About this file

This Performance Work Statement (PWS) outlines pavement clearance services for a naval installation, with a primary focus on sweeping various paved surfaces including roads, parking lots, sidewalks, and airfield pavement areas. The specification covers recurring and non-recurring work related to pavement maintenance, with specific emphasis on removing volcanic ash deposits from Mt. Etna eruptions and ensuring clear, safe surfaces. Key requirements include using specialized airfield-certified vacuum sweepers for airfield surfaces, obtaining proper clearances from airfield operations, and complying with FAA and Department of Defense safety regulations.

The contractor must meet stringent operational standards, including maintaining paved surfaces in accordance with specified Service Level Standards, minimizing disruptions to facility operations, and coordinating closely with government authorities. Personnel must obtain specific certifications, such as an airfield driver's license and completing the Airfield Vehicle Operators Course. Equipment restrictions mandate rubber-tired vehicles, and all work must adhere to safety protocols outlined in various advisory circulars. The contract allows for both scheduled sweeping services and potential service orders for additional pavement clearance work, with performance measured against detailed operational requirements and safety standards.

View the file

Other files

File Type Posted
Solicitation Amendment N6247025R00200011 SF 30.pdf PDF
Annex 1606001 C Water (Overseas) - Amend 0010.pdf PDF
J-1601000 Utility Management - Amend 0010.pdf PDF
Solicitation Amendment N6247025R00200009 SF 30.pdf PDF
Solicitation Amendment N6247025R00200008 SF 30.pdf PDF
J-1602000 Electrical - Amend 0008.pdf PDF
Solicitation Amendment N6247025R00200007.pdf PDF
Annex 1502000 C Facility Investment Amend 0007.pdf PDF
Annex 1503010 C Custodial - Amend 0007.pdf PDF
Annex 1601000 C Utility Management - Amend 0007.pdf PDF
J-12 PPI Responses (Ament 0007).pdf PDF
J-0200000-12 ELINs Sigonella - Amend 0007.xlsx XLSX spreadsheet
J-1606001 Water (Overseas) Amend 0007.pdf PDF
Solicitation Amendment N6247025R00200003.pdf PDF
Annex 0100000 General Information- Amendment 0002.pdf PDF
Solicitation Amendment N6247025R00200001 SF 30.pdf PDF
Section F Deliverables.pdf PDF
J-1 Past Performance Questionnaire (Form PPQ).pdf PDF
Annex 0100000 General Information.pdf PDF
Annex 1401000 Family Housing.pdf PDF
Annex 1402000 Unaccompanied Housing.pdf PDF
Annex 1503010 Custodial.pdf PDF
Annex 1503050 Grounds Maintenance and Landscaping.pdf PDF
Annex 1602000 Electrical.pdf PDF
J-0200000 Management and Adminstration.pdf PDF
J-1401000 Family Housing.pdf PDF
J-1501000 Facility Management.pdf PDF
J-1502000 Facility Investment.pdf PDF
J-1502000-04 Bldg 273 Critical Areas Requiring ICRA.pdf PDF
J-1502000-07.a POL Fuel Depot Equipment Description.xlsx XLSX spreadsheet
J-1503010-06.b Custodial Inventory and Frequencies.xlsx XLSX spreadsheet
J-1503030-04 Solid Waste Collection Pick-Up Points Maps.pdf PDF
J-1503050 Grounds Maintenance and Landscaping.pdf PDF
J-1503060 Pavement Clearance.pdf PDF
J-1601000-03 Annual Utility Service Order Workload.pdf PDF
1603000 J Natural Gas.pdf PDF
J-1603000-04 Critical Spare Parts Inventory.xlsx XLSX spreadsheet
1604000 J Wastewater.pdf PDF
1700000 J Transportation.pdf PDF
J-1700000-04 Bus Stops Maps.pdf PDF
J-1700000-05 Shuttle Bus Services Satisfaction Survey Sample.pdf PDF
1800000 J Environmental.pdf PDF
J3 Section B Supplies or Services and Prices.pdf PDF
J-5 Pre Proposal Site Visit Sigonella.pdf PDF
Annex 1503030 Integrated Solid Waste Management.pdf PDF
Annex 1601000 Utility Management.pdf PDF
Annex 1800000 Environmental.pdf PDF
J-0200000-10 Oil and Hazardous Substance Spill Response Procedures.pdf PDF
J-1502000-07 Base Systems Description RFP.xlsx XLSX spreadsheet
J-1502000-07.b Critical Spare Parts List.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1503060 – Pavement Clearance Spec Item Title 1 General Information

1.1 Concept of Operations

2 Management And Administration

2.1 Definitions and Acronyms

2.2 Personnel

2.2.1 Certification, Training, and Licensing

2.3 Special Requirements

2.3.1 Safety

2.3.2 Equipment Restrictions

2.3.3 Airfield Equipment Restrictions

2.3.4 Work Identification

2.3.5 Communication

2.3.5.1 Airfield Communications

2.4 References and Technical Documents

3 Recurring Work

3.1 Pavement Sweeping Services

3.1.1 Roads and Other Paved Surfaces

3.1.2 Airfield Pavement Surfaces

3.2 Pavement Clearance Service Orders

4 Non-Recurring Work

1503060 - Pavement Clearance Spec Item

Title Description

1 General Information

1.1 Concept of

Operations

The intent of 1503060 Pavement Clearance is to specify the requirements related to pavement sweeping of major paved surfaces, e.g., streets, parking lots and sidewalks and other paved areas located away from building perimeter and removal of periodic volcanic ash deposits resulting from Mt. Etna eruptions, and will include recurring and non-recurring services.

Sweeping of exterior surfaces adjacent to buildings is detailed in Technical Specification 1503010 Custodial.

Spec Item Title Description 2 Management And

Administration

2.1 Definitions and

Acronyms

Definitions and Acronyms are listed in J-1503060-01.

2.2 Personnel In addition to the Employee Requirements specified in Annex 2, the Contractor shall provide personnel with the qualifications, technical knowledge, experience and skill required to efficiently provide pavement clearance services and as specified below:

2.2.1 Certification, Training, and Licensing

An airfield drivers license is required prior to driving within the airfield boundaries (fenceline). Contractor personnel will complete the Airfield Vehicle Operators Course (AVOC) and pass written test per NAVAIR 00-80T-124, NASSIGINST 3710-1R, and NASSIGINST 3721-16.

2.3 Special Requirements

2.3.1 Safety Refer to Annex 0200000, Spec Item 2.9, Contractor Safety Program.

The Contractor shall comply with safety requirements for pavement clearance operations on airfields as specified in Advisory Circular (AC) No. 150/5210-23, Ground Vehicle Operations on Airports and Advisory Circular (AC) No., 150/5200-30C Airport Winter Safety and Operations.

2.3.2 Equipment

Restrictions

Equipment used shall have rubber type tires, tracks are not acceptable.

2.3.3 Airfield Equipment

Restrictions

All equipment used to clear debris, volcanic ashes or snow on the airfield must comply with the Naval Air Station (NAS) and FAA requirements.

Equipment specifically designed for airfield and runway clearing shall be used to clear areas on airfield, around radar, airfield taxiway, runway sidelights and over runway center lights.

2.3.4 Work Identification The Contractor shall identify and recommend non-recurring work as appropriate to the KO.

2. 3.5 Communication The Contractor shall coordinate all access to performance areas such as airfields with appropriate Government authority, and be in radio contact with the controlling authority during work performance.

2.3.5.1 Airfield

Communications

All airfield communications shall be coordinated through the KO. The KO will coordinate with Air Operations (Air Ops) to obtain permission for the Contractor to communicate/operate directly with Air Ops.

2.4 References and

Technical Documents

References and Technical Documents are listed in J-1503060-02.

Item

Title Performance Objective

Related Information Performance Standard

3 Recurring Work

Contractor shall provide pavement clearance to achieve a cleared appearance and safe use of paved surfaces.

Service Level Standards are defined by Commander, Navy Installations Command (CNIC) for Navy Shore Commands. Service Level Standards for pavement clearance are specified as shown in J- 150305003.

The Contractor shall comply with the EM-385-1-1 Safety Manual and the Italian Safety norms, and all FAA and DoD requirements to sweep around all aircraft parked on ramp areas.

No work shall start prior to obtaining all approvals from the

KO.

Debris resulting from pavement clearance operations shall be removed and disposed of off station in accordance to current environmental protection rules and regulations.

All facilities will remain in operation during pavement clearance operations; therefore, the Contractor shall manage work execution in such way to reduce to the minimum possible work performance impact with facility daily operations.

The Contractor shall provide an annual Pavement Sweeping Schedule per Section F.

Pavement clearance working areas, frequencies and site maps are included in J-1503060-04.

Paved surfaces are clear, safe, and passable in accordance with the specified Service Level Standards.

3.1 Pavement

Sweeping Services

The Contractor shall sweep paved surfaces to ensure paved surfaces are clear.

The Contractor shall provide pavement sweeping to remove volcanic ash, winter abrasives and other debris, improve the appearance of paved areas, improve the safety of paved areas, reduce maintenance costs by keeping the drainage systems clean and, reduce pollutants entering the storm drain system.

Paved surfaces are swept per the schedule and in accordance with specified Service Level Standards.

Item

Title Performance Objective

Related Information Performance Standard

3.1.1 Roads and

Other Paved Surfaces

The Contractor shall sweep roads and other paved surfaces to ensure they are clear.

Roads and other paved surfaces include roads, parking areas, sidewalks, walkways, aprons, porch areas, smoking areas, entrance/canopy areas, external stairs/steps, recreational areas, bleachers, terraces, running tracks, open storage and other similar areas.

The Contractor shall sweep roads per the schedule and frequency specified inJ-1503060-04.

Informational Note: The Government has found on previous contracts that the frequency and schedule for sweeping of roads and paved surfaces as shown in the Working Areas, Frequencies and Site Maps provided in J-1503060-04 has maintained services at an acceptable level.

If the severity of weather makes it impracticable to sweep during the scheduled times, the Contractor shall coordinate with the KO to reschedule services.

Roads and other paved surfaces are clear in accordance with specified Service Level Standards.

3.1.2 Airfield

Pavement Surfaces

The Contractor shall sweep airfield pavement to ensure surfaces are clear.

Airfield pavement surfaces include runways, taxiways, and parking aprons, including tie-down points and depressions as shown on Site Maps provided in J-1503060-04

Airfield sweeping shall be accomplished with an airfield certified vacuum sweeper. The use of a standard road sweeper is not authorized.

The Contractor shall receive clearance from the airfield operations center and coordinate with Air Ops for FOD walk downs prior to commencing sweeping operations for airfield pavement surfaces.

The Contractor shall sweep airfield pavement surfaces per the schedule and frequency specified in J- 1503060-04.

Airfield pavement surfaces are swept in accordance with specified operational requirements.

Airfield is free of Foreign Object Debris

(FOD).

Item

Title Performance Objective

Related Information Performance Standard

The Contractor shall comply with all FAA and DoD requirements to sweep around all aircraft parked on ramp areas.

Sweep as scheduled except during periods in which the severity of weather, as deemed by Air Ops and directed by KO, makes it impracticable to sweep.

The Contractor shall coordinate with the KO to reschedule services.

3.2 Pavement

Clearance Service Orders

The Contractor shall perform pavement clearance service order work in a timely manner to accomplish any pavement clearance work identified within the entire boundary of the installation to ensure requirements are responded to and completed in accordance with specified standards.

The Contractor shall receive pavement clearance service orders in accordance with the work reception requirements in Annex 2.

The Contractor shall schedule and perform pavement clearance service orders in a way that minimize disruptions to customers and Government operations.

The Government may issue service orders for work requirements at any location within the defined boundaries of this contract for any reason at the discretion of the KO.

Service orders will include a wide variety of work. Anticipated pavement clearance service order data including limits of liability are provided in J-1503050-05.

The Contractor may invoice for completed pavement clearance service orders. The Contractor shall not invoice for incomplete pavement clearance service orders and pavement clearance service orders not issued. A modification will be processed at the end of each period of performance to deduct for pavement clearance service orders not issued and incomplete pavement clearance service orders. Deduction will be based on the unit prices specified in Attachment J-0200000- 12 ELINs.

Pavement clearance service order work is completed within the period of performance specified in J-1503050- 05 or on the pavement clearance service order.

Pavement clearance service orders are signed by the original requestor or PAR prior to being closed.

Item

Title Performance Objective

Related Information Performance Standard

The Contractor shall submit a monthly summary of completed pavement clearance service orders per Section F.

1503060 – Pavement Clearance

Item

Title Performance Objective Related Information Performance Standard

4 Non- Recurring Work

Non-Recurring work may be ordered utilizing DoD FEDMALL in accordance with Section H or on a task order in accordance with the

PROCEDURES FOR

ISSUING ORDERS clause in Section G. The order will specify the exact locations and types of work to be accomplished. The period of performance will be specified in each order.

Refer to Non-Recurring Work ELINs for task listings, descriptions and related requirements. All periods of performance are measured from issue date of order to acceptance of the work.

Performance Standards for Non-Recurring work will be the same as those in Spec Item 3 where applicable.

File details come from the government source that posted it. Updated .