FA852316R0001_______0007-amendment.pdf

PDF 117 KB Posted

Attached to
Pocket J Engineering Support Federal contract opportunity
Solicitation number
FD2060-14-30523
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

Amendment 07

View the file

Other files for this federal contract opportunity

Other files attached to Pocket J Engineering Support, newest first.
File Type Posted
Pocket_J_Proposal_spreadsheet.xlsx XLSX spreadsheet
FA852316R0001_0011(4).pdf PDF
PktJConsolidatedGFPDec2016.pdf PDF
FA8523-16-R-0001-0010.pdf PDF
GFP_compliance_RFP.pdf PDF
Pocket_J_Proposal_spreadsheet.xlsx XLSX spreadsheet
DD254.pdf PDF
CDRLs_Portfolio.pdf PDF
QASP7mar17.pdf PDF
Pocket_J_PWS_(2_Feb_17).pdf PDF
PktJConsolidatedGFPDec2016.pdf PDF
FA852316R0001_0009,_rev13.pdf PDF
Pocket_J_Proposal_spreadsheet_(2_Feb_17).xlsx XLSX spreadsheet
AFMC158_00.pdf PDF
DD1653.pdf PDF
FA852316R0001_0008.pdf PDF
Mod_5_PJ_Questions_(Govt_Responses).xlsx XLSX spreadsheet
Mod_6_PJ_Questions_(Govt_Responses).xlsx XLSX spreadsheet
Repost_Amend_05_Questions.pdf PDF
FA852316R0001_______0006.pdf PDF
FA852316R0001_0005(8).pdf PDF
PWS_31Aug16_(FINAL).pdf PDF
FA852316R0001_______0004.pdf PDF
FA852316R0001_______0003.pdf PDF
TO_31R2-2FSC134-1_Pocket_J_Spiral_2.3.1_Fixed_Element_(FE)_30_June_2011.pdf PDF
TO_31R2-2FSC135-1_Pocket_J_Spiral_2.3.1_Remote_Element_(RE)_30_June_2011.pdf PDF
RFP_Questions_and_Answer_22_Jan_2016.docx.pdf PDF
REInstructorTrainingGuide141216_v6.pdf PDF
FE_Training_Instructor_Guide_141216 _v5.pdf PDF
FA852316R0001_______0002.pdf PDF
RFP_Combined_Questions_and_Answers_Rev1.docx DOCX document
PWS_18Dec2015.pdf PDF
NewCDRLList_31Dec2015.pdf PDF
FA852316R0001_______0001.pdf PDF
RFP_Combined_Questions_and_Answers.pdf PDF
SGFP.pdf PDF
254.pdf PDF
PKG.pdf PDF
CDRLs.pdf PDF
FA852316R0001-FINAL.pdf PDF
PWSv3.pdf PDF
PWS_14_May_15.pdf PDF
L_and_M_Lowest_Price_Technically_Acceptable_v2.pdf PDF
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

JSU

2. AMENDMENT/MODIFICATION NO.

FA8523-16-R-0001-0007

3. EFFECTIVE DATE

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO (If applicable)

6. ISSUED BY CODE

AVIONICS, AFLCMC/WNKD

235 BYRON ST STE 19A

BLDG 300 CML PHN 478 926 7462

ROBINS AFB GA 31098-1670

BUYER: Ashley D. Wynn/WNKE ashley.wynn.1@us.af.mil Phone: (478) 926- 5371 No Collect Calls

7. ADMINISTERED BY (If other than item 6) CODEFA8540

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE

X

9A. AMENDMENT OF SOLICITATION NO.

FA852316R0001

9B. DATED (SEE ITEM 11)

8-DEC-2016

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. 6-JAN-2017 4:00 PM

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

ROUTINE

15A. NAME AND TITLE OF SIGNER (Type or print)

15B. CONTRACTOR/OFFEROR

BY ________________________________________________________

(Signature of person authorized to sign)

15C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16B. UNITED STATES OF AMERICA

BY ____________________________________________________

(Signature of Contracting Officer)

16C. DATE SIGNED

FACILITY CODE

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (REV. 10-83)

PRESCRIBED BY GSA

FAR (48 CFR) 53.243

X

X X

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

Amendment/Modification FA8523-16-R-0001-0007

Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION

A. Provide extension until January 06, 2017.

B. Clarification purposes only to include CLINS for options 1, 2, 3, and 4.

All other terms and conditions remain unchanged.

Request for Proposal FA8523-16-R-0001-0007

PART I - THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.

In accordance with the OSD AT&L memorandum dated 10 November 2011, any incurred proposal preparation expenses are to be treated as indirect costs and direct charge billings against the resultant task/delivery order are unallowable.

MINIMUM/MAXIMUM VALUE: The contractor shall furnish to the Government, if and when ordered, the items of supplies or services specified in this Schedule up to and including the “Maximum”amount of $XXXXXX.XX for all orders issued hereunder. The Government shall order at least the “Minimum” amount of 2,000,000.00 in conjunction with award of the basic contract. The quantities of supplies or services specified in this Schedule are estimates only and are not purchased by this contract. Except as this contract may otherwise provide, if the Government’s requirements do not result in orders in the quantities described as “estimated” or “maximum” in the schedule, that fact shall not constitute the basis for an equitable price adjustment equitable price adjustment.

BASIC CONTRACT PERIOD OF PERFORMANCE: Date of Award through 12 Months

Note: An option is considered to have been exercised at the time the Government deposits written notification to the Contractor via mail or other electronic means of notification.

PAA: Packaging IAW attached AFMC 158

Program Management

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

R408 RE

Program Management Program Management IAW PWS dated 31 Aug 2016, para. 4.2 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

Program Management

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Government Furnished Property

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

R408 Government Furnished Equipment (GFE) Consumable/Expendable, Contractor Repair, and MILSTRIP Repair GFE IAW PWS dated 31 Aug 2016, para. 4.3 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None none Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Maintenance Concept

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

Maintenance Concept

12 MO

R408 RE

Maintenance Concept Maintenance Concept IAW PWS dated 31 Aug 2016, para. 4.4 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Help Desk Support

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

R408 Help Desk Support Help Desk Support IAW PWS dated 31 Aug 2016, para. 4.5 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required Period of Performance

IAW PWS 12 MO *12 Months

Help Desk Support

Proposed Period of Performance

IAW PWS 12 MO

Scheduled Maintenance

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

R408 Scheduled Maintenance Scheduled Maintenance IAW PWS dated 31 Aug 2016, para. 4.7 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Unscheduled Maintenance

Item No.

Cost Plus Fixed Fee Quantity U/I Unit Price Fixed Fee Amount

12 MO

R408 Unscheduled Maintenance Unscheduled Maintenance IAW PWS dated 31 Aug 2016, para. 4.6 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Unscheduled Maintenance

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Travel

Item No.

Cost Reimbursement - No Fee Quantity U/I Unit Price Total Estimated Cost

1 LO

TRAV

TRAVEL AS APPROVED IN ADVANCE BY CONTRACTING OFFICER

TRAVEL IN SUPPORT OF CLINs 0005 and 0006. TRAVEL REIMBURSED IAW FAR 31.2 Priority: R ROUTINE

Cybersecurity

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

R408 RE

Cybersecurity Cybersecurity IAW PWS dated 31 Aug 2016, paragraphs 6.1 thru 6.4 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Cybersecurity

Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Over and Above

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost 1 LO To be Determined To be Determined

R408 Over and Above Over and Above IAW PWS dated 31 Aug 2016, para. 4.6.2 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required Period of Performance

IAW PWS 1 LO *12 Months

Proposed Period of Performance

IAW PWS 1 LO

DATA

Item No.

Firm Fixed Price Quantity U/I Quantity Amount 1 LO Not Separately Priced Not Separately Priced

DATA

DATA

Data IAW PWS dated 31 Aug 2016. See attached DD1423s.

ELIN Title: Data Acq Doc No:

A003 Status Reports DI-MGMT-80368A A004 Accident/Incident Report DI-SAFT-81563/T A006 Engineering Change Proposal DI-CMAN-80639D A007 Software Version Description DI-IPSC-81442A A009 Interface Control Document DI-CMAN-81248B A010 Parts Approval Request DI-MISC-80071E A011 Gov't Industry Data Exchange Program DI-QCIC-80125B

(GIDEP)

A012 Gov't Industry Data Exchange Program DI-QCIC-80126B

(GIDEP) Alert Response A013 Logistics Product Data DI-SESS-81757/T A017 Report, Record of Meeting Minutes DI-ADMN-81505 A018 Product Drawings/Models and DI-SESS-81000E/T

Associated Lists A019 Software Development Plan (SDP) DI-IPSC-81427A A022 Software Design Description DI-ISPC-81435A A023 Interface Design Descriptions DI-IPSC-81436A A026 Software Requirements Specifications DI-IPSC-81433A

(SRS)

A027 Interface Requirements Specification DI-IPSC-81434A

(IRS)

A030 Specification Change Notice (SCN) DI-CMAN-80643D A031 System Subsystem Design Description DI-IPSC-81432A

(SSDD)

A032 Source Data for Forecasting Dim. DI-SESS-81656

Mfg Sources & Material Shorts A033 Technical Manual Contract Reqs TM-86-01P

(TMCR)

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

+ IAW1423 1 LO *12 Months

Proposed Period of Performance

+ IAW1423 1 LO

Block Cycle Upgrade/Tech Refresh Work Requirements

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

R408 RE

Block Cycle Upgrade/Tech Refresh Work Requirements Block Cycle Upgrade/Tech Refresh Work Requirements IAW PWS dated 31 Aug 2016, para. 8.1.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required Period of Performance

IAW PWS 1 LO *12 Months

Proposed Period of Performance

IAW PWS 1 LO

Training (1 Week Course)

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

R408 RE

Training (1 Week Course) Training (1 Week Course) IAW PWS dated 31 Aug 2016, para. 9.0.

Training (1 Week Course)

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required Period of Performance

IAW PWS 1 LO *12 Months

Proposed Period of Performance

IAW PWS 1 LO

Engineering Support

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

Engineering Support Configuration Management, Technical Data, Provisioning, and Engineering Change Proposal Engineering Support IAW PWS dated 31 Aug 2016, para 7.1.3.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

IUID Required: Yes Physical Item Markings:

Place of Perf Quantity (U/I) *ARO Contract Req No / Pri

Required Period of

Engineering Support

Proposed Period of Performance

IAW PWS 12 MO

Repair

Item No.

Cost Plus Fixed Fee Quantity U/I Unit Price Fixed Fee Amount

1 EA

R408 Repair Repair IAW PWS dated 31 Aug 2016, paras. 4.17.1, 4.17.2, and Appendix E of the PWS Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required Period of Performance

+ TBD 1 EA *12 Months

Proposed Period of Performance

+ TBD 1 EA

GFE Replenishment

Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

R408 GFE Replenishment IAW PWS dated 31 Aug 2016, para. 4.3.1.

GFE Replenishment

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required Period of Performance

IAW PWS 1 LO *12 Months

Proposed Period of Performance

IAW PWS 1 LO

Software

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

R408 RE

Software Software IAW PWS dated 31 Aug 2016, paragraphs 10.1 thru 10.4.2.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None none Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

IAW PWS 1 LO *12 Months

Proposed Period of

Software

IAW PWS 1 LO

NOTE FOR ALL OPTIONS: The PR numbers and PR line items cited below will be revised upon exercise of each option.

OPTION I: Option I may be exercised anytime within 12 months after effective date of award. The period of performance for Option I shall not begin until the end of the basic period of performance, and shall not exceed 12 months. An option is determined to have been exercised when transmitted electronically by email or fax.

Program Management

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

R408 RE

Program Management Program Management IAW PWS dated 31 Aug 2016, para. 4.2 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Government Furnished Property

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

R408 Government Furnished Equipment (GFE) Consumable/Expendable, Contractor Repair, and MILSTRIP Repair

Government Furnished Property

GFE IAW PWS dated 31 Aug 2016, para. 4.3 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None none Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Maintenance Concept

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

R408 RE

Maintenance Concept Maintenance Concept IAW PWS dated 31 Aug 2016, para. 4.4 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required

Maintenance Concept

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Help Desk Support

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

R408 Help Desk Support Help Desk Support IAW PWS dated 31 Aug 2016, para. 4.5 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Scheduled Maintenance

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

R408 Scheduled Maintenance Scheduled Maintenance IAW PWS dated 31 Aug 2016, para. 4.7

Scheduled Maintenance

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Unscheduled Maintenance

Item No.

Cost Plus Fixed Fee Quantity U/I Unit Price Fixed Fee Amount

12 MO

R408 Unscheduled Maintenance Unscheduled Maintenance IAW PWS dated 31 Aug 2016, para. 4.6 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed

Unscheduled Maintenance

IAW PWS 12 MO

Travel

Item No.

Cost Reimbursement - No Fee Quantity U/I Unit Price Total Estimated Cost

1 LO

TRAV

TRAVEL AS APPROVED IN ADVANCE BY CONTRACTING OFFICER

TRAVEL IN SUPPORT OF CLINs 0005 and 0006. TRAVEL REIMBURSED IAW FAR 31.2 Priority: R ROUTINE

Cybersecurity

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

R408 RE

Cybersecurity Cybersecurity IAW PWS dated 31 Aug 2016, paragraphs 6.1 thru 6.4 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of

IAW PWS 12 MO

Over and Above

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost 1 LO To be Determined To be Determined

R408 Over and Above Over and Above IAW PWS dated 31 Aug 2016, para. 4.6.2 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required Period of Performance

IAW PWS 1 LO *12 Months

Proposed Period of Performance

IAW PWS 1 LO

DATA

Item No.

Firm Fixed Price Quantity U/I Quantity Amount 1 LO Not Separately Priced Not Separately Priced

DATA

DATA

Data IAW PWS dated 31 Aug 2016. See attached DD1423s.

ELIN Title: Data Acq Doc No:

A003 Status Reports DI-MGMT-80368A A004 Accident/Incident Report DI-SAFT-81563/T A006 Engineering Change Proposal DI-CMAN-80639D A007 Software Version Description DI-IPSC-81442A A009 Interface Control Document DI-CMAN-81248B A010 Parts Approval Request DI-MISC-80071E A011 Gov't Industry Data Exchange Program DI-QCIC-80125B

(GIDEP)

A012 Gov't Industry Data Exchange Program DI-QCIC-80126B

(GIDEP) Alert Response A013 Logistics Product Data DI-SESS-81757/T A017 Report, Record of Meeting Minutes DI-ADMN-81505 A018 Product Drawings/Models and DI-SESS-81000E/T

Associated Lists A019 Software Development Plan (SDP) DI-IPSC-81427A A022 Software Design Description DI-ISPC-81435A A023 Interface Design Descriptions DI-IPSC-81436A A026 Software Requirements Specifications DI-IPSC-81433A

(SRS)

A027 Interface Requirements Specification DI-IPSC-81434A

(IRS)

A030 Specification Change Notice (SCN) DI-CMAN-80643D A031 System Subsystem Design Description DI-IPSC-81432A

(SSDD)

A032 Source Data for Forecasting Dim. DI-SESS-81656

Mfg Sources & Material Shorts A033 Technical Manual Contract Reqs TM-86-01P

(TMCR)

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required Period of Performance

+ IAW1423 1 LO *12 Months

Proposed Period of

+ IAW1423 1 LO

Block Cycle Upgrade/Tech Refresh Work Requirements

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

R408 RE

Block Cycle Upgrade/Tech Refresh Work Requirements Block Cycle Upgrade/Tech Refresh Work Requirements IAW PWS dated 31 Aug 2016, para. 8.1.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required Period of Performance

IAW PWS 1 LO *12 Months

Proposed Period of Performance

IAW PWS 1 LO

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

R408 RE

Training (1 Week Course) Training (1 Week Course) IAW PWS dated 31 Aug 2016, para. 9.0.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required Period of Performance

IAW PWS 1 LO *12 Months

Proposed Period of Performance

IAW PWS 1 LO

Engineering Support

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

Engineering Support Configuration Management, Technical Data, Provisioning, and Engineering Change Proposal Engineering Support IAW PWS dated 31 Aug 2016, para 7.1.3.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

IUID Required: Yes Physical Item Markings:

Place of Perf Quantity (U/I) *ARO Contract Req No / Pri

Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Repair

Item No.

Cost Plus Fixed Fee

Repair

Quantity U/I Unit Price Fixed Fee Amount

1 EA

R408 Repair Repair IAW PWS dated 31 Aug 2016, paras. 4.17.1, 4.17.2, and Appendix E of the PWS Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required Period of Performance

+ TBD 1 EA *12 Months

Proposed Period of Performance

+ TBD 1 EA

GFE Replenishment

Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

R408 GFE Replenishment IAW PWS dated 31 Aug 2016, para. 4.3.1.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required

GFE Replenishment

IAW PWS 1 LO *12 Months

Proposed Period of Performance

IAW PWS 1 LO

Software

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

R408 RE

Software Software IAW PWS dated 31 Aug 2016, paragraphs 10.1 thru 10.4.2.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None none Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

IAW PWS 1 LO *12 Months

Proposed Period of Performance

IAW PWS 1 LO

NOTE FOR ALL OPTIONS: The PR numbers and PR line items cited below will be revised upon exercise of each option.

OPTION I: Option I may be exercised anytime within 12 months after effective date of award. The period of performance for Option I shall not begin until the end of the basic period of performance, and shall not exceed 12 months. An option is determined to have been exercised when transmitted electronically by email or fax.

Program Management

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

R408 RE

Program Management Program Management IAW PWS dated 31 Aug 2016, para. 4.2 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Maintenance Concept

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

R408 RE

Maintenance Concept Maintenance Concept IAW PWS dated 31 Aug 2016, para. 4.4 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Maintenance Concept

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Help Desk Support

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

R408 Help Desk Support Help Desk Support IAW PWS dated 31 Aug 2016, para. 4.5 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Scheduled Maintenance

Item No.

Scheduled Maintenance

12 MO

R408 Scheduled Maintenance Scheduled Maintenance IAW PWS dated 31 Aug 2016, para. 4.7 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Unscheduled Maintenance

Item No.

Cost Plus Fixed Fee Quantity U/I Unit Price Fixed Fee Amount

12 MO

R408 Unscheduled Maintenance Unscheduled Maintenance IAW PWS dated 31 Aug 2016, para. 4.6 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required

Unscheduled Maintenance

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Government Furnished Property

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

R408 Government Furnished Equipment (GFE) Consumable/Expendable, Contractor Repair, and MILSTRIP Repair GFE IAW PWS dated 31 Aug 2016, para. 4.3 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None none Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Travel

Item No.

Cost Reimbursement - No Fee Quantity U/I Unit Price Total Estimated Cost

Travel

1 LO

TRAV

TRAVEL AS APPROVED IN ADVANCE BY CONTRACTING OFFICER

TRAVEL IN SUPPORT OF CLINs 0005 and 0006. TRAVEL REIMBURSED IAW FAR 31.2

Cybersecurity

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

R408 RE

Cybersecurity Cybersecurity IAW PWS dated 31 Aug 2016, paragraphs 6.1 thru 6.4 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Over and Above

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost 1 LO To be Determined To be Determined

R408 Over and Above Over and Above IAW PWS dated 31 Aug 2016, para. 4.6.2

Over and Above

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required Period of Performance

IAW PWS 1 LO *12 Months

Proposed Period of Performance

IAW PWS 1 LO

DATA

Item No.

Firm Fixed Price Quantity U/I Quantity Amount 1 LO Not Separately Priced Not Separately Priced

DATA

DATA

Data IAW PWS dated 31 Aug 2016. See attached DD1423s.

ELIN Title: Data Acq Doc No:

A003 Status Reports DI-MGMT-80368A A004 Accident/Incident Report DI-SAFT-81563/T A006 Engineering Change Proposal DI-CMAN-80639D A007 Software Version Description DI-IPSC-81442A A009 Interface Control Document DI-CMAN-81248B A010 Parts Approval Request DI-MISC-80071E A011 Gov't Industry Data Exchange Program DI-QCIC-80125B

(GIDEP)

A012 Gov't Industry Data Exchange Program DI-QCIC-80126B

(GIDEP) Alert Response A013 Logistics Product Data DI-SESS-81757/T A017 Report, Record of Meeting Minutes DI-ADMN-81505 A018 Product Drawings/Models and DI-SESS-81000E/T

Associated Lists

A019 Software Development Plan (SDP) DI-IPSC-81427A A022 Software Design Description DI-ISPC-81435A A023 Interface Design Descriptions DI-IPSC-81436A A026 Software Requirements Specifications DI-IPSC-81433A

(SRS)

A027 Interface Requirements Specification DI-IPSC-81434A

(IRS)

A030 Specification Change Notice (SCN) DI-CMAN-80643D A031 System Subsystem Design Description DI-IPSC-81432A

(SSDD)

A032 Source Data for Forecasting Dim. DI-SESS-81656

Mfg Sources & Material Shorts A033 Technical Manual Contract Reqs TM-86-01P

(TMCR)

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required Period of Performance

+ IAW1423 1 LO *12 Months

Proposed Period of Performance

+ IAW1423 1 LO

Block Cycle Upgrade/Tech Refresh Work Requirements

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

R408 RE

Block Cycle Upgrade/Tech Refresh Work Requirements

Block Cycle Upgrade/Tech Refresh Work Requirements Block Cycle Upgrade/Tech Refresh Work Requirements IAW PWS dated 31 Aug 2016, para. 8.1.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required Period of Performance

IAW PWS 1 LO *12 Months

Proposed Period of Performance

IAW PWS 1 LO

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

R408 RE

Training (1 Week Course) Training (1 Week Course) IAW PWS dated 31 Aug 2016, para. 9.0.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required Period of

IAW PWS 1 LO *12 Months

Proposed Period of Performance

IAW PWS 1 LO

Engineering Support

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

Engineering Support Configuration Management, Technical Data, Provisioning, and Engineering Change Proposal Engineering Support IAW PWS dated 31 Aug 2016, para 7.1.3.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

IUID Required: Yes Physical Item Markings:

Place of Perf Quantity (U/I) *ARO Contract Req No / Pri

Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Repair

Item No.

Cost Plus Fixed Fee Quantity U/I Unit Price Fixed Fee Amount

1 EA

R408 Repair Repair IAW PWS dated 31 Aug 2016, paras. 4.17.1, 4.17.2, and Appendix E of the PWS

Repair

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required Period of Performance

+ TBD 1 EA *12 Months

Proposed Period of Performance

+ TBD 1 EA

GFE Replenishment

Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

R408 GFE Replenishment IAW PWS dated 31 Aug 2016, para. 4.3.1.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required Period of Performance

IAW PWS 1 LO *12 Months

Proposed

GFE Replenishment

IAW PWS 1 LO

Software

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

R408 RE

Software Software IAW PWS dated 31 Aug 2016, paragraphs 10.1 thru 10.4.2.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None none Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri

Required Period of Performance

IAW PWS 1 LO *12 Months

Proposed Period of Performance

IAW PWS 1 LO

NOTE FOR ALL OPTIONS: The PR numbers and PR line items cited below will be revised upon exercise of each option.

OPTION I: Option I may be exercised anytime within 12 months after effective date of award. The period of performance for Option I shall not begin until the end of the basic period of performance, and shall not exceed 12 months. An option is determined to have been exercised when transmitted electronically by email or fax.

Program Management

Item No.

Program Management

12 MO

R408 RE

Program Management Program Management IAW PWS dated 31 Aug 2016, para. 4.2 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Government Furnished Property

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

R408 Government Furnished Equipment (GFE) Consumable/Expendable, Contractor Repair, and MILSTRIP Repair GFE IAW PWS dated 31 Aug 2016, para. 4.3 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Class I ODS Substance Application/Use Quantity None none

Government Furnished Property

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Maintenance Concept

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

R408 RE

Maintenance Concept Maintenance Concept IAW PWS dated 31 Aug 2016, para. 4.4 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Help Desk Support

Item No.

Help Desk Support

12 MO

R408 Help Desk Support Help Desk Support IAW PWS dated 31 Aug 2016, para. 4.5 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Scheduled Maintenance

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

R408 Scheduled Maintenance Scheduled Maintenance IAW PWS dated 31 Aug 2016, para. 4.7 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required

Scheduled Maintenance

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Unscheduled Maintenance

Item No.

Cost Plus Fixed Fee Quantity U/I Unit Price Fixed Fee Amount

12 MO

R408 Unscheduled Maintenance Unscheduled Maintenance IAW PWS dated 31 Aug 2016, para. 4.6 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Travel

Item No.

Cost Reimbursement - No Fee Quantity U/I Unit Price Total Estimated Cost

1 LO

TRAV

TRAVEL AS APPROVED IN ADVANCE BY CONTRACTING OFFICER

TRAVEL IN SUPPORT OF CLINs 0005 and 0006. TRAVEL REIMBURSED IAW FAR 31.2

Travel

Priority: R ROUTINE

Cybersecurity

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

R408 RE

Cybersecurity Cybersecurity IAW PWS dated 31 Aug 2016, paragraphs 6.1 thru 6.4 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required Period of Performance

IAW PWS 12 MO *12 Months

Proposed Period of Performance

IAW PWS 12 MO

Over and Above

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost 1 LO To be Determined To be Determined

R408 Over and Above Over and Above IAW PWS dated 31 Aug 2016, para. 4.6.2

Over and Above

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .