Atch__8_-_AF_Form_3000.pdf

PDF 740 KB Posted

Attached to
CEMACC II Federal contract opportunity
Solicitation number
FA8501-19-B-A001
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

This document contains an Air Force Material Command form for contractor submittal of materials for government approval related to contract number FA8501-19-B-A001.

The form outlines an indefinite-delivery, indefinite-quantity contract called CEMACC II for design-build and design-bid-build construction projects at Robins Air Force Base. Work may include new construction, renovation, repair, utilities, and specialty construction. The contract has a one year base period and four option years with a maximum value of $95 million to be awarded to multiple small disadvantaged veteran-owned small businesses. Task orders will typically range from $250,000 to $3 million but may be higher or lower. Contractors must be able to provide bid bonds of $3.8 million and performance/payment bonds over $35,000 for individual task orders. The Department of the Air Force Materiel Command Lifecycle Management Center at Robins AFB is the contracting agency.

Atch #8 AF Form 3000

View the file

Other files for this federal contract opportunity

Other files attached to CEMACC II, newest first.
File Type Posted
Post_Award_Synopsis.docx DOCX document
Construction_Abstracts.pdf PDF
A11_Layout1.pdf PDF
A14_Layout1.pdf PDF
M09-Layout1.pdf PDF
A13_Layout1.pdf PDF
S11_Layout1.pdf PDF
A02-Layout1.pdf PDF
A04-Layout1.pdf PDF
M07-Layout1.pdf PDF
RFI__3_Final.docx DOCX document
Solicitation_Amendment_FA850119BA0010001_SF_30.pdf PDF
Photo_5.JPG JPG image
Photo_7.JPG JPG image
Photo_3.JPG JPG image
Photo_1.JPG JPG image
IMG_7174.JPG JPG image
Photo_4.JPG JPG image
Photo_8.JPG JPG image
Pre-Proposal_Conference_Briefing-FINAL__4_Aug_19.ppt PPT presentation
Site_Visit_Attendee_List_-_Final.pdf PDF
2019-07-31_UHHZ130375_-_Combined_Specifications_(Updated).pdf PDF
2019-07-31_UHHZ130375_Corrected_Final_Drawings_(Updated).pdf PDF
RFI__2.docx DOCX document
Notice_to_Bidders__4.docx DOCX document
UHHZ130375_-_Revision_No_2_(Addendum_20190718).pdf PDF
RFI__1.docx DOCX document
Notice_to_Bidders__3_Site_Visit.docx DOCX document
Notice_to_Bidders__2.pdf PDF
Appendix_C_1080274.pdf PDF
Solicitation_-_FA850119BA001.pdf PDF
Notice_to_Bidders__1.pdf PDF
Atch__7_-_BLANK_SAMPLE_AF_Form_3065.xlsx XLSX spreadsheet
Atch__5_-_Blank_Sample_AF_Form_3052.xls XLS spreadsheet
Demonstration_Project_Attachment_4_Bid_Schedule.docx DOCX document
Demonstration_Project_Attachment_1_Specifications.pdf PDF
CEMACC_SOW_dated_15_April_2019.pdf PDF
Atch__4_-_Robins_AFB_Asbestos_Management_Plan_-_January_2015.pdf PDF
Atch__15_-_AF_Form_2586_Flightline_Driving_Request.pdf PDF
Davis_Bacon_Wage_Determination.pdf PDF
Atch__3_-_Robins_AFB_Division_1_Specs.pdf PDF
Demonstration_Project_Attachment_2_Addendum_1_dated_April_15_2019.pdf PDF
Atch__9_-_Master_Utility_Outage.pdf PDF
Atch__6_-_BLANK_SAMPLE_AF_Form_3064.xlsx XLSX spreadsheet
Atch__2_-_PROCEDURAL_GUIDE_FOR_DESIGNERS_INCLUDING_AE_FIRMS_29_May_15.pdf PDF
Atch__13_-_AFMAN_31-116_Motor_Vehicle_Traffic_Supervision.pdf PDF
Atch__11_-_Form_911,_xx__Design,_Discipline_Review.docx DOCX document
Demonstration_Project_Attachment_3_Corrected_Final_Drawings.pdf PDF
Atch__14_-_AFMAN_32-1084_Civil_Engineering_Facility_Requirements.pdf PDF
Sample_Bid_Bond_dated_June_24,_2019.pdf PDF
Show all 50

CEMACC II has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For Evaluation and Action

(YYYYMMDD)

(YYYYMMDD)

(YYYYMMDD)

(YYYYMMDD)

(YYYYMMDD)

Form Approved OMB No 9000-0062 Expires May 31, 2005

MATERIAL APPROVAL SUBMITTAL

(See Instructions on Reverse)

Public reporting burden for this collection of information is estimated to average 20 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project OMB No 9000-0062, Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send your completed form to: SAF/AQCP, 1060 Air Force Pentagon, Washington DC

TO: (Contracting Officer) FROM: (Contractor) DATE

CONTRACT NUMBER SUBMISSION NUMBER SUBMITTAL

NEW RESUBMITTAL

PREVIOUS SUBMISSION NUMBER PROJECT NUMBER

TO BE COMPLETED BY CONTRACTOR FOR GOVERNMENT USE ONLY

ITEM SPECIFICATION SECTION/ DESCRIPTION OF MATERIAL AP-

PROVED

DISAP-

PROVED

SEE

REVERSE INITIAL

BY COMPLETING THIS FORM, THE UNDERSIGNED CONTRACTOR CERTIFIES THAT

THE MATERIAL COMPLIES WITH ALL SPECIFICATIONS OF SUBJECT CONTRACT.

DATE TYPE OR PRINT NAME AND TITLE SIGNATURE

FOR GOVERNMENT USE ONLY

TO: (Base Civil Engineering Officer)

DATE TYPE OR PRINT NAME AND GRADE SIGNATURE

TO: (AF Contracting Office)

RECOMMEND APPROVAL DISAPPROVAL AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE REVERSE

DATE TYPE OR PRINT NAME AND GRADE SIGNATURE

TO: (Contractor)

DISAPROVED AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE REVERSE SIDE. REQUEST

APPROVED

RESUBMITTAL ON DISAPPROVED ITEMS WITHIN DAYS OF DATE SHOWN BELOW.

DATE TYPE OR PRINT NAME AND GRADE SIGNATURE

AF IMT 3000, 20030901, V1 PREVIOUS EDITION IS OBSOLETE.

NO. PARA NO./DRAWING NO. (Include Type, Model Number, Catalog Number, Mfg., etc.)

COMMENTS

(Number to correspond with applicable Item Number on reverse)

INSTRUCTIONS TO CONTRACTORS

1. The term "material" is defined as articles, supplies, raw materials, equipment, parts, components, and end items that are to be incorporated into the work required by the contract.

2. This form is to be used by contractors for submitting Shop Drawings, Equipment Data, Manufacturer's Literature and Certificates and samples of Materials to the Government for approval in accordance with the provisions of this contract. Unless otherwise specified, it is to be prepared in 4 copies, signed, and provided to the contracting officer with appropriate attachments.

3. Item(s) to be approved will be clearly tabbed or identified. Data pertaining to item(s) to be approved will be clearly identified or tabbed, particularly where documents are voluminous, in order to properly evaluate the materials or articles to be incorporated in the work. Each attachment will be numbered to correspond with the item number shown on the face of this form.

4. Requests submitted shall be numbered consecutively, by contract, in the space entitled "Submission No.". This number, in addition to the Contract No., will be used to identify each Material Approval Submittal. Resubmissions will be indicated in the appropriate block and the insertion of previous submission number and data in addition to a new submission number. A single submission should be used for all work of a section of the specifications, but in NO instance should the submission include work for more than one (1) contract. Submittals requiring priority handling will be submitted by separate submittal using the form and so marked across the face of the form.

5. This Material Approval Submittal is not valid unless it is signed by the contracting officer. This approval is required as called for by the contracting officer under the terms of this contract.

AF IMT 3000, 20030901, V1 (REVERSE)

TO Contracting Officer:
FROM Contractor:
YYYYMMDD DATE:
CONTRACT NUMBER:
SUBMISSION NUMBER:
NEW: Off
RESUBMITTAL: Off
PREVIOUS SUBMISSION NUMBER:
PROJECT NUMBER:
ITEM NORow1:
SPECIFICATION SECTION PARA NODRAWING NORow1:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow1:
INITIAL:
ITEM NORow2:
SPECIFICATION SECTION PARA NODRAWING NORow2:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow2:
INITIAL_2:
ITEM NORow3:
SPECIFICATION SECTION PARA NODRAWING NORow3:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow3:
INITIAL_3:
ITEM NORow4:
SPECIFICATION SECTION PARA NODRAWING NORow4:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow4:
INITIAL_4:
ITEM NORow5:
SPECIFICATION SECTION PARA NODRAWING NORow5:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow5:
INITIAL_5:
ITEM NORow6:
SPECIFICATION SECTION PARA NODRAWING NORow6:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow6:
INITIAL_6:
ITEM NORow7:
SPECIFICATION SECTION PARA NODRAWING NORow7:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow7:
INITIAL_7:
ITEM NORow8:
SPECIFICATION SECTION PARA NODRAWING NORow8:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow8:
INITIAL_8:
ITEM NORow9:
SPECIFICATION SECTION PARA NODRAWING NORow9:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow9:
INITIAL_9:
ITEM NORow10:
SPECIFICATION SECTION PARA NODRAWING NORow10:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow10:
INITIAL_10:
ITEM NORow11:
SPECIFICATION SECTION PARA NODRAWING NORow11:
DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow11:
INITIAL_11:
YYYYMMDD DATE_2:
TYPE OR PRINT NAME AND TITLE:
SIGNATURE:
TO Base Civil Engineering Officer:
For Evaluation and Action:
YYYYMMDD DATE_3:
TYPE OR PRINT NAME AND GRADE:
SIGNATURE_2:
TO AF Contracting Office:
YYYYMMDD DATE_4:
TYPE OR PRINT NAME AND GRADE_2:
SIGNATURE_3:
TO Contractor:
APPROVED: Off
undefined_34:
DAYS OF DATE SHOWN BELOW:
YYYYMMDD DATE_5:
TYPE OR PRINT NAME AND GRADE_3:
SIGNATURE_4:
COMMENTS Number to correspond with applicable Item Number on reverseRow1:
COMMENTS Number to correspond with applicable Item Number on reverseRow2:
COMMENTS Number to correspond with applicable Item Number on reverseRow3:
COMMENTS Number to correspond with applicable Item Number on reverseRow4:
COMMENTS Number to correspond with applicable Item Number on reverseRow5:
COMMENTS Number to correspond with applicable Item Number on reverseRow6:
COMMENTS Number to correspond with applicable Item Number on reverseRow7:
COMMENTS Number to correspond with applicable Item Number on reverseRow8:
COMMENTS Number to correspond with applicable Item Number on reverseRow9:
COMMENTS Number to correspond with applicable Item Number on reverseRow10:
COMMENTS Number to correspond with applicable Item Number on reverseRow11:
COMMENTS Number to correspond with applicable Item Number on reverseRow12:
COMMENTS Number to correspond with applicable Item Number on reverseRow13:
COMMENTS Number to correspond with applicable Item Number on reverseRow14:
COMMENTS Number to correspond with applicable Item Number on reverseRow15:
COMMENTS Number to correspond with applicable Item Number on reverseRow16:
COMMENTS Number to correspond with applicable Item Number on reverseRow17:
COMMENTS Number to correspond with applicable Item Number on reverseRow18:
COMMENTS Number to correspond with applicable Item Number on reverseRow19:
COMMENTS Number to correspond with applicable Item Number on reverseRow20:
Check Box2: Off
Check Box3: Off
1: Off
2: Off
3: Off
4: Off
5: Off
6: Off
7: Off
8: Off
9: Off
10: Off
11: Off
12: Off
13: Off
14: Off
15: Off
16: Off
17: Off
18: Off
19: Off
20: Off
21: Off
22: Off
23: Off
24: Off
25: Off
26: Off
27: Off
28: Off
29: Off
30: Off
31: Off
32: Off
33: Off

File details come from the government source that posted it. Updated .