FA852316R0001_______0001.pdf
PDF 27 KB Posted
- Attached to
- Pocket J Engineering Support Federal contract opportunity
- Solicitation number
- FD2060-14-30523
About this file
Amendment -0001 to the RFP
View the file
Other files for this federal contract opportunity
Show all 43
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
JS
2. AMENDMENT/MODIFICATION NO.
FA8523-16-R-0001-0001
3. EFFECTIVE DATE
31 DEC 2015
4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO (If applicable)
6. ISSUED BY CODE
EW/AVIONICS, AFLCMC/WNYKA
235 BYRON ST STE 19A
BLDG 301 CML PHN 478 926 7212
ROBINS AFB GA 31098-1670
BUYER: Brandi W. Moody Brandi.Moody@us.af.mil Phone: (478) 222- 5267 No Collect Calls
7. ADMINISTERED BY (If other than item 6) CODEFA8523
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE
X
9A. AMENDMENT OF SOLICITATION NO.
FA852316R0001
9B. DATED (SEE ITEM 11)
24-NOV-2015
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. 27-JAN-2015 3:00 PM
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
ROUTINE
15A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR
BY ________________________________________________________
(Signature of person authorized to sign)
15C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16B. UNITED STATES OF AMERICA
BY ____________________________________________________
(Signature of Contracting Officer)
16C. DATE SIGNED
FACILITY CODE
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (REV. 10-83)
PRESCRIBED BY GSA
FAR (48 CFR) 53.243
X
X X
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
Amendment/Modification FA8523-16-R-0001-0001
Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION
The purpose of this amendment is as follows:
1. To extend the proposal due date as follows:
FROM: 06 January 2016
TO: 27 January 2016
2. To update the PWS attached to Section J of the solicitation. PWS Revision dated 18 December 2015 supersedes all other PWS.
3. To change CLINs 0011, 1011, 2011, 3011, and 4011 to read as To be Determined (TBD) and they will not be included in the evaluation of the proposals. See Section B below.
4. To remove CLINs 0012AB, 1012AB, 2012AB, 3012AB, and 4012AB from the solicitation.
5. To change CLINs 0015, 1015, 2015, 3015, and 4015 as follows:
FROM: Firm Fixed Price (FFP)
TO: Cost Reimbursable, No Fee (CRNF)
6. To change Section L, Technical Subfactor One, as follows:
FROM: f) 5.2 Clearances – how will you ensure personnel meet the required security clearances?
TO: f) 5.2.1 Clearances – how will you ensure personnel meet the required security clearances?
7. To change Section M, Technical Subfactor One, as follows:
FROM: Measure of Merit: This requirement is met when the offeror’s proposal specifies means/ methods to meet work requirements set forth in 4.2.2, 4.2.5, 4.13, 4.14, 5.2 of PWS, with a low to moderate risk of unsuccessful contract performance.
TO: Measure of Merit: This requirement is met when the offeror’s proposal specifies means/ methods to meet work requirements set forth in 4.2.2, 4.2.5, 4.13, 4.14, 5.2.1 of PWS, with a low to moderate risk of unsuccessful contract performance.
Amendment/Modification FA8523-16-R-0001-0001
8. To update the CDRLs attached to Section J of the solicitation. CDRLs dated 31 December 2015 supersedes all other CDRLs. See attached.
9. To change the size standard on the front page as follows:
FROM: $15.00
TO: $38.5
10. All other terms and conditions remain the same.
Request for Proposal FA8523-16-R-0001-0001
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
Block Cycle Upgrade
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO To be Determined To be Determined
R408 Block Cycle Upgrade Block Cycle Upgrade IAW PWS dated 16 Oct 2015, para. 8.1.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required Period of Performance
IAW PWS 1 LO *12 Months
Proposed Period of Performance
IAW PWS 1 LO
GFE Replenishment
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R408 GFE Replenishment IAW PWS dated 16 Oct 2015, para. 4.3.1.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
GFE Replenishment
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required Period of Performance
IAW PWS 1 LO *12 Months
Proposed Period of Performance
IAW PWS 1 LO
Block Cycle Upgrade
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO To be Determined To be Determined
R408 Block Cycle Upgrade Block Cycle Upgrade IAW PWS dated 16 Oct 2015, para. 8.1.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required Period of Performance
IAW PWS 1 LO *12 Months
Proposed Period of Performance
IAW PWS 1 LO
GFE Replenishment
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R408 GFE Replenishment IAW PWS dated 16 Oct 2015, para. 4.3.1.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required Period of Performance
IAW PWS 1 LO *12 Months
Proposed Period of Performance
IAW PWS 1 LO
Block Cycle Upgrade
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO To be Determined To be Determined
R408 Block Cycle Upgrade Block Cycle Upgrade IAW PWS dated 16 Oct 2015, para. 8.1.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri
Block Cycle Upgrade
Required Period of Performance
IAW PWS 1 LO *12 Months
Proposed Period of Performance
IAW PWS 1 LO
GFE Replenishment
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R408 GFE Replenishment IAW PWS dated 16 Oct 2015, para. 4.3.1.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required Period of Performance
IAW PWS 1 LO *12 Months
Proposed Period of Performance
IAW PWS 1 LO
Block Cycle Upgrade
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO To be Determined To be Determined
R408
Block Cycle Upgrade
Block Cycle Upgrade Block Cycle Upgrade IAW PWS dated 16 Oct 2015, para. 8.1.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required Period of Performance
IAW PWS 1 LO *12 Months
Proposed Period of Performance
IAW PWS 1 LO
GFE Replenishment
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R408 GFE Replenishment IAW PWS dated 16 Oct 2015, para. 4.3.1.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required Period of Performance
IAW PWS 1 LO *12 Months
GFE Replenishment
Proposed Period of Performance
IAW PWS 1 LO
Block Cycle Upgrade
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO To be Determined To be Determined
R408 Block Cycle Upgrade Block Cycle Upgrade IAW PWS dated 16 Oct 2015, para. 8.1.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required Period of Performance
IAW PWS 1 LO *12 Months
Proposed Period of Performance
IAW PWS 1 LO
GFE Replenishment
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R408 GFE Replenishment IAW PWS dated 16 Oct 2015, para. 4.3.1.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
GFE Replenishment
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Place of Perf Quantity (U/I) *ARO Contract _ Req No / Pri Required Period of Performance
IAW PWS 1 LO *12 Months
Proposed Period of Performance
IAW PWS 1 LO
PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J
LIST OF ATTACHMENTS
Form Number Description/File Name Date Number of Pages Performance Work Statement Revision
18DEC2015 78
DD FORM 1423-1 Contract Data Requirements List Revised CDRLs including TMCR
31DEC2015 77
File details come from the government source that posted it. Updated .