GSA 014100 Structural Testing Laboratory Services FY15 Update Oct. 1, 2014_Solicitation No. GS-04-P-16-BV-C-7005.pdf

PDF 16 KB Posted

Attached to
Construction Manager as Constructor (CMc), New - Greenville, SC Federal Courthouse Building
Solicitation number
GS--04-P-16-BV-C-7005
Issued by

About this file

GSA 014100 Structural Testing Laboratory Services FY 15 Update

View the file

Other files

File Type Posted
0003_Solicitation_Amendment_GS-04-P-16-BV-C-7005_0003.pdf PDF
0002_Solicitation_Amendment_GS-04-P-16-BV-C-7005R.pdf PDF
0001_Solicitation_Amendment_GS-04-P-16-BV-C-7005_0001R.pdf PDF
GSA 013600COBieFY15UpdateOct.12014_SolicitationNo.GS-04-P-16-BV-C-7005.docx.pdf PDF
Technology Policy for PBS-Owned Buildings Monitoring _ Control Systems.pdf PDF
GSA 013300 Submittal Procedures FY15 Update Oct. 1, 2014_Solicitation No. GS-04-P-16-BV-C-7005.pdf PDF
06032016 FitForPurposeintheChangingClimate Greenville SC.pdf PDF
TheSolicitation_GreenvilleSC.pdf PDF
GSA 016000 Product Requirements FY15 Update Oct. 1, 2014.pdf PDF
GSA 015930SecurityRegulationsFY15UpdateOct.12014.docx.pdf PDF
Updated Meeting Schedule Matrix_Design Restart_R02_082216.pdf PDF
GSA 013100 Project Management _ Coordination FY15 Update Oct. 1, 2014_Solicitation No. GS-04-P-16-BV-C-7005.pdf PDF
SITESv2_Scorecard.pdf PDF
NBSAP_Clarification2_2014 Jun -4762.pdf PDF
Greenville SC AE SOW CONTRACT MODIFICATION_6-17-16_FINAL_R04.pdf PDF
Project Milestone Schedule Update May 25 2017.pdf PDF
USAO Design Guide 10-13-15.pdf PDF
CMc_Pricing_Sheet_Attachment_A_REV_01.pdf PDF
CMcSOW_Greenville_SC_CTHS_Attachment_B.pdf PDF
GSA__Form527-15b_(1).pdf PDF
GSA 012900 Payment Procedures FY15 Update Oct. 1, 2014_Solicitation No. GS-04-P-16-BV-C-7005.pdf PDF
GSA 017000ExecutionRequirementsFY15UpdateOct.12014.docx.pdf PDF
SITESv2_RatingSystem —
Courts Mailroom Construction Guidelines.pdf PDF
SF_1442_GS-04-P-16-BV-C-7005__Greenville_SC_CMc_Solicitation.pdf PDF
GSA 014025QualityControlTestingforAirBarriersFY15UpdateOct.12014_SolicitationNo.GS-04-P-16-BV-C-7005.docx.pdf PDF
GSA 015639TreePlantProtectionFY15UpdateOct.12014.docx.pdf PDF
GSA 012100 Allowances FY15 Update Oct. 1, 2014_Solicitation No. GS-04-P-16-BV-C-7005 —
GSA 014200ReferencesFY15UpdateOct.12014_SolicitationNo.GS-04-P-16-BV-C-7005.doc.pdf PDF
US Courts Design Guide 2007.pdf PDF
2017-04-18-finishes.pdf PDF
The_Agreement_Greenvill_SC_CMc_May_15_2017_(1).pdf PDF
Greenville, SC Courthouse Project Phase II ESA report - PHE May 27, 2010.pdf PDF
GSA 017410 Construction Indoor Air Quality FY15 Update Oct. 1, 2014.pdf PDF
2014 Final, Pub 64 Revised.pdf PDF
CMc301_Reps_and_Certs_Attachment_C.docx DOCX document
GSA 017810ProjectRecordDocumentsFY15UpdateOct.12014.docx.pdf PDF
GSA 018111SustainableDesignRequirementsFY15UpdateOct.12014.docx.pdf PDF
GSA 017350 Fire Prevention Precautions for Hot Work FY15 Update Oct. 1, 2014.pdf PDF
NBSAP_Clarification1_2013 July Final-VOIDs.pdf PDF
GSA 017419ConstructionNonhazardousWasteManagementDisposalFY15UpdateOct.12014.docx.pdf PDF
PBS_P_3490.2_Document_Security_for_Sensitive_But_Unclassified_Building_Information_-_(Signed_on_Sept._2__2014).pdf PDF
GSA 017822 Operation _ Maintenance Documentation FY15 Update Oct. 1, 2014.pdf PDF
GSA 014000 Quality Assurance _ Control FY15 Update Oct. 1, 2014_Solicitation No. GS-04-P-16-BV-C-7005.pdf PDF
Layout_of_Water_Main_DOC120616-12062016151956_(1).pdf PDF
SpringSt1_Irvine_2017_Water Main Relocation_Greenville SC CTHS Project.pdf PDF
GSARegion4BuildingAutomationSystemRequirementsv6.pdf PDF
NBSAP_Final_Feb 2013.pdf PDF
GSA 013000 Electronic Project Management FY15 Update Oct. 1, 2014_Solicitation No. GS-04-P-BV-C-7005.pdf PDF
GSA 013200 Construction Progress Documentation FY15 Update Oct. 1, 2014_Solicitation No. GS-04-P-16-BV-C-7005.pdf PDF
Show 40 more

Latest 50 of 79 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Greenville, SC Courthouse Project Greenville, South Carolina Solicitation No. GS-04-P-16-BV-C-7005

FY15 Update Oct. 1, 2014 Structural Testing Laboratory Services 014100 - 1

SECTION 014025 – STRUCTURAL TESTING LABORATORY SERVICES

GENERAL

1.1 SUMMARY: This section includes administrative and procedural requirements for the necessary special inspection services as determined and overseen by the Licensed Engineer responsible for the structural Contract Documents.

A. The administrative and procedural requirements of Division 1 Section "Quality Assurance and Control" apply to the work of this section, unless modified in this section for the special inspections only.

B. Special structural inspections and the testing for special structural inspections shall be managed and tracked separately from the Quality Assurance testing and the Contractor’s Quality Control Plan.

C. Duplication of the tests of the Independent Testing Agency is to be avoided, but the common testing is to be attached and recorded in both logs.

D. The scope of such inspection services shall be as defined in the prevailing edition of the International Building Code (IBC).

E. Only the GSA can modify scope.

1.2 Alternate Licensed Engineer: Should the Licensed Engineer responsible for the structural Contract Documents no longer be available due to relocation, or, the Government accepts a specific alternate Licensed Engineer. The alternate Licensed Engineer:

A. Shall be licensed in the State where the project is located, B. Shall review the Contract Documents and communicate with the responsible Licensed

Engineer to achieve full understanding of the system design, C. Shall have any modifications reviewed and accepted by the Licensed Engineer responsible for the structural Contract Documents.

1.3 Contractor Responsibilities:

A. The presence of the Licensed Engineer shall in no way relieve the Contractor of his obligation to perform the work in accordance with the Contract Documents.

B. The Contractor shall provide the coordination and services for the special inspections as indicated in Section "Quality Assurance and Control" including, but not limited to:

1. Coordination of the trades, quality control and the sequence of construction to ensure continuity of the system for the inspection(s).

2. Not covering or encasing inspection areas prior to inspections.

3. Additional testing or retesting.

4. Associated services for the inspections.

5. Repair.

1.4 Payment for Special Inspections: The Contractor shall obtain and include the cost for special inspections as a separate line in the Contract Sum.

A. The Contractor shall submit payments for the inspecting and testing services, track the budget and keep the GSA informed on projected costs and remaining budget.

PART 1 - PRODUCTS (Not Used)

PART 2 - EXECUTION (Not Used)

END OF SECTION 014100

B. Special structural inspections and the testing for special structural inspections shall be managed and tracked separately from the Quality Assurance testing and the Contractor’s Quality Control Plan.
C. Duplication of the tests of the Independent Testing Agency is to be avoided, but the common testing is to be attached and recorded in both logs.
1.3 Contractor Responsibilities:
A. The presence of the Licensed Engineer shall in no way relieve the Contractor of his obligation to perform the work in accordance with the Contract Documents.
B. The Contractor shall provide the coordination and services for the special inspections as indicated in Section "Quality Assurance and Control" including, but not limited to:
1. Coordination of the trades, quality control and the sequence of construction to ensure continuity of the system for the inspection(s).
2. Not covering or encasing inspection areas prior to inspections.
3. Additional testing or retesting.
4. Associated services for the inspections.
5. Repair.
1.4 Payment for Special Inspections: The Contractor shall obtain and include the cost for special inspections as a separate line in the Contract Sum.
A. The Contractor shall submit payments for the inspecting and testing services, track the budget and keep the GSA informed on projected costs and remaining budget.

File details come from the government source that posted it. Updated .