NBSAP_Clarification2_2014 Jun -4762.pdf

PDF 53 KB Posted

Attached to
Construction Manager as Constructor (CMc), New - Greenville, SC Federal Courthouse Building
Solicitation number
GS--04-P-16-BV-C-7005
Issued by

About this file

NBSAP_Clarification2_2014 Jun -4762.pdf

View the file

Other files

File Type Posted
0003_Solicitation_Amendment_GS-04-P-16-BV-C-7005_0003.pdf PDF
0002_Solicitation_Amendment_GS-04-P-16-BV-C-7005R.pdf PDF
0001_Solicitation_Amendment_GS-04-P-16-BV-C-7005_0001R.pdf PDF
GSA 013600COBieFY15UpdateOct.12014_SolicitationNo.GS-04-P-16-BV-C-7005.docx.pdf PDF
Technology Policy for PBS-Owned Buildings Monitoring _ Control Systems.pdf PDF
GSA 014100 Structural Testing Laboratory Services FY15 Update Oct. 1, 2014_Solicitation No. GS-04-P-16-BV-C-7005.pdf PDF
GSA 013300 Submittal Procedures FY15 Update Oct. 1, 2014_Solicitation No. GS-04-P-16-BV-C-7005.pdf PDF
06032016 FitForPurposeintheChangingClimate Greenville SC.pdf PDF
TheSolicitation_GreenvilleSC.pdf PDF
GSA 016000 Product Requirements FY15 Update Oct. 1, 2014.pdf PDF
GSA 015930SecurityRegulationsFY15UpdateOct.12014.docx.pdf PDF
Updated Meeting Schedule Matrix_Design Restart_R02_082216.pdf PDF
GSA 013100 Project Management _ Coordination FY15 Update Oct. 1, 2014_Solicitation No. GS-04-P-16-BV-C-7005.pdf PDF
SITESv2_Scorecard.pdf PDF
Greenville SC AE SOW CONTRACT MODIFICATION_6-17-16_FINAL_R04.pdf PDF
Project Milestone Schedule Update May 25 2017.pdf PDF
USAO Design Guide 10-13-15.pdf PDF
CMc_Pricing_Sheet_Attachment_A_REV_01.pdf PDF
CMcSOW_Greenville_SC_CTHS_Attachment_B.pdf PDF
GSA__Form527-15b_(1).pdf PDF
GSA 012900 Payment Procedures FY15 Update Oct. 1, 2014_Solicitation No. GS-04-P-16-BV-C-7005.pdf PDF
GSA 017000ExecutionRequirementsFY15UpdateOct.12014.docx.pdf PDF
SITESv2_RatingSystem —
Courts Mailroom Construction Guidelines.pdf PDF
SF_1442_GS-04-P-16-BV-C-7005__Greenville_SC_CMc_Solicitation.pdf PDF
GSA 014025QualityControlTestingforAirBarriersFY15UpdateOct.12014_SolicitationNo.GS-04-P-16-BV-C-7005.docx.pdf PDF
GSA 015639TreePlantProtectionFY15UpdateOct.12014.docx.pdf PDF
GSA 012100 Allowances FY15 Update Oct. 1, 2014_Solicitation No. GS-04-P-16-BV-C-7005 —
GSA 014200ReferencesFY15UpdateOct.12014_SolicitationNo.GS-04-P-16-BV-C-7005.doc.pdf PDF
US Courts Design Guide 2007.pdf PDF
2017-04-18-finishes.pdf PDF
The_Agreement_Greenvill_SC_CMc_May_15_2017_(1).pdf PDF
Greenville, SC Courthouse Project Phase II ESA report - PHE May 27, 2010.pdf PDF
GSA 017410 Construction Indoor Air Quality FY15 Update Oct. 1, 2014.pdf PDF
2014 Final, Pub 64 Revised.pdf PDF
CMc301_Reps_and_Certs_Attachment_C.docx DOCX document
GSA 017810ProjectRecordDocumentsFY15UpdateOct.12014.docx.pdf PDF
GSA 018111SustainableDesignRequirementsFY15UpdateOct.12014.docx.pdf PDF
GSA 017350 Fire Prevention Precautions for Hot Work FY15 Update Oct. 1, 2014.pdf PDF
NBSAP_Clarification1_2013 July Final-VOIDs.pdf PDF
GSA 017419ConstructionNonhazardousWasteManagementDisposalFY15UpdateOct.12014.docx.pdf PDF
PBS_P_3490.2_Document_Security_for_Sensitive_But_Unclassified_Building_Information_-_(Signed_on_Sept._2__2014).pdf PDF
GSA 017822 Operation _ Maintenance Documentation FY15 Update Oct. 1, 2014.pdf PDF
GSA 014000 Quality Assurance _ Control FY15 Update Oct. 1, 2014_Solicitation No. GS-04-P-16-BV-C-7005.pdf PDF
Layout_of_Water_Main_DOC120616-12062016151956_(1).pdf PDF
SpringSt1_Irvine_2017_Water Main Relocation_Greenville SC CTHS Project.pdf PDF
GSARegion4BuildingAutomationSystemRequirementsv6.pdf PDF
NBSAP_Final_Feb 2013.pdf PDF
GSA 013000 Electronic Project Management FY15 Update Oct. 1, 2014_Solicitation No. GS-04-P-BV-C-7005.pdf PDF
GSA 013200 Construction Progress Documentation FY15 Update Oct. 1, 2014_Solicitation No. GS-04-P-16-BV-C-7005.pdf PDF
Show 40 more

Latest 50 of 79 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Clarification/Correction #2 on the National Business Space Assignment Policy dated February 2013

This document captures the clarifications to the National Business Space Assignment Policy (NBSAP) issued February 2013. The following paragraphs replace the existing Note. The original preceding bullet is included to help the reader.

1. Clarification, NBSAP, Pages 16 and 27:

Maintenance and contractor space used specifically to support or service the building.

New Notes:

1. The use of AB Code 4762 is to capture spaces for building support activities, above what is provided in the base building, that now occupy Marketable/Assignable spaces built to office standards (not INS or GNS) and not part of the original Custodial (CST) and Mechanical (MCH) spaces.

2. Buildings are designed with a certain amount of CST and Mechanical MCH spaces.

Descriptions of these spaces start on Page 25 of the NBSAP. The spaces that meet these criteria are to remain assigned as such.

o Additional examples, not listed on Pages 26-29, include mechanical shops that service the building or multiple buildings, locker rooms and break rooms located within CST and MCH areas designated exclusively for use by the custodial and mechanical staffs.

3. When custodial, mechanical and/or facilities management personnel expand or work exclusively in areas previously classified as built to office standards space (not INS or GNS), then these spaces will be assigned to an agency code (typically AB 4762). Beginning on Page 16 of the NBSAP are descriptions and examples of Marketable/Assignable spaces built to office standards (not INS or GNS).

o Examples for needing additional building support space could include: the need for more office space for building support personnel, need for more storage area for tools, manuals, replacement parts and other items used to service or repair the building (multiple buildings) above what is found in CST or MCH and finally need to place new building equipment into previous office standard areas when MCH space is not available.

4. When custodial, mechanical and/or facilities management personnel expand or work exclusively in areas not built to office standards, such as INS or GNS space, then these spaces will be assigned to one of the Building Common PBS Space Categories.

o Examples of such spaces could include spaces that are not fully conditioned, have height restrictions and spaces that have been added or modified within Mechanical or Custodial space.

5. Construction contractor staging areas or office areas that will only be used on a temporary basis (i.e. the length of remodel or construction project) will remain assigned what they were before project (for example if Vacant, then leave as

Vacant). If there is a permanent designated staging area used for a variety of projects or personnel and the space meets office standard definition, assign to an agency code (typically AB Code 4762). While regions have some discretion on use of AB Code 4762 in semi-permanent staging areas, the use of this code was not meant to change frequently.

If you have any questions regarding NBSAP Clarification/Correction #2, please contact your SDM Regional Program Manager or the National SDM Program Manager, Fernando Rocha.

Clarification/Correction #2: Dated June 5, 2014

File details come from the government source that posted it. Updated .