CAMMO_Notional_CLIN_Structure_ver_2_0.pdf

PDF 107 KB Posted

Attached to
Consolidated Air Force Satellite Control Network (AFSCN) Modifications, Maintenance & Operations (CAMMO) Contract
Solicitation number
FA8823-13-R-0009
Issued by

About this file

CAMMO Notional CLIN Structure ver 2_0

View the file

Other files

File Type Posted
Industry_Day__2_Master_Brief_v1_0.pdf PDF
Notification_of_Industry_Day__2.docx DOCX document
FBO_Notice_Update_on_CAMMO_DRFP _Industry_Day__2_and_One-on-one_Meetings.docx DOCX document
CAMMO_Feedback_Matrix_RFI__4_Govt_Response_ver_1_0.xlsx XLSX spreadsheet
CAMMO_Feedback_Matrix_RFI__4_Govt_Response_ver_1_0.pdf PDF
CAMMO_Feedback_Matrix_RFI__3_Govt_Response_ver_1_2.pdf PDF
CAMMO_Feedback_Matrix_RFI__3_Govt_Response_ver_1_2.xlsx XLSX spreadsheet
CAMMO_Notional_WBS_ver_3_0.xlsx XLSX spreadsheet
CAMMO_Notional_Section_L_ver_2_0a.pdf PDF
CAMMO_Notional_Section_H_ver_1_0.pdf PDF
CAMMO_Notional_WBS_ver_3_0.pdf PDF
CAMMO_Notional_Performance_Work_Statement_(PWS)_ver_4_0.pdf PDF
CAMMO_Notional_DD_254_ver_2_0.pdf PDF
CAMMO_Notional_Incentive_Plan_ver_2_0.pdf PDF
CAMMO_Notional_Section_M_ver_2_0a.pdf PDF
CAMMO_Feedback_Matrix_RFI_number_4_v1_0.xlsx XLSX spreadsheet
Response_to_Industry_Day_Questions_Ver_1_0.pdf PDF
Response_to_Industry_Day_Questions_Ver_1_0.xlsx XLSX spreadsheet
CAMMO_Lab_Tour__Slides_DELTA_Pkg.pdf PDF
CAMMO_ATB_Script.pdf PDF
CAMMO_Repair_Lab_and_Warehouse_script.pdf PDF
CAMMO_Lab_Tour_Slides.pdf PDF
CAMMO_ATB_Lab_Tour_2014_Slides_-_Updated.pdf PDF
CAMMO_Transportables_Script.pdf PDF
CAMMO_Industry_Day_Briefing_Business_Attendees.pdf PDF
CAMMO_EOSOF_Industry_Day_2014_Script.pdf PDF
CAMMO_50_OG_Industry_Day_Tour_2014_Slides.pdf PDF
CAMMO_22_SOPS_Industry_Day_Tour_2014_Slides.pdf PDF
CAMMO_50_SCS_Mod_3-4_Industry_Day_2014_Script.pdf PDF
CAMMO_22_SOPS_Industry_Day_2014_Script.pdf PDF
CAMMO_50_OG_Industry_Day_2014_Script.pdf PDF
CAMMO_VTS_Industry_Day_2014_Script.pdf PDF
CAMMO_Bidders_Library_Access_Instructions.pdf PDF
CAMMO_Industry_Day_Master_Brief_FBO.pdf PDF
Notional_CAMMO_WBS_ver_2_0.xlsx XLSX spreadsheet
OO-ALC_PPP_and_Capabilities.ppt PPT presentation
2_NDA_Company_5CC.docx DOCX document
1_OO-ALC_CAMMO_PPP_One-On-One_Request_Form.docx DOCX document
4_OO-ALC_PA_Template_(2013).docx DOCX document
CAMMO_Feedback_Matrix_RFI_3_v1_0.xlsx XLSX spreadsheet
CAMMO_Bidders_Library_Access_Agreement_(NDA).pdf PDF
CAMMO_Notional_CLIN_Structure_v1_0.pdf PDF
CAMMO_Notional_Incentive_Plan_Ver_1_0.pdf PDF
CAMMO_PWS__Ver_3_0.pdf PDF
CAMMO_Notification_of_Industry_Day_-_Appendix_A.docx DOCX document
CAMMO_Milestones_v0_1.pdf PDF
Notification_of_Industry_Day_v01.pdf PDF
Updated_CAMMO_Milestones_dated_19_Dec_13.pdf PDF
Clarification_Q A_1_for_RFI_2nd_Set_Question__3.pdf PDF
1_Aug_13_Info_to_Accompany_Draft_CAMMO_PWS.pdf PDF
Show 40 more

Latest 50 of 61 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA8823‐13‐R‐0009 Notional CLIN Structure_v2_0 Page 1 of 2

Notional Contract Line Item Number (CLIN) Structure for Consolidated Air Force Satellite Control Network 1

(AFSCN) Modifications, Maintenance, and Operations (CAMMO) FA8823‐13‐R‐0009 2

The CAMMO contract will be a Fixed Priced Incentive Firm (FPIF) contract utilizing several CLIN Types: 3

Fixed Price Incentive Firm (FPIF) ‐ Operations, Maintenance and Sustainment (OM&S) 4

Firm Fixed Price (FFP) – Operating Location Support Services and Factory Compatibility Testing (FCT) 5

Cost Plus Fixed Fee (CPFF) – Transition Phase‐In, Transition Phase‐Out, and Special Studies 6

Cost Reimbursable (CR) – Travel for Transition ‐ Phase‐In; Government‐Directed Travel and Other Direct 7

Costs (ODCs); Travel for Transition ‐ Phase‐Out; Travel and Transportation for FCT; Replenishment 8

Spares; and Stocklisted Item Repairs – Material Support Division (MSD) 9

Not Separately Priced (NSP) – Data and Reports 10

Pricing elements for FPIF CLIN will be: 12

Target Profit ‐ 10% 13

Ceiling Price ‐ 115% 14

Share Ratio: 15

Underrun 50%/50% (Government/Contractor) 16

Overrun 50%/50% (Government/Contractor) 17

Pricing elements for CPFF CLINs will be: 19

Target Fixed Fee ‐ 8% 20

Sequential numbering applies to CLINs 3000, 3500, 4000, 5000, 6000, and 7000 and will be added as needed. 22

For CLINs 1500‐2100, 1501‐2101, and 1502‐2102 the first two digits represent the projected fiscal year of the 23 award. The notional CLIN Structure, with associated Performance Work Statement (PWS) Paragraph scope is 24 shown in the following table.25

FA8823‐13‐R‐0009 Notional CLIN Structure_v2_0 Page 2 of 2

FA8823‐13‐R‐0009 Notional CLIN Structure

CLIN Description Type PWS Title PWS Paragraph(s)

1400 Transition ‐ Phase‐In CPFF Transition – Phase‐In 3.9.1.1 through 3.9.1.11

1401 Travel for Transition ‐ Phase‐in CR Travel for Transition ‐ Phase‐In 3.9.1.12

1500, 1600, 1700, 1800, 1900, 2000, 2100

Operations, Maintenance, and Sustainment (OM&S)

FPIF a) General Requirements a) 2.1 through 2.1.8, 2.10, 2.11.3

b) AFSCN Opertional Performance b) 3.1

c) Operations c) 3.2.1.1 through 3.2.1.7, 3.2.2.1

d) Org Level Mx and Support d) 3.3.1.1 through 3.3.1.8 (except 3.3.1.4), 3.3.2.1 through 3.3.2.16, 3.3.3.1 through 3.3.3.7, 3.3.4.1 through 3.3.4.6 (except 3.3.4.3), 3.3.4.8, 3.3.4.9, 3.3.5.1, 3.3.5.2, 3.3.6.1 through 3.3.6.5

e) Depot Level Mx e) 3.4.1.1, 3.4.2.1, 3.4.3.1, 3.4.4.1, 3.4.5.2 through 3.4.5.5, 3.4.6.1 through 3.4.6.4

f) Sustainment Logistics Support f) 3.5.1.1, 3.5.1.3, 3.5.2.1, 3.5.2.2, 3.5.2.3, 3.5.4.1, 3.5.4.2

g) Sustaining Support g) 3.6.1.1 through 3.6.1.4, 3.6.2.1 through 3.6.2.12, 3.6.3.1 through 3.6.3.25 (except 3.6.3.24), 3.6.4.1 through 3.6.4.24 (except 3.6.4.8)

h) Software Sustainment and Mx h) 3.7.2.1 through 3.7.2.5

1501, 1601, 1701, 1801, 1901, 2001, 2101

Government‐directed Travel and Other Direct Costs (ODCs)

CR a) Reimbursable Travel a) 2.11.2

b) Purchase of Materials, Supplies and Equipment

b) 2.12.2, 3.3.1.4, 3.3.1.9, 3.3.4.3, 3.3.4.7, 3.6.4.8, 3.8.1.1.3

c) Licenses, Service Contracts, Warranties, and Subscriptions

c) 3.6.3.24

1502, 1602, 1702, 1802,1902, 2002, 2102

Operating Location Support Services FFP Operating Location Support Services 3.8.1 through 3.8.5 (except 3.8.1.1.3)

2400 Transition ‐ Phase‐out CPFF Transition – Phase‐Out 3.9.2.1 through 3.9.2.7, 3.9.2.9

2401 Travel for Transition ‐ Phase‐Out CR Travel for Transition ‐ Phase‐Out 3.9.2.8

3000‐3499* Factory Compatibility Testing (FCT) FFP Factory Compatibility Testing (FCT) 3.6.6.1 through 3.6.6.3

3500‐3999 Travel and Transportation for FCT CR Travel and Transportation for FCT 3.6.6.4, 3.6.6.5

4000‐4999* Replenishment Spares CR Replenishment Spares 3.5.1.2

5000‐5999 Offsite Stocklisted Item Repairs ‐ Material Support Division (MSD)

CR Offsite Stocklisted Item Repairs ‐ Material Support Division (MSD)

3.4.5.1

6000‐6999* Special Studies CPFF Special Studies 3.7.3.1

7000‐7999* Modification Projects TBD** Modification Projects 3.7.1.1, 3.7.1.2

9999 Data and Reports NSP Data and Reports N/A

*CLINS to be added as they are needed. Range is listed as a placeholder. 27 **CLIN type to be determined when modification project is issued. 28

File details come from the government source that posted it. Updated .