SITESv2_Scorecard.pdf

PDF 93 KB Posted

Attached to
Construction Manager as Constructor (CMc), New - Greenville, SC Federal Courthouse Building
Solicitation number
GS--04-P-16-BV-C-7005
Issued by

About this file

SITESv2_Scorecard.pdf

View the file

Other files

File Type Posted
0003_Solicitation_Amendment_GS-04-P-16-BV-C-7005_0003.pdf PDF
0002_Solicitation_Amendment_GS-04-P-16-BV-C-7005R.pdf PDF
0001_Solicitation_Amendment_GS-04-P-16-BV-C-7005_0001R.pdf PDF
GSA 013600COBieFY15UpdateOct.12014_SolicitationNo.GS-04-P-16-BV-C-7005.docx.pdf PDF
Technology Policy for PBS-Owned Buildings Monitoring _ Control Systems.pdf PDF
GSA 014100 Structural Testing Laboratory Services FY15 Update Oct. 1, 2014_Solicitation No. GS-04-P-16-BV-C-7005.pdf PDF
GSA 013300 Submittal Procedures FY15 Update Oct. 1, 2014_Solicitation No. GS-04-P-16-BV-C-7005.pdf PDF
06032016 FitForPurposeintheChangingClimate Greenville SC.pdf PDF
TheSolicitation_GreenvilleSC.pdf PDF
GSA 016000 Product Requirements FY15 Update Oct. 1, 2014.pdf PDF
GSA 015930SecurityRegulationsFY15UpdateOct.12014.docx.pdf PDF
Updated Meeting Schedule Matrix_Design Restart_R02_082216.pdf PDF
GSA 013100 Project Management _ Coordination FY15 Update Oct. 1, 2014_Solicitation No. GS-04-P-16-BV-C-7005.pdf PDF
NBSAP_Clarification2_2014 Jun -4762.pdf PDF
Greenville SC AE SOW CONTRACT MODIFICATION_6-17-16_FINAL_R04.pdf PDF
Project Milestone Schedule Update May 25 2017.pdf PDF
USAO Design Guide 10-13-15.pdf PDF
CMc_Pricing_Sheet_Attachment_A_REV_01.pdf PDF
CMcSOW_Greenville_SC_CTHS_Attachment_B.pdf PDF
GSA__Form527-15b_(1).pdf PDF
GSA 012900 Payment Procedures FY15 Update Oct. 1, 2014_Solicitation No. GS-04-P-16-BV-C-7005.pdf PDF
GSA 017000ExecutionRequirementsFY15UpdateOct.12014.docx.pdf PDF
SITESv2_RatingSystem —
Courts Mailroom Construction Guidelines.pdf PDF
SF_1442_GS-04-P-16-BV-C-7005__Greenville_SC_CMc_Solicitation.pdf PDF
GSA 014025QualityControlTestingforAirBarriersFY15UpdateOct.12014_SolicitationNo.GS-04-P-16-BV-C-7005.docx.pdf PDF
GSA 015639TreePlantProtectionFY15UpdateOct.12014.docx.pdf PDF
GSA 012100 Allowances FY15 Update Oct. 1, 2014_Solicitation No. GS-04-P-16-BV-C-7005 —
GSA 014200ReferencesFY15UpdateOct.12014_SolicitationNo.GS-04-P-16-BV-C-7005.doc.pdf PDF
US Courts Design Guide 2007.pdf PDF
2017-04-18-finishes.pdf PDF
The_Agreement_Greenvill_SC_CMc_May_15_2017_(1).pdf PDF
Greenville, SC Courthouse Project Phase II ESA report - PHE May 27, 2010.pdf PDF
GSA 017410 Construction Indoor Air Quality FY15 Update Oct. 1, 2014.pdf PDF
2014 Final, Pub 64 Revised.pdf PDF
CMc301_Reps_and_Certs_Attachment_C.docx DOCX document
GSA 017810ProjectRecordDocumentsFY15UpdateOct.12014.docx.pdf PDF
GSA 018111SustainableDesignRequirementsFY15UpdateOct.12014.docx.pdf PDF
GSA 017350 Fire Prevention Precautions for Hot Work FY15 Update Oct. 1, 2014.pdf PDF
NBSAP_Clarification1_2013 July Final-VOIDs.pdf PDF
GSA 017419ConstructionNonhazardousWasteManagementDisposalFY15UpdateOct.12014.docx.pdf PDF
PBS_P_3490.2_Document_Security_for_Sensitive_But_Unclassified_Building_Information_-_(Signed_on_Sept._2__2014).pdf PDF
GSA 017822 Operation _ Maintenance Documentation FY15 Update Oct. 1, 2014.pdf PDF
GSA 014000 Quality Assurance _ Control FY15 Update Oct. 1, 2014_Solicitation No. GS-04-P-16-BV-C-7005.pdf PDF
Layout_of_Water_Main_DOC120616-12062016151956_(1).pdf PDF
SpringSt1_Irvine_2017_Water Main Relocation_Greenville SC CTHS Project.pdf PDF
GSARegion4BuildingAutomationSystemRequirementsv6.pdf PDF
NBSAP_Final_Feb 2013.pdf PDF
GSA 013000 Electronic Project Management FY15 Update Oct. 1, 2014_Solicitation No. GS-04-P-BV-C-7005.pdf PDF
GSA 013200 Construction Progress Documentation FY15 Update Oct. 1, 2014_Solicitation No. GS-04-P-16-BV-C-7005.pdf PDF
Show 40 more

Latest 50 of 79 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Name: _____________________________________________________________________ Project ID#:_______________ Date: __________________

YES ? NO YES ? NO

0 0 0 Possible Points: 13 0 0 0 Possible Points: 30 Y CONTEXT P1.1 HHWB C6.1 2 to 3

Y CONTEXT P1.2 HHWB C6.2 2

Y CONTEXT P1.3 HHWB C6.3 2

Y CONTEXT P1.4 HHWB C6.4 2

CONTEXT C1.5 3 to 6 HHWB C6.5 2

CONTEXT C1.6 4 HHWB C6.6 2

CONTEXT C1.7 2 to 3 HHWB C6.7 3 to 4

HHWB C6.8 4

0 0 0 Possible Points: 3 HHWB C6.9 4 Y PRE‐DESIGN P2.1 HHWB C6.10 1 to 2

Y PRE‐DESIGN P2.2 HHWB C6.11 3

Y PRE‐DESIGN P2.3

PRE‐DESIGN C2.4 3 0 0 0 Possible Points: 17

Y CONSTRUCTION P7.1

0 0 0 Possible Points: 23 Y CONSTRUCTION P7.2

Y WATER P3.1 Y CONSTRUCTION P7.3

Y WATER P3.2 CONSTRUCTION C7.4 3 to 5

WATER C3.3 4 to 6 CONSTRUCTION C7.5 3 to 4 WATER C3.4 4 to 6 CONSTRUCTION C7.6 3 to 4 WATER C3.5 4 to 5 CONSTRUCTION C7.7 2 to 4 WATER C3.6 4 to 6

0 0 0 Possible Points: 22 0 0 0 Possible Points: 40 Y O+M P8.1

Y SOIL+VEG P4.1 Y O+M P8.2

Y SOIL+VEG P4.2 O+M C8.3 3 to 5 Y SOIL+VEG P4.3 O+M C8.4 4 to 5

SOIL+VEG C4.4 4 to 6 O+M C8.5 2 to 4 SOIL+VEG C4.5 4 O+M C8.6 3 to 4 SOIL+VEG C4.6 3 to 6 O+M C8.7 2 to 4 SOIL+VEG C4.7 4 to 6 SOIL+VEG C4.8 1 to 6 0 0 0 Possible Points: 11 SOIL+VEG C4.9 4 EDUCATION C9.1 3 to 4 SOIL+VEG C4.10 1 to 4 EDUCATION C9.2 3

SOIL+VEG C4.11 4 EDUCATION C9.3 4

0 0 0 Possible Points: 41 0 0 0 Bonus Points: 9 Y MATERIALS P5.1 INNOVATION C10.1 3 to 9

MATERIALS C5.2 2 to 4 MATERIALS C5.3 3 to 4 YES ? NO

MATERIALS C5.4 3 to 4 0 0 0 Total Possible Points: 200 MATERIALS C5.5 3 to 4 MATERIALS C5.6 3 to 5 KEY SITES Certification levels Points MATERIALS C5.7 1 to 5 YES CERTIFIED 70 MATERIALS C5.8 1 to 5 ? SILVER 85

MATERIALS C5.9 5 NO GOLD 100

MATERIALS C5.10 1 to 5 PLATINUM 135

Project striving to achieve points, not 100% confident

Project is unable to achieve these credit points

Reduce urban heat island effects

Conserve and restore native plant communities

Support sustainability in plant production

Design for adaptability and disassembly Use salvaged materials and plants Use recycled content materials Use regional materials Support responsible extraction of raw materials Support transparency and safer chemistry Support sustainability in materials manufacturing

Maintain on‐site structures and paving

Optimize biomass

Project confident points are achievable

Plan to monitor and report site performance

Innovation or exemplary performance

TOTAL ESTIMATED POINTS

Use vegetation to minimize building energy use

Eliminate the use of wood from threatened tree species

5: SITE DESIGN ‐ MATERIALS SELECTION

Reduce the risk of catastrophic wildfire Develop and communicate a case study

10. INNOVATION OR EXEMPLARY PERFORMANCE

Promote sustainability awareness and education

SITES v2 Scorecard Summary

Restore soils disturbed by previous development Divert construction and demolition materials from disposal Divert reusable vegetation, rocks, and soil from disposal Protect air quality during construction

Protect and maintain cultural and historic places

Support physical activity

Support local economy

Provide optimum site accessibility, safety, and wayfinding Promote equitable site use Support mental restoration

Communicate and verify sustainable construction practices

Locate projects within existing developed areas

2: PRE‐DESIGN ASSESSMENT + PLANNING

Reduce light pollution

Conduct a pre‐design site assessment

Encourage fuel efficient and multi‐modal transportation Minimize exposure to environmental tobacco smoke

Provide on‐site food production Support social connection

Restore soils disturbed during construction

9. EDUCATION + PERFORMANCE MONITORING

Plan for sustainable site maintenance

Use renewable sources for landscape electricity needs Reduce outdoor energy consumption

Provide for storage and collection of recyclables Recycle organic matter Minimize pesticide and fertilizer use

Protect air quality during landscape maintenance

8. OPERATIONS + MAINTENANCE

Limit development on farmland Protect floodplain functions Conserve aquatic ecosystems Conserve habitats for threatened and endangered species Redevelop degraded sites

Conserve and use native plants Conserve special status vegetation

Designate and communicate VSPZs

3: SITE DESIGN ‐ WATER

4: SITE DESIGN ‐ SOIL + VEGETATION

Manage precipitation on site

Use appropriate plants Conserve healthy soils and appropriate vegetation

Create and communicate a soil management plan Control and manage invasive plants

Restore aquatic ecosystems

Manage precipitation beyond baseline Reduce water use for landscape irrigation

Control and retain construction pollutants

6: SITE DESIGN ‐ HUMAN HEALTH + WELL‐BEING

7: CONSTRUCTION

Reduce outdoor water use Design functional stormwater features as amenities

Connect to multi‐modal transit networks

Use an integrative design process

Engage users and stakeholders

1: SITE CONTEXT

4/18/2016