View the file

Other files for this federal contract opportunity

Other files attached to Consolidated Air Force Satellite Control Network (AFSCN) Modifications, Maintenance & Operations (CAMMO) Contract, newest first.
File Type Posted
Industry_Day__2_Master_Brief_v1_0.pdf PDF
CAMMO_Feedback_Matrix_RFI__4_Govt_Response_ver_1_0.xlsx XLSX spreadsheet
CAMMO_Feedback_Matrix_RFI__4_Govt_Response_ver_1_0.pdf PDF
CAMMO_Feedback_Matrix_RFI__3_Govt_Response_ver_1_2.pdf PDF
CAMMO_Feedback_Matrix_RFI__3_Govt_Response_ver_1_2.xlsx XLSX spreadsheet
CAMMO_Notional_Section_L_ver_2_0a.pdf PDF
CAMMO_Notional_Section_H_ver_1_0.pdf PDF
CAMMO_Notional_WBS_ver_3_0.pdf PDF
CAMMO_Notional_WBS_ver_3_0.xlsx XLSX spreadsheet
CAMMO_Notional_Performance_Work_Statement_(PWS)_ver_4_0.pdf PDF
CAMMO_Notional_CLIN_Structure_ver_2_0.pdf PDF
CAMMO_Notional_DD_254_ver_2_0.pdf PDF
Response_to_Industry_Day_Questions_Ver_1_0.pdf PDF
Response_to_Industry_Day_Questions_Ver_1_0.xlsx XLSX spreadsheet
CAMMO_Lab_Tour_Slides.pdf PDF
CAMMO_Repair_Lab_and_Warehouse_script.pdf PDF
CAMMO_Lab_Tour__Slides_DELTA_Pkg.pdf PDF
CAMMO_ATB_Script.pdf PDF
CAMMO_ATB_Lab_Tour_2014_Slides_-_Updated.pdf PDF
CAMMO_Industry_Day_Briefing_Business_Attendees.pdf PDF
CAMMO_22_SOPS_Industry_Day_Tour_2014_Slides.pdf PDF
CAMMO_50_OG_Industry_Day_Tour_2014_Slides.pdf PDF
CAMMO_50_SCS_Mod_3-4_Industry_Day_2014_Script.pdf PDF
CAMMO_22_SOPS_Industry_Day_2014_Script.pdf PDF
CAMMO_50_OG_Industry_Day_2014_Script.pdf PDF
CAMMO_EOSOF_Industry_Day_2014_Script.pdf PDF
CAMMO_Bidders_Library_Access_Instructions.pdf PDF
CAMMO_Industry_Day_Master_Brief_FBO.pdf PDF
Notional_CAMMO_WBS_ver_2_0.xlsx XLSX spreadsheet
OO-ALC_PPP_and_Capabilities.ppt PPT presentation
4_OO-ALC_PA_Template_(2013).docx DOCX document
2_NDA_Company_5CC.docx DOCX document
CAMMO_Feedback_Matrix_RFI_3_v1_0.xlsx XLSX spreadsheet
CAMMO_Bidders_Library_Access_Agreement_(NDA).pdf PDF
CAMMO_Notional_Incentive_Plan_Ver_1_0.pdf PDF
CAMMO_Notification_of_Industry_Day_-_Appendix_A.docx DOCX document
CAMMO_Milestones_v0_1.pdf PDF
Notification_of_Industry_Day_v01.pdf PDF
Updated_CAMMO_Milestones_dated_19_Dec_13.pdf PDF
Clarification_Q A_1_for_RFI_2nd_Set_Question__3.pdf PDF
1_Aug_13_Info_to_Accompany_Draft_CAMMO_PWS.pdf PDF
1_Aug_13_Draft_CAMMO_PWS_v1.pdf PDF
1_Aug_13_CAMMO_RFI__2nd_Set.pdf PDF
Save_the_Date_for_CAMMO_Information_Brief_v3.pdf PDF
Save_the_Date_for_CAMMO_Information_Brief-2.pdf PDF
CAMMO_Info_Brief_(6_Aug_13).pdf PDF
Save_the_Date_for_CAMMO_Information_Brief.pdf PDF
CAMMO_RFI_Small_Business_16May13.docx DOCX document
CAMMO_RFI_Small_Business_v1_3.docx DOCX document
CAMMO_Sources_Sought_v1_4_(3).docx DOCX document
Show all 50

Consolidated Air Force Satellite Control Network (AFSCN) Modifications, Maintenance & Operations (CAMMO) Contract has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA8823-13-R-0009 Notional CLIN Structure_v1.0 Page 1 of 2

Notional Contract Line Item Number (CLIN) Structure for Consolidated Air Force Satellite Control Network 1

(AFSCN) Modifications, Maintenance, and Operations (CAMMO) FA8823-13-R-0009 2

The CAMMO contract will be a Fixed Priced Incentive Firm (FPIF) contract utilizing several CLIN Types: 3

Fixed Price Incentive Firm (FPIF) - Operations, Maintenance and Sustainment (OM&S) 4

Firm Fixed Price (FFP) – Remote Site Support (RSS) and Factory Compatibility Testing (FCT) 5

Cost Plus Fixed Fee (CPFF) – Transition Phase-In, Transition Phase-Out, and Special Studies 6

Cost Reimbursable (CR) – Travel for Transition - Phase-In; Government-directed Travel and Other Direct 7

Costs (ODCs); Travel for Transition - Phase-Out; Travel and Transportation for FCT; Replenishment 8

Spares; and Stocklisted Item Repairs – Material Support Division (MSD) 9

Not Separately Priced (NSP) – Data and Reports 10

Pricing elements for FPIF CLIN will be: 12

Target Profit - 10% 13

Ceiling Price - 115% 14

Share Ratio: 15

Underrun 70% / 30% (Government / Contractor) 16

Overrun 30% / 70% (Government / Contractor) 17

Pricing elements for CPFF CLINs will be: 19

Target Fixed Fee - 8% 20

Sequential numbering applies to CLINs 3000, 3500, 4000, 5000, 6000, and 7000 and will be added as needed. 22

For CLINs 1500-2100, 1501-2101, and 1502-2102 the first two digits represent the projected fiscal year of the 23 award. The anticipated CLIN Structure, with associated Performance Work Statement (PWS) Paragraph scope is 24 shown in the following table. 25

FA8823-13-R-0009 Notional CLIN Structure_v1.0 Page 2 of 2

FA8823-13-R-0009 Notional CLIN Structure

CLIN Description Type Task Title PWS Paragraph(s)

1400 Transition - Phase-In CPFF Transition – Phase-In 3.9.1 (except 3.9.1.12)

1401 Travel for Transition - Phase-in CR Travel for Transition - Phase-In 3.9.1.12

1500, 1600, 1700, 1800, 1900, 2000, Operations, Maintenance, and Sustainment (OM&S)

FPIF a) General Requirements

b) AFSCN Ops Performance Standards

c) Operations

d) Org Level Mx and Support

e) Depot Level Mx

f) Sustainment Logistics Support

g) Sustaining Support

h) Software Sustainment and Mx

a) 2.0 (except 2.11.2 and 2.12)

b) 3.1.1

c) 3.2.1 and 3.2.2

d) 3.3.1 through 3.3.7

e) 3.4.1 through 3.4.8 (except 3.4.8.1)

f) 3.5.1 through 3.5.3 (except 3.5.1.2)

g) 3.6.1 through 3.6.5

h) 3.7.3 (except 3.7.3.7)

1501, 1601, 1701, 1801, 1901, 2001, Government-directed Travel and Other Direct Costs (ODCs)

CR a) Reimbursable Travel

b) Local Purchase

c) Licenses, Service Contracts, Warranties, and Subscriptions

a) 2.11.2

b) 2.12

c) 3.7.3.7

1502, 1602, 1702, 1802, 1902, 2002, Remote Site Support (RSS) FFP Remote Site Support (RSS) 3.8

2400 Transition - Phase-out CPFF Transition – Phase-Out 3.9.2 (except 3.9.2.8)

2401 Travel for Transition - Phase-Out CR Travel for Transition - Phase-Out 3.9.2.8

3000-3499* Factory Compatibility Testing (FCT) FFP Factory Compatibility Testing (FCT) 3.6.6.1 through 3.6.6.3

3500-39998 Travel and Transportation for FCT CR Travel and Transportation for FCT 3.6.6.4 through 3.6.6.5

4000-4999* Replenishment Spares CR Replenishment Spares 3.5.1.2

5000-59998 Offsite Stocklisted Item Repairs - Material Support Division (MSD)

CR Offsite Stocklisted Item Repairs - Material Support Division (MSD)

3.4.8.1

6000-6999* Special Studies CPFF Special Studies 3.7.2

7000-7999* Modifications Projects TBD** Modification Projects 3.7.1

9999 Data and Reports NSP Data and Reports N/A

*CLINS to be added as they are needed. Range is listed as a placeholder. 26

**CLIN type to be determined when modification project is issued. 27

File details come from the government source that posted it. Updated .