Attachment C - Price Proposal Form.docx

DOCX document 25 KB Posted

Attached to
P502 Replace MCAS Beaufort Fuel Pier, Marine Corps Air Station Beaufort, South Carolina
Solicitation number
N4008525R2522
Issued by

About this file

This is a Price Proposal Form for the P502 Project to replace the Fuel Pier at Marine Corps Air Station Beaufort, South Carolina. The document outlines detailed pricing for multiple contract line items (CLINs), including a base price for pier demolition and reconstruction, with specific unit prices for prestressed concrete piles, pile load testing, and potential work stoppages. The base contract includes demolition of an existing pier, construction of a new fuel pier, approach road realignment, and associated incidental work.

The pricing structure includes six primary line items with both base and optional components, covering concrete pile installation, dynamic pile load testing, work shutdowns related to Marine Mammal Protection Act (MMPA) compliance, fuel loading arm replacement, storage container concrete pads, and potential soil remediation. The government reserves the right to award optional line items within 270 calendar days after contract award, with a total contract completion timeline of 900 calendar days. The solicitation is issued by the Department of the Navy Naval Facilities Engineering Command, with a solicitation number of N4008525R2522, and includes provisions for unilateral government options and potential bid rejections for unbalanced pricing.

View the file

Other files

File Type Posted
AMD 07.pdf PDF
SF 30 Amendment 06.pdf PDF
Returned to AQ PPI Log_13JUN25.xlsx XLSX spreadsheet
_SF 30 Amendment 04.pdf PDF
_SF 30 Amendment 05.pdf PDF
Returned to AQ PPI Log_11JUN25.xlsx XLSX spreadsheet
Attachment C - Price Proposal Form_R3.docx DOCX document
Returned to AQ PPI Log_10JUN25.xlsx XLSX spreadsheet
Returned to AQ PPI Log_4JUN25.xlsx XLSX spreadsheet
Attachment C - Price Proposal Form_R2 SS.docx DOCX document
_SF 30 Amendment 03.pdf PDF
AD101.pdf PDF
Attachment C - Price Proposal Form_R2.docx DOCX document
SF 30 Amendment 02.pdf PDF
P-502 AMD 007_DWGS_19MAY25.pdf PDF
Trailer and Parking Map.pdf PDF
Attachment C - Price Proposal Form_R2.docx DOCX document
Returned to AQ PPI Log_21MAY2025.xlsx XLSX spreadsheet
Corps of Engineers Permit.pdf PDF
SF 30 Amendment 02.pdf PDF
25R2522 P502 Site visit log.pdf PDF
PPI Log 14May25.xlsx XLSX spreadsheet
RFP AMD 01.pdf PDF
Attachment C - Price Proposal Form (Revised).docx DOCX document
Attachment A - Pre-Proposal Inquiry (PPI) Form.xlsx XLSX spreadsheet
Fuel Pier Extension Drawings-14MAY1985.pdf PDF
Attachment J - 1731481dwg01of01.pdf PDF
Attachment F - Historical Small Business Utilization.docx DOCX document
Attachment I - 1731481spc02of03.pdf PDF
Fuel Pier Condition Assessment Report-2022.pdf PDF
Attachment I - 1731481spc01of03.pdf PDF
Attachment E - Past Performance Questionnaire (PPQ).docx DOCX document
Attachment H - Small Business Subcontracting Plan.docx DOCX document
Attachment B - PIEE Vendor Access Instructions.pdf PDF
SECNAV 5512.pdf PDF
616 Map.pdf PDF
Attachment I - 1731481spc03of03.pdf PDF
N4008525R2522.pdf PDF
Fuel Pier Condition Assessment Report-2016.pdf PDF
Fuel Pier Drawings-25MAY1956.pdf PDF
Fuel Pier and Boat Storage Repairs-21OCT2011.pdf PDF
Attachment D - Construction Experience Data Sheet.docx DOCX document
Attachment G - Small Business Participation Commitment Document (SBPCD).docx DOCX document
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICE PROPOSAL FORM

Provide line item prices, where indicated by blank underlines, for the following items:

Line Item (CLIN)
Description
Quantity
Unit
Unit Price
Sub-Total
Total Price
1
BASE PRICE: Total Price for the entire work for Project P502 – the demolition of an existing pier, provision of a Fuel Pier, approach road realignment, and incidental work in accordance with the drawings and specifications, complete, but excluding work provided in another Priced Line Item.
1
EA
1A
Unit Price for providing 18” square prestressed concrete bearing piles with HP Stingers complete in accordance with the drawings and specifications, but excluding work provided in another Line Item.
9,040
LF
1B
Unit Price for providing 18” square prestressed concrete floating platform guide piles with HP Stingers complete in accordance with the drawings and specifications, but excluding work provided in another Line Item.
4
EA
1C
Unit Price for providing Dynamic Pile Load Test for the 18” square prestressed concrete bearing piles (includes re-strike), complete in accordance with the drawings and specifications, but excluding work provided in another Line Item.
9
EA
1D
Unit Price for a 100% work shutdown resulting from required compliance with the Marine Mammal Protection Plan (MMPP) for all applicable waterborne construction operations. The hourly rate price includes all costs associated with work stoppage. (Each Delays will be rounded up to the next "whole" hour.)
34
Hour
2
Option Item No. 1: Price for providing all work in connection with the demolition of the existing Fuel Loading Arm and the provision of a Fuel Loading Arm, Controls, incidentals, and acceptance testing, complete in accordance with the drawings and specifications, but excluding work provided in another Line Item.
1
Lump Sum
3
Option Item No. 2: Price for providing all work in connection with provision of Conex Storage Container Concrete Pads, complete in accordance with the drawings and specifications, but excluding work provided in another Line Item.
1
Lump Sum
4
Option Item No. 3 Unit Price for a 100% work shutdown, not already identified in the contract, resulting from Government activities which may last more than (2) hours and less than one day for which the contractor will be required to stop work and evacuate his personnel from the job site. Hourly unit price includes all costs associated with vacating the job site.
40
Hour
5
Option Item No. 4: Unit Price for a 100% total work shutdown, not already identified in the contract, resulting from Government activities and lasting more than one day and for which the contractor will be require to stop work and completely evacuate his personnel and equipment from the job site. Daily rate price includes all costs associated with vacating the job site.
10
Day
6
Option Item No. 5: Unit Price for undercut, temporary stockpiling, and disposal of geotechnically unsuitable subgrade soils and replacement with imported structural fill material or with #57 crushed stone for the P502 Project, complete in accordance with the drawings and specifications, but excluding work provided in another Line Item.
2,000
CY

1.1 GENERAL BID NOTES

a. Award will be made on the total sum of Contract Line Item (CLINs) 1. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.

b. The Government reserves the unilateral right to award CLINs 2, 3, 4, 5, and 6 to the Contractor at the proposed price within 270 calendar days after the contract award. A firm fixed proposed price is required for CLINs 2, 3, 4, 5, and 6. No provision is made for economic price adjustment. If the Option is exercised, the contract completion date remains 900 calendar days after award of the contract.

c. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.

1.2 CLIN BID NOTES

a. For CLIN 1F: Unit Price for only 100% work shutdown not previously identified in the contract and only related to waterborne operations associated with MMPA compliance. This pertain to only those work stoppages, during typical work day hours, in which the contractor has already begun his work but is then required by MMPA compliance to temporarily halt his operations due to that activity. The subject "Unit Priced Bid Item(s)" will require approval as directed by the Contracting Officer.

b. Requirements for the Marine Mammal Protection Act (MMPA) "observers" and for the various unit prices identified in the schedule(s) above shall be deemed to include all costs required for the specified work, complete in accordance with the specifications, including all materials, labor, equipment, tools, supervision, reporting and related items. Refer to contract documents for MMPA "observer(s)" and operational requirements.

c. For CLIN 4 and 5: Unit price for the ABOVE AND BEYOND 100% work shutdown, not previously identified in connection with Project P502 resulting from a Government Activity where the contractor is unable to shift manpower and equipment to other productive contract work. The Contractor must notify the Contracting Officer immediately of a pending shutdown if directed by any other government official so that the Contracting Officer has the opportunity to avoid or mitigate the down time, complete in accordance with drawings and specifications. The subject "Unit Priced Bid Item(s)" do not extend beyond the typical working hours of a normal business day and all will require approval as directed by the Contracting Officer.

d. For CLIN 6: Unit price for all work in connection with the removal, disposal and replacement of geotechnically unsuitable subgrade soil (i.e. soft subgrade soils) with imported structural backfill or imported #57 crushed stone as specified. Unsuitable subgrade soil determinations shall be made by the Government Geotechnical Engineer and approved by the Contracting Officer. The price shall include removal of geotechnically unsuitable soils encountered at the planned footing subgrades or identified during proofrolling of planned subgrades, disposal at the specified disposal facility, and backfilling the excavation with compacted imported structural backfill or imported aggregate. Soils disturbed by the contractor’s construction activities, or that are excessively wet and soft due to lack of proper site maintenance and protection measures, and lack of specified drainage or excavation dewatering will not be considered unsuitable. Unit price shall include all handling and transportation. The volume of material removed and imported backfill required shall be neat quantities determined based on field measurements (length x width x depth) of the completed excavation to remove the unsuitable soil as approved by the Contracting Officer. Any work under this CLIN will not proceed without prior written approval of the Contracting Officer and direction of the Government Geotechnical Engineer.