FA852316R0001_0011(4).pdf

PDF 108 KB Posted

Attached to
Pocket J Engineering Support Federal contract opportunity
Solicitation number
FD2060-14-30523
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

FA8523-116-R-0001-0011

View the file

Other files for this federal contract opportunity

Other files attached to Pocket J Engineering Support, newest first.
File Type Posted
Pocket_J_Proposal_spreadsheet.xlsx XLSX spreadsheet
PktJConsolidatedGFPDec2016.pdf PDF
FA8523-16-R-0001-0010.pdf PDF
GFP_compliance_RFP.pdf PDF
Pocket_J_Proposal_spreadsheet.xlsx XLSX spreadsheet
DD254.pdf PDF
CDRLs_Portfolio.pdf PDF
QASP7mar17.pdf PDF
Pocket_J_PWS_(2_Feb_17).pdf PDF
PktJConsolidatedGFPDec2016.pdf PDF
DD1653.pdf PDF
FA852316R0001_0009,_rev13.pdf PDF
Pocket_J_Proposal_spreadsheet_(2_Feb_17).xlsx XLSX spreadsheet
AFMC158_00.pdf PDF
FA852316R0001_0008.pdf PDF
Mod_5_PJ_Questions_(Govt_Responses).xlsx XLSX spreadsheet
Mod_6_PJ_Questions_(Govt_Responses).xlsx XLSX spreadsheet
Repost_Amend_05_Questions.pdf PDF
FA852316R0001_______0007-amendment.pdf PDF
FA852316R0001_______0006.pdf PDF
FA852316R0001_0005(8).pdf PDF
PWS_31Aug16_(FINAL).pdf PDF
FA852316R0001_______0004.pdf PDF
FA852316R0001_______0003.pdf PDF
RFP_Questions_and_Answer_22_Jan_2016.docx.pdf PDF
REInstructorTrainingGuide141216_v6.pdf PDF
FE_Training_Instructor_Guide_141216 _v5.pdf PDF
TO_31R2-2FSC134-1_Pocket_J_Spiral_2.3.1_Fixed_Element_(FE)_30_June_2011.pdf PDF
TO_31R2-2FSC135-1_Pocket_J_Spiral_2.3.1_Remote_Element_(RE)_30_June_2011.pdf PDF
RFP_Combined_Questions_and_Answers_Rev1.docx DOCX document
FA852316R0001_______0002.pdf PDF
PWS_18Dec2015.pdf PDF
NewCDRLList_31Dec2015.pdf PDF
RFP_Combined_Questions_and_Answers.pdf PDF
FA852316R0001_______0001.pdf PDF
SGFP.pdf PDF
254.pdf PDF
PKG.pdf PDF
CDRLs.pdf PDF
FA852316R0001-FINAL.pdf PDF
PWSv3.pdf PDF
PWS_14_May_15.pdf PDF
L_and_M_Lowest_Price_Technically_Acceptable_v2.pdf PDF
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

JSU

2. AMENDMENT/MODIFICATION NO.

FA8523-16-R-0001-0011

3. EFFECTIVE DATE

4. REQUISITION/PURCHASE REQ. NO.

FD20601430523

5. PROJECT NO (If applicable)

6. ISSUED BY CODE

AVIONICS, AFLCMC/WNKE

235 BYRON ST STE 19A

BLDG 300 CML PHN 478 926 7462

ROBINS AFB GA 31098-1670

BUYER: Chutney W. Guyton/WNKE chutney.guyton@us.af.mil Phone: (478) 926- 7000 No Collect Calls

7. ADMINISTERED BY (If other than item 6) CODEFA8540

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE

X

9A. AMENDMENT OF SOLICITATION NO.

FA852316R0001

9B. DATED (SEE ITEM 11)

3-MAY-2017

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

ROUTINE

15A. NAME AND TITLE OF SIGNER (Type or print)

15B. CONTRACTOR/OFFEROR

BY ________________________________________________________

(Signature of person authorized to sign)

15C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16B. UNITED STATES OF AMERICA

BY ____________________________________________________

(Signature of Contracting Officer)

16C. DATE SIGNED

FACILITY CODE

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (REV. 10-83)

PRESCRIBED BY GSA

FAR (48 CFR) 53.243

X

X

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION

The purpose of this amendment is to:

1) Revise the following Note for CLIN X005 as follows:

FROM: Pricing for CLIN X003 for the Base Year and Option Year II will be included as part of the Total Evaluated Price (TEP). However, this CLIN will be negotiated in Option Years II, III, and IV.

TO: The known occurrence/task will be priced and included in the TEP at the Base Year only. The price for this occurrence will remain valid for two years (the Base Year and Option Year I). All other occurrences are to be negotiated (TBN) and will not be included in the TEP.

2) All other terms and conditions remained unchanged.

PART I - THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 NOTICE TO OFFERORS: Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.

B.2 GENERAL: This Request for Proposals (RFP) is issued with the intent to establish a contract for the Pocket J System. The Contractor (independently and not as an agent of the Government) shall furnish all necessary personnel, labor, supplies, materials and travel (except as otherwise authorized by the Contracting Officer) as required to perform the Pocket J requirements described herein, and as required under each line item.

Performance shall be in accordance with all provisions and specifications as stipulated herein.

B.3 CONTRACT TYPE: This is an Indefinite Delivery, Indefinite Quantity (IDIQ) type contract as contemplated at FAR 16.504. This contract utilizes a mix of Contract Line Item (CLIN) types, specifically Firm-Fixed-Price (FFP), Cost-Plus-Fixed-Fee (CPFF), Cost Reimbursable-No Fee (CRNF). Each CLIN indicates the type used for each particular requirement.

B.4 OPTION PERIODS: This contract will include four 12 month option periods that will be awarded with the basic contract, but not exercised at the time of award. In accordance with the clauses in Section I of this contract, FAR 52.217-9, Option to Extend the Term of the Contract, the Government may extend the term of this contract by written notice to the Contractor within a stated period of time within which the Contracting Officer may exercise the option. In accordance with FAR 52.217-8, Option to Extend Services, the Government may require continued performance of any services within the limits at the specified rates in the contract. The option provision may be exercised more than once, but shall not exceed six months. The Contracting Officer may exercise the option by written notice to the Contractor within a stated period of time. The inclusion of the options will not obligate the Government to exercise them. The option periods associated with each CLIN series are defined as follows:

000X – Contract Award thru 365 calendar days after contract award 100X – 366 calendar days after contract award thru 730 calendar days after contract award 200X – 731 calendar days after contract award thru 1,095 calendar days after contract award 300X – 1,096 calendar days after contract award thru 1,460 calendar days after contract award 400X – 1,461 calendar days after contract award thru 1,825 calendar days after contract award

Note: An option is considered to have been exercised at the time the Government deposits written notification to the Contractor via mail or other electronic means of notification.

B.5 PLACE OF PERFORMANCE: Performance of options issued hereunder shall be in accordance with t h e e x e r c i s e o f e a c h individual option.

B.6 MINIMUM/MAXIMUM VALUE: The contractor shall furnish to the Government, when and if ordered, the items of supplies or services specified in this Schedule up to and including the “Maximum" amount $XX,XXX,XXX for all orders issued hereunder. The Government shall order at least the “Minimum” amount $2,000,000 in conjunction with award of the basic contract. The quantities of supplies or services specified in this Schedule are estimates only and are not purchased by this contract. Except as this contract may otherwise provide, if the

Government’s requirements do not result in orders in the quantities described as ”estimated” or “maximum” in the schedule, that fact shall not constitute the basis for an e q u i t a b le price adjustment.

Program Management

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

Program Management Program Management IAW PWS dated 2 Feb 2017, para. 4.2.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

Req No / Pri

Required Period of Performance

IAW PWS 12 MO TBC

Proposed Period of Performance

IAW PWS 12 MO

Maintenance Support

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

Maintenance Support Maintenance Support IAW PWS dated 2 Feb 2017, para. 4.4.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Maintenance Support

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

IAW PWS 12 MO TBC

Proposed Period of Performance

IAW PWS 12 MO

Over and Above

Item No.

Cost Plus Fixed Fee Quantity U/I Unit Price Fixed Fee Est Total Cost 1 LO To be Negotiated To be Negotiated

Over and Above Over and Above IAW PWS dated 2 Feb 2017, para. 4.6.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

Over and Above

IAW PWS 1 LO TBC

Proposed Period of Performance

IAW PWS 1 LO

Training (1 Week Course)

Item No.

Firm Fixed Price From Quantity U/I To Quantity U/I Unit Price Amount

1 EA 5 EA

Training (1 Week Course) Training (1 Week Course) IAW PWS dated 2 Feb 2017, para. 9.0.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

IAW PWS 1 EA

TBC

Proposed Period of Performance

IAW PWS 1 EA

Block Cycle & Software Upgrades

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

Block Cycle & Software Upgrades

Block Cycle & Software Upgrades Block Cycle & Software Upgrades IAW PWS dated 2 Feb 2017, all paras in section 8.0.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

IAW PWS 1 LO TBC

Proposed Period of Performance

IAW PWS 1 LO

The known occurrence/task will be priced and included in the TEP at the Base Year only. The price for this occurrence will remain valid for two years (the Base Year and Option Year I). All other occurrences are to be negotiated (TBN) and will not be included in the TEP.

Cybersecurity

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

Cybersecurity Cybersecurity IAW PWS dated 2 Feb 2017, all paras in section 6.0.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required

Cybersecurity

Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

IAW PWS 1 LO TBC

Proposed Period of Performance

IAW PWS 1 LO

GFE Management

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

GFE Management GFE Management IAW PWS dated 2 Feb 2017, para 4.3.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

IAW PWS 1 LO TBC

Proposed

GFE Management

IAW PWS 1 LO

Repair (Minor)

Item No.

Firm Fixed Price From Quantity U/I To Quantity U/I Amount

1 EA 50 EA

Repair (Minor) Minor Repairs IAW PWS dated 2 Feb 2017, para. 4.5.1.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be determined _ Req No / Pri

Required Period of Performance

IAW PWS 1 EA

TBD

Proposed Period of Performance

IAW PWS 1 EA

Repair (Major)

Item No.

Firm Fixed Price From Quantity U/I To Quantity U/I Unit Price Amount

1 EA 50 EA

R408 Repair (Major) Major Repairs IAW PWS dated 2 Feb 2017, para. 4.5.2.

Repair (Major)

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be determined _ Req No / Pri

Required Period of Performance

IAW PWS 1 EA

TBD

Proposed Period of Performance

IAW PWS 1 EA

Travel

Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

TRAVEL AS APPROVED IN ADVANCE BY CONTRACTING OFFICER

Travel IAW PWS dated 2 Feb 2017, para. 4.9. All Travel shall be IAW Joint Travel Regulations (JTR) and FAR 31.2.

Priority: R ROUTINE

Contractor Furnished Material (CFM)

Item No.

Cost Reimbursement - No Fee Quantity U/I Estimated Unit Price Total Estimated Cost

1 LO

Contractor Furnished Material (CFM) Consumable/Expendable GFE Items PWS dated 2 Feb 2017, para. 4.3.1.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Contractor Furnished Material (CFM)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

IAW PWS 1 LO TBC

Proposed Period of Performance

IAW PWS 1 LO

DATA

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

DATA

Data IAW PWS dated 2 Feb 2017, para 7.0. See attached DD1423s.

ELIN Title Data Acq Doc #

A001 Presentation Material DI-ADMN-81373

A002 Conference Minutes DI-ADMN-81249, 81250B

A003 Diminishing Source of Supply and Material Shortage (DMSMS) DI-MGMT-81948

A004 Configuration Management Plan DI-MGMT-81875

A005 Status Reports DI-MGMT-80368A

A006 Parts Approval Reuest DI-MISC-80071E

A007 Acceptance Test Plan DI-QCIC-80553A

A008 Technical Manual Contract Requirement (TMCR) TM-86-01P

A009 Product Drawings/Models and Associated Lists DI-SESS-81000E

A010 Provisioning DI-SESS-81758A, -81759A, -81874

A011 Accident/Incident Report DI-SAFT-81563

A012 Gov't Industry Data Exchange Program (GIDEP) Alert Response DI-QCIC-80126B

A013 Gov't Industry Data Exchange Program (GIDEP) Alert/Safe-Alert Report DI-QCIC-80125B

A014 Engineering Change Proposal DI-SESS-80639D

A015 Software Development Plan DI-IPSC-81427A

A016 Software Version Description DI-IPSC-81442A

A017 Software Design Description DI-IPSC-81435A

DATA

A018 Interface Control Document DI-CMAN-81248B

A019 Software Requirements Specification DI-IPSC-81433A

A020 Interface Requirements Specification DI-IPSC-81434A

A021 Specification Change Notice DI-CMAN-80643D

A022 System/Subsystem Design Description DI-IPSC-81432A

A023 Interface Design Descriptions DI-IPSC-81436A

A024 Item Unique Identification Marking Plan DI-MGMT-80803

A025 Phase-Out Transition Plan DI-MGMT-81945

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW1423 1 LO TBC

Proposed Period of Performance

+ IAW1423 1 LO

Program Management

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

Program Management Program Management IAW PWS dated 2 Feb 2017, para. 4.2.

Program Management

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

Req No / Pri

Required Period of Performance

IAW PWS 12 MO TBC

Proposed Period of Performance

IAW PWS 12 MO

Maintenance Support

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

Maintenance Support Maintenance Support IAW PWS dated 2 Feb 2017, para. 4.4.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required

Maintenance Support

IAW PWS 12 MO TBC

Proposed Period of Performance

IAW PWS 12 MO

Over and Above

Item No.

Cost Plus Fixed Fee Quantity U/I Unit Price Fixed Fee Est Total Cost 1 LO To be Negotiated To be Negotiated

Over and Above Over and Above IAW PWS dated 2 Feb 2017, para. 4.6.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

IAW PWS 1 LO TBC

Proposed Period of Performance

IAW PWS 1 LO

Training (1 Week Course)

Item No.

Firm Fixed Price From Quantity U/I To Quantity U/I Unit Price Amount

1 EA 5 EA

Training (1 Week Course)

Training (1 Week Course) Training (1 Week Course) IAW PWS dated 2 Feb 2017, para. 9.0.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

IAW PWS 1 EA

TBC

Proposed Period of Performance

IAW PWS 1 EA

Block Cycle & Software Upgrades

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

Block Cycle & Software Upgrades Block Cycle & Software Upgrades IAW PWS dated 2 Feb 2017, all paras in section 8.0.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None

Block Cycle & Software Upgrades

Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

IAW PWS 1 LO TBC

Proposed Period of Performance

IAW PWS 1 LO

The known occurrence/task will be priced and included in the TEP at the Base Year only. The

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

Cybersecurity Cybersecurity IAW PWS dated 2 Feb 2017, all paras in section 6.0.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of

IAW PWS 1 LO TBC

Cybersecurity

Proposed Period of Performance

IAW PWS 1 LO

GFE Management

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

GFE Management GFE Management IAW PWS dated 2 Feb 2017, para 4.3.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

IAW PWS 1 LO TBC

Proposed Period of Performance

IAW PWS 1 LO

Repair (Minor)

Item No.

Firm Fixed Price From Quantity U/I To Quantity U/I Amount

1 EA 50 EA

Repair (Minor) Minor Repairs IAW PWS dated 2 Feb 2017, para. 4.5.1.

Repair (Minor)

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be determined _ Req No / Pri

Required Period of Performance

IAW PWS 1 EA

TBD

Proposed Period of Performance

IAW PWS 1 EA

Repair (Major)

Item No.

Firm Fixed Price From Quantity U/I To Quantity U/I Unit Price Amount

1 EA 50 EA

R408 Repair (Major) Major Repairs IAW PWS dated 2 Feb 2017, para. 4.5.2.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be determined _ Req No / Pri

Required

Repair (Major)

IAW PWS 1 EA

TBD

Proposed Period of Performance

IAW PWS 1 EA

Travel

Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

TRAVEL AS APPROVED IN ADVANCE BY CONTRACTING OFFICER

Travel IAW PWS dated 2 Feb 2017, para. 4.9. All Travel shall be IAW Joint Travel Regulations (JTR) and FAR 31.2.

Priority: R ROUTINE

Contractor Furnished Material (CFM)

Item No.

Cost Reimbursement - No Fee Quantity U/I Estimated Unit Price Total Estimated Cost

1 LO

Contractor Furnished Material (CFM) Consumable/Expendable GFE Items PWS dated 2 Feb 2017, para. 4.3.1.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of

Contractor Furnished Material (CFM)

Proposed Period of Performance

IAW PWS 1 LO

DATA

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

DATA

Data IAW PWS dated 2 Feb 2017, para 7.0. See attached DD1423s.

ELIN Title Data Acq Doc #

A001 Presentation Material DI-ADMN-81373

A002 Conference Minutes DI-ADMN-81249, 81250B

A003 Diminishing Source of Supply and Material Shortage (DMSMS) DI-MGMT-81948

A004 Configuration Management Plan DI-MGMT-81875

A005 Status Reports DI-MGMT-80368A

A006 Parts Approval Reuest DI-MISC-80071E

A007 Acceptance Test Plan DI-QCIC-80553A

A008 Technical Manual Contract Requirement (TMCR) TM-86-01P

A009 Product Drawings/Models and Associated Lists DI-SESS-81000E

A010 Provisioning DI-SESS-81758A, -81759A, -81874

A011 Accident/Incident Report DI-SAFT-81563

A012 Gov't Industry Data Exchange Program (GIDEP) Alert Response DI-QCIC-80126B

A013 Gov't Industry Data Exchange Program (GIDEP) Alert/Safe-Alert Report DI-QCIC-80125B

A014 Engineering Change Proposal DI-SESS-80639D

A015 Software Development Plan DI-IPSC-81427A

A016 Software Version Description DI-IPSC-81442A

A017 Software Design Description DI-IPSC-81435A

A018 Interface Control Document DI-CMAN-81248B

A019 Software Requirements Specification DI-IPSC-81433A

A020 Interface Requirements Specification DI-IPSC-81434A

A021 Specification Change Notice DI-CMAN-80643D

A022 System/Subsystem Design Description DI-IPSC-81432A

A023 Interface Design Descriptions DI-IPSC-81436A

A024 Item Unique Identification Marking Plan DI-MGMT-80803

A025 Phase-Out Transition Plan DI-MGMT-81945

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW1423 1 LO TBC

Proposed Period of Performance

+ IAW1423 1 LO

Program Management

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

Program Management Program Management IAW PWS dated 2 Feb 2017, para. 4.2.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

Req No / Pri

Required

Program Management

IAW PWS 12 MO TBC

Proposed Period of Performance

IAW PWS 12 MO

Maintenance Support

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

Maintenance Support Maintenance Support IAW PWS dated 2 Feb 2017, para. 4.4.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

IAW PWS 12 MO TBC

Proposed Period of Performance

IAW PWS 12 MO

Over and Above

Item No.

Cost Plus Fixed Fee Quantity U/I Unit Price Fixed Fee Est Total Cost 1 LO To be Negotiated To be Negotiated

Over and Above

Over and Above Over and Above IAW PWS dated 2 Feb 2017, para. 4.6.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

IAW PWS 1 LO TBC

Proposed Period of Performance

IAW PWS 1 LO

Training (1 Week Course)

Item No.

Firm Fixed Price From Quantity U/I To Quantity U/I Unit Price Amount

1 EA 5 EA

Training (1 Week Course) Training (1 Week Course) IAW PWS dated 2 Feb 2017, para. 9.0.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

None

Training (1 Week Course)

Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

IAW PWS 1 EA

TBC

Proposed Period of Performance

IAW PWS 1 EA

Block Cycle & Software Upgrades

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

Block Cycle & Software Upgrades Block Cycle & Software Upgrades IAW PWS dated 2 Feb 2017, all paras in section 8.0.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

IAW PWS 1 LO TBC

Proposed Period of

IAW PWS 1 LO

The known occurrence/task will be priced and included in the TEP at the Base Year only. The

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

Cybersecurity Cybersecurity IAW PWS dated 2 Feb 2017, all paras in section 6.0.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

IAW PWS 1 LO TBC

Proposed Period of Performance

IAW PWS 1 LO

GFE Management

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

GFE Management GFE Management IAW PWS dated 2 Feb 2017, para 4.3.

GFE Management

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

IAW PWS 1 LO TBC

Proposed Period of Performance

IAW PWS 1 LO

Repair (Minor)

Item No.

Firm Fixed Price From Quantity U/I To Quantity U/I Amount

1 EA 50 EA

Repair (Minor) Minor Repairs IAW PWS dated 2 Feb 2017, para. 4.5.1.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be determined _ Req No / Pri

Required

Repair (Minor)

IAW PWS 1 EA

TBD

Proposed Period of Performance

IAW PWS 1 EA

Repair (Major)

Item No.

Firm Fixed Price From Quantity U/I To Quantity U/I Unit Price Amount

1 EA 50 EA

R408 Repair (Major) Major Repairs IAW PWS dated 2 Feb 2017, para. 4.5.2.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be determined _ Req No / Pri

Required Period of Performance

IAW PWS 1 EA

TBD

Proposed Period of Performance

IAW PWS 1 EA

Travel

Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

TRAVEL AS APPROVED IN ADVANCE BY CONTRACTING OFFICER

Travel

Travel IAW PWS dated 2 Feb 2017, para. 4.9. All Travel shall be IAW Joint Travel Regulations (JTR) and FAR 31.2.

Priority: R ROUTINE

Contractor Furnished Material (CFM)

Item No.

Cost Reimbursement - No Fee Quantity U/I Estimated Unit Price Total Estimated Cost

1 LO

Contractor Furnished Material (CFM) Consumable/Expendable GFE Items PWS dated 2 Feb 2017, para. 4.3.1.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

IAW PWS 1 LO TBC

Proposed Period of Performance

IAW PWS 1 LO

DATA

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

DATA

Data IAW PWS dated 2 Feb 2017, para 7.0. See attached DD1423s.

ELIN Title Data Acq Doc #

A001 Presentation Material DI-ADMN-81373

DATA

A002 Conference Minutes DI-ADMN-81249, 81250B

A003 Diminishing Source of Supply and Material Shortage (DMSMS) DI-MGMT-81948

A004 Configuration Management Plan DI-MGMT-81875

A005 Status Reports DI-MGMT-80368A

A006 Parts Approval Reuest DI-MISC-80071E

A007 Acceptance Test Plan DI-QCIC-80553A

A008 Technical Manual Contract Requirement (TMCR) TM-86-01P

A009 Product Drawings/Models and Associated Lists DI-SESS-81000E

A010 Provisioning DI-SESS-81758A, -81759A, -81874

A011 Accident/Incident Report DI-SAFT-81563

A012 Gov't Industry Data Exchange Program (GIDEP) Alert Response DI-QCIC-80126B

A013 Gov't Industry Data Exchange Program (GIDEP) Alert/Safe-Alert Report DI-QCIC-80125B

A014 Engineering Change Proposal DI-SESS-80639D

A015 Software Development Plan DI-IPSC-81427A

A016 Software Version Description DI-IPSC-81442A

A017 Software Design Description DI-IPSC-81435A

A018 Interface Control Document DI-CMAN-81248B

A019 Software Requirements Specification DI-IPSC-81433A

A020 Interface Requirements Specification DI-IPSC-81434A

A021 Specification Change Notice DI-CMAN-80643D

A022 System/Subsystem Design Description DI-IPSC-81432A

A023 Interface Design Descriptions DI-IPSC-81436A

A024 Item Unique Identification Marking Plan DI-MGMT-80803

A025 Phase-Out Transition Plan DI-MGMT-81945

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required

+ IAW1423 1 LO TBC

Proposed Period of Performance

+ IAW1423 1 LO

Program Management

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

Program Management Program Management IAW PWS dated 2 Feb 2017, para. 4.2.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

Req No / Pri

Required Period of Performance

IAW PWS 12 MO TBC

Proposed Period of Performance

IAW PWS 12 MO

Maintenance Support

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

Maintenance Support Maintenance Support IAW PWS dated 2 Feb 2017, para. 4.4.

Maintenance Support

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

IAW PWS 12 MO TBC

Proposed Period of Performance

IAW PWS 12 MO

Over and Above

Item No.

Cost Plus Fixed Fee Quantity U/I Unit Price Fixed Fee Est Total Cost 1 LO To be Negotiated To be Negotiated

Over and Above Over and Above IAW PWS dated 2 Feb 2017, para. 4.6.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Over and Above

Required Period of Performance

IAW PWS 1 LO TBC

Proposed Period of Performance

IAW PWS 1 LO

Training (1 Week Course)

Item No.

Firm Fixed Price From Quantity U/I To Quantity U/I Unit Price Amount

1 EA 5 EA

Training (1 Week Course) Training (1 Week Course) IAW PWS dated 2 Feb 2017, para. 9.0.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

IAW PWS 1 EA

TBC

Proposed Period of Performance

IAW PWS 1 EA

Block Cycle & Software Upgrades

Item No.

Firm Fixed Price

Block Cycle & Software Upgrades

Quantity U/I Unit Price Amount

1 LO

Block Cycle & Software Upgrades Block Cycle & Software Upgrades IAW PWS dated 2 Feb 2017, all paras in section 8.0.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

IAW PWS 1 LO TBC

Proposed Period of Performance

IAW PWS 1 LO

The known occurrence/task will be priced and included in the TEP at the Base Year only. The

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

Cybersecurity Cybersecurity IAW PWS dated 2 Feb 2017, all paras in section 6.0.

Cybersecurity

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

IAW PWS 1 LO TBC

Proposed Period of Performance

IAW PWS 1 LO

GFE Management

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

GFE Management GFE Management IAW PWS dated 2 Feb 2017, para 4.3.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required

GFE Management

IAW PWS 1 LO TBC

Proposed Period of Performance

IAW PWS 1 LO

Repair (Minor)

Item No.

Firm Fixed Price From Quantity U/I To Quantity U/I Amount

1 EA 50 EA

Repair (Minor) Minor Repairs IAW PWS dated 2 Feb 2017, para. 4.5.1.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be determined _ Req No / Pri

Required Period of Performance

IAW PWS 1 EA

TBD

Proposed Period of Performance

IAW PWS 1 EA

Repair (Major)

Item No.

Firm Fixed Price From Quantity U/I To Quantity U/I Unit Price Amount

1 EA 50 EA

R408 Repair (Major)

Repair (Major)

Major Repairs IAW PWS dated 2 Feb 2017, para. 4.5.2.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be determined _ Req No / Pri

Required Period of Performance

IAW PWS 1 EA

TBD

Proposed Period of Performance

IAW PWS 1 EA

Travel

Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

TRAVEL AS APPROVED IN ADVANCE BY CONTRACTING OFFICER

Travel IAW PWS dated 2 Feb 2017, para. 4.9. All Travel shall be IAW Joint Travel Regulations (JTR) and FAR 31.2.

Priority: R ROUTINE

Contractor Furnished Material (CFM)

Item No.

Cost Reimbursement - No Fee Quantity U/I Estimated Unit Price Total Estimated Cost

1 LO

Contractor Furnished Material (CFM) Consumable/Expendable GFE Items PWS dated 2 Feb 2017, para. 4.3.1.

Contractor Furnished Material (CFM)

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

IAW PWS 1 LO TBC

Proposed Period of Performance

IAW PWS 1 LO

DATA

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

DATA

Data IAW PWS dated 2 Feb 2017, para 7.0. See attached DD1423s.

ELIN Title Data Acq Doc #

A001 Presentation Material DI-ADMN-81373

A002 Conference Minutes DI-ADMN-81249, 81250B

A003 Diminishing Source of Supply and Material Shortage (DMSMS) DI-MGMT-81948

A004 Configuration Management Plan DI-MGMT-81875

A005 Status Reports DI-MGMT-80368A

A006 Parts Approval Reuest DI-MISC-80071E

A007 Acceptance Test Plan DI-QCIC-80553A

A008 Technical Manual Contract Requirement (TMCR) TM-86-01P

A009 Product Drawings/Models and Associated Lists DI-SESS-81000E

A010 Provisioning DI-SESS-81758A, -81759A, -81874

A011 Accident/Incident Report DI-SAFT-81563

A012 Gov't Industry Data Exchange Program (GIDEP) Alert Response DI-QCIC-80126B

A013 Gov't Industry Data Exchange Program (GIDEP) Alert/Safe-Alert Report DI-QCIC-80125B

DATA

A014 Engineering Change Proposal DI-SESS-80639D

A015 Software Development Plan DI-IPSC-81427A

A016 Software Version Description DI-IPSC-81442A

A017 Software Design Description DI-IPSC-81435A

A018 Interface Control Document DI-CMAN-81248B

A019 Software Requirements Specification DI-IPSC-81433A

A020 Interface Requirements Specification DI-IPSC-81434A

A021 Specification Change Notice DI-CMAN-80643D

A022 System/Subsystem Design Description DI-IPSC-81432A

A023 Interface Design Descriptions DI-IPSC-81436A

A024 Item Unique Identification Marking Plan DI-MGMT-80803

A025 Phase-Out Transition Plan DI-MGMT-81945

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

+ IAW1423 1 LO TBC

Proposed Period of Performance

+ IAW1423 1 LO

Program Management

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

Program Management

Program Management

Program Management IAW PWS dated 2 Feb 2017, para. 4.2.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .