FA852316R0001_0009,_rev13.pdf
PDF 175 KB Posted
- Attached to
- Pocket J Engineering Support Federal contract opportunity
- Solicitation number
- FD2060-14-30523
About this file
RFP Amendment 0009
View the file
Other files for this federal contract opportunity
Show all 43
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
JSU
2. AMENDMENT/MODIFICATION NO.
FA8523-16-R-0001-0009
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ. NO.
FD20601430523
5. PROJECT NO (If applicable)
6. ISSUED BY CODE
ELECTRONIC WARFARE/EW, AFLCMC/WNKD
235 BYRON ST STE 19A
BLDG 301 CML PHN 478 926 7212
ROBINS AFB GA 31098-1670
BUYER: Chutney W. Guyton/WNKE chutney.guyton@us.af.mil Phone: (478) 926- 7000 No Collect Calls
7. ADMINISTERED BY (If other than item 6) CODEFA8540
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE
X
9A. AMENDMENT OF SOLICITATION NO.
FA852316R0001
9B. DATED (SEE ITEM 11)
6-MAR-2017
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. 27-MAR-2017 5:00 PM
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
ROUTINE
15A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR
BY ________________________________________________________
(Signature of person authorized to sign)
15C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16B. UNITED STATES OF AMERICA
BY ____________________________________________________
(Signature of Contracting Officer)
16C. DATE SIGNED
FACILITY CODE
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (REV. 10-83)
PRESCRIBED BY GSA
FAR (48 CFR) 53.243
X
X X
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION
The purpose of this amendment is to restate the Government’s requirement in its entirety. In doing so, the following changes have been made to the solicitation document:
1) Incorporated Performance Work Statement (PWS) revision, dated 2 February 2017, as shown in Section J of the solicitation. This PWS revision shall supersede all other PWS versions.
2) The Contract Line Item Number (CLIN) structure has changed as follows:
FROM:
CLIN
# CLIN Name Contract Type Unit of Measurement
X001 Program Management FFP 12 months
X002 Government Furnished Property FFP 12 months
X003 Maintenance Concept FFP 12 months
X004 Help Desk Support FFP 1-5 each
X005 Scheduled Maintenance FFP 12 months
X006 Unscheduled Maintenance CPFF 12 months
X007 Travel CRNF 1 Lot
X008 Cybersecurity CRNF 1 Lot
X009 Over and Above CPFF 1 Lot
X010 DATA FFP NSP
X011 Block Cycle Upgrade/Tech Refresh Requirements FFP 1 Lot
X012 Training (1 week) FFP 1 Lot
X013 Engineering Support FFP 12 months
X014 Repair CPFF 1 Ea
X015 GFE Replenishment CRNF 1 Lot
X016 Software FFP 1 Lot
TO:
CLIN
# CLIN Name Contract Type Unit of Measurement
X001 Program Management FFP 12 months
X002 Maintenance Support FFP 12 months
X003 Over and Above CPFF 1 Lot TBN
X004 Training (1 week) FFP 1-5 each
X005 Block Cycle and Software Upgrades FFP 1 lot
X006 Cyber Security FFP 1 lot
X007 GFE/GFP Management FFP 1 lot
X008 Repair: Minor FFP 1-50 Each
X009 Repair: Major FFP 1-50 Each
X010 Travel CRNF 1 Lot
Amendment/Modification FA8523-16-R-0001-0009
X011 Contractor Furnished Material CRNF 1 Lot
X012 DATA FFP NSP
3) Section L, Instructions, Conditions, and Notices to Offerors, has been changed as follows:
a. Added Volume III – PRICING PROPOSAL, which will include a pricing proposal spreadsheet and instructions on how to complete the spreadsheet.
b. The Pricing Proposal Spreadsheet will calculate the Total Evaluated Price (TEP) for all offerors.
4) Incorporated the Pricing Proposal Spreadsheet, dated 14 February 2017, as shown in Section J of the solicitation.
5) Section M, Evaluation Factors for Award, has been changed as follows:
FROM: The Travel CLINs (0007, 1007, 2007, 3007, and 4007) will be excluded in the TEP.
TO: CLINs X003 – Over and Above, X010 – Travel, and X011 – Contractor Furnished Equipment will be excluded from the TEP.
6) Revised all clauses from the Basic solicitation as shown in Section I of this solicitation.
7) Revised Preamble Language in its entirety, as shown in Section B.
8) This amendment serves as the conformed copy for the Basic soliciation and all corresponding amendments and attachments.
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
B.1 NOTICE TO OFFERORS: Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.
B.2 GENERAL: This Request for Proposals (RFP) is issued with the intent to establish a contract for the Pocket J System. The Contractor (independently and not as an agent of the Government) shall furnish all necessary personnel, labor, supplies, materials and travel (except as otherwise authorized by the Contracting Officer) as required to perform the Pocket J requirements described herein, and as required under each line item. Performance shall be in accordance with all provisions and specifications as stipulated herein.
B.3 CONTRACT TYPE: This is an Indefinite Delivery, Indefinite Quantity (IDIQ) type contract as contemplated at FAR 16.504. This contract utilizes a mix of Contract Line Item (CLIN) types, specifically Firm-Fixed-Price (FFP), Cost-Plus-Fixed-Fee (CPFF), Cost Reimbursable-No Fee (CRNF). Each CLIN indicates the type used for each particular requirement.
B.4 OPTION PERIODS: This contract will include four 12 month option periods that will be awarded with the basic contract, but not exercised at the time of award. In accordance with the clauses in Section I of this contract, FAR 52.217-9, Option to Extend the Term of the Contract, the Government may extend the term of this contract by written notice to the Contractor within a stated period of time within which the Contracting Officer may exercise the option. In accordance with FAR 52.217-8, Option to Extend Services, the Government may require continued performance of any services within the limits at the specified rates in the contract. The option provision may be exercised more than once, but shall not exceed six months. The Contracting Officer may exercise the option by written notice to the Contractor within a stated period of time. The inclusion of the options will not obligate the Government to exercise them. The option periods associated with each CLIN series are defined as follows:
000X – Contract Award thru 365 calendar days after contract award 100X – 366 calendar days after contract award thru 730 calendar days after contract award 200X – 731 calendar days after contract award thru 1,095 calendar days after contract award 300X – 1,096 calendar days after contract award thru 1,460 calendar days after contract award 400X – 1,461 calendar days after contract award thru 1,825 calendar days after contract award
Note: An option is considered to have been exercised at the time the Government deposits written notification to the Contractor via mail or other electronic means of notification.
B.5 PLACE OF PERFORMANCE: Performance of options issued hereunder shall be in accordance with t h e e x e r c i s e o f e a c h individual option.
B.6 MINIMUM/MAXIMUM VALUE: The contractor shall furnish to the Government, when and if ordered, the items of supplies or services specified in this Schedule up to and including the “Maximum" amount $XX,XXX,XXX for all orders issued hereunder. The Government shall order at least the “Minimum” amount $2,000,000 in conjunction with award of the basic contract. The quantities of supplies or services specified in this Schedule are estimates only and are not purchased by this contract. Except as this contract may otherwise provide, if the Government’s requirements do not result in orders in the quantities described as ”estimated” or “maximum” in the schedule, that fact shall not constitute the basis for an e q u i t a b le price adjustment.
Program Management
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
12 MO
Program Management Program Management IAW PWS dated 2 Feb 2017, para. 4.2.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
Req No / Pri
Required Period of Performance
IAW PWS 12 MO TBC
Proposed Period of Performance
IAW PWS 12 MO
Maintenance Support
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
12 MO
Maintenance Support Maintenance Support IAW PWS dated 2 Feb 2017, para. 4.4.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Maintenance Support
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
IAW PWS 12 MO TBC
Proposed Period of Performance
IAW PWS 12 MO
Over and Above
Item No.
Cost Plus Fixed Fee Quantity U/I Unit Price Fixed Fee Est Total Cost 1 LO To be Negotiated To be Negotiated
Over and Above Over and Above IAW PWS dated 2 Feb 2017, para. 4.6.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
IAW PWS 1 LO TBC
Proposed Period of Performance
Over and Above
IAW PWS 1 LO
Training (1 Week Course)
Item No.
Firm Fixed Price From Quantity
U/I To Quantity U/I Unit Price Amount
1 EA 5 EA
Training (1 Week Course) Training (1 Week Course) IAW PWS dated 2 Feb 2017, para. 9.0.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
IAW PWS 1 EA
TBC
Proposed Period of Performance
IAW PWS 1 EA
Pricing for CLIN X003 for the Base Year and Option Year II will be included as a part of the Total Evaluated Price (TEP). However, this CLIN will be negotiated in Option Years III, IV, and V.
Block Cycle & Software Upgrades
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
Block Cycle & Software Upgrades Block Cycle & Software Upgrades IAW PWS dated 2 Feb 2017, all paras in section 8.0.
Block Cycle & Software Upgrades
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
IAW PWS 1 LO TBC
Proposed Period of
IAW PWS 1 LO
Cybersecurity
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
Cybersecurity Cybersecurity IAW PWS dated 2 Feb 2017, all paras in section 6.0.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Cybersecurity
Required Period of Performance
IAW PWS 1 LO TBC
Proposed Period of Performance
IAW PWS 1 LO
GFE Management
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
GFE Management GFE Management IAW PWS dated 2 Feb 2017, para 4.3.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
IAW PWS 1 LO TBC
Proposed Period of Performance
IAW PWS 1 LO
Repair (Minor)
Item No.
Firm Fixed Price From Quantity
U/I To Quantity U/I Amount
1 EA 50 EA
Repair (Minor)
Repair (Minor) Minor Repairs IAW PWS dated 2 Feb 2017, para. 4.5.1.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be determined _ Req No / Pri
Required Period of Performance
IAW PWS 1 EA
TBD
Proposed Period of Performance
IAW PWS 1 EA
Repair (Major)
Item No.
Firm Fixed Price From Quantity
U/I To Quantity U/I Unit Price Amount
1 EA 50 EA
R408 Repair (Major) Major Repairs IAW PWS dated 2 Feb 2017, para. 4.5.2.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be determined _ Req No / Pri
Required Period of Performance
IAW PWS 1 EA
TBD
Repair (Major)
Proposed Period of Performance
IAW PWS 1 EA
Travel
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
TRAVEL AS APPROVED IN ADVANCE BY CONTRACTING OFFICER
Travel IAW PWS dated 2 Feb 2017, para. 4.9. All Travel shall be IAW Joint Travel Regulations (JTR) and FAR 31.2.
Priority: R ROUTINE
Contractor Furnished Material (CFM)
Item No.
Cost Reimbursement - No Fee Quantity U/I Estimated Unit Price Total Estimated Cost
1 LO $200,000.0000 $200,000.00
Contractor Furnished Material (CFM) Consumable/Expendable GFE Items PWS dated 2 Feb 2017, para. 4.3.1.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
IAW PWS 1 LO TBC
Proposed Period of
DATA
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
Data IAW PWS dated 2 Feb 2017, para 7.0. See attached DD1423s.
ELIN Title Data Acq Doc #
A001 Presentation Material DI-ADMN-81373
A002 Conference Minutes DI-ADMN-81249, 81250B
A003 Diminishing Source of Supply and Material Shortage (DMSMS) DI-MGMT-81948
A004 Configuration Management Plan DI-MGMT-81875
A005 Status Reports DI-MGMT-80368A
A006 Parts Approval Reuest DI-MISC-80071E
A007 Acceptance Test Plan DI-QCIC-80553A
A008 Technical Manual Contract Requirement (TMCR) TM-86-01P
A009 Product Drawings/Models and Associated Lists DI-SESS-81000E
A010 Provisioning DI-SESS-81758A, -81759A, -81874
A011 Accident/Incident Report DI-SAFT-81563
A012 Gov't Industry Data Exchange Program (GIDEP) Alert Response DI-QCIC-80126B
A013 Gov't Industry Data Exchange Program (GIDEP) Alert/Safe-Alert Report DI-QCIC-80125B
A014 Engineering Change Proposal DI-SESS-80639D
A015 Software Development Plan DI-IPSC-81427A
A016 Software Version Description DI-IPSC-81442A
A017 Software Design Description DI-IPSC-81435A
A018 Interface Control Document DI-CMAN-81248B
A019 Software Requirements Specification DI-IPSC-81433A
A020 Interface Requirements Specification DI-IPSC-81434A
A021 Specification Change Notice DI-CMAN-80643D
A022 System/Subsystem Design Description DI-IPSC-81432A
A023 Interface Design Descriptions DI-IPSC-81436A
A024 Item Unique Identification Marking Plan DI-MGMT-80803
A025 Phase-Out Transition Plan DI-MGMT-81945
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ IAW1423 1 LO TBC
Proposed Period of Performance
+ IAW1423 1 LO
Program Management
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
12 MO
Program Management Program Management IAW PWS dated 2 Feb 2017, para. 4.2.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
Req No / Pri
Required Period of Performance
IAW PWS 12 MO TBC
Proposed Period of
IAW PWS 12 MO
Maintenance Support
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
12 MO
Maintenance Support Maintenance Support IAW PWS dated 2 Feb 2017, para. 4.4.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
IAW PWS 12 MO TBC
Proposed Period of Performance
IAW PWS 12 MO
Over and Above
Item No.
Cost Plus Fixed Fee Quantity U/I Unit Price Fixed Fee Est Total Cost 1 LO To be Negotiated To be Negotiated
Over and Above Over and Above IAW PWS dated 2 Feb 2017, para. 4.6.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Over and Above
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
IAW PWS 1 LO TBC
Proposed Period of Performance
IAW PWS 1 LO
Training (1 Week Course)
Item No.
Firm Fixed Price From Quantity U/I To Quantity U/I Unit Price Amount
1 EA 5 EA
Training (1 Week Course) Training (1 Week Course) IAW PWS dated 2 Feb 2017, para. 9.0.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
IAW PWS 1 EA
TBC
Proposed Period of Performance
IAW PWS 1 EA
Pricing for CLIN X003 for the Base Year and Option Year II will be included as a part of the Total Evaluated Price (TEP). However, this CLIN will be negotiated in Option Years III, IV, and V.
Block Cycle & Software Upgrades
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
Block Cycle & Software Upgrades Block Cycle & Software Upgrades IAW PWS dated 2 Feb 2017, all paras in section 8.0.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
IAW PWS 1 LO TBC
Proposed Period of
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
Cybersecurity
Cybersecurity IAW PWS dated 2 Feb 2017, all paras in section 6.0.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
IAW PWS 1 LO TBC
Proposed Period of Performance
IAW PWS 1 LO
GFE Management
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
GFE Management GFE Management IAW PWS dated 2 Feb 2017, para 4.3.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
GFE Management
Required Period of Performance
IAW PWS 1 LO TBC
Proposed Period of Performance
IAW PWS 1 LO
Repair (Minor)
Item No.
Firm Fixed Price From Quantity U/I To Quantity U/I Amount
1 EA 50 EA
Repair (Minor) Minor Repairs IAW PWS dated 2 Feb 2017, para. 4.5.1.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be determined _ Req No / Pri
Required Period of Performance
IAW PWS 1 EA
TBD
Proposed Period of Performance
IAW PWS 1 EA
Repair (Major)
Item No.
Firm Fixed Price From Quantity U/I To Quantity U/I Unit Price Amount
Repair (Major)
1 EA 50 EA
R408 Repair (Major) Major Repairs IAW PWS dated 2 Feb 2017, para. 4.5.2.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be determined _ Req No / Pri
Required Period of Performance
IAW PWS 1 EA
TBD
Proposed Period of Performance
IAW PWS 1 EA
Travel
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
TRAVEL AS APPROVED IN ADVANCE BY CONTRACTING OFFICER
Travel IAW PWS dated 2 Feb 2017, para. 4.9. All Travel shall be IAW Joint Travel Regulations (JTR) and FAR 31.2.
Priority: R ROUTINE
Contractor Furnished Material (CFM)
Item No.
Cost Reimbursement - No Fee Quantity U/I Estimated Unit Price Total Estimated Cost
1 LO
Contractor Furnished Material (CFM) Consumable/Expendable GFE Items PWS dated 2 Feb 2017, para. 4.3.1.
Contractor Furnished Material (CFM)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
IAW PWS 1 LO TBC
Proposed Period of Performance
IAW PWS 1 LO
DATA
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
Data IAW PWS dated 2 Feb 2017, para 7.0. See attached DD1423s.
ELIN Title Data Acq Doc #
A001 Presentation Material DI-ADMN-81373
A002 Conference Minutes DI-ADMN-81249, 81250B
A003 Diminishing Source of Supply and Material Shortage (DMSMS) DI-MGMT-81948
A004 Configuration Management Plan DI-MGMT-81875
A005 Status Reports DI-MGMT-80368A
A006 Parts Approval Reuest DI-MISC-80071E
A007 Acceptance Test Plan DI-QCIC-80553A
A008 Technical Manual Contract Requirement (TMCR) TM-86-01P
A009 Product Drawings/Models and Associated Lists DI-SESS-81000E
A010 Provisioning DI-SESS-81758A, -81759A, -81874
A011 Accident/Incident Report DI-SAFT-81563
DATA
A012 Gov't Industry Data Exchange Program (GIDEP) Alert Response DI-QCIC-80126B
A013 Gov't Industry Data Exchange Program (GIDEP) Alert/Safe-Alert Report DI-QCIC-80125B
A014 Engineering Change Proposal DI-SESS-80639D
A015 Software Development Plan DI-IPSC-81427A
A016 Software Version Description DI-IPSC-81442A
A017 Software Design Description DI-IPSC-81435A
A018 Interface Control Document DI-CMAN-81248B
A019 Software Requirements Specification DI-IPSC-81433A
A020 Interface Requirements Specification DI-IPSC-81434A
A021 Specification Change Notice DI-CMAN-80643D
A022 System/Subsystem Design Description DI-IPSC-81432A
A023 Interface Design Descriptions DI-IPSC-81436A
A024 Item Unique Identification Marking Plan DI-MGMT-80803
A025 Phase-Out Transition Plan DI-MGMT-81945
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ IAW1423 1 LO TBC
Proposed Period of Performance
+ IAW1423 1 LO
Program Management
Item No.
Quantity U/I Unit Price Amount
Program Management
12 MO
Program Management Program Management IAW PWS dated 2 Feb 2017, para. 4.2.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
Req No / Pri
Required Period of Performance
IAW PWS 12 MO TBC
Proposed Period of Performance
IAW PWS 12 MO
Maintenance Support
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
12 MO
Maintenance Support Maintenance Support IAW PWS dated 2 Feb 2017, para. 4.4.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None
Maintenance Support
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
IAW PWS 12 MO TBC
Proposed Period of Performance
IAW PWS 12 MO
Over and Above
Item No.
Cost Plus Fixed Fee Quantity U/I Unit Price Fixed Fee Est Total Cost 1 LO To be Negotiated To be Negotiated
Over and Above Over and Above IAW PWS dated 2 Feb 2017, para. 4.6.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
IAW PWS 1 LO TBC
Proposed Period of
Training (1 Week Course)
Item No.
Firm Fixed Price From Quantity U/I To Quantity U/I Unit Price Amount
1 EA 5 EA
Training (1 Week Course) Training (1 Week Course) IAW PWS dated 2 Feb 2017, para. 9.0.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
IAW PWS 1 EA
TBC
Proposed Period of Performance
IAW PWS 1 EA
Pricing for CLIN X003 for the Base Year and Option Year II will be included as a part of the Total Evaluated Price (TEP). However, this CLIN will be negotiated in Option Years III, IV, and V.
Block Cycle & Software Upgrades
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
Block Cycle & Software Upgrades Block Cycle & Software Upgrades IAW PWS dated 2 Feb 2017, all paras in section 8.0.
Block Cycle & Software Upgrades
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
IAW PWS 1 LO TBC
Proposed Period of
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
Cybersecurity Cybersecurity IAW PWS dated 2 Feb 2017, all paras in section 6.0.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
None
Cybersecurity
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
IAW PWS 1 LO TBC
Proposed Period of Performance
IAW PWS 1 LO
GFE Management
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
GFE Management GFE Management IAW PWS dated 2 Feb 2017, para 4.3.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
IAW PWS 1 LO TBC
Proposed Period of
Repair (Minor)
Item No.
Firm Fixed Price From Quantity U/I To Quantity U/I Amount
1 EA 50 EA
Repair (Minor) Minor Repairs IAW PWS dated 2 Feb 2017, para. 4.5.1.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be determined _ Req No / Pri
Required Period of Performance
IAW PWS 1 EA
TBD
Proposed Period of Performance
IAW PWS 1 EA
Repair (Major)
Item No.
Firm Fixed Price From Quantity U/I To Quantity U/I Unit Price Amount
1 EA 50 EA
R408 Repair (Major) Major Repairs IAW PWS dated 2 Feb 2017, para. 4.5.2.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
Repair (Major)
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity
None Place of Perf Quantity (U/I) To be determined _ Req No / Pri
Required Period of Performance
IAW PWS 1 EA
TBD
Proposed Period of Performance
IAW PWS 1 EA
Travel
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
TRAVEL AS APPROVED IN ADVANCE BY CONTRACTING OFFICER
Travel IAW PWS dated 2 Feb 2017, para. 4.9. All Travel shall be IAW Joint Travel Regulations (JTR) and FAR 31.2.
Priority: R ROUTINE
Contractor Furnished Material (CFM)
Item No.
Cost Reimbursement - No Fee Quantity U/I Estimated Unit Price Total Estimated Cost
1 LO
Contractor Furnished Material (CFM) Consumable/Expendable GFE Items PWS dated 2 Feb 2017, para. 4.3.1.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
Contractor Furnished Material (CFM)
Required Period of Performance
IAW PWS 1 LO TBC
Proposed Period of Performance
IAW PWS 1 LO
DATA
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
Data IAW PWS dated 2 Feb 2017, para 7.0. See attached DD1423s.
ELIN Title Data Acq Doc #
A001 Presentation Material DI-ADMN-81373
A002 Conference Minutes DI-ADMN-81249, 81250B
A003 Diminishing Source of Supply and Material Shortage (DMSMS) DI-MGMT-81948
A004 Configuration Management Plan DI-MGMT-81875
A005 Status Reports DI-MGMT-80368A
A006 Parts Approval Reuest DI-MISC-80071E
A007 Acceptance Test Plan DI-QCIC-80553A
A008 Technical Manual Contract Requirement (TMCR) TM-86-01P
A009 Product Drawings/Models and Associated Lists DI-SESS-81000E
A010 Provisioning DI-SESS-81758A, -81759A, -81874
A011 Accident/Incident Report DI-SAFT-81563
A012 Gov't Industry Data Exchange Program (GIDEP) Alert Response DI-QCIC-80126B
A013 Gov't Industry Data Exchange Program (GIDEP) Alert/Safe-Alert Report DI-QCIC-80125B
A014 Engineering Change Proposal DI-SESS-80639D
A015 Software Development Plan DI-IPSC-81427A
A016 Software Version Description DI-IPSC-81442A
A017 Software Design Description DI-IPSC-81435A
A018 Interface Control Document DI-CMAN-81248B
A019 Software Requirements Specification DI-IPSC-81433A
A020 Interface Requirements Specification DI-IPSC-81434A
A021 Specification Change Notice DI-CMAN-80643D
A022 System/Subsystem Design Description DI-IPSC-81432A
DATA
A023 Interface Design Descriptions DI-IPSC-81436A
A024 Item Unique Identification Marking Plan DI-MGMT-80803
A025 Phase-Out Transition Plan DI-MGMT-81945
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ IAW1423 1 LO TBC
Proposed Period of Performance
+ IAW1423 1 LO
Program Management
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
12 MO
Program Management Program Management IAW PWS dated 2 Feb 2017, para. 4.2.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Program Management
None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
Req No / Pri
Required Period of Performance
IAW PWS 12 MO TBC
Proposed Period of Performance
IAW PWS 12 MO
Maintenance Support
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
12 MO
Maintenance Support Maintenance Support IAW PWS dated 2 Feb 2017, para. 4.4.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
IAW PWS 12 MO TBC
Proposed Period of
IAW PWS 12 MO
Over and Above
Item No.
Cost Plus Fixed Fee Quantity U/I Unit Price Fixed Fee Est Total Cost 1 LO To be Negotiated To be Negotiated
Over and Above Over and Above IAW PWS dated 2 Feb 2017, para. 4.6.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
IAW PWS 1 LO TBC
Proposed Period of Performance
IAW PWS 1 LO
Training (1 Week Course)
Item No.
Firm Fixed Price From Quantity U/I To Quantity U/I Unit Price Amount
1 EA 5 EA
Training (1 Week Course) Training (1 Week Course) IAW PWS dated 2 Feb 2017, para. 9.0.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Training (1 Week Course)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
IAW PWS 1 EA
TBC
Proposed Period of Performance
IAW PWS 1 EA
Pricing for CLIN X003 for the Base Year and Option Year II will be included as a part of the Total Evaluated Price (TEP). However, this CLIN will be negotiated in Option Years III, IV, and V.
Block Cycle & Software Upgrades
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
Block Cycle & Software Upgrades Block Cycle & Software Upgrades IAW PWS dated 2 Feb 2017, all paras in section 8.0.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of
IAW PWS 1 LO TBC
Block Cycle & Software Upgrades
Proposed Period of
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
Cybersecurity Cybersecurity IAW PWS dated 2 Feb 2017, all paras in section 6.0.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
IAW PWS 1 LO TBC
Proposed Period of Performance
IAW PWS 1 LO
GFE Management
Item No.
GFE Management
Quantity U/I Unit Price Amount
1 LO
GFE Management GFE Management IAW PWS dated 2 Feb 2017, para 4.3.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
IAW PWS 1 LO TBC
Proposed Period of Performance
IAW PWS 1 LO
Repair (Minor)
Item No.
Firm Fixed Price From Quantity U/I To Quantity U/I Amount
1 EA 50 EA
Repair (Minor) Minor Repairs IAW PWS dated 2 Feb 2017, para. 4.5.1.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
Repair (Minor)
None Place of Perf Quantity (U/I) To be determined _ Req No / Pri
Required Period of Performance
IAW PWS 1 EA
TBD
Proposed Period of Performance
IAW PWS 1 EA
Repair (Major)
Item No.
Firm Fixed Price From Quantity U/I To Quantity U/I Unit Price Amount
1 EA 50 EA
R408 Repair (Major) Major Repairs IAW PWS dated 2 Feb 2017, para. 4.5.2.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be determined _ Req No / Pri
Required Period of Performance
IAW PWS 1 EA
TBD
Proposed Period of Performance
IAW PWS 1 EA
Travel
Travel
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
TRAVEL AS APPROVED IN ADVANCE BY CONTRACTING OFFICER
Travel IAW PWS dated 2 Feb 2017, para. 4.9. All Travel shall be IAW Joint Travel Regulations (JTR) and FAR 31.2.
Priority: R ROUTINE
Contractor Furnished Material (CFM)
Item No.
Cost Reimbursement - No Fee Quantity U/I Estimated Unit Price Total Estimated Cost
1 LO
Contractor Furnished Material (CFM) Consumable/Expendable GFE Items PWS dated 2 Feb 2017, para. 4.3.1.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
IAW PWS 1 LO TBC
Proposed Period of Performance
IAW PWS 1 LO
DATA
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
DATA
DATA
Data IAW PWS dated 2 Feb 2017, para 7.0. See attached DD1423s.
ELIN Title Data Acq Doc #
A001 Presentation Material DI-ADMN-81373
A002 Conference Minutes DI-ADMN-81249, 81250B
A003 Diminishing Source of Supply and Material Shortage (DMSMS) DI-MGMT-81948
A004 Configuration Management Plan DI-MGMT-81875
A005 Status Reports DI-MGMT-80368A
A006 Parts Approval Reuest DI-MISC-80071E
A007 Acceptance Test Plan DI-QCIC-80553A
A008…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .