FA852316R0001_______0002.pdf

PDF 23 KB Posted

Attached to
Pocket J Engineering Support Federal contract opportunity
Solicitation number
FD2060-14-30523
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

Amendment 0002 FA8523-16-R-0001-0002

View the file

Other files for this federal contract opportunity

Other files attached to Pocket J Engineering Support, newest first.
File Type Posted
Pocket_J_Proposal_spreadsheet.xlsx XLSX spreadsheet
FA852316R0001_0011(4).pdf PDF
PktJConsolidatedGFPDec2016.pdf PDF
FA8523-16-R-0001-0010.pdf PDF
GFP_compliance_RFP.pdf PDF
Pocket_J_Proposal_spreadsheet.xlsx XLSX spreadsheet
DD254.pdf PDF
CDRLs_Portfolio.pdf PDF
QASP7mar17.pdf PDF
Pocket_J_PWS_(2_Feb_17).pdf PDF
PktJConsolidatedGFPDec2016.pdf PDF
FA852316R0001_0009,_rev13.pdf PDF
Pocket_J_Proposal_spreadsheet_(2_Feb_17).xlsx XLSX spreadsheet
AFMC158_00.pdf PDF
DD1653.pdf PDF
FA852316R0001_0008.pdf PDF
Mod_5_PJ_Questions_(Govt_Responses).xlsx XLSX spreadsheet
Mod_6_PJ_Questions_(Govt_Responses).xlsx XLSX spreadsheet
FA852316R0001_______0007-amendment.pdf PDF
Repost_Amend_05_Questions.pdf PDF
FA852316R0001_______0006.pdf PDF
FA852316R0001_0005(8).pdf PDF
PWS_31Aug16_(FINAL).pdf PDF
FA852316R0001_______0004.pdf PDF
FA852316R0001_______0003.pdf PDF
TO_31R2-2FSC134-1_Pocket_J_Spiral_2.3.1_Fixed_Element_(FE)_30_June_2011.pdf PDF
TO_31R2-2FSC135-1_Pocket_J_Spiral_2.3.1_Remote_Element_(RE)_30_June_2011.pdf PDF
RFP_Questions_and_Answer_22_Jan_2016.docx.pdf PDF
REInstructorTrainingGuide141216_v6.pdf PDF
FE_Training_Instructor_Guide_141216 _v5.pdf PDF
RFP_Combined_Questions_and_Answers_Rev1.docx DOCX document
PWS_18Dec2015.pdf PDF
NewCDRLList_31Dec2015.pdf PDF
FA852316R0001_______0001.pdf PDF
RFP_Combined_Questions_and_Answers.pdf PDF
SGFP.pdf PDF
254.pdf PDF
PKG.pdf PDF
CDRLs.pdf PDF
FA852316R0001-FINAL.pdf PDF
PWSv3.pdf PDF
PWS_14_May_15.pdf PDF
L_and_M_Lowest_Price_Technically_Acceptable_v2.pdf PDF
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

JS

2. AMENDMENT/MODIFICATION NO.

FA8523-16-R-0001-0002

3. EFFECTIVE DATE

4. REQUISITION/PURCHASE REQ. NO.

FD20601430523

5. PROJECT NO (If applicable)

6. ISSUED BY CODE

EW/AVIONICS, AFLCMC/WNYKA

235 BYRON ST STE 19A

BLDG 301 CML PHN 478 926 7212

ROBINS AFB GA 31098-1670

BUYER: Kyle E. Smith, 1Lt USAF kyle.smith.45@us.af.mil Phone: (478) 222- 1918 No Collect Calls

7. ADMINISTERED BY (If other than item 6) CODEFA8523

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE

X

9A. AMENDMENT OF SOLICITATION NO.

FA852316R0001

9B. DATED (SEE ITEM 11)

24-NOV-2015

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

ROUTINE

15A. NAME AND TITLE OF SIGNER (Type or print)

15B. CONTRACTOR/OFFEROR

BY ________________________________________________________

(Signature of person authorized to sign)

15C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16B. UNITED STATES OF AMERICA

BY ____________________________________________________

(Signature of Contracting Officer)

16C. DATE SIGNED

FACILITY CODE

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (REV. 10-83)

PRESCRIBED BY GSA

FAR (48 CFR) 53.243

X

X X

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

Amendment/Modification FA8523-16-R-0001-0002

Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION

The purpose of this amendment is to:

1. Revise description of CLINs 0007, 1007, 2007, 3007, and 4007 as follows:

FROM: TRAVEL IN SUPPORT OF CLINs 1005 and 1006.

TO: TRAVEL IN SUPPORT OF ALL CLINs.

2. Incorporate Engineering Support into Schedule B under CLINs 0013, 1013, 2013, 3013, and 4013. These CLINs are changed from RESERVED to Engineering Support within Schedule B.

3. All other terms and conditions remain the same.

Request for Proposal FA8523-16-R-0001-0002

PART I - THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

Travel

Item No.

Cost Reimbursement - No Fee Quantity U/I Unit Price Total Estimated Cost

1 LO

TRAV

TRAVEL AS APPROVED IN ADVANCE BY CONTRACTING OFFICER

TRAVEL IN SUPPORT OF ALL CLINs. TRAVEL REIMBURSED IAW FAR 31.2 Priority: R ROUTINE

Engineering Support

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

Engineering Support Configuration Management, Technical Data, Provisioning, and Engineering Change Proposal Engineering Support IAW PWS dated 18 Dec 2015, para 4.2.5, 4.13, 4.14, and 7.1.3 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract Req No / Pri Required Period of Performance

12 MO *12 Months

Proposed Period of Performance

12 MO

Travel

Item No.

Cost Reimbursement - No Fee Quantity U/I Unit Price Total Estimated Cost

1 LO

TRAV

TRAVEL AS APPROVED IN ADVANCE BY CONTRACTING OFFICER

TRAVEL IN SUPPORT OF ALL CLINs. TRAVEL REIMBURSED IAW FAR 31.2 Priority: R ROUTINE

Engineering Support

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

Engineering Support Configuration Management, Technical Data, Provisioning, and Engineering Change Proposal Engineering Support IAW PWS dated 18 Dec 2015, para 4.2.5, 4.13, 4.14, and 7.1.3 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract Req No / Pri Required Period of Performance

12 MO *12 Months

Proposed Period of Performance

12 MO

Travel

Item No.

Cost Reimbursement - No Fee Quantity U/I Unit Price Total Estimated Cost

1 LO

Travel

TRAV

TRAVEL AS APPROVED IN ADVANCE BY CONTRACTING OFFICER

TRAVEL IN SUPPORT OF ALL CLINs. TRAVEL REIMBURSED IAW FAR 31.2 Priority: R ROUTINE

Engineering Support

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

Engineering Support Configuration Management, Technical Data, Provisioning, and Engineering Change Proposal Engineering Support IAW PWS dated 18 Dec 2015, para 4.2.5, 4.13, 4.14, and 7.1.3 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract Req No / Pri Required Period of Performance

12 MO *12 Months

Proposed Period of Performance

12 MO

Travel

Item No.

Cost Reimbursement - No Fee Quantity U/I Unit Price Total Estimated Cost

1 LO

TRAV

TRAVEL AS APPROVED IN ADVANCE BY CONTRACTING OFFICER

TRAVEL IN SUPPORT OF ALL CLINs. TRAVEL REIMBURSED IAW FAR 31.2 Priority: R ROUTINE

Engineering Support

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

12 MO

Engineering Support Configuration Management, Technical Data, Provisioning, and Engineering Change Proposal Engineering Support IAW PWS dated 18 Dec 2015, para 4.2.5, 4.13, 4.14, and 7.1.3 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract Req No / Pri Required Period of Performance

12 MO *12 Months

Proposed Period of Performance

12 MO

Travel

Item No.

Cost Reimbursement - No Fee Quantity U/I Unit Price Total Estimated Cost

1 LO

TRAV

TRAVEL AS APPROVED IN ADVANCE BY CONTRACTING OFFICER

TRAVEL IN SUPPORT OF ALL CLINs. TRAVEL REIMBURSED IAW FAR 31.2 Priority: R ROUTINE

Engineering Support

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

Engineering Support

Engineering Support Configuration Management, Technical Data, Provisioning, and Engineering Change Proposal Engineering Support IAW PWS dated 18 Dec 2015, para 4.2.5, 4.13, 4.14, and 7.1.3 Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Place of Perf Quantity (U/I) *ARO Contract Req No / Pri Required Period of Performance

12 MO *12 Months

Proposed Period of Performance

File details come from the government source that posted it. Updated .