Panel HLP-NT-1 (400/230V, 50Hz)1
Global Hawk413NAS IIElectric Panel HP-T1 (400/230V, 50Hz)1
Global Hawk413NAS IIElectric Panel HP-T3 (400/230V, 50Hz)1
Global Hawk413NAS IIElectric Panel HP-T2 (208/120V, 60Hz)1
Global Hawk413NAS IIElectric Panel HP-T4 (208/120V, 60Hz)1
Global Hawk413NAS IIElectric Panel HP-T5 (208/120V, 60Hz)1
Global Hawk413NAS IIElectric Panel FMP-3 (208/120V, 60Hz)1
Global Hawk413NAS IIElectric Panel SP-C (208/120V, 60Hz)1
Global Hawk413NAS IIElectric Panel HP-C (208/120V, 60Hz)1
Global Hawk413NAS IIElectric Panel FMP-C (208/120V, 60Hz)1
Global Hawk413NAS IIElectric Panel CP-C (208/120V, 60Hz)1
Global Hawk413NAS IIElectric Panel RP-C (208/120V, 60Hz)1
Global Hawk3873NAS IIMain distribution electrical panels - EMSWBD (400/230V, 50Hz)1
Global Hawk3873NAS IIMain distribution electrical panels - ESSWBD (400/230V, 50Hz)1
Global Hawk3873NAS IIMain distribution electrical panels - SWBD-UPS-1 (208/120V, 60Hz)1
Global Hawk3873NAS IIMain distribution electrical panels - SWBD-UPS-2 (208/120V, 60Hz)1
Global Hawk3873NAS IIAntennas electric panels - RAD 1-16 (400/230V, 50Hz)16
Global Hawk3873NAS IIAntennas electric panels - RAD T1-T4 (400/230V, 50Hz)4
Global Hawk3873NAS IIAntennas electric panels - SAT T1-T4 (208/120V, 60Hz)4
Global Hawk3873NAS IIAntennas electric panels - SAT 1-16 (208/120V, 60Hz)16
Global Hawk3873NAS IILocal distribution electrical panels - EH1-8 (400/230V, 50Hz)8
Global Hawk3873NAS IILocal distribution electrical panels - ES1 (400/230V, 50Hz)1
Global Hawk3873NAS IILocal distribution electrical panels - G1 (400/230V, 50Hz)1
Global Hawk3873NAS IILocal distribution electrical panels - ATS-1 (400/230V, 50Hz)1
Global Hawk3873NAS IILocal distribution electrical panels - ES2 (400/230V, 50Hz)1
Global Hawk3873NAS IILocal distribution electrical panels - M1 (400/230V, 50Hz)1
Global Hawk3873NAS IILocal distribution electrical panels - B1 (400/230V, 50Hz)1
Global Hawk3873NAS IILocal distribution electrical panels - EL1 (208/120V, 60Hz)1
Global Hawk3873NAS IILocal distribution electrical panels - EL8 (208/120V, 60Hz)1
Global Hawk3873NAS IILocal distribution electrical panels - UPSP1 (208/120V, 60Hz)1
Global Hawk3873NAS IILocal distribution electrical panels - UPSP2-1 (208/120V, 60Hz)1
Global Hawk3873NAS IILocal distribution electrical panels - UPSP2-2 (208/120V, 60Hz)1
Global Hawk3873NAS IILocal distribution electrical panels - UPSP2-3 (208/120V, 60Hz)1
Global Hawk3873NAS IILocal distribution electrical panels - UPSP3-1 (208/120V, 60Hz)1
Global Hawk3873NAS IILocal distribution electrical panels - UPSP3-2 (208/120V, 60Hz)1
Global Hawk3873NAS IILocal distribution electrical panels - UPSP3-3A (208/120V, 60Hz)1
Global Hawk3873NAS IILocal distribution electrical panels - UPSP3-3B (208/120V, 60Hz)1

&P of &N

3.3.15 AST AND UST

ATTACHMENT J-1502000-07
ABOVEGROUND (AST) AND UNDERGROUND (UST) STORAGE TANKS DESCRIPTION
Funding ActivityTank NumberCapacity (gal)Type of TankCurrent UseContentsFacility
Active Regulated ASTs (STI)
CNRE53-A500AST- Cont. SoluGeneratorIncludes Diesel, Used Oil and JP-5NAS II
CNRE156-A3,000AST-double wallHeatingNAS I
CNRE183-Gen1,000AST-w/dikeGeneratorNAS 1
CNRE204-A300AST(italian)Generator/
Fire SuppressionNAS I
AFN212-A2,000AST - ConvaultGeneratorNAS I
DODEA216-A100AST-w/dikeEmergency Generator/
Fire SuppressionNAS I
CNRE225-A396AST-w/dikeFire SuppressionNAS I
CNRE225-D280AST-w/dikeHeatingNAS I
CNRE202-NW125AST-w/dikeFire SuppressionNAS I
CNRE315-A3,000AST - ConvaultHeatingNAS I
CNRE320-A2,000AST-w/dikeGeneratorNAS I
CNRE403-A211ASTGeneratorNAS II
CNRE405-A2000AST – ConvaultHeatingNAS II
CNRE408-E9000AST-double wallGeneratorNAS II
CNRE409-A211ASTGeneratorNAS II
CNRE410-NW9,000AST-double wallGeneratorNAS II
GLOBAL HAWK413-Gen850ASTGeneratorNAS II
CNRE419-A330AST-w/dikeGeneratorNAS II
CNRE419-B330AST-w/dikeGeneratorNAS II
CNRE419-C330AST-w/dikeGeneratorNAS II
CNRE419-D330AST-w/dikeGeneratorNAS II
CNRE420-A1,000AST-SupervaultGeneratorNAS II
CNRE420-B250AST-SupervaultHeatingNAS II
SPACE FORCE423-Gen500ASTHeatingNAS II
CNRE426-B2,000AST-w/dikeHeatingNAS II
CNRE435-A793AST-w/dikeGeneratorNAS II
CNRE438-W500AST-MOIMEFuels vehiclesNAS II
NAVSUP Fuels & DLA Energy449-A2,000AST - ConvaultGeneratorNAS II
CNRE463-S1,145AST-w/dikeGeneratorNAS II
CNRE463-Gen126ASTGeneratorNAS II
CNRE463-2(Well)250AST-w/dikeGeneratorOffsite Well
FUELS464-N2,000AST - ConvaultGeneratorNAS II
NAVSUP Fuels & DLA Energy464-A500AST-MargenGeneratorNAS II
CNRE465-SE500AST-Contain.SoluGeneratorNAS II
NAVSUP Fuels & DLA Energy466-E500AST-LebGeneratorNAS II
CNRE488-S500ASTGeneratorNAS II
CNRE496-Gen745ASTGeneratorNAS II
GLOBAL HAWK510-N-13,000AST-SupervaultHeatingNAS II
GLOBAL HAWK510-N-23,000AST-SupervaultGeneratorNAS II
CNRE522-A745ASTUsed OilNAS II
CNRE522-B745ASTUsed OilNAS II
NGIS545-B500ASTHeatingNAS II
CNRE548-E2,000AST – ConvaultGeneratorNAS II
CNRE553-A500ASTGeneratorNAS II
NGIS559-A374AST-SW/dikeFire SuppressionNAS II
CNRE560-E1,700ASTGeneratorNAS II
CNRE563-A374AST-SW/dikeFire SuppressionNAS II
CNRE564-A2,000AST – ConvaultHeatingNAS II
CNRE585-S-DT1175ASTGeneratorNAS II
CNRE585-S-DT2175ASTGeneratorNAS II
NAVSUP Fuels & DLA Energy605-A2,500ASTDrain TankNAS II
CNRE618-N2,000AST - ConvaultHeatingNAS II
CNRE619-N745ASTUsed Oil ContainerNAS II
CNRE620-W3,000AST – ConvaultHeatingNAS II
CNRE622-SE3,000AST – ConvaultHeatingNAS II
CNRE624300ASTFire SuppressionNAS II
CNRE630-E745ASTUsed Oil ContainerNAS II
CNRE639-A3,000ASTGeneratorNAS II
CNRE641-Gen100ASTGeneratorNAS II
CNRE697-Gen500ASTGeneratorNAS II
DLA Distribution721-B396ASTFire SuppressionNAS II
CNRE723-B396ASTGeneratorNAS II
CNRE747(Well)250ASTGeneratorOffsite Well
CNRE1012117ASTFire SuppressionNAS II
CNRE1020-W2,000AST - ConvaultHeatingNAS II
NAVSUP Fuels & DLA Energy1030-A800AST - SupervaultGeneratorNAS II
NAVSUP Fuels & DLA Energy1042-B27,612ASTBulk FuelsNAS II
NAVSUP Fuels & DLA Energy1043-C27,598ASTBulk FuelsNAS II
NAVSUP Fuels & DLA Energy1044-D27,550ASTBulk FuelsNAS II
CNRE2100-A12,000AST - ConvaultGeneratorNISCEMI
CNRE2100-B12,000AST - ConvaultGeneratorNISCEMI
CNRE2100-C12,000AST - ConvaultGeneratorNISCEMI
CNRE2100-D12,000AST - ConvaultGeneratorNISCEMI
CNRE2100-E12,000AST - ConvaultGeneratorNISCEMI
CNRE2100-F250ASTGeneratorNISCEMI
CNRE2100-H250ASTGeneratorNISCEMI
CNRE2100-I250ASTGeneratorNISCEMI
CNRE2100-L250ASTGeneratorNISCEMI
CNRE2112-16,000ASTGeneratorNISCEMI
CNRE2112-26,000ASTGeneratorNISCEMI
CNRE2112-36,000ASTGeneratorNISCEMI
GLOBAL HAWK3873-A2,000AST-ConvaultGeneratorNAS II
GLOBAL HAWK3873-1 Gen500ASTGeneratorNAS II
GLOBAL HAWK3873-2 Gen500ASTGeneratorNAS II
GLOBAL HAWK3873-3 Gen500ASTGeneratorNAS II
CNRE6183-B120ASTGeneratorNAS II
Active Regulated USTs
CNRE537-A2,642USTHeatingNAS II
CNRE563-B2,500USTHeatingNAS II
Small Day Tanks
CNRE53-gen60ASTGeneratorNAS II
CNRE403-gen60ASTGeneratorNAS II

&P of &N

3.3.16 OVERHEAD ROLL-UP DOORS

ATTACHMENT J-1502000-07
OVERHEAD AND ROLL-UP DOORS DESCRIPTION
Funding ActivityBldgLocationEquipment DescriptionAsset No.Quantity
CNRE183NAS IElectric Roll-up Door6-183-RLD-C035
CNRE494NAS IIHydaraulic Folding Doors6-494-RLD-C036
CNRE618NAS IIHydaraulic Folding Doors6-618-RLD-C01/0213
CNRE619NAS IIHydaraulic Folding Doors6-619-RLD-C01/0223
CNRE621NAS IIHydaraulic Folding Doors6-621-RLD-001 thru 0044
CNRE622NAS IIHydaraulic Folding Doors6-622-RLD-001 thru 0044
CNRE1010NAS IIHydaraulic Folding Doors1-1010-RLD-001/0022
CNRE1020NAS IIHydaraulic Folding Doors1-1020-RLD-001 thru 0066
Global Hawk510NAS IIElectric Roll-up Door6-510-RLD-0021
Global Hawk510NAS IIElectric Roll-up Door6-510-RLD-0031
Global Hawk510NAS IIElectric Roll-up Door6-510-RLD-0041
Global Hawk510NAS IIElectric Folding Door6-510-SLD-0011
Global Hawk510NAS IIElectric Folding Door6-510-SLD-0021
Global Hawk413NAS IIElectric Folding Door6-510-BOI-0023
Global Hawk3873NAS IIElectric Roll-up Door1

&P of &N

3.3.17 HANGAR DOORS

ATTACHMENT J-1502000-07
HANGAR DOORS DESCRIPTION
Funding ActivityBldgLocationEquipment DescriptionAsset No.Quantity
CNRE408NAS IIHangar Bay Door6-408-LFT-002/72
CNRE410NAS IIHangar Bay Door6-410-LFT-002/72
Global Hawk510NAS IIHangar Bay Door2
Global Hawk413NAS IIHangar Bay Door2

&P of &N

3.3.18 DRINK FOUNT & WATER COOL

ATTACHMENT J-1502000-07
DRINKING FOUNTAINS AND WATER COOLERS DESCRIPTION
Funding ActivityBldgLocationEquipment DescriptionQuantity
CNRE157NAS IDrinking Fountain2
CNRE170NAS IDrinking Fountain2
CNRE175NAS IDrinking Fountain17
CNRE317NAS IDrinking Fountain2
CNRE318NAS IDrinking Fountain2
CNRE319NAS IDrinking Fountain4
Global Hawk412NAS IIDrinking Fountain1
SPACE FORCE423NAS IIDrinking Fountain1
CNRE436NAS IIDrinking Fountain1
CNRE471NAS IIDrinking Fountain1
Global Hawk510NAS IIDrinking Fountain / 6-510-DRF-0011
Global Hawk510NAS IIDrinking Fountain / 6-510-DRF-0021
Global Hawk510NAS IIDrinking Fountain / 6-510-DRF-C012
Global Hawk510NAS IIDrinking Fountain3
CNRE618NAS IIDrinking Fountain4
CNRE619NAS IIDrinking Fountain2
CNRE720NAS IIDrinking Fountain2
CNRE724NAS IIDrinking Fountain2
CNRE1020NAS IIDrinking Fountain2
Global Hawk3873NAS IIDrinking Fountain2
Global Hawk510NAS IIDrinking Fountain / 6-510-DRF-0021
Global Hawk510NAS IIDrinking Fountain / 6-510-DRF-C012

&P of &N

3.3.19 AIRFIELD LIGHT TOWERS

ATTACHMENT J-1502000-07
AIRFIELD LIGHT TOWERS DESCRIPTION
FUNDING ACTIVITYSITELOCATIONEQUIPMENT DESCRIPTION
CNRENAS II8119Mobile Light Tower
CNRENAS II8119Mobile Light Tower
CNRENAS II8119Mobile Light Tower
CNRENAS II8119Mobile Light Tower
CNRENAS II8119Mobile Light Tower

Page &P of &N

3.3.20 EMERGENCY EYEWASH STAT

ATTACHMENT J-1502000-07
EMERGENCY EYEWASH STATIONS DESCRIPTION
FUNDING ACTIVITYSITELOCATIONEQUIPMENT DESCRIPTIONASSET NO.Qty
Global HawkNAS II413Emergency Eyewash6-510-BOI-0013
Global HawkNAS II510Emergency Eyewash6-510-PLMB-0016

Page &P of &N

3.3.21 IRRIGATION SYSTEMS

ATTACHMENT J-1502000-07
IRRIGATION SYSTEMS DESCRIPTION
Funding Activity: CNRE
Location: NAS I
ProximityType (Automated/ Manual)Control Valve BoxElectrical Connection BoxTimerRemarks
Bldg. 157Automated41

Bldg. 170 Manual 5

Bldg. 175 Automated 10 1

Bldg. 202 Automated 3 1

Bldg. 212Automated / ManualAutomated: 21
Manual: 2
Bldg. 303Manual2

Bldg. 308 Automated 2 1

Bldg. 313 Manual 2

Bldg. 314Automated / ManualAutomated: 421Manual control valves are located at the back of Bldg. 314. Automated control valves are located at the front of Bldg. 314. Main electrical control panel is located exterior right side of Bldg. 314
Manual: 4
Bldg. 315Automated11

Bldg. 317 Automated 3 2 1

Bldg. 318 Automated 11 2 1 Control valves and electrical connection boxes are located at the back of Bldg 318

Bldg. 319 Automated 5 1

Bldg. 320 Automated 5 1

PlaygroundsAutomated51Main electrical control panel and timer are located inside the playground
NOTE:
1) Main electrical control panel, timer, and water pumps for NAS I automated irrigation system are located in Bldg. 183 (Water Treatment Plant).
2) Total irrigated grounds for Region at NAS I are approximately 58762 sq. meters.
Location: NAS II
ProximityType (Automated/ Manual)Control Valve BoxElectrical Connection BoxTimerRemarks
Bldg. 405Manual11
Across Road from Bldg. 523Manual1
Across Road from Bldg. 407Manual1
Bldg. 414Manual22

Bldg. 418 Manual 8 5

From Bldg. 424Manual279
Bldg. 436Manual11

Bldg. 476 Manual 3

Area Near Front Gate (Ex Bldg. 477)Manual2
Bldg. 542Manual1
Bldg. 546Manual33

Bldg. 549 Manual 1 1

Bldg. 562 Manual 1

Bldg. 564 Manual 1

Across Road from Bldg. 606Manual
Bldg. 608 and Bldg. 609Automated2511
Bldg. 618Automated / ManualAutomated: 155Manual valve located near parking area
Manual: 1
Bldgs. 618/619/620Automated1041Main electrical control panel and timer are located at NAVFAC/ Seabees Compound rear east side
Bldg. 622Manual44

Bldg. 623 Manual 8 Includes a ground area requiring irrigation with portable equipment

Bldg. 624 Manual 1 Includes a ground area requiring irrigation with portable equipment

Manual93
Bldg. 628 to Bldg. 456
Bldg. 722 to Bldg. 436Manual93
Bldg. 1010Automated811Timer controls entire Hazmat Compound grounds

Bldg. 1014 Automated 2 1

Bldg. 1015 Automated 2 1

Bldg. 1017 Automated 1 1

Bldg. 1020 Automated 7 2 1

Bldg. 612ManualGround areas require irrigation with portable equipment
NOTE:
1) Currently most of the irrigation system at NAS II is not functional. Manual irrigation is required. Portable irrigation system shall be provided by Contractor.
2) Total irrigated grounds for Region at NAS II are approximately 40000 sq. meters.
3) Total irrigated grounds for NAVFAC/Seabees Compound is approximately 2306 sq. meters.
Funding Activity: CNRE
Location: Marinai Housing Complex
ProximityType (Automated/Manual)Control Valve BoxesElectrical Connection BoxesTimersRemarks
Bldg. 2569Automated1121
Funding Activity: Billeted Housing
Location: NAS I (Hill Drive)
ZoneUnitProximityTypeControl Valve BoxPop-Up TypeRemarks
(Automated/ Manual)
1-5101Back Yard / Back Yard Common Area Next GarageAutomated5Dynamic
6101Front Yard / Front Yard Common AreaAutomated1Static
45850102Front Yard / Front Yard Common Area / Front DoorAutomated4Static
13-14102Back YardAutomated2Dynamic
15-17/ 19 / 21103Front Yard / Front Yard Common AreaAutomated2Static & Dynamic
18 / 20103Back YardAutomated1Dynamic
23-27104Front Yard / Right Side / Front Side / Front Yard Common AreaAutomated2Static
22104Back YardAutomated1Dynamic
28105Back YardAutomated2Dynamic
29-32105Front Yard / Front Yard Common Area / Partial Back Yard Right SideAutomated1Static & Dynamic
33- 36106Front Yard / Front Yard Common Area / Front Yard Right Side / Front DoorAutomated2Static
37106Back YardAutomated1Dynamic
38107Back YardAutomated2Dynamic
39-40107Front Yard / Right-Left SideAutomated1Static & Dynamic
42-46108Front Yard / Front & Next to Wooden Fence Common Area / Front Door /Automated2Static
47Front of 101/102Common Area Round AboutAutomated1Static
NOTE:
1) Main electrical control panel and timer are located road across from Unit 104, Substation 221.
2) Total irrigated grounds for Billeted Housing are approximately 11000 sq. meters.
3) Current Billeted Housing Hill Drive irrigation system schedule is provided in J-1503050-06.a

3.3.22 POL FUEL & DISTRIBUTION

ATTACHMENT J-1502000-07.a
POL FUEL DEPOT FACILITES AND DISTRIBUTION SYSTEMS DESCRIPTION
Funding Activity: NAVSUP FUELS - DLA ENERGY FUNDED
Reference to Excel file “J-1502000-07.a POL Fuel Depot Facilities and Distribution Systems Description".

3.3.22 CRITICAL SPARE PARTS

ATTACHMENT J-1502000-07.b
CRITICAL SPARE PARTS INVENTORY FOR POL, AVIATION AND MOGAS SYSTEMS
Funding Activity: NAVSUP FUELS - DLA ENERGY FUNDED
Reference to Excel file “ J-1502000-07.b Critical Spare Parts List”.

3.3.23 AVIATION SUPPORT SYS

ATTACHMENT J-1502000-07.c
AVIATION FUEL SUPPORT SYSTEMS DESCRIPTION
Funding Activity: NAVSUP FUELS - DLA ENERGY FUNDED
Reference to Excel file “J-1502000-07.c Aviation Fuel Systems Equipment Description”.

3.3.24 VEHICLES FUEL STATION

ATTACHMENT J-1502000-07.d
VEHICLE FUELING STATION SYSTEM DESCRIPTION
Funding Activity: NAVSUP FUELS - DLA ENERGY FUNDED
Reference to Excel file “J-1502000-06.d Vehicle Fueling Station Equipment Description”.

3.3.25 VEHICLE ARRESTOR SYS

ATTACHMENT J-1502000-07
VEHICLE ARRESTOR SYSTEM DESCRIPTION
FUNDING ACTIVITYSITEBUILDINGMANUFACTURERMODELQUANTITY
GLOBAL HAWKNAS II3873O&OGRIZZLY-N 275-800/1216

3.3.26 FLOOD GATES

ATTACHMENT J-1502000-07
FLOOD GATES DESCRIPTION
FUNDING ACTIVITYSITEBUILDINGMANUFACTURERMODELQUANTITY
GLOBAL HAWKNAS II3873FLOODBREAKAUTOMATIC FLOOD GATES2

3.4.1 HVAC AND REFRIGERATION

ATTACHMENT J-1502000-07
HVAC AND REFRIGERATION SYSTEMS DESCRIPTION
Funding ActivityBldg / FacilityLocationAir Cooled ChillerAHUFan CoilCentr. PumpWater SoftenerChilled / Hot Water SystemChiller UnitCondensing Unit 2 - 25 TonCondensing Unit >25 TonHeat Exch.Exhaust FansCap. (Tons)HVAC Seasonal Startup / ShutdownNotes
CNRE2100Niscemi4887116Yes
Family Housing101NAS I1223
Family Housing102NAS I1223
Family Housing103NAS I1223
Family Housing104NAS I1223
Family Housing105NAS I1223
Family Housing106NAS I1223
Family Housing107NAS I1223
Family Housing108NAS I1223
Funding ActivityBldg / FacilityLocationEquipment DescriptionQuantityEquipment NumberNotes
Global Hawk510NAS IIA/C Split Unit16-510-A/C-001
Global Hawk510NAS IIA/C Split Unit16-510-A/C-002
Global Hawk510NAS IIA/C Split Unit16-510-A/C-003
Global Hawk510NAS IIA/C Split Unit1
Global Hawk510NAS IIA/C Split Unit1
Global Hawk510NAS IIAir Handling Unit (AHU)16-510-AHU-00138, 84 Ton
Global Hawk510NAS IIAir Handling Unit (AHU)16-510-AHU-00244, 44 Ton
Global Hawk510NAS IIAir Handling Unit (AHU)16-510-AHU-00344, 44 Ton
Global Hawk510NAS IIAir Handling Unit (AHU)16-510-AHU-00444, 44 Ton
Global Hawk510NAS IIAir Handling Unit (AHU)16-510-AHU-00544, 44 Ton
Global Hawk510NAS IIDDC Trend1LS
Global Hawk510NAS IIWater Chiller - Reciprocating Chiller Air Cooled16-510-CHL-00143 Ton
Global Hawk510NAS IIWater Chiller - Reciprocating Chiller Air Cooled16-510-CHL-00250 Ton
Global Hawk510NAS IIWater Chiller - Reciprocating Chiller Air Cooled16-510-CHL-00350 Ton
Global Hawk510NAS IIWater Chiller - Reciprocating Chiller Air Cooled16-510-CHL-00450 Ton
Global Hawk510NAS IIWater Chiller - Reciprocating Chiller Air Cooled16-510-CHL-00550 Ton
Global Hawk510NAS IIExhaust Fan - EF / 1.116-510-EXF-001
Global Hawk510NAS IIExhaust Fan - EF / 1.216-510-EXF-002
Global Hawk510NAS IIExpansion Tank16-510-EXT-001300 Lt
Global Hawk510NAS IIExpansion Tank16-510-EXT-002250 Lt
Global Hawk510NAS IIExpansion Tank16-510-EXT-003500 Lt
Global Hawk510NAS IIExpansion Tank16-510-EXT-004150 Lt
Global Hawk510NAS IISupply Fan - SF / 616-510-FAN-001
Global Hawk510NAS IIAir Dryer26-510-HMD-001
Global Hawk510NAS IIDomestic Water Booster Pumps26-510-PMP-002
Global Hawk510NAS IIWater Circulation Pump26-510-PMP-003

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .