Attachment D - Construction Experience Data Sheet.docx

DOCX document 43 KB Posted

Attached to
P502 Replace MCAS Beaufort Fuel Pier, Marine Corps Air Station Beaufort, South Carolina
Solicitation number
N4008525R2522
Issued by

About this file

Attachment D is a Construction Experience Data Sheet template designed for contractors to provide detailed project history when responding to the Naval Facilities Engineering Command's solicitation for replacing the MCAS Beaufort Fuel Pier in South Carolina. The form requires comprehensive documentation of past construction projects, including project type, contract details, performance role, award and completion dates, contract value, and specific work performed.

The template captures critical information such as contractor identification, project classification (new construction, renovation, repair), contract type (firm-fixed price, cost/time and material), and delivery method (design-build, design-bid-build). Contractors must provide a detailed description of previous projects, emphasizing relevance to the current solicitation requirements, self-performed work, and any unique features or sustainable certifications. This form serves as a key evaluation tool for assessing a contractor's qualifications and experience for the Marine Corps Air Station Beaufort fuel pier replacement project.

View the file

Other files

File Type Posted
AMD 07.pdf PDF
SF 30 Amendment 06.pdf PDF
Returned to AQ PPI Log_13JUN25.xlsx XLSX spreadsheet
_SF 30 Amendment 04.pdf PDF
_SF 30 Amendment 05.pdf PDF
Returned to AQ PPI Log_11JUN25.xlsx XLSX spreadsheet
Attachment C - Price Proposal Form_R3.docx DOCX document
Returned to AQ PPI Log_10JUN25.xlsx XLSX spreadsheet
Returned to AQ PPI Log_4JUN25.xlsx XLSX spreadsheet
Attachment C - Price Proposal Form_R2 SS.docx DOCX document
_SF 30 Amendment 03.pdf PDF
AD101.pdf PDF
Attachment C - Price Proposal Form_R2.docx DOCX document
SF 30 Amendment 02.pdf PDF
P-502 AMD 007_DWGS_19MAY25.pdf PDF
Trailer and Parking Map.pdf PDF
Attachment C - Price Proposal Form_R2.docx DOCX document
Returned to AQ PPI Log_21MAY2025.xlsx XLSX spreadsheet
Corps of Engineers Permit.pdf PDF
SF 30 Amendment 02.pdf PDF
25R2522 P502 Site visit log.pdf PDF
PPI Log 14May25.xlsx XLSX spreadsheet
RFP AMD 01.pdf PDF
Attachment C - Price Proposal Form (Revised).docx DOCX document
Attachment C - Price Proposal Form.docx DOCX document
Attachment A - Pre-Proposal Inquiry (PPI) Form.xlsx XLSX spreadsheet
Fuel Pier Extension Drawings-14MAY1985.pdf PDF
Attachment J - 1731481dwg01of01.pdf PDF
Attachment F - Historical Small Business Utilization.docx DOCX document
Attachment I - 1731481spc02of03.pdf PDF
Fuel Pier Condition Assessment Report-2022.pdf PDF
Attachment I - 1731481spc01of03.pdf PDF
Attachment E - Past Performance Questionnaire (PPQ).docx DOCX document
Attachment H - Small Business Subcontracting Plan.docx DOCX document
Attachment B - PIEE Vendor Access Instructions.pdf PDF
SECNAV 5512.pdf PDF
616 Map.pdf PDF
Attachment I - 1731481spc03of03.pdf PDF
N4008525R2522.pdf PDF
Fuel Pier Condition Assessment Report-2016.pdf PDF
Fuel Pier Drawings-25MAY1956.pdf PDF
Fuel Pier and Boat Storage Repairs-21OCT2011.pdf PDF
Attachment G - Small Business Participation Commitment Document (SBPCD).docx DOCX document
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT D

CONSTRUCTION EXPERIENCE PROJECT DATA SHEET

Project No. (check one) : |_| CON #1 |_| CON #2 |_| CON #3 |_| CON #4 |_| CON #5

1. Experience for: |_| Offeror |_| Joint-Venture |_| Other (Explain)

Firm Name:

Address:

Phone Number:

UEI Number:

Point of Contact: Contact Phone Number:

2. Work Performed as: |_| Prime Contractor |_| Subcontractor |_| Joint Venture |_| Other (Explain)

Percent of project work performed:

If subcontractor, who was prime (Name/Phone #):

3. Contract Number: Delivery/Task Order Number:

Title:

Location:

4. Award Date (mm/dd/yy): Completion Date (mm/dd/yy):

5. Type of work:

|_| New Construction |_| Renovation |_| Repair |_| Alteration |_| Other (explain):

6. Type of Contract/Task Order: (Check ALL that apply)

|_| Firm-Fixed Price |_| Cost/Time and Material |_| Other (explain):

Complete Block 7 for Construction Projects.

7. Construction Project:

Award Amount: Final Price:

Type of Contract/Task Order: (Check ALL that apply)

|_| Design-Build |_| Design-Bid-Build |_| Delivery/Task Order (IDIQ) |_| Other (explain):

If Design-Build, identify the Lead Design Firm:______________________________________________

8. Provide a detailed description of the project and the relevancy to the project requirements of this RFP (i.e.: unique features, square footage, construction methods), including any sustainable features or Third-Party sustainable certifications. If design-build, include a description of the design-effort.

9. Provide a detailed description of what work your firm self-performed on this project:

10. Other Information:

Attachment D (April 2022)
Page 2 of 2

File details come from the government source that posted it. Updated .