About this file

This document is an attachment to a federal contract for electrical power transmission and distribution systems, specifically Attachment J-1602000. It contains four key attachments: Definitions and Acronyms, References and Technical Documents, Electrical Power Transmission and Distribution System Description and Inventory, and a Minimum Critical Spare Parts List. The Minimum Critical Spare Parts List details specific equipment for the Niscemi Sub-Station, including Sepam Relays S40, 24 kV Medium voltage electric cables, and 20 kV HV SF6 Circuit Breakers. The estimated minimum stock levels require 2 units of Sepam Relays, 50 meters of medium voltage electric cable, 4 cable termination sets, 2 circuit breakers, 2 transformer thermostats, and 2 UPS units for substation ancillary systems to ensure operational readiness and quick maintenance/replacement capabilities.

View the file

Other files

File Type Posted
Solicitation Amendment N6247025R00200012 SF 30.pdf PDF
J-14 PPI Responses (Ament 0010).pdf PDF
J-1606001-03 Water System Description and Inventory - Amend 0010.xlsx XLSX spreadsheet
Annex 1601000 C Utility Management - Amend 0008.pdf PDF
Annex 1602000 C Electrical - Amend 0008.pdf PDF
J-13 PPI Responses (Ament 0008).pdf PDF
J-10 Pre-Proposal Site Visit Sign-In Sheet (Amend 0007).pdf PDF
J-11 Pre-Proposal Conference Presentation Sigonella BOS (Amend 0007).pdf PDF
J-1502000-05 Base Systems Description RFP - Amend 0007.xlsx XLSX spreadsheet
J-1503030-06 Solid Waste Containers Inventory - Amend 0007.xlsx XLSX spreadsheet
J-1606001-03 Water System Description and Inventory Amend 0007.xlsx XLSX spreadsheet
Solicitation Amendment N6247025R00200005 SF 30.pdf PDF
Attachment J-9- PPI Responses.pdf PDF
J-4 Pre-Award Inquiry Form (AMD 0001).xlsx XLSX spreadsheet
J-2 Corporate Experience Project Data Sheet.pdf PDF
J-4 Pre-Award Inquiry Form.xlsx XLSX spreadsheet
J-7 Communicazione Antimafia self-cert form.pdf PDF
J-8 Informazione Antimafia self-cert form.pdf PDF
Annex 1503020 Pest Control.pdf PDF
Annex 1604000 Wastewater.pdf PDF
Annex 1606001 Water (Overseas).pdf PDF
Annex 1700000 Transportation.pdf PDF
J-0200000-06.a - ASSET SPECIFICATION.xlsx XLSX spreadsheet
J-0200000 -12 ELINs Sigonella.xlsx XLSX spreadsheet
J-1402000 Unaccompanied Housing.pdf PDF
J-1502000-06 DHA Systems Descriptions.xlsx XLSX spreadsheet
J-1502000-07.d Vehicle Fueling Station Equipment Description.xlsx XLSX spreadsheet
J-1503010-06.a Custodial Inventory and Frequencies.xlsx XLSX spreadsheet
J-1503020-04 Sigonella IPMP 2024.pdf PDF
J-1503050-02.b Eucalyptus Trees Inventory.xlsx XLSX spreadsheet
J-1503050-06 BASH Requirements and Site Map.pdf PDF
J-1503050-07 NASSIG WHA.pdf PDF
J-1503050-08 Exterior Containers Inventory.xlsx XLSX spreadsheet
J-1601000-08 Utility Asset Inventory.xlsx XLSX spreadsheet
J-1604000-03 Wastewater Systems Description and Inventory.xlsx XLSX spreadsheet
J-1606001-04 Historical Critical Spare Parts Inventory.xlsx XLSX spreadsheet
J-1606001-06 Unidirectional Flushing Plan NAS I.pdf PDF
J3 Section B Supplies or Services and Prices.pdf PDF
J-5 Pre Proposal Site Visit Sigonella.pdf PDF
Annex 1503030 Integrated Solid Waste Management.pdf PDF
Annex 1503060 Pavement Clearance.pdf PDF
Annex 1601000 Utility Management.pdf PDF
Annex 1800000 Environmental.pdf PDF
J-0200000-10 Oil and Hazardous Substance Spill Response Procedures.pdf PDF
J-1502000-07 Base Systems Description RFP.xlsx XLSX spreadsheet
J-1502000-07.b Critical Spare Parts List.xlsx XLSX spreadsheet
J-1502000-07.f ufc_3_460_03_2017_c2.pdf PDF
J-1502000-08.b Monthly UST Checklist - DHA.pdf PDF
J-1502000-08.c Yearly UST Checklist - DHA.pdf PDF
J-1503010 Custodial.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section J – 1602000 Electrical

Attachment Number Attachment Title J-1602000-01 Definitions and Acronyms J-1602000-02 References and Technical Documents J-1602000-03 Electrical Power Transmission and Distribution Systems Description and

Inventory J-1602000-04 Minimum Critical Spare Parts List

Attachment J-1602000-01 Definitions and Acronyms

Equipment, Collateral Encompasses built-in and large substantially affixed equipment/property that is normally acquired and installed as part of a facility project.

Equipment, Installed Encompasses building-type equipment, built-in equipment, and large, substantially affixed equipment/property, and is normally acquired and installed as part of a facility project. Installed equipment is normally required to make a facility useful and operable.

Removing such equipment would impair the usefulness, safety, or environment of the facility or the facility restoration work required after its removal, is substantial.

Equipment, Personal Property

Personal property equipment includes all equipment other than collateral equipment.

Such equipment, when acquired and used in a facility or a test apparatus, can be severed and removed after erection or installation without substantial loss of value or damage thereto or to the premises where installed.

Facilities Life Cycle A facilities life cycle is divided into four stages, requirements (planning and design), acquisition (construction and acceptance), stewardship (operations, maintenance and repair), and disposal.

Facilities Maintenance Management

The planning, prioritizing, organizing, controlling, reporting, evaluating, and adjusting of facilities maintenance operations to support the CNO/NAVFAC facilities policy and objectives and satisfy customers’ facility needs. Defined by the International Facility Management Association as “the practice of coordinating the physical workplace with the people and work of the organization.”

High Voltage Transmission

Transmission of electrical loads greater than 600Volts (V) and less than 24kilovolts (kV)

Integrated Maintenance Plan

IMP is a recurring state-of-the-art, reliability-centered inspection, testing, maintenance and repair program that determines best practices for managing the functions and consequences of failures of facilities equipment and system components. IMP encompasses accepted commercial practices, including reactive, preventive, predictive and proactive maintenance, into one optimal program. The IMP approach gives the Contractor full responsibility to maintain systems and equipment and perform repairs whenever necessary to ensure equipment and systems are operational and remain in a constant state of readiness.

Life-Cycle Costs A form of economic analysis that considers the total cost of owning, operating, and maintaining a building or system over its useful life.

Low Voltage Distribution

Distribution of electrical loads less than or equal to 600 volts (V).

Medium Voltage Distribution

Distribution of electrical loads ranging from greater than 600 V up to and including 24 kilovolts (kV).

NEC National Electrical Code NFPA National Fire Protection Association Repair Repair is the restoration of facilities or equipment to such a condition that it may be effectively utilized for its designated purposes by overhaul, reconstruction, or replacement of constituent parts or materials which have deteriorated by action of the elements or usage, and which have not been corrected through maintenance. This term also applies to replacement of the entire unit or system if beyond economical repair. The intent of repair is to have the equipment at normal working condition.

Replacement Replacement, as a distinct work element, is confined to a program of planned replacement of a facility or its components. It may be further limited to major components such as air conditioning compressors, furnaces or hot water heaters.

Replacement is performed when the equipment has reached the end of its useful life;

when it no longer can perform due to degradation of its internal components and repair is no longer cost effective. Included under the replacement would be the major rebuilding of any component, since rebuilding also restores performance.

Attachment J-1602000-01 Definitions and Acronyms

Restoration Restoration of real property to such a condition that it can be used for its intended purpose. Includes repair or replacement work to restore facilities damaged by inadequate sustainment, excessive age, natural disaster, fire, accident or other causes.

Sustainment Maintenance and repair activities necessary to keep a typical inventory of facilities in “normal working condition”. Sustainment includes regularly scheduled maintenance as well as cyclical major repairs or replacement of components that occur periodically over the expected service life of the facilities.

Acronym Title AC Alternating Current (electricity) ANSI American National Standards Institute ASME American Society of Mechanical Engineers IMP Integrated Maintenance Program SRM Sustainment, Restoration and Modernization UFC Unified Facilities Criteria

Attachment J-1602000-02

References and Technical Documents Reference Title MO-209 Engineering Criteria UFC 3-501-01 Electrical Engineering UFC 3-550-01 Exterior Electrical Power Distribution UFC 3-560-01 Electrical Safety. O&M NAVFAC P-603 Utilities Infrastructure Management Manual NAVFAC P-604 Electrical – Safe Acts for Employees (E-SAFE) NETA MTS – 1997 Maintenance Testing Specifications for Electrical Power Distribution

Equipment and Systems NETA ATS – 1999 Maintenance Testing Specifications for Electrical Power Distribution

Equipment and Systems CEI 11-27 Requirement to work on LV (energized and not energized system), and HV system (no energized system) CEI 78-17 Requirement for HV Maintenance to be comply at the CEI 0-16 (User connected at the distributor)

Non-Government Publications.

American National Standards Institute, Inc. (ANSI)

Attachment J-1602000-03

Electrical Power Transmission and Distribution System Description and Inventory

Reference Excel file “J-1602000-03 Electrical Power Transmission and Distribution Systems Description and Inventory”

Attachment J-1602000-04

Minimum Critical Spare Parts List

Installation Location Equipment Type Niscemi Sub-Station Sepam Relays S40 Niscemi High Voltage System 24 kV Medium voltage Electric Cable Niscemi Sub-Station 20 kV HV SF6 Circuit Breaker Critical spare parts are provided by the Contractor

Estimated Minimum Stock Levels

Sepam Relays S40 Quantity: 2 units - for immediate replacement and backup for testing and maintenance.

24 kV Medium Voltage Electric Cable Quantity: 50 meters minimum (or appropriate length based on installation scope) - sufficient length to replace or extend cables during maintenance or emergencies.

24 kV Medium Voltage Termination for Electric Cable Quantity: 4 sets - to cover at least 2 transformers or feeders, including spares.

24 kV HV SF6 Circuit Breaker Quantity: 2 units - operational and spare for maintenance or emergency replacement.

Thermostat and Temperature Control for Transformer Temperature Quantity: 2 units - for immediate replacement and maintenance.

UPS for Substation Ancillary (substation-type with auto-recharge function) Quantity: 2 units - primary unit and spare to ensure uninterrupted power supply during maintenance or failure.