NBSAP_Clarification3_2015 July-INS and GNS.pdf

PDF 446 KB Posted

Attached to
Construction Manager as Constructor (CMc), New - Greenville, SC Federal Courthouse Building
Solicitation number
GS--04-P-16-BV-C-7005
Issued by

About this file

NBSAP_Clarification3_2015 July-INS and GNS.pdf

View the file

Other files

File Type Posted
0003_Solicitation_Amendment_GS-04-P-16-BV-C-7005_0003.pdf PDF
0002_Solicitation_Amendment_GS-04-P-16-BV-C-7005R.pdf PDF
0001_Solicitation_Amendment_GS-04-P-16-BV-C-7005_0001R.pdf PDF
GSA 013600COBieFY15UpdateOct.12014_SolicitationNo.GS-04-P-16-BV-C-7005.docx.pdf PDF
Technology Policy for PBS-Owned Buildings Monitoring _ Control Systems.pdf PDF
GSA 014100 Structural Testing Laboratory Services FY15 Update Oct. 1, 2014_Solicitation No. GS-04-P-16-BV-C-7005.pdf PDF
GSA 013300 Submittal Procedures FY15 Update Oct. 1, 2014_Solicitation No. GS-04-P-16-BV-C-7005.pdf PDF
06032016 FitForPurposeintheChangingClimate Greenville SC.pdf PDF
TheSolicitation_GreenvilleSC.pdf PDF
GSA 016000 Product Requirements FY15 Update Oct. 1, 2014.pdf PDF
GSA 015930SecurityRegulationsFY15UpdateOct.12014.docx.pdf PDF
Updated Meeting Schedule Matrix_Design Restart_R02_082216.pdf PDF
GSA 013100 Project Management _ Coordination FY15 Update Oct. 1, 2014_Solicitation No. GS-04-P-16-BV-C-7005.pdf PDF
SITESv2_Scorecard.pdf PDF
NBSAP_Clarification2_2014 Jun -4762.pdf PDF
Greenville SC AE SOW CONTRACT MODIFICATION_6-17-16_FINAL_R04.pdf PDF
Project Milestone Schedule Update May 25 2017.pdf PDF
USAO Design Guide 10-13-15.pdf PDF
CMc_Pricing_Sheet_Attachment_A_REV_01.pdf PDF
CMcSOW_Greenville_SC_CTHS_Attachment_B.pdf PDF
GSA__Form527-15b_(1).pdf PDF
GSA 012900 Payment Procedures FY15 Update Oct. 1, 2014_Solicitation No. GS-04-P-16-BV-C-7005.pdf PDF
GSA 017000ExecutionRequirementsFY15UpdateOct.12014.docx.pdf PDF
SITESv2_RatingSystem —
Courts Mailroom Construction Guidelines.pdf PDF
SF_1442_GS-04-P-16-BV-C-7005__Greenville_SC_CMc_Solicitation.pdf PDF
GSA 014025QualityControlTestingforAirBarriersFY15UpdateOct.12014_SolicitationNo.GS-04-P-16-BV-C-7005.docx.pdf PDF
GSA 015639TreePlantProtectionFY15UpdateOct.12014.docx.pdf PDF
GSA 012100 Allowances FY15 Update Oct. 1, 2014_Solicitation No. GS-04-P-16-BV-C-7005 —
GSA 014200ReferencesFY15UpdateOct.12014_SolicitationNo.GS-04-P-16-BV-C-7005.doc.pdf PDF
US Courts Design Guide 2007.pdf PDF
2017-04-18-finishes.pdf PDF
The_Agreement_Greenvill_SC_CMc_May_15_2017_(1).pdf PDF
Greenville, SC Courthouse Project Phase II ESA report - PHE May 27, 2010.pdf PDF
GSA 017410 Construction Indoor Air Quality FY15 Update Oct. 1, 2014.pdf PDF
2014 Final, Pub 64 Revised.pdf PDF
CMc301_Reps_and_Certs_Attachment_C.docx DOCX document
GSA 017810ProjectRecordDocumentsFY15UpdateOct.12014.docx.pdf PDF
GSA 018111SustainableDesignRequirementsFY15UpdateOct.12014.docx.pdf PDF
GSA 017350 Fire Prevention Precautions for Hot Work FY15 Update Oct. 1, 2014.pdf PDF
NBSAP_Clarification1_2013 July Final-VOIDs.pdf PDF
GSA 017419ConstructionNonhazardousWasteManagementDisposalFY15UpdateOct.12014.docx.pdf PDF
PBS_P_3490.2_Document_Security_for_Sensitive_But_Unclassified_Building_Information_-_(Signed_on_Sept._2__2014).pdf PDF
GSA 017822 Operation _ Maintenance Documentation FY15 Update Oct. 1, 2014.pdf PDF
GSA 014000 Quality Assurance _ Control FY15 Update Oct. 1, 2014_Solicitation No. GS-04-P-16-BV-C-7005.pdf PDF
Layout_of_Water_Main_DOC120616-12062016151956_(1).pdf PDF
SpringSt1_Irvine_2017_Water Main Relocation_Greenville SC CTHS Project.pdf PDF
GSARegion4BuildingAutomationSystemRequirementsv6.pdf PDF
NBSAP_Final_Feb 2013.pdf PDF
GSA 013000 Electronic Project Management FY15 Update Oct. 1, 2014_Solicitation No. GS-04-P-BV-C-7005.pdf PDF
Show 40 more

Latest 50 of 79 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Clarification/Correction #3 to the National Business Space Assignment Policy dated February 2013

This document captures clarifications to the National Business Space Assignment Policy (NBSAP) issued February 2013.

1. Clarification, NBSAP, Page 6, Purpose, replace the entire last paragraph with the following:

To the extent possible, PBS assigns space at unique facilities the same way it assigns space at other Federal Buildings. We recognize that Land Ports of Entry (LPOEs) do have unique features; therefore, please refer to the PBS’ Pricing Desk Guide and the PBS Provisional Guidance on LPOEs soon to be replaced by the NBSAP LPOE Addendum for more information and guidance.

2. Clarification, NBSAP, Page 21, replace the entire GNS – General Storage section with the following:

GNS–General Storage

Space that is used for storage and has significant diminished use that prohibits the space from otherwise being used as standard office space, typically found in basements or attics and it meets the following characteristics:

Space must have permanent conditions, obstructions, or protrusions below the ceiling height and into or within all or a portion of the space that do not allow for general office use and it would be cost prohibitive to build out the space to office standards, and

Space is typically not within standard office space and the space is not completely built out to shell.

Space that is used by an occupant as storage and is built out to office standards is assigned a Space Type of Total Office (TTO). Storage space that is not built out to office standards may be assigned as either Space Type GNS or INS, according to the build out.

Note: Refer to PBS’ Pricing Policy for additional information. Consult with your regional SDM RPM on assignments. In cases where there is still ambiguity, contact the Central Office RPAM (SDM Team), who will consult with Pricing and make the final GNS classification decision.

Table GNS-1: This table compares features to assist in determining whether space is GNS versus INS. For a space to be classified as GNS it must meet both the “Protrusions and Obstructions” and “Ability to Convert to Office Standards” criteria in addition to at least one other feature criteria. For more information on building shell refer to the Pricing Desk Guide.

Feature GNS INS

A GNS classification must meet both the “Protrusions & Obstructions” and the “Ability to Convert to Office Standards (TTO)” criteria.

Protrusions & Obstructions

Can emanate from walls, floor or ceiling, they are permanent and they render space unable to meet Office standards

None or very minimum

Ability to convert to Office standards (TTO)

Cost prohibitive Not cost prohibitive

And at least one of the following features.

Location Space is typically not within standard office space

Space could be anywhere

Lighting & HVAC Does not meet shell Less than full Office features

Floor Unfinished floors Concrete, typically unfinished

Ceilings

Open or unfinished.

Could not meet 7-ft minimum height requirement if they were to be finished

Open or unfinished.

If finished, needs to meet 7-ft minimum height requirement

Photograph GNS-1: This photograph shows a typical example of GNS space; located in the basement, contains obstructions and protrusions and it would be cost-prohibitive to convert to office standards.

3. Clarification, NBSAP, Page 22, add photograph to INS – Light Industrial section.

Photograph INS-1: This photograph shows a typical example of INS space; note space has lighting, HVAC, walls, etc. It would not be cost prohibitive to build out the space to office standards. Space contains no significant protrusions or obstructions.

If you have any questions regarding NBSAP Clarification/Correction #3, please contact your SDM Regional Program Manager or the National SDM Program Manager, Fernando Rocha.

Clarification/Correction #3: Dated July 14, 2015