Attachment I - 1731481spc01of03.pdf

PDF 6 MB Posted

Attached to
P502 Replace MCAS Beaufort Fuel Pier, Marine Corps Air Station Beaufort, South Carolina
Solicitation number
N4008525R2522
Issued by

View the file

Other files

File Type Posted
AMD 07.pdf PDF
SF 30 Amendment 06.pdf PDF
Returned to AQ PPI Log_13JUN25.xlsx XLSX spreadsheet
_SF 30 Amendment 04.pdf PDF
_SF 30 Amendment 05.pdf PDF
Returned to AQ PPI Log_11JUN25.xlsx XLSX spreadsheet
Attachment C - Price Proposal Form_R3.docx DOCX document
Returned to AQ PPI Log_10JUN25.xlsx XLSX spreadsheet
Returned to AQ PPI Log_4JUN25.xlsx XLSX spreadsheet
Attachment C - Price Proposal Form_R2 SS.docx DOCX document
_SF 30 Amendment 03.pdf PDF
AD101.pdf PDF
Attachment C - Price Proposal Form_R2.docx DOCX document
SF 30 Amendment 02.pdf PDF
P-502 AMD 007_DWGS_19MAY25.pdf PDF
Trailer and Parking Map.pdf PDF
Attachment C - Price Proposal Form_R2.docx DOCX document
Returned to AQ PPI Log_21MAY2025.xlsx XLSX spreadsheet
Corps of Engineers Permit.pdf PDF
SF 30 Amendment 02.pdf PDF
25R2522 P502 Site visit log.pdf PDF
PPI Log 14May25.xlsx XLSX spreadsheet
RFP AMD 01.pdf PDF
Attachment C - Price Proposal Form (Revised).docx DOCX document
Attachment C - Price Proposal Form.docx DOCX document
Attachment A - Pre-Proposal Inquiry (PPI) Form.xlsx XLSX spreadsheet
Fuel Pier Extension Drawings-14MAY1985.pdf PDF
Attachment J - 1731481dwg01of01.pdf PDF
Attachment F - Historical Small Business Utilization.docx DOCX document
Attachment I - 1731481spc02of03.pdf PDF
Fuel Pier Condition Assessment Report-2022.pdf PDF
Attachment E - Past Performance Questionnaire (PPQ).docx DOCX document
Attachment H - Small Business Subcontracting Plan.docx DOCX document
Attachment B - PIEE Vendor Access Instructions.pdf PDF
SECNAV 5512.pdf PDF
616 Map.pdf PDF
Attachment I - 1731481spc03of03.pdf PDF
N4008525R2522.pdf PDF
Fuel Pier Condition Assessment Report-2016.pdf PDF
Fuel Pier Drawings-25MAY1956.pdf PDF
Fuel Pier and Boat Storage Repairs-21OCT2011.pdf PDF
Attachment D - Construction Experience Data Sheet.docx DOCX document
Attachment G - Small Business Participation Commitment Document (SBPCD).docx DOCX document
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

eProject No. 1731481

Contract No. N40085-23-F-4195

P-502 REPLACE FUEL PIER

SPECIFICATIONS

READY TO ADVERTISE

SUBMITTAL

Volume 1 of 2

At the

Marine Corp Air Station, Beaufort, SC

PREPARED BY:

Moffatt & Nichol/Burns & McDonnell JV 101 W. Main Street

Suite 3000 Norfolk, VA 23511

Civil: Noah T. Guthrie, PE Structural: Landon P. Dellenbaugh, PE Patrick R. Graney, PE Architecture: Laura E. Sunderland, RA Fire Protection: Andrew P. Leahy, PE Plumbing: Ryan M. Browning, PE Mechanical: Ryan M. Browning, PE Electrical: Boris K. Goli, PE Janelle J. Burd, PE Derrick A. Bachtel, PE

Submitted By: Meghan Orscheln, PE Date: 5 September 2024

Approved By: Date: 5 September 2024

Meghan Orscheln, NCIDQ

Noah T. Guthrie, PE Civil

Landon Parker Dellenbaugh, PE Structural

Patrick R. Graney, PE

Structural - Waterfront Laura E. Sunderland, RA

Architecture

Andrew P. Leahy, PE

Fire Protection Ryan Michael Browning, PE

Plumbing

Ryan Michael Browning, PE

Mechanical Janelle J. Burd, PE

Mechanical

Boris Konan Goli, PE Electrical

Derrick A. Bachtel, PE Electrical

FY 25 Mi l con Pr oj ect P- 502 Repl ace Fuel Pi er Wor k Or der No. 1731481 MCAS Beauf or t , SC

PROJECT TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

00 01 15 02/ 11, CHG 1: 08/ 14 LI ST OF DRAWI NGS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 11 00 08/ 15, CHG 2: 08/ 21 SUMMARY OF WORK

01 14 00 11/ 22, CHG 1: 02/ 23 WORK RESTRI CTI ONS

01 20 00 11/ 20, CHG 3: 02/ 23 PRI CE AND PAYMENT PROCEDURES

01 30 00 11/ 20, CHG 3: 08/ 23 ADMI NI STRATI VE REQUI REMENTS

01 31 23. 13 20 05/ 17, CHG 8: 02/ 23 ELECTRONI C CONSTRUCTI ON AND FACI LI TY

SUPPORT CONTRACT MANAGEMENT SYSTEM

01 32 17. 00 20 05/ 18, CHG 3: 08/ 20 COST- LOADED NETWORK ANALYSI S SCHEDULES

( NAS)

01 33 00 08/ 18, CHG 4: 02/ 21 SUBMI TTAL PROCEDURES

01 35 26 05/ 24 GOVERNMENTAL SAFETY REQUI REMENTS

01 35 40. 00 22 04/ 15 MARI NE MAMMAL PROTECTI ON

01 42 00 02/ 19, CHG 1: 08/ 23 SOURCES FOR REFERENCE PUBLI CATI ONS

01 45 00 08/ 23 QUALI TY CONTROL

01 45 35 11/ 20 SPECI AL I NSPECTI ONS

01 50 00 11/ 20, CHG 2: 08/ 22 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND

CONTROLS

01 57 19 08/ 22 TEMPORARY ENVI RONMENTAL CONTROLS

01 57 19. 21 TURBI DI TY CURTAI N

01 58 00 08/ 19, CHG 5: 08/ 22 PROJECT I DENTI FI CATI ON

01 74 19 02/ 19, CHG 3: 11/ 21 CONSTRUCTI ON WASTE MANAGEMENT AND

DI SPOSAL

01 78 00 05/ 19, CHG 1: 08/ 21 CLOSEOUT SUBMI TTALS

01 78 23 05/ 23 OPERATI ON AND MAI NTENANCE DATA

01 78 23. 33 08/ 18, CHG 1: 02/ 21 OPERATI ON AND MAI NTENANCE MANUALS FOR

AVI ATI ON FUEL SYSTEMS

01 78 24. 00 20 05/ 23 FACI LI TY DATA WORKBOOK ( FDW)

01 78 30. 00 22 01/ 23 GI S DATA DELI VERABLES

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 41 00 08/ 22 DEMOLI TI ON

02 82 00 11/ 18, CHG 1: 11/ 19 ASBESTOS REMEDI ATI ON

02 83 00 11/ 18 LEAD REMEDI ATI ON

02 84 16 11/ 22 HANDLI NG OF LI GHTI NG BALLASTS AND

LAMPS CONTAI NI NG PCBs AND MERCURY

DI VI SI ON 03 - CONCRETE

03 31 30 02/ 19 MARI NE CONCRETE

03 45 33 05/ 16, CHG 1: 11/ 21 PRECAST STRUCTURAL CONCRETE

DI VI SI ON 05 - METALS

05 05 20 05/ 22 POST- I NSTALLED CONCRETE ANCHORS

05 12 00 08/ 18, CHG 2: 05/ 21 STRUCTURAL STEEL

05 50 13 05/ 17, CHG 1: 08/ 18 MI SCELLANEOUS METAL FABRI CATI ONS

DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES

06 13 33 11/ 16, CHG 1: 08/ 17 PI ER TI MBERWORK

PROJECT TABLE OF CONTENTS Page 1

DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON

07 61 15. 00 20 08/ 16, CHG 2: 11/ 18 ALUMI NUM STANDI NG SEAM ROOFI NG

DI VI SI ON 08 - OPENI NGS

08 11 13 08/ 20 STEEL DOORS AND FRAMES

08 33 23 08/ 20, CHG 1: 02/ 22 OVERHEAD COI LI NG DOORS

08 71 00 02/ 16, CHG 4: 02/ 22 DOOR HARDWARE

08 81 00 05/ 19 GLAZI NG

DI VI SI ON 09 - FI NI SHES

09 90 00 02/ 21 PAI NTS AND COATI NGS

09 96 00 11/ 14 HI GH- PERFORMANCE COATI NGS

09 97 13. 26 COATI NG OF STEEL MONOPI LE DOLPHI NS

09 97 13. 27 02/ 21, CHG 1: 08/ 22 HI GH PERFORMANCE COATI NG FOR STEEL

STRUCTURES

DI VI SI ON 10 - SPECI ALTI ES

10 14 00. 10 08/ 17, CHG 1: 11/ 18 EXTERI OR SI GNAGE

10 44 16 11/ 19 FI RE EXTI NGUI SHERS

DI VI SI ON 13 - SPECI AL CONSTRUCTI ON

13 34 19 08/ 20, CHG 1: 02/ 21 METAL BUI LDI NG SYSTEMS

DI VI SI ON 21 - FI RE SUPPRESSI ON

21 12 00 05/ 11 STANDPI PE SYSTEMS

DI VI SI ON 22 - PLUMBI NG

22 00 00 11/ 15, CHG 4: 05/ 21 PLUMBI NG, GENERAL PURPOSE

DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)

23 05 48. 19 05/ 18, CHG 2: 08/ 20 SEI SMI C BRACI NG FOR PI ER UTI LI TY

SYSTEMS AND EQUI PMENT

DI VI SI ON 26 - ELECTRI CAL

26 05 33 02/ 22 DOCKSI DE POWER CONNECTI ON STATI ONS

26 05 48. 00 10 10/ 07 SEI SMI C PROTECTI ON FOR ELECTRI CAL

EQUI PMENT

26 08 00 11/ 22 APPARATUS I NSPECTI ON AND TESTI NG

26 12 19. 10 05/ 19, CHG 1: 11/ 19 THREE- PHASE, LI QUI D- FI LLED PAD- MOUNTED

TRANSFORMERS

26 20 00 08/ 23 I NTERI OR DI STRI BUTI ON SYSTEM

26 41 00 08/ 23 LI GHTNI NG PROTECTI ON SYSTEM

26 42 13 05/ 21 GALVANI C ( SACRI FI CI AL) ANODE CATHODI C

PROTECTI ON ( GACP) SYSTEM

26 51 00 05/ 20, CHG 2: 11/ 21 I NTERI OR LI GHTI NG

26 56 00 08/ 21 EXTERI OR LI GHTI NG

DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY

28 31 33 08/ 23 FI RE ALARM REPORTI NG SYSTEM, RADI O TYPE

PROJECT TABLE OF CONTENTS Page 2

DI VI SI ON 31 - EARTHWORK

31 00 00 08/ 23 EARTHWORK

31 11 00 11/ 18 CLEARI NG AND GRUBBI NG

31 32 19. 13 02/ 21 GEOGRI D SOI L STABI LI ZATI ON

31 62 13. 20 11/ 20, CHG 1: 05/ 22 PRECAST/ PRESTRESSED CONCRETE PI LES

31 62 16. 13 11/ 20, CHG 1: 05/ 22 STEEL PI PE PI LES

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 11 23 05/ 22 AGGREGATE BASE COURSE FOR FLEXI BLE

PAVI NG

32 12 16. 16 11/ 20 ROAD- MI X ASPHALT PAVI NG

32 13 13. 06 05/ 20 PORTLAND CEMENT CONCRETE PAVEMENT FOR

ROADS AND SI TE FACI LI TI ES

32 17 23 08/ 16, CHG 5: 11/ 18 PAVEMENT MARKI NGS

32 31 13. 53 11/ 21 HI GH- SECURI TY FENCES ( CHAI N LI NK AND

ORNAMENTAL) AND GATES

32 32 23. 13 02/ 20 SEGMENTAL CONCRETE BLOCK RETAI NI NG WALL

32 92 19 08/ 17, CHG 1: 08/ 21 SEEDI NG

DI VI SI ON 33 - UTI LI TI ES

33 08 55 08/ 19 FUEL DI STRI BUTI ON SYSTEM START- UP

( NON- HYDRANT)

33 09 53. 10 02/ 10 RELAY CONTROL PANEL

33 11 00 02/ 18, CHG 1: 02/ 22 WATER UTI LI TY DI STRI BUTI ON PI PI NG

33 52 23. 15 11/ 18 POL SERVI CE PI PI NG WELDI NG

33 52 40 11/ 18, CHG 2: 11/ 20 FUEL SYSTEMS PI PI NG ( NON- HYDRANT)

33 57 55 11/ 18, CHG 1: 11/ 20 FUEL SYSTEM COMPONENTS ( NON- HYDRANT)

33 57 55. 20 02/ 10 MARI NE LOAD ARMS

33 71 02 08/ 21 UNDERGROUND ELECTRI CAL DI STRI BUTI ON

33 82 00 04/ 06 TELECOMMUNI CATI ONS OUTSI DE PLANT ( OSP)

DI VI SI ON 35 - WATERWAY AND MARI NE CONSTRUCTI ON

35 51 13. 00 04/ 06 CONCRETE FLOATI NG PI ER FOR SMALL CRAFT

35 59 13. 14 02/ 18 POLYMERI C PI LES

35 59 13. 16 11/ 21 EXTRUDED AND MOLDED MARI NE FENDERS

35 59 35 06/ 19 MOORI NG FI TTI NGS

DI VI SI ON 40 - PROCESS I NTERCONNECTI ONS

40 05 13 10/ 07, CHG 2: 02/ 20 PI PELI NES, LI QUI D PROCESS PI PI NG

40 05 13. 96 05/ 10 WELDI NG PROCESS PI PI NG

- - End of Pr oj ect Tabl e of Cont ent s - -

PROJECT TABLE OF CONTENTS Page 3

THI S PAGE I NTENTI ONALLY LEFT BLANK

PROJECT TABLE OF CONTENTS Page 4

DOCUMENT 00 01 15

LI ST OF DRAWI NGS

02/ 11, CHG 1: 08/ 14

PART 1 GENERAL

1. 1 SUMMARY

Thi s sect i on l i s t s t he dr awi ngs f or t he pr oj ect pur suant t o cont r act c l ause " DFARS 252. 236- 7001, Cont r act Dr awi ngs, Maps and Speci f i cat i ons. "

1. 2 CONTRACT DRAWI NGS

Cont r act dr awi ngs ar e as f ol l ows:

I NDEX OF

DRAWI NGS

SHEET OF NAVFAC NO. SHEET

NO.

SHEET NAME

GENERAL

1 12901793 G- 001 COVER SHEET

2 12901794 G- 002 I NDEX OF DRAWI NGS

3 12901795 GI 001 STORAGE BUI LDI NG - BUI LDI NG CODE ANALYSI S AND LI FE

SAFETY PLAN

4 12901796 G- 111 PI ER - MOORI NG PLAN - 1 OF 2

5 12901797 G- 112 PI ER - MOORI NG PLAN - 2 OF 2

HAZARDOUS MATERI ALS

6 12901798 H- 101 HAZARDOUS MATERI ALS LCOATI ON PLAN

BORI NG

7 12901799 B- 001 BORI NG LOGS

8 12901800 B- 002 BORI NG LOGS

9 12901801 B- 003 BORI NG LOGS

10 12901802 B- 004 SOI L PROFI LES AND LAB TEST RESULTS

SURVEY

11 12901803 VF001 SURVEY NOTES, LEGEND AND ABBREVI ATI ONS

12 12901804 VF101 EXI STI NG CONDI TI ONS PLAN - AREA 1

DOCUMENT 00 01 15 Page 1

13 12901805 VF102 EXI STI NG CONDI TI ONS PLAN - AREA 2

14 12901806 VF103 EXI STI NG CONDI TI ONS PLAN - AREA 3

15 12901807 VF104 EXI STI NG CONDI TI ONS PLAN - AREA 4

CI VI L

16 12901808 C- 001 CI VI L NOTES, LEGEND AND ABBREVI ATI ONS

17 12901809 C- 002 CONTRACTOR HAUL ROUTE AND LAYDOWN PLAN

18 12901810 C- 100 BJWSA I NDEX SHEET

19 12901811 CD101 DEMOLI TI ON PLAN - AREA 1

20 12901812 CD102 DEMOLI TI ON PLAN - AREA 2

21 12901813 CS101 SI TE PLAN - AREA 1

22 12901814 CS102 SI TE PLAN - AREA 2

23 12901815 CS111 DI MENSI ONAL LAYOUT AND STAKI NG PLAN - AREA 1

24 12901816 CS112 DI MENSI ONAL LAYOUT AND STAKI NG PLAN - AREA 2

25 12901817 CS201 PI ER ACCESS ROAD PLAN AND PROFI LE

26 12901818 CS501 SI TE DETAI LS - 1

27 12901819 CS502 SI TE DETAI LS - 2

28 12901820 CU101 UTI LI TY PLAN - AREA 1

29 12901821 CU102 UTI LI TY PLAN - AREA 2

30 12901822 CU201 WATER LI NE PLAN AND PROFI LE

31 12901823 CU501 UTI LI TY DETAI LS - 1

32 12901824 CU502 UTI LI TY DETAI LS - 2

33 12901825 CG101 GRADI NG AND DRAI NAGE PLAN - AREA 1

34 12901826 CG102 GRADI NG AND DRAI NAGE PLAN - AREA 2

35 12901827 CG401 ENLARGED GRADI NG PLANS

36 12901828 CG501 GRADI NG AND DRAI NAGE DETAI LS

37 12901829 CE101 EROSI ON AND SEDI MENT CONTROL PLAN - AREA 1

38 12901830 CE102 EROSI ON AND SEDI MENT CONTROL PLAN - AREA 2

DOCUMENT 00 01 15 Page 2

39 12901831 CE501 EROSI ON AND SEDI MENT CONTROL DETAI LS - 1

40 12901832 CE502 EROSI ON AND SEDI MENT CONTROL DETAI LS - 2

STRUCTURAL WATERFRONT

41 12901833 SB001 PI ER - STRUCTURAL NOTES - 1 OF 2

42 12901834 SB002 PI ER - STRUCTURAL NOTES - 2 OF 2

43 12901835 SB003 PI ER - STRUCTURAL NOTES - 3 OF 4

44 12901836 SB004 PI ER - TURBI DI TY CURTAI N

45 12901837 SD100 PI ER - DEMOLI TI ON PLAN - OVERALL

46 12901838 SD101 PI ER - DEMOLI TI ON PLAN - PHASE 1

47 12901839 SD102 PI ER - DEMOLI TI ON PLAN - PHASE 2

48 12901840 SD301 PI ER - PHASE 1 DEMOLI TI ON SECTI ONS

49 12901841 SD501 DOLPHI N FENDER DEMOLI TI ON DETAI LS

50 12901842 SD601 SI TE PHOTOGRAPHS - 1 OF 2

51 12901843 SD602 SI TE PHOTOGRAPHS - 2 OF 2

52 12901844 SB100 PI ER - GENERAL ARRANGEMENT - PLAN

53 12901845 SB102 TRESTLE - SUBSTRUCTURE PLAN - AREA B AND C

54 12901846 SB104 PI ER - SUBSTRUCTURE PLAN - AREA D

55 12901847 SB112 TRESTLE - PRECAST PANEL PLAN - AREAS B & C

56 12901848 SB114 PI ER - PRECAST PANEL PLAN - AREA D

57 12901849 SB122 TRESTLE - DECK PLAN - AREA B AND C

58 12901850 SB124 PI ER - DECK PLAN - AREA D

59 12901851 SB127 FLOATI NG DOCK AND GANGWAYS - DECK PLAN - AREA G

60 12901852 SB130 TRESTLE AND PI ER - STRI PI NG PLAN

61 12901853 SB201 TRESTLE - ELEVATI ON

62 12901854 SB202 PI ER - ELEVATI ON

63 12901855 SB203 GANGWAY - ELEVATI ON

64 12901856 SB301 TRESTLE - TYPI CAL SECTI ON

DOCUMENT 00 01 15 Page 3

65 12901857 SB302 PI ER - SECTI ONS - 1 OF 2

66 12901858 SB303 PI ER - SECTI ONS - 2 OF 2

67 12901859 SB401 PI ER - FENDER SYSTEM PLAN

68 12901860 SB402 GANGWAY PLATFORM - PLANS & SECTI ON

69 12901861 SB501 PRESTRESSED CONCRETE PI LE DETAI LS - 1 OF 2

70 12901862 SB502 PRESTRESSED CONCRETE PI LE DETAI LS - 2 OF 2

71 12901863 SB503 PRECAST BENT CAPS - 1 OF 3

72 12901864 SB504 PRECAST BENT CAPS - 2 OF 3

73 12901865 SB505 PRECAST BENT CAPS - 3 OF 3

74 12901866 SB506 BENT SECTI ONS - 1 OF 3

75 12901867 SB507 BENT SECTI ONS - 2 OF 3

76 12901868 SB508 BENT SECTI ONS - 3 OF 3

77 12901869 SB509 PRECAST PANEL DETAI LS - 1 OF 2

78 12901870 SB510 PRECAST PANEL DETAI LS - 2 OF 2

79 12901871 SB511 TOPPI NG SLAB DETAI LS

80 12901872 SB512 TOPPI NG SLAB JOI NT DETAI LS

81 12901873 SB513 APPROACH SLAB, CURB, DRAI N AND SCUPPER DETAI LS

82 12901874 SB514 LOADI NG ARM AND BUI LDI NG FOUNDATI ON DETAI LS

83 12901875 SB515 FENDER SYSTEM DETAI LS

84 12901876 SB516 MONOPI LE DOLPHI N DETAI LS

85 12901877 SB517 MOORI NG HARDWARE DETAI LS

86 12901878 SB518 EXPANSI ON JOI NT DETAI LS

87 12901879 SB519 BARGE ACCESS STAI RS PEDESTAL PLAN AND SECTI ONS

88 12901880 SB520 BARGE GANGWAY SECTI ONS

89 12901881 SB521 STAI R DETAI LS

90 12901882 SB522 ALUMI NUM GANGWAY DETAI LS

91 12901883 SB523 ELECTRI CAL SUPPORT DETAI LS

DOCUMENT 00 01 15 Page 4

92 12901884 SB524 PERMAMENT BOOM OUTRI GGER DETAI LS

93 12901885 SB525 BOOM REEL FLOAT DETAI LS

94 12901886 SB526 BOOM ROLLER GUI DE DETAI LS - 1 OF 2

95 12901887 SB527 BOOM ROLLER GUI DE DETAI LS - 2 OF 2

96 12901888 SB528 GUARDRAI L AND LI FE RI NG DETAI LS

97 12901889 SB529 LADDER DETAI LS

98 12901890 SB530 SECURI TY GATE AND FLOATI NG DOCK DETAI LS

99 12901891 SB601 PI LE SCHEDULES

STRUCTURAL

100 12901892 S- 001 STRUCTURAL GENERAL NOTES

101 12901893 S- 002 STRUCTURAL ABBREVI ATI ONS AND SYMBOLS

102 12901894 S- 100 OVERALL STRUCTURAL LAYOUT

103 12901895 S- 111 METER PAD - FOUNDATI ON AND SLAB PLAN

104 12901896 S- 112 METER PAD - CANOPY PLAN

105 12901897 S- 121 STRI PPI NG PUMP PAD - FOUNDATI ON AND SLAB PLAN

106 12901898 S- 122 STRI PPI NG PUMP PAD - CANOPY PLAN

107 12901899 S- 211 METER PAD - ELEVATI ONS

108 12901900 S- 221 STRI PPI NG PUMP PAD - ELEVATI ONS

109 12901901 S- 501 STANDARD STRUCTURAL DETAI LS

110 12901902 S- 502 STANDARD STRUCTURAL DETAI LS

111 12901903 S- 511 METER PAD DETAI LS

112 12901904 S- 521 STRI PPI NG PUMP PAD DETAI LS

113 12901905 S- 531 STEEL DETAI LS

114 12901906 S- 541 ACCESS STAI RS AND PLATFORMS - PLAN AND SECTI ONS

115 12901907 S- 542 ACCESS STAI RS AND PLATFORMS - PLAN AND SECTI ONS

116 12901908 S- 543 ACCESS STAI RS AND PLATFORMS - PLAN AND SECTI ONS

117 12901909 S- 544 ACCESS STAI RS AND PLATFORMS - PLAN AND SECTI ONS

DOCUMENT 00 01 15 Page 5

118 12901910 S- 545 ACCESS STAI RS AND PLATFORMS - DETAI LS

119 12901911 S- 546 ACCESS STAI RS AND PLATFORMS - DETAI LS

120 12901912 S- 551 PI PE SUPPORT DETAI LS

121 12901913 S- 552 PI PE SUPPORT DETAI LS

122 12901914 S- 553 PI PE SUPPORT DETAI LS

123 12901915 S- 554 PI PE SUPPORT DETAI LS

ARCHI TECTURAL

124 12901916 A- 001 ARCHI TECTURAL SYMBOLS, LEGENDS, ABBREVI ATI ONS AND

NOTES

125 12901917 AD101 BUI LDI NG 986 - DEMOLI TI ON PLAN & PHOTOS

126 12901918 A- 101 STORAGE BUI LDI NG - FLOOR PLAN, REFLECTED CEI LI NG

PLAN, AND ROOF PLAN

127 12901919 A- 201 STORAGE BUI LDI NG - ELEVATI ONS AND SECTI ONS

128 12901920 A- 601 SCHEDULES AND DETAI LS

FI RE PROTECTI ON

129 12901921 FP001 FI RE PROTECTI ON NOTES, LEGEND AND ABBREVI ATI ONS

130 12901922 FP100 PI ER - FI RE SUPPRESSI ON PLAN - OVERALL

131 12901923 FP101 TRESTLE - FI RE SUPPRESSI ON PLAN - AREAS B AND C

132 12901924 FP102 PI ER - FI RE SUPPRESSI ON PLAN - AREA D

133 12901925 FP501 FI RE PROTECTI ON DETAI LS ( SHEET 1 OF 2)

134 12901926 FP502 FI RE PROTECTI ON DETAI LS ( SHEET 2 OF 2)

MECHANI CAL FUELI NG

135 12901927 MF001 MECHANI CAL LEGEND

136 12901928 MF002 MECHANI CAL ABBREVI ATI ONS AND GENERAL NOTES

137 12901929 MF005 FLOW DI AGRAM

138 12901930 MD101 PI PI NG DEMOLI TI ON SI TE PLAN - PHASE 2

139 12901931 MD401 FUEL PI PI NG DEMOLI TI ON PLAN - PHASE 2 - AREA AA

140 12901932 MD402 FUEL PI PI NG DEMOLI TI ON PLAN - PHASE 2 - AREA BB

141 12901933 MD901 FUEL PI PI NG DEMOLI TI ON PHOTOS - PHASE 2

DOCUMENT 00 01 15 Page 6

142 12901934 MF100 FUELS - MECHANI CAL SI TE PLAN - OVERALL

143 12901935 MF101 FUELS - OVERALL - AREA A

144 12901936 MF102 FUELS - OVERALL - AREA B

145 12901937 MF103 FUELS - OVERALL - AREA C

146 12901938 MF104 FUELS - OVERALL - AREA D

147 12901939 MF105 FUELS - OVERALL - AREA E

148 12901940 MF301 METER SKI D - SECTI ON VI EWS - AREA A WEST

149 12901941 MF302 STRI PPER PUMP SKI D - SECTI ON VI EWS - AREA A WEST

150 12901942 MF303 MARI NE LOADI NG ARM – SECTI ON VI EW – AREA D – NORTH

151 12901943 MF401 METER SKI D - ENLARGED PLAN - AREA A WEST

152 12901944 MF402 STRI PPER PUMP PAD - ENLARGED PLAN - AREA A EAST

153 12901945 MF403 TRESTLE - ENLARGED PLAN - AREA B WEST

154 12901946 MF404 TRESTLE - ENLARGED PLAN - AREA B EAST

155 12901947 MF405 TRESTLE - ENLARGED PLAN - AREA C WEST

156 12901948 MF406 TRESTLE - ENLARGED PLAN - AREA C EAST

157 12901949 MF407 PI ER - ENLARGED PLAN - AREA D SOUTH

158 12901950 MF408 PI ER - ENLARGED PLAN - AREA D NORTH

159 12901951 MF409 PI ER - ENLARGED PLAN - AREA E SOUTH

160 12901952 MF501 PI ER - MLA1 OPERATI NG ENVELOPE DS- 12 BARGE

161 12901953 MF502 PI ER - MLA2 OPERATI NG ENVELOPE DS- 12 BARGE

162 12901954 MF503 MECHANI CAL DETAI LS

163 12901955 MF601 P&I D - METER PAD

164 12901956 MF602 P&I D - FUEL PI ER

165 12901957 MF603 I NSTRUMENTS AND CONTROLS SCHEDULE

166 12901958 MF750 MECHANI CAL SCHEDULES

167 12901959 MF801 PI ER RECEI PT PI PI NG PNEUMATI C, HYDROSTATI C TESTI NG

AND FLUSHI NG PLAN

168 12901960 MF802 PI ER RECEI PT PI PI NG LI NE FI LL AND SOAK TEST

DOCUMENT 00 01 15 Page 7

169 12901961 MF803 PI ER FUEL RECEI PT PI PI NG SYSTEM COMMI SSI ONI NG

PLUMBI NG

170 12901962 P- 001 PLUMBI NG NOTES, LEGENDS AND ABBREVI ATI ONS

171 12901963 PD101 PLUMBI NG - PI ER - DEMOLI TI ON SI TE PLAN - OVERALL

172 12901964 PD102 PLUMBI NG - PI ER - DEMOLI TI ON PHOTOS

173 12901965 PL100 PLUMBI NG OVERALL PLAN

174 12901966 PL101 PLUMBI NG OVERALL PLAN - AREA B & C

175 12901967 PL102 PLUMBI NG OVERALL PLAN - AREA D

176 12901968 PL103 PLUMBI NG - FLOATI NG DOCK AND GANGWAYS DECK PLAN

177 12901969 PL501 DETAI LS

178 12901970 PL502 DETAI LS

179 12901971 PL601 SCHEDULES

ELECTRI CAL

180 12901972 E- 001 LEGEND, ABBREVI ATI ONS AND GENERAL NOTES ( 1 OF 2)

181 12901973 E- 002 LEGEND, ABBREVI ATI ONS AND GENERAL NOTES ( 2 of 2)

182 12901974 E- 011 HAZARDOUS AREA CLASSI FI CATI ON PLAN - OVERALL

183 12901975 E- 051 HAZARDOUS AREA DETAI LS

184 12901976 ED101 PI ER - DEMOLI TI ON PLAN - AREA AA

185 12901977 ED102 PI ER - DEMOLI TI ON PLAN - AREA BB

186 12901978 ED103 PI ER - DEMOLI TI ON PLAN - AREA CC

187 12901979 ED601 PI ER - ONE- LI NE DEMOLI TI ON DI AGRAM

188 12901980 ES100 PI ER - ELECTRI CAL SI TE PLAN - OVERALL

189 12901981 ES101 PI ER - ELECTRI CAL SI TE PLAN - AREA A

189 12901981 ES102 ELECTRI CAL SI TE PLAN - AREAS B & C

190 12901982 ES103 ELECTRI CAL SI TE PLAN - AREA D

191 12901983 ES104 PI ER - ELECTRI CAL SI TE PLAN - AREAS E & F

192 12901984 ES105 PI ER - ELECTRI CAL SI TE PLAN - AREAS G & H

DOCUMENT 00 01 15 Page 8

193 12901985 EF401 FUEL METER & STRI PPER PUMP PAD ENLARGED PLAN

194 12901986 EF601 CONTROL DI AGRAMS ( STRI PPER PUMP)

195 12901987 EL501 LI GHTI NG CONTROLS AND SEQUENCE OF OPERATI ONS

196 12901988 EL502 LI GHTI NG DETAI LS

197 12901989 EL503 LI GHTI NG DETAI LS

198 12901990 EG101 GROUNDI NG SI TE PLAN - OVERALL

199 12901991 EG401 FUEL METER & STRI PPER PUMP PAD ENLARGED GROUNDI NG &

LP PLAN

200 12901992 EG402 STORAGE BUI LDI NG - ENLARGED GROUNDI NG & LI GHTNI NG

PROTECTI ON PLAN

201 12901993 EG501 GROUNDI NG DETAI LS

202 12901994 EG502 LI GHTNI NG PROTECTI ON DETAI LS

203 12901995 E- 401 STORAGE BUI LDI NG - ENLARGED POWER & LI GHTI NG PLANS

204 12901996 E- 402 ENLARGED FUELI NG PADS LI GHTI NG PLAN

205 12901997 E- 501 POWER DETAI LS

206 12901998 E- 502 POWER DETAI LS

207 12901999 E- 503 SI TE DETAI LS

208 12902000 E- 504 SI TE DETAI LS

209 12902001 E- 505 SI TE DETAI LS

210 12902002 E- 506 CONTROLS DETAI LS

211 12902003 E- 601 PI ER - ONE- LI NE DI AGRAM

211 12902003 E- 601 PI ER - ONE- LI NE DI AGRAM

212 12902004 E- 602 FEEDER SCHEDULE

213 12902005 E- 701 PANEL SCHEDULES

1. 3 SUPPLEMENTARY DRAWI NGS

These suppl ement ar y dr awi ngs may not be a par t of t he cont r act but ar e i ncl uded wi t h t he dr awi ngs f or i nf or mat i on.

1. 3. 1 Ref er ence Dr awi ngs

The f ol l owi ng r ef er ence dr awi ngs ar e i nt ended onl y t o show t he or i gi nal const r uct i on. Dr awi ngs ar e t he pr oper t y of t he Gover nment and shal l not be used f or any pur pose ot her t han t hat i nt ended by t he cont r act .

DOCUMENT 00 01 15 Page 9

FY 25 Milcon Project P-502 Replace Fuel Pier Work Order No. 1731481 MCAS Beaufort, SC

NAVFAC DWG NO. TITLE

PW No. 6369 Drawings 1-26 Fuel Pier Extension Drawings-14MAY1985.pdf

PW No. 6372 Drawings 1-25 Fuel Pier and Boat Storage Repairs-21OCT2011.pdf

PW No. 4179 Drawings 1-3 Fuel Pier Drawings-25MAY1956.pdf

N/A Fuel Pier Condition Assessment Report-2016.pdf

N/A Fuel Pier Condition Assessment Report-2022.pdf

1.3.2 Boring Logs

The Government does not guarantee that borings indicate actual conditions, except for the exact locations and the time that they were made.

1.3.3 Subsurface Data

Subsurface data, not specified or indicated, have been obtained by the Government at the station.

-- End of Document --

DOCUMENT 00 01 15 Page 10

SECTI ON 01 11 00

SUMMARY OF WORK

08/ 15, CHG 2: 08/ 21

PART 1 GENERAL

1. 1 SUBMI TTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" c l assi f i cat i on.

Submi t t al s not havi ng a " G" c l assi f i cat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00

SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Sal vage Pl an; G

1. 2 WORK COVERED BY CONTRACT DOCUMENTS

1. 2. 1 Pr oj ect Descr i pt i on

The wor k i ncl udes a s i ngl e deck, pi l e- suppor t ed pi er and appr oach t r est l e t o r epl ace t he exi st i ng pi er . Phased demol i t i on of t he exi st i ng pi er i s r equi r ed t o al l ow t he exi st i ng f aci l i t y t o mai nt ai n f uel i ng oper at i ons dur i ng const r uct i on. An exi st i ng br east i ng and f uel i ng pl at f or m shal l r emai n as wel l as t he exi st i ng f l oat i ng smal l boat dock. The pr oj ect i ncl udes a pr e- engi neer ed met al bui l di ng l ocat ed on t he pi er , per manent booms and boom r eel , boom r eel f l oat i ng dock and gui de pi l es, mar i ne f uel l oadi ng ar ms, moor i ng dol phi ns; moor i ng har dwar e, f uel pi pi ng, t wo f uel l oadi ng ar ms, aut omat ed f uel handl i ng equi pment and cont r ol s. The pr oj ect i ncl udes si t e pr epar at i ons i ncl udi ng f uel i ng and el ect r i cal equi pment pads, r et ai ni ng wal l and r i pr ap r evet ment . The pr oj ect i ncl udes pot abl e wat er , pi er f i r e pr ot ect i on, upgr ades t o el ect r i cal and l i ght i ng syst ems, and i nci dent al r el at ed wor k.

1. 2. 2 Locat i on

The wor k i s l ocat ed at t he MCAS Beauf or t , Beauf or t , Sout h Car ol i na, appr oxi mat el y as i ndi cat ed. The exact l ocat i on wi l l be shown by t he Cont r act i ng Of f i cer .

1. 3 CONTRACT DRAWI NGS

1. 4 OCCUPANCY OF PREMI SES

Pi er and bui l di ng( s) adj acent t o t he s i t e wi l l be occupi ed dur i ng per f or mance of wor k under t hi s Cont r act .

Bef or e wor k i s st ar t ed, ar r ange wi t h t he Cont r act i ng Of f i cer a sequence of pr ocedur e, means of access, space f or st or age of mat er i al s and equi pment , and use of appr oaches, cor r i dor s, and st ai r ways.

1. 5 EXI STI NG WORK

I n addi t i on t o FAR 52. 236- 9 Pr ot ect i on of Exi st i ng Veget at i on, St r uct ur es, Equi pment , Ut i l i t i es, and I mpr ovement s:

SECTI ON 01 11 00 Page 1

a. Remove or al t er exi st i ng wor k i n such a manner as t o pr event i nj ur y or damage t o any por t i ons of t he exi st i ng wor k whi ch r emai n.

b. Repai r or r epl ace por t i ons of exi st i ng wor k whi ch have been al t er ed dur i ng const r uct i on oper at i ons t o mat ch exi st i ng or adj oi ni ng wor k, as appr oved by t he Cont r act i ng Of f i cer . At t he compl et i on of oper at i ons, exi st i ng wor k must be i n a condi t i on equal t o or bet t er t han t hat whi ch exi st ed bef or e new wor k st ar t ed.

1. 6 LOCATI ON OF UNDERGROUND UTI LI TI ES

Obt ai n di ggi ng per mi t s pr i or t o st ar t of excavat i on, and compl y wi t h I nst al l at i on r equi r ement s f or l ocat i ng and mar ki ng under gr ound ut i l i t i es.

Cont act l ocal ut i l i t y l ocat i ng ser vi ce a mi ni mum of 48 hour s pr i or t o excavat i ng, t o mar k ut i l i t i es, and wi t hi n suf f i c i ent t i me r equi r ed i f wor k occur s on a Monday or af t er a Hol i day. Ver i f y exi st i ng ut i l i t y l ocat i ons i ndi cat ed on cont r act dr awi ngs, wi t hi n ar ea of wor k.

I dent i f y and mar k al l ot her ut i l i t i es not managed and l ocat ed by t he l ocal ut i l i t y compani es. Scan t he const r uct i on s i t e wi t h Gr ound Penet r at i ng Radar ( GPR) , el ect r omagnet i c, or soni c equi pment , and mar k t he sur f ace of t he gr ound or paved sur f ace wher e exi st i ng under gr ound ut i l i t i es or ut i l i t i es encased i n pi er st r uct ur es ar e di scover ed. Ver i f y t he el evat i ons of exi st i ng pi pi ng, ut i l i t i es, and any t ype of under gr ound or encased obst r uct i on not i ndi cat ed, or speci f i ed t o be r emoved, t hat i s i ndi cat ed or di scover ed dur i ng scanni ng, i n l ocat i ons t o be t r aver sed by pi pi ng, duct s, and ot her wor k t o be conduct ed or i nst al l ed. Ver i f y el evat i ons bef or e i nst al l i ng new wor k c l oser t han near est manhol e or ot her st r uct ur e at whi ch an adj ust ment i n gr ade can be made.

1. 6. 1 Not i f i cat i on Pr i or t o Excavat i on

Not i f y t he Cont r act i ng Of f i cer at l east 15 days pr i or t o st ar t i ng excavat i on wor k.

1. 7 WELDI NG AND BURNI NG PERMI TS

ACTI VI TY SUBMI SSI ON DATE

Wel di ng and/ or Hot Wor k Per mi t s 15 Cal endar days pr i or t o wor k

Per mi t s shal l be post ed at a conspi cuous l ocat i on i n t he const r uct i on ar ea.

Bur i ng of t r ach or r ubbi sh i s not per mi t t ed at on pr oj ect s i t e.

1. 8 NAVY AND MARI NE CORPS I NTRANET( NMCI ) COORDI NATI ON REQUI REMENTS

1. 8. 1 NMCI Cont r act or Access

Al l ow t he NMCI Cont r act or access t o t he f aci l i t y t owar ds t he end of const r uct i on ( f i ni shes 90 per cent compl et e, r ough- i n 100 per cent compl et e, I nsi de Pl ant ( I SP) / Out si de Pl ant ( OSP) i nf r ast r uct ur e i n pl ace) t o pr ovi de equi pment i n t he t el ecommuni cat i ons r ooms and make f i nal connect i ons.

Coor di nat e ef f or t s wi t h t he NMCI Cont r act or t o f aci l i t at e j oi nt use of bui l di ng spaces dur i ng t he f i nal phases of const r uct i on. Af t er t he Cont r act i ng Of f i cer has f aci l i t at ed coor di nat i on meet i ngs bet ween t he t wo cont r act or s, wi t hi n one week, i ncor por at e t he ef f or t of addi t i onal coor di nat i on wi t h t he NMCI Cont r act or i nt o t he const r uct i on schedul e t o

SECTI ON 01 11 00 Page 2 demonst r at e a pl an f or mai nt ai ni ng t he cont r act dur at i on.

1. 9 SALVAGE MATERI AL AND EQUI PMENT

I t ems desi gnat ed by t he Cont r act i ng Of f i cer t o be sal vaged r emai n t he pr oper t y of t he Gover nment . I t ems t o be sal vaged ar e t he eyewash st at i ons and spi l l boom r eel assembl y. Segr egat e, i t emi ze, del i ver and of f - l oad t he sal vaged pr oper t y at t he Gover nment desi gnat ed st or age ar ea l ocat ed wi t hi n 5 mi l es of t he const r uct i on s i t e.

Pr ovi de a sal vage pl an, l i s t i ng mat er i al and equi pment t o be sal vaged, and t hei r st or age l ocat i on. Mai nt ai n pr oper t y cont r ol r ecor ds f or mat er i al or equi pment desi gnat ed as sal vage. Pr ovi de a syst em f or pr oper t y cont r ol i n t he sal vage pl an. St or e and pr ot ect sal vaged mat er i al s and equi pment unt i l di sposi t i on by t he Cont r act i ng Of f i cer .

PART 2 PRODUCTS

Not used.

PART 3 EXECUTI ON

Not used.

- - End of Sect i on - -

SECTI ON 01 11 00 Page 3

SECTI ON 01 11 00 Page 4

SECTI ON 01 14 00

WORK RESTRI CTI ONS

11/ 22, CHG 1: 02/ 23

PART 1 GENERAL

1. 1 SUBMI TTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" c l assi f i cat i on.

Submi t t al s not havi ng a " G" c l assi f i cat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00

SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Li st of Cont act Per sonnel

1. 2 NOTI FI CATI ONS AND PERMI TTI NG REQUI REMENTS

Wor k at MCAS Beauf or t , Beauf or t , Sout h Car ol i na, f al l s wi t hi n t he ai r space of mi l i t ar y and l ocal c i v i l i an ai r f i el ds. Rest r i ct i ons must appl y t o speci f i c cr ane hei ght s t o pr ot ect f l i ght oper at i ons and t her ef or e not i f i cat i ons and appr oval s f r om t he Feder al Avi at i on Admi ni st r at i on ( FAA) , f or mi l i t ar y and l ocal c i v i l i an ai r f i el ds wi l l be r equi r ed.

Const r uct i on at MCAS Beauf or t , Beauf or t , Sout h Car ol i na, and t he adj acent wat er ways r equi r es t he not i f i cat i on, submi ssi on of per mi t s, and appr oval Feder al , St at e, and Local or gani zat i on pr i or t o begi nni ng any oper at i on t hat af f ect s t he wat er ways, r i ver bot t om, or gener at es under wat er noi se.

Pr i or t o begi nni ng any oper at i on t hat t hat ut i l i zes cr anes or may gener at e under wat er noi se, ensur e at al l not i f i cat i ons have been made and al l per mi t s have been obt ai ned.

1. 3 SPECI AL SCHEDULI NG REQUI REMENTS

a. Phase 1 pi er const r uct i on must be r eady f or oper at i on as appr oved by Cont r act i ng Of f i cer bef or e wor k i s st ar t ed on Phase 2. Nor mal f uel of f - l oadi ng oper at i ons must be mai nt ai ned t hr oughout t he const r uct i on.

b. Have mat er i al s, equi pment , and per sonnel r equi r ed t o per f or m t he wor k at t he s i t e pr i or t o t he commencement of t he wor k.

c. Fuel of f - l oadi ng oper at i ons wi l l cont i nue i n t he exi st i ng f uel i ng ar m dur i ng t he ent i r e const r uct i on per i od. The Cont r act or must conduct hi s oper at i ons so as t o cause no unschedul edi nt er f er ence wi t h nor mal oper at i ons of t he act i v i t y.

d. I nt er f er ence wi t h Navi gat i on Ai r space: The cont r act or must conduct hi s oper at i ons so as t o avoi d i nt er f er ence wi t h t he ai r space ar ound MCAS Beauf or t . The Cont r act or must f i l e a " Not i ce of Pr oposed Const r uct i on or Al t er at i on ( FAA For m 7460- 1) " wi t h t he Feder al Avi at i on Admi ni st r at i on ( FAA) ei t her el ect r oni cal l y v i a t he websi t e at :

ht t ps: / / oeaaa. f aa. gov/ oeaaa/ ext er nal / por t al . j sp or manual l y wi t h t he FAA. The Cont r act or must f ol l ow al l gui dance and di r ect i on r equi r ed by t he FAA. Ant i c i pat ed cost s must be i ncl uded i n t he bi d.

SECTI ON 01 14 00 Page 1

e. The r epai r s r equi r e not i f i cat i on and may r equi r e per mi t s f r om t he US Ar my Cor ps of Engi neer s, Mar i ne Resour ces Commi ssi on, and t he Depar t ment of Fi sher i es. The gover nment wi l l obt ai n and pr ovi de t hese not i ces and per mi t s. The cont r act or must ensur e t hat t hey r ecei ve a copy f or t hei r r ecor ds, pr i or t o st ar t i ng any demol i t i on or const r uct i on wor k i n whi ch may i mpact s t he wat er ways or r i ver bot t om.

The cont r act or i s r equi r ed t o obt ai n any ot her r equi r ed per mi t s and not i f i cat i ons.

f . Fuel i ng Oper at i ons t ypi cal l y occur ever y 10 days, i ncl udi ng weekends and Hol i days, whi ch r equi r ed t he pi er and adj acent ar ea t o be cl osed t o non- essent i al per sonnel f or a f ul l day. The dur at i on l ast s no mor e t han 8- hour s f or whi ch t he Gover nment wi l l r equi r e t hat t he cont r act or schedul e and coor di nat e t he pi er r epai r s t o ensur e f uel i ng oper at i ons ar e not hi nder ed. Cont r act or per sonnel , mat er i al s, and equi pment must be r el ocat e t o al l ow f or t hese f uel i ng oper at i ons. Per i odi c smal l boat oper at i ons wi l l be necessar y f or t he f l oat i ng dock and coor di nat i on wi l l be necessar y such t hat smal l boat s can access t he r i ver way.

The gover nment wi l l not i f y t he cont r act or 7 days i n advance t o al l ow f or schedul i ng when r el ocat i on of t hei r asset s ar e r equi r ed.

g. Ai r Shows ar e t ent at i vel y schedul ed on t he Base ever y t wo year s f or whi ch t he cont r act or ' s const r uct i on act i v i t i es may be af f ect ed over t hi s t wo- week per i od. The next Ai r Show i s schedul ed f or Apr i l 2025.

Dur i ng t hi s t wo- week per i od:

i ) Gr ound access t o t he base and pr oj ect s i t e may be del ayed due t o base secur i t y and t r af f i c oper at i ons dur i ng t hi s t i me.

i i ) Const r uct i on equi pment ( mobi l e and bar ge mount ed cr anes) must ensur e t hei r booms do not exceed t he cei l i ng hei ght pr escr i bed by ai r oper at i ons. Al l cane booms, whi l e not i n use, must be l ower ed and st owed dur i ng t hi s t i me per i od unl ess ot her wi se al l owed by t he Cont r act i ng Of f i cer .

i i i ) Al l r unways, t axi ways, and apr ons ( except t he Cont r act or ' s wor k ar ea encl osed by FOD f enci ng) wi l l be c l ear ed of al l cont r act or equi pment and mat er i al s. The Cont r act or ' s const r uct i on ar eas t o i ncl ude t he l aydown ar ea wi l l be c l eaned and secur ed.

g. The cont r act or wi l l be r equi r ed t o submi t t o t he Cont r act i ng Of f i cer f or appr oval a schedul e t hat r ef l ect s t he t i mi ng and wor k bei ng per f or med pr i or t o af f ect i ng any gover nment oper at i on.

h. The cont r act or must not begi n r epai r s t o any por t i on of t he pi er or moor i ng dol phi ns unt i l mat er i al s, l abor , and equi pment , f or t hese r epai r s, ar e on si t e and r eady f or const r uct i on.

i . The Cont r act or must make pr ovi s i ons f or t he st or age of equi pment and mat er i al s on bar ges i f t her e i s not a suf f i c i ent ar ea assi gned t o t he cont r act or whi l e he' s wor ki ng. Ther e i s a shor e s i de mat er i al st or age ar ea made avai l abl e f or t he cont r act or ' s of f i ce t r ai l er upon awar d of t he cont r act . The si t e wi l l be i dent i f i ed af t er awar d of t he cont r act and must be wi t hi n ( 2. 0) mi l es of t he wor ksi t e.

The cont r act or must pr ovi de al l secur i t y, f enci ng, Er osi on and Sedi ment Cont r ol s, and St or m Wat er Pr ot ect i on f or hi s l aydown ar ea and

SECTI ON 01 14 00 Page 2 must pr ovi de al l met er i ng and ut i l i t y hooks t o hi s t r ai l er s. The si t e must have t o be r et ur ned t o t hei r or i gi nal condi t i on upon compl et i on of t he cont r act .

j . The cont r act or must per f or m hi s f i el d i nspect i ons and pr econst r uct i on sur veys at hi s ear l i est conveni ence subj ect t o avai l abl y. The cont r act or must coor di nat e t hese i nspect i ons wi t h t hr ough t he Cont r act i ng Of f i cer .

k. I nt er f er ence wi t h Navi gat i on: The cont r act or must conduct hi s oper at i on so as t o cause no i nt er f er ence wi t h nor mal oper at i ons of t he act i v i t y. Cont r act or ' s f l oat i ng asset s must not af f ect ber t hi ng oper at i ons and i t may become necessar y t o shi f t or i nt er r upt const r uct i on oper at i ons t o accommodat e t he movement of vessel s upon di r ect i on of t he Cont r act i ng Of f i cer .

l . Mai nt ai n compl et e cont r ol of t he movement of f l oat i ng equi pment and mat er i al . Loose f l oat i ng equi pment and mat er i al ar e not per mi t t ed.

Secur e f l oat i ng equi pment whi ch may get l oose and become a hazar d t o navi gat i on.

m. Obt ai n " DFARS 252. 236- 7002, Obst r uct i on of Navi gabl e Wat er ways, " f r om t he Commandi ng Of f i cer and t he Secur i t y Of f i ce at MCAS Beauf or t v i a t he Cont r act i ng Of f i cer . Submi t a wat er cr af t l i s t wi t h a descr i pt i on of cr af t s, i ncl udi ng si zes, t ypes, number s and boat cr ew f or appr oval . Cont r act or must be i n const ant communi cat i ons wi t h Base Fuel i ng Oper at i ons.

n. Speci al Fi r e Pr ovi s i ons: The cont r act or must be f ur ni shed a l i s t of f i r e and saf et y r egul at i ons per t ai ni ng t o t he st at i on and t he pi er , and he must conf or m t o t he r equi r ement s set f or t h at al l t i mes.

o. Per mi ssi on t o i nt er r upt any Act i v i t y r oads, r ai l r oads, and/ or ut i l i t y ser vi ce must be r equest ed i n wr i t i ng a mi ni mum of 15 cal endar days pr i or t o t he desi r ed dat e of i nt er r upt i on.

p. Per mi ssi on t o i nt er r upt any ut i l i t y ser vi ce must be r equest ed i n wr i t i ng at l east 15 busi ness days i n advance and appr oval of t he Cont r act i ng Of f i cer must be r ecei ved bef or e any ser vi ce i s i nt er r upt ed. I nt er r upt i ons of ut i l i t y ser vi ces must be al l owed onl y when t hey must cause no i nt er f er ence wi t h t he oper at i ons of t he act i v i t y. Al l ut i l i t y cut over s must be made af t er nor mal wor ki ng hour s or on weekends; ant i c i pat ed cost s must be i ncl uded i n t he bi d.

NOTE: Ut i l i t i es i dent i f i ed i n t he cont r act document s or f ound dur i ng t he cont r act or ' s i nspect i ons r unni ng al ong t he wat er f r ont and pi er s or under gr ound, whi ch ar e not i dent i f i ed as abandoned, or i nact i ve, shoul d assume t o be l i ve. I f condi t i ons ar e obser ved t hat may pose danger , r epor t condi t i ons t o t he Cont r act i ng Of f i cer as soon as possi bl e f or di r ect i on.

q. Thr oughout t he dur at i on of t hi s cont r act , t her e must be gover nment act i v i t i es on and adj acent t o t hi s s i t e t hat must r equi r e t he cont r act or t o st op wor k and vacat e hi s per sonnel and equi pment f r om t he si t e. These act i v i t i es i ncl ude, but ar e not l i mi t ed t o bar ge movement s and f uel i ng oper at i ons.

SECTI ON 01 14 00 Page 3

1. 4 EXI STI NG PI ER LOAD LI MI TS

Cr ane Oper at i onal Load Li mi t s: Ther e ar e cr ane oper at i onal and wei ght handl i ng r est r i ct i ons f or t he exi st i ng pi er . Al l pi er debr i s r emoval must be accompl i shed f r om f l oat i ng asset s.

EXI STI NG PI ER - The cont r act or must not exceed a l oadi ng of 100 pounds per squar e f oot on t he pi er . Wei ght handl i ng equi pment wi l l be r est r i ct ed on t he pi er .

The cont r act or must pr ovi de Load Ver i f i cat i on, s i gned by a l i censed pr of essi onal engi neer f r om t he st at e of Sout h Car ol i na, when t he pl acement of equi pment or mat er i al s may be excessi ve or appr oach t he i dent i f i ed st r uct ur al al l owabl e l oadi ng.

1. 5 CONTRACTOR ACCESS AND USE OF PREMI SES

1. 5. 1 Act i v i t y Regul at i ons

Ensur e t hat Cont r act or per sonnel empl oyed on t he Act i v i t y become f ami l i ar wi t h and obey Act i v i t y r egul at i ons i ncl udi ng saf et y, f i r e, t r af f i c and secur i t y r egul at i ons. Keep wi t hi n t he l i mi t s of t he wor k and avenues of i ngr ess and egr ess. Wear appr opr i at e per sonal pr ot ect i ve equi pment ( PPE) i n desi gnat ed ar eas. Do not ent er any r est r i ct ed ar eas unl ess r equi r ed t o do so and unt i l c l ear ed f or such ent r y. Ensur e al l Cont r act or equi pment , i ncl ude del i ver y vehi c l es, ar e c l ear l y i dent i f i ed wi t h t hei r company name.

1. 5. 1. 1 Subcont r act or s and Per sonnel Cont act s

Pr ovi de a l i s t of cont act per sonnel of t he Cont r act or and subcont r act or s i ncl udi ng addr esses and t el ephone number s f or use i n t he event of an emer gency. As changes occur and addi t i onal i nf or mat i on becomes avai l abl e, cor r ect and change t he i nf or mat i on cont ai ned i n pr evi ous l i s t s.

1. 5. 1. 2 I nst al l at i on Access

Obt ai n access t o Navy i nst al l at i ons t hr ough par t i c i pat i on i n t he Def ense Bi omet r i cs I dent i f i cat i on Syst em ( DBI DS) . Requi r ement s f or Cont r act or empl oyee r egi st r at i on, and t r ansi t i on f or empl oyees cur r ent l y under Navy Commer ci al Access Cont r ol Syst em ( NCACS) , ar e avai l abl e at ht t ps: / / www. cni c. navy. mi l / Oper at i ons- and- Management / Base- Suppor t / DBI DS/ .

No f ees ar e associ at ed wi t h obt ai ni ng a DBI DS cr edent i al .

Par t i c i pat i on i n t he DBI DS i s not mandat or y, and Cont r act or per sonnel may appl y f or One- Day Passes at t he Base Vi s i t or Cont r ol Of f i ce t o access an i nst al l at i on.

1. 5. 1. 2. 1 Regi st r at i on f or DBI DS

Regi st r at i on f or DBI DS i s avai l abl e at ht t ps: / / www. cni c. navy. mi l / Oper at i ons- and- Management / Base- Suppor t / DBI DS/ .

Pr ocedur e i ncl udes:

a. Pr esent a l et t er or of f i c i al awar d document ( i . e. DD For m 1155 or SF 1442) f r om t he Cont r act i ng Of f i cer , t hat pr ovi des t he pur pose f or access, t o t he base Vi s i t or Cont r ol Cent er r epr esent at i ve.

b. Pr esent val i d i dent i f i cat i on, such as a passpor t or Real I D Act - compl i ant st at e dr i ver ' s l i cense.

SECTI ON 01 14 00 Page 4

c. Pr ovi de compl et ed SECNAV FORM 5512/ 1 t o t he base Vi s i t or Cont r ol Cent er r epr esent at i ve t o obt ai n a backgr ound check. Thi s f or m i s avai l abl e f or downl oad at ht t ps: / / www. cni c. navy. mi l / Oper at i ons- and- Management / Base- Suppor t / DBI DS/ .

d. Upon successf ul compl et i on of t he backgr ound check, t he Gover nment wi l l compl et e t he DBI DS enr ol l ment pr ocess, whi ch i ncl udes Cont r act or empl oyee phot o, f i nger pr i nt s, base r est r i ct i on and sever al ot her assessment s.

e. Upon successf ul compl et i on of t he enr ol l ment pr ocess, t he Cont r act or empl oyee wi l l be i ssued a DBI DS cr edent i al , and wi l l be al l owed t o pr oceed t o wor ksi t e.

1. 5. 1. 2. 2 DBI DS El i gi bi l i t y Requi r ement s

Thr oughout t he l engt h of t he cont r act , t he Cont r act or empl oyee must cont i nue t o meet backgr ound scr een st andar ds. Per i odi c backgr ound scr eeni ngs ar e conduct ed t o ver i f y cont i nued DBI DS par t i c i pat i on and i nst al l at i on access pr i v i l eges. DBI DS access pr i v i l eges wi l l be i mmedi at el y suspended or r evoked i f at any t i me a Cont r act or empl oyee becomes i nel i gi bl e.

An adj udi cat i on pr ocess may be i ni t i at ed when a backgr ound scr een f ai l ur e r esul t s i n di squal i f i cat i on f r om par t i c i pat i on i n t he DBI DS, and Cont r act or empl oyee does not agr ee wi t h t he r eason f or di squal i f i cat i on.

The Gover nment i s t he f i nal aut hor i t y.

1. 5. 1. 2. 3 DBI DS Not i f i cat i on Requi r ement s

a. I mmedi at el y r epor t i nst ances of l ost or st ol en badges t o t he Cont r act i ng Of f i cer .

b. I mmedi at el y col l ect DBI DS cr edent i al s and not i f y t he Cont r act i ng Of f i cer i n wr i t i ng under t he f ol l owi ng ci r cumst ances:

( 1) An empl oyee has depar t ed t he company wi t hout havi ng pr oper l y r et ur ned or sur r ender ed t hei r DBI DS cr edent i al s.

( 2) Ther e i s a r easonabl e basi s t o concl ude t hat an empl oyee, or f or mer empl oyee, mi ght pose a r i sk, compr omi se, or t hr eat t o t he saf et y or secur i t y of t he I nst al l at i on or anyone t her ei n.

1. 5. 1. 2. 4 One- Day Passes

Per sonnel appl y i ng f or One- Day passes at t he Base Vi s i t or Cont r ol Of f i ce ar e subj ect t o dai l y mandat or y vehi c l e i nspect i on, and wi l l have l i mi t ed access t o t he i nst al l at i on. The Gover nment i s not r esponsi bl e f or any cost or l ost t i me associ at ed wi t h obt ai ni ng dai l y passes or added vehi c l e i nspect i ons i ncur r ed by non- par t i c i pant s i n t he DBI DS.

1. 5. 1. 2. 5 Secur i t y Requi r ement s

Cont r act Cl ause FAR 52. 204- 2 Secur i t y Requi r ement s and Al t er nat e I I and t he f ol l owi ng appl y:

a. Cont r act or Regi st r at i on. Regi st er wi t h t he Base Secur i t y Of f i ce.

Fur ni sh a l i s t of cont r act per sonnel of t he Cont r act or and

SECTI ON 01 14 00 Page 5 subcont r act or s i ncl udi ng addr esses and t el ephone number s f or use i n t he event of an emer gency. As changes occur and addi t i onal i nf or mat i on becomes avai l abl e, cor r ect and change t he i nf or mat i on cont ai ned i n pr evi ous l i s t s.

b. Ci t i zenshi p Requi r ement s. Cont r act or empl oyees and r epr esent at i ves per f or mi ng wor k under t hi s cont r act ar e r equi r ed t o be Uni t ed St at es c i t i zens. Except i ons t o c i t i zenshi p r equi r ement s wi l l be consi der ed upon wr i t t en r equest t o t he Cont r act i ng Of f i cer .

c. St or age and Of f i ce Tr ai l er Regi st r at i on. Regi st er st or age and of f i ce t r ai l er s t o be used on base wi t h t he Base Secur i t y Of f i ce. Tr ai l er s must meet St at e l aw r equi r ement s and must be i n good condi t i on.

1. Tr ai l er s must be l ockabl e and must be l ocked when not i n use.

2. Tr ai l er s must have a s i gn i n t he l ower l ef t hand cor ner of t he l ef t door of t r ai l er wi t h t he f ol l owi ng i nf or mat i on: Company name, addr ess, r egi st r at i on number of t r ai l er or vehi c l e i dent i f i cat i on number , l ocat i on on base, dur at i on of cont r act or st ay on base, cont r act number , l ocal on- base phone number , of f - base phone number of mai n of f i ce, and emer gency r ecal l per son and phone number .

d. Equi pment Mar ki ngs. Equi pment owned or r ent ed by t he company must have t he company name pai nt ed or st enci l ed on t he equi pment i n a conspi cuous l ocat i on. Rent ed equi pment i s t o be conspi cuousl y mar ked wi t h a t ag showi ng who r ent ed t he equi pment . Regi st er t he equi pment wi t h t he t r uck i nvest i gat i on t eam.

e. Pr ocedur e i nf or mat i on. For addi t i onal i nf or mat i on r egar di ng r egi st r at i on pr ocedur es, cont act t he Cont r act i ng Of f i cer .

1. 5. 1. 2. 6 Per sonnel Li st

Submi t f or appr oval , at l east 15 days pr i or t o t he desi r ed dat e of ent r y, an or i gi nal al phabet i cal l i s t of per sonnel who r equi r e ent r y i nt o Gover nment pr oper t y t o per f or m wor k on t he pr oj ect . Fur ni sh f or each per son:

a. Name

b. Dat e and pl ace of bi r t h

c. Ci t i zenshi p

d. Home addr ess

e. Soci al secur i t y number f . Cur r ent pass expi r at i on dat e

1. 5. 1. 3 No Smoki ng Pol i cy

Smoki ng i s pr ohi bi t ed wi t hi n and out si de of pi er , f uel i ng ar m and bui l di ng, except i n desi gnat ed smoki ng ar eas. Thi s appl i es t o exi st i ng bui l di ngs, bui l di ngs under const r uct i on and bui l di ngs under r enovat i on.

Di scar di ng t obacco mat er i al s ot her t han i nt o desi gnat ed t obacco r ecept acl es i s consi der ed l i t t er i ng and i s subj ect t o f i nes. The Cont r act i ng Of f i cer wi l l i dent i f y desi gnat ed smoki ng ar eas.

SECTI ON 01 14 00 Page 6

1. 5. 2 Wor ki ng Hour s

Regul ar wor ki ng hour s wi l l consi st of an 8 1/ 2 hour per i od est abl i shed by t he Cont r act i ng Of f i cer , Monday t hr ough Fr i day, excl udi ng Gover nment hol i days.

1. 5. 3 Wor k Out si de Regul ar Hour s

Wor k out si de r egul ar wor ki ng hour s r equi r es Cont r act i ng Of f i cer appr oval .

Make appl i cat i on 15 cal endar days pr i or t o such wor k t o al l ow ar r angement s t o be made by t he Gover nment f or i nspect i ng t he wor k i n pr ogr ess, gi v i ng t he speci f i c dat es, hour s, l ocat i on, t ype of wor k t o be per f or med, cont r act number and pr oj ect t i t l e. Based on t he j ust i f i cat i on pr ovi ded, t he Cont r act i ng Of f i cer may appr ove wor k out si de r egul ar hour s. Dur i ng per i ods of dar kness, t he di f f er ent par t s of t he wor k must be l i ght ed i n a manner appr oved by t he Cont r act i ng Of f i cer . Make ut i l i t y cut over s af t er nor mal wor ki ng hour s or on Sat ur days, Sundays, and Gover nment hol i days unl ess di r ect ed ot her wi se.

1. 5. 4 Occupi ed Bui l di ngs and Pi er

The Cont r act or shal l be wor ki ng ar ound exi st i ng pi er , f uel i ng ar m, and bui l di ng whi ch ar e oper at i onal . Do not ent er t he pi er or bui l di ng wi t hout pr i or appr oval of t he Cont r act i ng Of f i cer .

The Cont r act or must r emove and r el ocat e Gover nment pr oper t y on t he pi er as i ndi cat ed on t he dr awi ngs.

1. 5. 5 Ut i l i t y Cut over s and I nt er r upt i ons

a. Make ut i l i t y cut over s and i nt er r upt i ons af t er nor mal wor ki ng hour s or on Sat ur days, Sundays, and Gover nment hol i days. Conf or m t o pr ocedur es r equi r ed i n par agr aph WORK OUTSI DE REGULAR HOURS.

b. Ensur e t hat new ut i l i t y l i nes ar e compl et e, except f or t he connect i on, bef or e i nt er r upt i ng exi st i ng ser vi ce.

c. I nt er r upt i on t o wat er , sani t ar y sewer , st or m sewer , t el ephone ser vi ce, el ect r i c ser vi ce, f i r e al ar m, compr essed ai r ar e consi der ed ut i l i t y cut over s pur suant t o t he par agr aph WORK OUTSI DE REGULAR HOURS.

d. Oper at i on of St at i on Ut i l i t i es: The Cont r act or must not oper at e nor di st ur b t he set t i ng of cont r ol devi ces i n t he st at i on ut i l i t i es syst em, i ncl udi ng wat er , sewer , el ect r i cal , and st eam ser vi ces. The Gover nment wi l l oper at e t he cont r ol devi ces as r equi r ed f or nor mal conduct of t he wor k. The Cont r act or must not i f y t he Cont r act i ng Of f i cer gi v i ng r easonabl e advance not i ce when such oper at i on i s r equi r ed.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTI ON

Not Used

SECTI ON 01 14 00 Page 7

SECTI ON 01 14 00 Page 8

SECTI ON 01 20 00

PRI CE AND PAYMENT PROCEDURES

11/ 20, CHG 3: 02/ 23

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

EP 1110- 1- 8 ( 2021) Engi neer i ng and Desi gn - - Const r uct i on Equi pment Owner shi p and Oper at i ng Expense Schedul e

1. 2 SUBMI TTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" c l assi f i cat i on.

Submi t t al s not havi ng a " G" c l assi f i cat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00

SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Ear ned Val ue Repor t ; G

1. 3 EARNED VALUE REPORT

1. 3. 1 Dat a Requi r ed

Thi s Cont r act r equi r es t he use of a cost - l oaded Net wor k Anal ysi s Schedul e ( NAS) . Schedul e of Pr i ces must not be used wi t h cost - l oaded Net wor k Anal ysi s Schedul e ( NAS) . Use Ear ned Val ue Repor t der i ved f r om cost - l oaded NAS.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .