Industry_Day__2_Master_Brief_v1_0.pdf
PDF 1 MB Posted
- Attached to
- Consolidated Air Force Satellite Control Network (AFSCN) Modifications, Maintenance & Operations (CAMMO) Contract Federal contract opportunity
- Solicitation number
- FA8823-13-R-0009
View the file
Other files for this federal contract opportunity
Show all 50
Consolidated Air Force Satellite Control Network (AFSCN) Modifications, Maintenance & Operations (CAMMO) Contract has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Space and Missile Systems Center Space and Missile Systems Center
Consolidated Air Force
Satellite Control Network
(AFSCN) Modifications, Maintenance, & Operations
(CAMMO) Industry Day
3 September 2014
Safety & Facilities
Lt. Dan Beckett
SMC/RN
S P A C E A N D M I S S I L E S Y S T E M S C E N T E R
Evacuations
• In the event of an emergency, evacuate out the nearest exit & assemble at the appropriate rally point
– Fire Alarm: Southwest parking lot
– Bomb Threat or Gas Leak: Across Stewart Ave, behind the dental clinic
Evacuations
Restrooms
• The closest restrooms to the conference:
SMC Industry Day
Lt. Dan Beckett
Industry Day Overview
• Opening Comments
• DRFP
• Operations
• Break (room will be cleared)
• Check-in for Classified Briefing
• Space Security Development Team Briefing
• Closing Comments
Industry Day Rules of Engagement
• The briefings presented today contain preliminary, pre-decisional information only
• All information provided is subject to change
• The Government is not currently soliciting proposals
Signing In
• Please ensure that you have signed in with Ms. Vollbracht in the conference room foyer
• During the break, the room will be cleared and all individuals will be required to sign in again for the classified briefing
Questions
• To ensure that information is equally available to all parties, including those who weren’t able to attend, many questions will NOT be accepted during the course of the briefings today
• Examples of questions appropriate to ask during briefing:
– “Can you repeat what you just said?”
– “What does <acronym> stand for?”
• Examples of questions inappropriate to ask during briefing:
– “Can you describe how <technical process> works?”
– “Can you clarify <specific> maintenance process?”
Opening
Comments
Opening Comments
Colonel Jason Sutton
Commander, 50th Network Operations Group
50 Space Wing
Colonel Janet Grondin
Chief, Range and Network Division
Space and Missile Systems Center
CAMMO
Draft RFP
Mr. Michael Hennessy
• Changes and Additions for DRFP
• Overview of Sections L & M
• Proposal Volumes and Organization
• Factors and Subfactors
• Potential Changes or Additions to
Technical Factor
Overview
• Multiple changes since RFI #4 (10 Apr) such as:
– Minor changes/additions to CLIN Structure
– Offerors’ to propose fixed fee percentage for Special Studies and Transition Phase-in CLINs
– Multiple additions to Section J attachments (GFP List, Data Rights, etc.)
– CDRL Exhibit A has been added
– Revisions/restructuring of PWS requirements (Cybersecurity, Facility Lease, EDI, etc.)
– Minor changes to WBS Structure (e.g., WBS 4.3.5 now incorporates PWS 3.7.3.1 Special Studies)
– Number of PIMs reduced in Incentive Plan
– Reduction and Revision of Factors and Subfactors
– Relevancy Assessment Areas and Relevancy Definitions added to Past Performance
• Review Entire DRFP Carefully
Changes and Additions to DRFP
• Proposal Volumes and Organization
• General Organization
– Where possible Sections L & M section numbers are aligned (specifically in Volume II)
• PWS References
– PWS references are provided for each of the instructions in Section L and criteria in Section M
Overview of Section L & M
Volume
ITO
Paragraph Number
Title Electronic
Copies
Hard Copies
Page Limit
I 2.0 Executive Summary 2 2 10
2.4 Attachment E1: Cross Reference Matrix 2 2 Unlimited
II 3.0 Technical
Main Body 2 2 80
Attachment T1: Operations and Maintenance Shift and Schedule Table
2 2 Unlimited
Attachment T2: Configuration Management Plan
2 2 20
Attachment T3: WBS Man-hour Estimate 2 2 Unlimited
Attachment T4: BOEs for WBS Man-hour Estimate
2 2 50
Attachment T5: Transition Phase-in Plan 2 2 35
III 4.0 Past Performance
Main Body 2 2 40
Attachment PP1: Contract Relevancy Matrix 2 2 Unlimited
Attachment PP2: Past Performance Information Forms
2 2 10
Attachment PP3: Subcontractor Consent Letters 2 2 1 for each
Attachment PP4: Client Authorization Letters 2 2 1 for each
IV 5.0 Cost/Price
Main Body 2 2 Unlimited
Attachment PC1: TEP Calculation Table 2 2 Unlimited
Attachment PC2: CLIN Pricing Summary Table 2 2 Unlimited
Attachment PC3: Special Studies Composite Rate Computation Table
2 2 Unlimited
Attachment PC4: FCT Pricing Menu 2 2 Unlimited
Attachment PC5: FCT BOEs 2 2 Unlimited
V 6.0 Contract Documentation N/A
Proposal Volumes and Organization
• Factor 1: Technical Factor
– Three Subfactors
• Operations
• Maintenance and Sustainment
• Program Management
• Factor 2: Past Performance
• Factor 3: Price
Factors and Subfactors
• Cybersecurity
– Possible addition/revision of criteria related to contractor IT systems
• Bases of Estimate (BOE)
– BOEs to support man-hour estimates in the WBS in Annex
C of Section L
– Additional information regarding format and content of BOEs may be added
• Scenario
– A scenario has been prepared and will be included in the
Final RFP submittal
– The draft RFP includes placeholder for scenario
• Section L, paragraph 3.3
• Section M, paragraphs 3.2.1.2 (Operations Subfactor) and
3.2.2.5 (Maintenance and Sustainment Subfactor)
Potential Changes or Additions to
Technical Factor
Past Performance Factor
Price Factor
Contract Volume
Ms. Christina Ming, Contracting Officer
SMC/RNK
• Factor 2: Past Performance
• Factor 3: Price
• Determination of Prospective Contractor
Responsibility
• Areas for Potential Revision for Final RFP
• Key Milestone Dates
Overview
• Recency Assessment
– To be considered recent the effort must be ongoing, or must have been completed within the past five years from the date of issuance of the solicitation. Contract submissions that do not meet the recency criteria will not be evaluated for relevancy or quality (Sec M, Para 4.2.2)
• Relevancy Assessment
– The Offeror shall provide specific rationale for each contract's relevancy and categorize into the specific Relevancy Assessment Area used to evaluate the proposal (Sec L, Para 4.5)
– The Government will evaluate the Offeror’s recent contracts against the Relevancy Criteria in Tables 4-3. No single contract submission needs to meet the definition of “Very Relevant,” “Relevant,” or “Somewhat Relevant” in each Relevancy Assessment Area (Sec M, Para 4.2.3.2)
Factor 2: Past Performance
• Relevancy Determination
– A relevancy determination of the Offeror’s past performance will be made based upon the criteria definitions listed in Tables 4-3 of Section M. In determining relevancy for individual contracts, consideration will be given to the effort, or portion of the effort, being proposed by the Offeror, teaming partner, or subcontractor whose contract is being reviewed and evaluated (Sec M, Para 4.2.3.1)
• Quality Assessment
– Will consider the quality of recent, relevant efforts
– Quality of the work performed will be assessed for each Relevancy Assessment Area applicable to that contract.
However, all aspects of performance that relate to this acquisition may be considered
– Consists of an evaluation of all past performance information available, regardless of its source
– May result in positive or adverse findings
• Adverse: Defined as past performance information that supports a less than satisfactory rating or any unfavorable comment received from sources
• Will consider the number & severity of the problem(s), mitigating circumstances, & the effectiveness of corrective actions that have resulted in sustained improvements (Sec M, 4.2.4)
• Assigning Rating
– More recent and/or more relevant performance may have a greater impact on the Past Performance Evaluation Rating than a less recent and/or less relevant effort (Sec M, Para 4.2.5)
• Special Studies & Factory Compatibility Testing (FCT)
Scenarios
– A “typical” sample to help Offerors determine labor mix and composite rate/menu prices
– Do not submit a full cost proposal
– Do not submit an actual study or report
• Ensure CLIN Summary & TEP are consistent
• Watch for potential mathematical errors caused by rounding/hidden decimals
Factor 3: Price
• TEP Calculation (Sect L, Table 5-2)
Factor 3: Price
• PCO will determine prospective contractor responsibility IAW FAR 9.1
• Reviewing Volume V, Contract Document, Sec J, Attachments:
– Organizational Conflict of Interest Mitigation Plan
– Small Business Subcontracting Plan
– Public Private Partnership Plan
– Modification Management Plan
– Professional Employee Compensation
• Failure to meet the criteria for responsibility may result in the proposal being removed from consideration
Determination of Prospective Contractor
Responsibility
• Factor 3: Price
– Conduct realism (only on CLINs 1400 & 1401)
– Budget Limitations and Affordability
– CLIN Re-structure:
• Possible changes to comply with FIAR (Financial Improvement and Audit
Readiness)
– See Office of The Assistant Secretary Memorandum “Contractor Logistic Support (CLS)
Element of Expense Investment Code (EEIC) Structure Change Notification” dated 13 Jun 12
– See DoD’s FIAR Homepage: http://comptroller.defense.gov/fiar
• Volume V, Contract Documentation
– Attachment 19, Professional Employee Compensation: Instruction &
Evaluation Language
– Section B, CLINs 1400, 1401, 1500, 1501, & 1502
• At contract award, all CLINs above will be exercised
• However, PoP start date for CLIN 1500, 1501, & 1502 will not begin until day 61 (end of transition)
Areas for Potential Revision to RFP http://comptroller.defense.gov/fiar http://comptroller.defense.gov/fiar http://comptroller.defense.gov/fiar http://comptroller.defense.gov/fiar http://comptroller.defense.gov/fiar
Key Milestones Dates (Projected)
Action Scheduled
Industry Responses to DRFP 8-12 Sep 14
RFP Release to Industry 2 Dec 14
Offeror’s Past Performance Volume 5 Jan 15
Offeror’s Proposal 16 Jan 15
Contract Award 30 Sep 15