NBSAP_Clarification1_2013 July Final-VOIDs.pdf

PDF 69 KB Posted

Attached to
Construction Manager as Constructor (CMc), New - Greenville, SC Federal Courthouse Building
Solicitation number
GS--04-P-16-BV-C-7005
Issued by

About this file

NBSAP_Clarification1_2013 July Final-VOIDs.pdf

View the file

Other files

File Type Posted
0003_Solicitation_Amendment_GS-04-P-16-BV-C-7005_0003.pdf PDF
0002_Solicitation_Amendment_GS-04-P-16-BV-C-7005R.pdf PDF
0001_Solicitation_Amendment_GS-04-P-16-BV-C-7005_0001R.pdf PDF
GSA 013600COBieFY15UpdateOct.12014_SolicitationNo.GS-04-P-16-BV-C-7005.docx.pdf PDF
Technology Policy for PBS-Owned Buildings Monitoring _ Control Systems.pdf PDF
GSA 014100 Structural Testing Laboratory Services FY15 Update Oct. 1, 2014_Solicitation No. GS-04-P-16-BV-C-7005.pdf PDF
GSA 013300 Submittal Procedures FY15 Update Oct. 1, 2014_Solicitation No. GS-04-P-16-BV-C-7005.pdf PDF
06032016 FitForPurposeintheChangingClimate Greenville SC.pdf PDF
TheSolicitation_GreenvilleSC.pdf PDF
GSA 016000 Product Requirements FY15 Update Oct. 1, 2014.pdf PDF
GSA 015930SecurityRegulationsFY15UpdateOct.12014.docx.pdf PDF
Updated Meeting Schedule Matrix_Design Restart_R02_082216.pdf PDF
GSA 013100 Project Management _ Coordination FY15 Update Oct. 1, 2014_Solicitation No. GS-04-P-16-BV-C-7005.pdf PDF
SITESv2_Scorecard.pdf PDF
NBSAP_Clarification2_2014 Jun -4762.pdf PDF
Greenville SC AE SOW CONTRACT MODIFICATION_6-17-16_FINAL_R04.pdf PDF
Project Milestone Schedule Update May 25 2017.pdf PDF
USAO Design Guide 10-13-15.pdf PDF
CMc_Pricing_Sheet_Attachment_A_REV_01.pdf PDF
CMcSOW_Greenville_SC_CTHS_Attachment_B.pdf PDF
GSA__Form527-15b_(1).pdf PDF
GSA 012900 Payment Procedures FY15 Update Oct. 1, 2014_Solicitation No. GS-04-P-16-BV-C-7005.pdf PDF
GSA 017000ExecutionRequirementsFY15UpdateOct.12014.docx.pdf PDF
SITESv2_RatingSystem —
Courts Mailroom Construction Guidelines.pdf PDF
SF_1442_GS-04-P-16-BV-C-7005__Greenville_SC_CMc_Solicitation.pdf PDF
GSA 014025QualityControlTestingforAirBarriersFY15UpdateOct.12014_SolicitationNo.GS-04-P-16-BV-C-7005.docx.pdf PDF
GSA 015639TreePlantProtectionFY15UpdateOct.12014.docx.pdf PDF
GSA 012100 Allowances FY15 Update Oct. 1, 2014_Solicitation No. GS-04-P-16-BV-C-7005 —
GSA 014200ReferencesFY15UpdateOct.12014_SolicitationNo.GS-04-P-16-BV-C-7005.doc.pdf PDF
US Courts Design Guide 2007.pdf PDF
2017-04-18-finishes.pdf PDF
The_Agreement_Greenvill_SC_CMc_May_15_2017_(1).pdf PDF
Greenville, SC Courthouse Project Phase II ESA report - PHE May 27, 2010.pdf PDF
GSA 017410 Construction Indoor Air Quality FY15 Update Oct. 1, 2014.pdf PDF
2014 Final, Pub 64 Revised.pdf PDF
CMc301_Reps_and_Certs_Attachment_C.docx DOCX document
GSA 017810ProjectRecordDocumentsFY15UpdateOct.12014.docx.pdf PDF
GSA 018111SustainableDesignRequirementsFY15UpdateOct.12014.docx.pdf PDF
GSA 017350 Fire Prevention Precautions for Hot Work FY15 Update Oct. 1, 2014.pdf PDF
GSA 017419ConstructionNonhazardousWasteManagementDisposalFY15UpdateOct.12014.docx.pdf PDF
PBS_P_3490.2_Document_Security_for_Sensitive_But_Unclassified_Building_Information_-_(Signed_on_Sept._2__2014).pdf PDF
GSA 017822 Operation _ Maintenance Documentation FY15 Update Oct. 1, 2014.pdf PDF
GSA 014000 Quality Assurance _ Control FY15 Update Oct. 1, 2014_Solicitation No. GS-04-P-16-BV-C-7005.pdf PDF
Layout_of_Water_Main_DOC120616-12062016151956_(1).pdf PDF
SpringSt1_Irvine_2017_Water Main Relocation_Greenville SC CTHS Project.pdf PDF
GSARegion4BuildingAutomationSystemRequirementsv6.pdf PDF
NBSAP_Final_Feb 2013.pdf PDF
GSA 013000 Electronic Project Management FY15 Update Oct. 1, 2014_Solicitation No. GS-04-P-BV-C-7005.pdf PDF
GSA 013200 Construction Progress Documentation FY15 Update Oct. 1, 2014_Solicitation No. GS-04-P-16-BV-C-7005.pdf PDF
Show 40 more

Latest 50 of 79 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Clarification/Correction #1: National Business Space Assignment Policy dated February 2013

This document captures the clarifications/corrections to the National Business Space Assignment Policy (NBSAP) issued February 2013. The paragraphs below replace what is in the current document. The specific areas that changed are highlighted in Yellow; however, the entire paragraph or section is included to help the reader.

1. Correction & Clarification, NBSAP, Page 24:

TFC–Tenant Floor Cut

An opening in a floor above an occupant’s finished floor designed for or used by a specific occupant, such as a multi-level courtroom. The floor cut eliminates otherwise Usable space.

BOMA defines a tenant floor cut as an Occupant Void. This space may be part of the original building design or renovated by removing a portion of the slab. Spaces can include:

Private elevators Dumbwaiters Private stairs Private air shafts Multi-level courtrooms Multi-level auditoriums

Notes:

(a) If the upper portion of an occupant’s multi-level space, such as a courtroom, penetrates mechanical space, a roof or unmarketable attic space, it must be tagged as a 05–PBS Specific, designated 17–Excluded from Gross, given the Space Type OTB or Open to Below. See Illustration 16 for example.

(b) If there is occupant space adjacent to upper-level of the multi-level space on a floor, the space must remain TFC, despite the presence of mechanical space.

TTO–Total Office

Environment for office operation with features such as HVAC and lighting, with finished floors, ceilings, and walls. Types of total office spaces include:

An office or open office space housing personnel and furniture Closets within the general office space Private corridors Meeting and training rooms that do not meet criteria for conference/training (CFT) Storage in office space Reception space Health rooms without equipment File space without increased floor load Pedestrian processing space at land ports of entry Property Management Office (PMO)

Maintenance and contractor space used specifically to support or service the building.

Note: Note removed; see Page 16 for applicable notes.

2. Clarification, NBSAP, Page 28:

CRH–Circulation Horizontal

Common space attributable to a building or particular floor. Types of circulation horizontal spaces include:

Elevator lobbies Public lobbies Entrance lobbies Public corridors Public loading dock portions that are within the building line Guard and building monitoring stations

Corridors housing personnel and furniture, private corridors, and private loading docks designed for or used by one occupant are not classified as Space Type CRH. Instead, these spaces are assigned to that particular occupant as Usable space.

Note:

Control of a corridor is what determines whether it is assigned to an occupant or whether it is building common. Each situation is assessed individually. Contact your SDM RPM for more information.

3. Correction, NBSAP, Page 42:

17–Excluded from Gross

Excluded from Gross identifies all space within the building that is not included in the Gross Area. Excluded from Gross Space Type is Open to Below.

Excluded from Gross Space Types

OTB–Open to Below (Void)

Voids are areas where there is an absence of a floor within a building where a floor might otherwise be expected or measured. Voids are measured at 9 square feet or more (this is slightly different than ANSI/BOMA standards, which are over 10 square feet). Refer to Appendix B for placement of space boundaries. Absences that are less than 9 square feet are not Voids and should be measured with their adjacent space.

4. Change, NBSAP, Page 60:

Illustration B-5 (Wall Plan View): If a space is ANSI 04 (CRV) or ANSI 05 (OTB) and the adjoining space is ANSI 01, ANSI 02, ANSI 03, then the ANSI 04 (CRV) and ANSI 05 (OTB) space includes the wall thickness represented as the space between the parallel lines.

ANSI 01 – Office Space ANSI 04 – Vertical

Penetration

ANSI 04 – Vertical

Penetration

ANSI 02 – Building Common or

ANSI 03 – Floor Common

Wall Plan View

Finished Wall Surface Finished Wall Surface

Space Boundary

5. Change, NBSAP Page 61:

Illustration B-7 (Wall Plan View): Illustration B-7 is deleted as it is no longer needed due to changes made to Illustration B-5.

ANSI 05 - Open To Below (Void)

ANSI 05 - Open To

6. Change, NBSAP Page 61:

Illustration B-8 (Wall Plan View): If one space is ANSI 04 CRV or ANSI 05 STP or ANSI 05 OTB and the adjacent space is any of the same ANSI 04 CRV or ANSI 05 STP or ANSI 05 OTB, the wall thickness will be split.

Note: In general, treat OTB (Voids) in the same manner as Vertical Penetrations when placing space boundaries.

Wall Plan View

If you have any questions regarding NBSAP Clarification/Correction #1, please contact your SDM Regional Program Manager or the National SDM Program Manager, Fernando Rocha.

Clarification/Correction #1: Dated July 15, 2013

ANSI 04 Vertical Penetration, ANSI 05 Structured Parking or ANSI 05 Open To Below (Void)