Fuel Pier Condition Assessment Report-2022.pdf
PDF 9 MB Posted
- Solicitation number
- N4008525R2522
About this file
This document is a waterfront facilities inspection report for the Marine Corps Air Station Beaufort in South Carolina, conducted by Childs Engineering on September 21, 2022. The comprehensive assessment covers multiple waterfront infrastructure components, including the Fueling Pier, Mooring Dolphins, Fuel Spill Response Storage, and associated utilities and systems. The report details the physical condition of concrete and steel structures, noting key characteristics such as construction dates, structural components, and current state of facilities like concrete piles, fender systems, catwalks, electrical infrastructure, and fuel piping.
The inspection reveals that the Fueling Pier, originally built in 1957, now primarily provides access to floating docks and mooring dolphins and supports fuel lines connecting to inshore tank farms. The Mooring Dolphins, constructed in 1993 and repaired in 2015, consist of concrete and timber structures designed to support fuel barge berthing. The report includes detailed observations of infrastructure elements, highlighting minor issues such as surface corrosion on steel components, concrete spalling, and potential impact damage to timber pile dolphins. The document serves as a technical assessment of the facility's current condition, likely supporting potential replacement or renovation planning for the fuel pier infrastructure.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WATERFRONT FACILITIES
INSPECTIONS AND ASSESSMENTS AT
MARINE CORPS AIR STATION BEAUFORT
BEAUFORT, SOUTH CAROLINA
CR-NAVFAC EXWC-OC-
On Site Date: Sep-21-2022
Prepared for:
NAVFAC EXWC
Washington Navy Yard 720 Kennon Street, SE Building 36, Suite 333
Washington DC, 20374-5063
Prepared By:
Childs Engineering 34 William Way, #34
Bellingham, MA 02019
WasWa 720 K720 K BuildingBuilding shington DChington D
ONLY
This is a redacted inspection report that is provided to assist contractors by reflecting the conditions found at that.
Conditions may have changed since the time of this inspection.
This redacted report is provided to only reflect site conditions at the time of the inspection.
Present day conditions may have changed.
Marine Corps Air Station Beaufort Beaufort, South Carolina
Facility Summary:
This inspection report was prepared as part of the Waterfront Facilities Inspection Program administered by the OC Ocean Facilities Division of the Naval Facilities Engineering Systems Command, Engineering and Expeditionary Warfare Center (NAVFAC EXWC).
Fuel Spill Response Storage The Fuel Spill Response Storage facility consists of concrete floating docks anchored in place by square concrete guide piles. The floating docks are accessible via an aluminum gangway from the Fuel Pier. The floats were installed in 1999
Fueling Pier The Fueling Pier is a concrete pile supported pier with concrete pile caps and deck beams with a concrete deck overlay. The pier was built in 1957 and is used to support fuel delivery operations and provides access to the Mooring Dolphins and Fuel Spill Response floating docks.
REFERENCE
Response StoResponse St guide piles. Tuide piles.
floats wereloats were te pile suppoe pile suppo pier was builtier was bu o the Mooringo the Mooring
Ronse Stoonse StR
ONLY
VICINITY MAP
N
CREEK
BRICKYARD
FUEL SPILL REPSONCE BOAT STG
FUELING PIER
MOORING DOLPHIN AT DOCK
REFERENC
EE
NLYYYYYYY
PNG P
O
H1040 - Mooring & Berthing Systems
H104004 - Dolphins
UFII Component H104004 Dolphins Asset Type(s): DOL
The dolphins consist of three steel pipe piles each with steel plates forming the top of the dolphin and support a concrete deck. The concrete deck is the foundation for a steel bollard.
REFERENCE
RE
EN
Supporting Photos
Photo Northern steel pipe pile dolphin with minor corrosion throughout the tidal and splash zones.
ENCE
ENolphin with molphin with m splash zonessplash zone
H1050 - Appurtenances
H105002 - Brows
UFII Component H10500203 Gangway Platform Asset Type(s): GWR
Supporting Photos
Photo: The gangway ramp connects the Fueling Pier to the floating docks.
REFE
R osos FE
FUEL SPILL RESPONSE BOAT STG
UTILITY PLAN
N
PLAN
LOCUS PLAN
N
A A
REFERENCE
CNCNNENNEN
RERERENCNNENENENENE
EE
NCE
NCCCCCCCNCNCNCNCNCNCNCNCNCNNNNNNNEEEEEEEEREREREREREREREREREREEEEEEEEEEEEEEREREREREREREEEEEEEE
CECECECECECEA
ONLY
OO
YYYY
OOOO
FUEL SPILL RESPONSE BOAT STG
TYPICAL SECTION
SECTION A-A
ENCE
NNNCNCNNCNCNNNCNCNNNCNCNNCNCCNNNCNCCCE
REFEREN
REN
RERERERE
E
ERRRREEEEEEEEREN
EEEEEEEEEERERE
ERE
ER
NCCE
ENNNENENENENENEN
REENENEEENEN
RERERERERERERERE
ONLYYYYYYY
Beaufort, South Carolina
Max Water Current 0.5kn
Water Clarity 1ft
Tide Variation 8ft
Max Water Depth 9ft
Seasonal Water Temp 83°F
Seasonal Ambient
Temp 85°F
Facility Usage Description:
The Waterfront Fueling Pier is a concrete pier with concrete piles and batter piles supporting it.
It is accessible via a concrete walkway from the land behind it and supports a storage building as well as a guard tower. The purpose of the pier was originally to receive fuel shipments;
however it has been replaced by the outshore dolphin structure and now only provides access to the floating docks and mooring dolphins as well as providing support for the fuel lines running from the mooring dolphins to the inshore tank farms.
REFERENCE
EEENCNC
EENNCNCE
NCN
E ONLY
e piles and bpiles and it and suppoit and supp to receive fuo receive f d now only pnow only p port for the fort for th
Additional Facility Photos
Photo: East side of the Fueling Pier looking northwest at low tide.
ENng Pier lookinng Pier looki
Photo: View of the Fueling Pier from the gangway leading to the Fuel Spill Response.
Photo: North view of the Fueling Pier, looking southeast. Storage.
REN
RErom the gangm the ganEN
Photo: View of the access pier leading to the Fueling Pier.
RENCE
REaccess pier lccess pier
Photo: Concrete encased pipe piles at Bent 1.
Photo: Typical underwater view of a concrete pile.
ENC
ENencased pipencased pipNC
Photo: The concrete pile cap on the southern end of the pier supports three piles and one batter pile.
Photo: Typical concrete pile cap that supports the main body of the pier.
RENC
REthe southernhe southern batter pibatterNC
H1010 - Substructure
H101005 - Revetments
UFII Component H101005 Revetments Asset Type(s): REV one riprap revetment located around the inshore end of the approach to the pier to protect against scour. The riprap is typically 12 to 36 inches in diameter.
Supporting Photos
Photo: Stone riprap south of the approach.
REFE
H1030 - Deck Components
H103003 - Deck Overlay
UFII Component H103003 Deck Overlay Asset Type(s): DO
The bituminous deck overlay appears to be a bituminous base with an exposed aggregate top layer to act as a wear surface. It appears to have been placed over the existing cast in place concrete deck.
Supporting Photos
Photo: Bituminous deck overlay on the approach.
REFEREN
RERERE
H103004 - Curbs & Bullrails
UFII Component H103004 Curbs & Bullrails Asset Type(s): DC
The concrete deck curbs are in fair condition with closed corrosion spalling noted throughout the pier. The condition of the deck curb has generally remained unchanged since 2016.
Supporting Photos
Photo: Concrete deck curb along the east side of the pier.
REFEER
H103006 - High Mast Lighting Foundations
UFII Component H103006 High Mast Lighting Foundations Asset Type(s): LFD
B oncrete high mast lighting foundations
Supporting Photos
Photo: Concrete light pole foundation between Bents 17 and 18.
REFEER
H103009 - Guard Posts and Railings
UFII Component H103009 Guard Posts and Railings Asset Type(s): GR uard rail .
Supporting Photos
Photo: Galvanized steel guardrail along the southern side of the approach.
REF
hotoshotosEF
H104001 - Primary Fender System
UFII Component H10400101 Fender Piles Asset Type(s): FP
The timber fender piles
Supporting Photos
Photo: Timber fender piles on the northeastern corner of the pier.
REFER
RE
Photo: Timber wale running between the concrete deck of the pier and the timber fender piles.
Photo: Typical lower timber chocks along the eastern side of the pier.
RENC
REen the concren the concreNC
H104004 - Dolphins
UFII Component H104004 Dolphins Asset Type(s): DOL
The timber pile dolphin at the northern end of the pier At MLW the piles are only in approximately 6 inches of water.
Supporting Photos
Photo: Timber cluster pile dolphin at the north end of the pier.
REFEREN
H105007 - Oil Containment Booms
UFII Component H105007 Oil Containment Booms Asset Type(s): OCB
The oil boom spool.
Supporting Photos
Photo: An Oil boom spool is installed on the deck of the pier between Bents 4 and 5.
otosotosEF
H105008 - Other Appurtenances
UFII Component H105008 Other Appurtenances Asset Type(s): ROL & ROL1
The oil boom rollers
Supporting Photos
Photo: The 14 foot boom roller between Bents 4 and 5 allows the oil boom to be deployed without causing abrasion to the upper chock.
Photo: A six foot boom roller between Bents 5 and 6.
REboom roller boom roller b
H5010 - Civil/Mechanical Utilities
H501001 - Potable Water
UFII Component H50100101 Pipes & Fittings Asset Type(s): PWRP otable water pipes.
Supporting Photos
Photo: A 6 inch potable water pipe runs along the upper chock on the eastern side of the pier.
UFII Component H50100102 Hangers & Trays Asset Type(s): PWRS revious concrete pipe supports were abandoned in place and new steel hangers.
Supporting Photos
Photo: Steel support for the potable water pipe.
UFII Component H50100109 Emergency Chemical Wash Stations Asset Type(s): CWS hemical wash station.
Supporting Photos
Photo: A chemical wash station is installed on the southern part of the pier.
H501007 - Fuels
UFII Component H50100701 Pipes & Fittings Asset Type(s): FUEP uel pipes.
Supporting Photos
Photo: An eight inch fuel pipe on the west side of the pier.
UFII Component H50100702 Hangers & Trays Asset Type(s): FUES
The supports for the fuel pipes
Supporting Photos
Photo: Typical steel roller support for the fuel pipe.
H5020 - Electrical Utilities
H502001 - Electrical Power Distribution
UFII Component H50200103 Cables Asset Type(s): ELEC & ELEC1 onduits.
Supporting Photos
Photo: Electrical conduit along the west side of the pier.
REFER
ER
H502001 - Electrical Power Distribution
UFII Component H50200105 Other Electrical Power Distribution Components Asset Type(s): ELEP lectrical panels.
Supporting Photos
Photo: Electrical panel on the southern end of the pier.
REFE
H502003 - Lighting
UFII Component H502003 Lighting Asset Type(s): LGTP ight poles.
Supporting Photos
Photo: Typical light pole on the west side of Bent 14.
LOCUS PLAN
FUELING PIER
FACILITY PLAN
N
PLAN
ENCE
ENENENENENENENEEENEEN
REFERENENEEREERRREREEEEEENN
NLY
NLY
NLLNLNLNLNNNLNLLLLLNNLLLLLLLLLLNLNLNLNLLLLLLLLLLNLNNNNLNNONLNLNLNLNLNLNLNLNLNLNLNLNL
ONONONNONNNNLNNNNNNNLNLNLNLNLNNLNLLLLLLLLLLYYYY
NNNNN
YLYYYYYYYYLYLYLYLY
FUELING PIER
UTILITY PLAN
N
PLAN
PLAN
A
A
B B
REFERENCE
RRRERRRERRRRRRERERRRRRRRRRRRRRERRRRRRRRRERRRRRRERRRRRRRRRRRRERRRRRRRERERRRRRRRRRRERRERRERRRERE
RRRREREREREREEEEEEEERERERRRRRRERERERERERERERRRRRRRERERERERERERERRRREREREREEEEEREREEFEFEFEFEFEFAAFFFFEFFFFFEFFFEFEFEEEEEEEEEFEEEFEFEFEEE
EFEEE
EE
ONLYYYYY
FUELING PIER
UTILITY PLAN
N
PLAN
C
C
REFERENCE
RRENENEENEN
RRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRREREREREREREREREREREREREREREREREREREREREREREREREREREREREREREREREREREREREREREREREREEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEENENENENENENEENENERRRRRRRRRRRRRRRRRRRRRRRRRRRRREEEEEEEEEEEEEEEEERERERREEREERERERRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRREREREREREREREREREREREREREREREREREREREREREREREREREREREREREREREREREREREREREREEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE
ER
NNENENENENEN
FERERREREREREREREREEEEEENNNCNCNCNCNCCCCC
ERERERERERERRRRREENENENENENNNN
EEERRRRRRRRRRRRREEEEREREEERREFEFEFEFE
1131RRRRRRRRRRRRRRRRRRRRRRRRERER
ONLYLLL
NLNNLNLNNLNLNLNLLLLLLNLNLLNLNLLLNNNNNNNLNLNLNLNLNLNLNLNLNLNLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLNLNLLNLLLLLLLLNNNNNNLNLNLNLNLNLNLLLNLNLNLNLNLNLNLNLNNLNLNLNNNL
ONL
ONLNLNLNLNLNLNLNLNLNNNNNNN
FUELING PIER
TYPICAL SECTIONS
SECTION A-A SECTION B-B
SECTION C-C
NCE
REFEREN
R
CCCCCCCECCCCCECCCCCCCCCCCCECECCCCCECCCCCCCCCCCCCCECCCCCCECCCCCCCCCECCCCCCCCCCCCCCCCECCCCCCCCCCCCCCCCCCECCCCCCCCCCCCCCCCCCCCCCECCECCCCCCCCCECCECCCCCCCCCCCCCCCCCCCCCCCCCCCCCCECCCCECCCCCCCCCCCCECCECCCCCCCCCCCCCCCCCCCCCCCCECCCCCCCECCCCCCCCCC
RRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRRREFE
CE
RRRR
CECECECCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCCECECCCCCCCCCCCCCCCCCCCCCCCCCECCCCCCCCCCCCCCCCCCECCCCCCCECCCCCCCCCCCCCCCCCCECCCCCCCCECECCECCCCECCCCCCCCCECCECCCCCCCCECCCCCCCCCCCCCECECCCECECCCCCCCECCCCCCCECECCCCCCECCCCECCCECCCCECCECCCCCCCECECCCCCCECEECCEECCCCCCECCCE
FEFEFEFEFEFEEEEEEE
RREEE
NNNNNN
FFFFEFEFEFEFEEEFFFEFEFEFEFEEEEFEEEERERERER
FEFEEEERERERR
FFEEEEERERERR
FEEEERERERR
FEFEEERERERR
FEEERERR
EF
REREEERERERERERRRRREFFFFFFFFFFFEFEFEF
REEF
RERERERERERERERERERERE
ECC
EEF
EEEEEEECECC
RENCCE
NNNCNCNCNCNCNCNCNCNCNCNCNCNCCCCCCCC
FERERERRRRRRRRERERERRERRRRRRRRRRRRRRERERERER
YYY
ONLY
NLNLL
OOONONONOOONONONNLNLNNNNNLNNNNONL
OOOOOOOOONOOOOONONONNOOONONONOOONONONNOONONONLNL
OON
Beaufort, South Carolina
Max Water
Current 1kn
Water Clarity 1ft
Tide Variation 8ft
Max Water Depth
19ft
Seasonal Water Temp
83°F
Seasonal Ambient
Temp 85°F
Facility Usage Description:
The Mooring Dolphin at Dock is used to receive fuel entering the base. Ships can moor up to the dolphin and pump fuel onto the base. The dolphin is comprised of four concrete platforms with concrete catwalks connecting them, supported by concrete piles. There is a steel fender system supporting the dolphin platforms. Outshore of platforms, there are four timber and four steel mooring dolphins. An access walkway connects the facility to the Fuel Pier behind it.
EENC
ENCE
NCE ONLY
ng the base.g the base sed of foursed of four
s. There is as. There is are four timbre four tim l Pier behind Pier beh
Additional Facility Photos
Photo North end of the Mooring Dolphins at Dock looking southeast.
Photo: Overall of the south end of the Mooring Dolphins at Dock looking northwest.
ENg Dolphins ag Dolphins aNC
Photo: View of the north half of the Mooring Dolphins from the beginning of the catwalk leading out from the Fuel Pier.
Photo: South half of the Mooring Dolphins from the beginning of the catwalk leading out from the Fueling Pier.
RENC
REf the Mooringhe Moorin ng out from tng out fromNC
Photo: 14 inch square concrete batter pile supporting the catwalk.
Photo: Typical batter pile jackets epairs.
REe concrete be concrete bNC
Photo: Concrete deck of the catwalk running from the South Breasting Platform to the Fueling Pier.
Photo Spalling on the side of the South Breasting Dolphin.
RENC
REatwalk runnintwalk runnin
Fueling PFuelingNC
H103009 - Guard Posts and Railings
UFII Component H103009 Guard Posts and Railings Asset Type(s): GR uardrails on the platforms and catwalks
Supporting Photos
Photo: Typical guardrail on the catwalks that run between the platforms.
H104001 - Primary Fender System
UFII Component H10400101 Fender Piles Asset Type(s): FP teel fender piles.
Supporting Photos
Photo: Southernmost steel H-pile fender on the South Mooring Platform.
RE
CE
H104001 - Primary Fender System
UFII Component H10400102 Fender Framing Asset Type(s): WT ender framing
Supporting Photos
Photo: Steel H-beam wale connecting the steel fender piles together.
REFEREN
H104001 - Primary Fender System
UFII Component H10400103 Extruded Fenders Asset Type(s): EFE ubber extruded fender units.
Supporting Photos
Photo: Extruded rubber fenders are installed between the platform and wale, with a chain that connects the to the wale.
REFE
Photo: Overall of Steel Pipe Pile Dolphin 1.
Photo: Rubber fender unit on the outshore face of the steel dolphin.
ENof Steel Pipe of Steel PipeNC
Photo: Typical surface corrosion on the steel pipe pile dolphins. Photo
Photo: Overall of the northernmost timber pile dolphin.
REcorrosion oncorrosion onNC
Photo: The southernmost timber pile dolphin is listing due to impact damage.
RENpile dolphin pile dolph
H105008 - Other Appurtenances
UFII Component H105008 Other Appurtenances Asset Type(s): CW oncrete catwalks.
Supporting Photos
Photo: Concrete catwalk between the two breasting platforms.
REFER
RRR
RE
UFII Component H50100701 Pipes & Fittings Asset Type(s): FUEP el pipes.
Supporting Photos
Photo Fuel pipe running from the Fueling Pier to the fuel arm.
UFII Component H50100705 Loading/Off-Loading Arms Asset Type(s): FUEL el loading arm. T
Supporting Photos
Photo: The fuel arm is installed on the South Breasting Platform.
H502001 - Electrical Power Distribution
UFII Component H50200103 Cables Asset Type(s): ELEC & ELEC1 lectrical conduits.
Supporting Photos
Photo: Electrical conduit runs along the topside of the catwalk going from the Fueling Pier to the South Breasting Platform.
H502001 - Electrical Power Distribution
UFII Component H50200105 Other Electrical Power Distribution Components Asset Type(s): ELEP lectrical panel.
Supporting Photos
Photo: An electrical panel is installed on the South Breasting Platform.
H502003 - Lighting
UFII Component H502003 Lighting Asset Type(s): LGTP ght poles. The light poles
Photo: Typical light pole located on the South Mooring Platform.
Supporting PhotosREFEF osos
MOORING DOLPHIN AT DOCK
FACILITY PLAN
N
PLAN
LOCUS PLAN
N
ERENCE
CECECECECECECECECECECECECECECECECECECECECECECECECECECECECE
ER
EFERENCE
EFEFEFEE
ER
CCCCCCCECECE
FEREREREREREREREEFEFEEE
EEEEEEEEE
REFERENC
EEEEREREREREREEEEEREREREEEEEEEEEEEEEEEEEEEEEEEEEEEEEEREREREEE
ERER
FEEEEE
NCNCNCNCNCCCCCCCCCCCCNCNCNCCCCCCCCCECECEE ONLYYYYY
N
PLAN
LOCUS PLAN
N
A
A
REFERENCE
ENC
ENNENENNNNCC
ENENNCNC
EEEEENENENENENNNNNNNNN
RERERE
ONLY
ONOOOOONONOONONONONON
YYYY
NNNNNNNLNLNLNLNLNLNLNLNLNLNLLLLLLLNNNNLNLNLNLNLNLNL
ONONON
N
PLAN
LOCUS PLAN
N
PLAN
B
B
REFERENCE
NCNCNC
RRRRRRRRRRR
NNC
RRRRRR
EEEEEEEEE
NCNCCCCCCCNCNCNCNCC
FEEREEEEEEEEEEERERERERERERERERERERERERERER
ONLYYYYY
UTILITY DECK PLAN
NPLAN
LOCUS PLAN
N
B
A
A B
REFERENCE
CEECEEEEEEEEEEEEEEECECECECECECECECECEEEEECECECECE ONLYYLYLYYLY
ONONONONOOONONONOOOOONOOOONONONONONONONONONONONONONOOOONOOOOOOOONON
Y
N
YYYY
NNNNNNNNNNNONONONOOOOOOOOOOOOOOOO
YYY
TYPICAL SECTIONS
BREASTING PLATFORM SECTION
MOORING PLATFORM SECTION
RE
EEEE
REF
RRRRREEFEFEFEF
REREEEFERREEEEEFEEFEREEREEFEF
REREEF
RREEREEFEREREEEEF
REREEF
REERRREREREREREEREREEREREEREEEFEEFEEFERRRRRRREREREREREREREREEEEREEEEEEEFEFEEFEFEF
RREREEREREREREEEEEEFEEEEEFEEF
RREREREERREEEEEEEFEFEEF
R
RRRRRRRRRERERERERERERERERERERRRRR
RRRRRRRR
FFEFERENCE
FEFEFEFEFEFEFEEEEEEEEFEEEFEEEEEEEEEREEREREREREREERERERR
F
CECECECECEEEEEEEEEEEEEEEEEEEEEEEEE
NNNNNNNNNNNNNNN
RR
ONLY
OOOOOOONONOOOO
YYYYYYBREAL
O
YYYYYY
File details come from the government source that posted it. Updated .