Attachment_4_-_52.212-2_Evaluation_--_Commercial_Items.pdf

FAR Clause PDF 17 KB Posted

Attached to
AFICA AFMS Senior Leadership Workshop
Solicitation number
FA8052-17-R-0014
Issued by

About this file

52.212-2 Evaluation Commercial Items

View the file

Other versions and copies of FAR 52.212-2

File Revision Posted Attached to
Attachment 04 FAR 52.212-2 - Evaluation Draft rev.3.pdf Rev. 3 Vehicle Maintenance Services
HT940827RE003_Evaluation_52.212-2_30 Oct 2026.pdf Oct 30, 2026 Nutrition Care Services; Military Treatment Facilities - Forts Irwin, Leonard Wood, Riley, Stewart, and West Point
Attachment 3 _ 52.212-2 Evaluation_APS_20261023.pdf Oct 23, 2026 Combined Synopsis/Solicitation for Commercial Items Agile Professional Services (APS) Department of the Army
Attachment 3 _ 52.212-2 Evaluation—Commercial Products and Commercial Services_20261008.docx Oct 8, 2026 Combined Synopsis/Solicitation for Commercial Items Agile Professional Services (APS) Department of the Army
Attachment 3 _ 52.212-2 Evaluation—Commercial Products and Commercial Services_9.18.2026.docx Sep 18, 2026 Combined Synopsis/Solicitation for Commercial Items Agile Professional Services (APS) Department of the Army
ADD 02 52.212-2 - Evaluation 9.2.26v Final.pdf Sep 2, 2026 Joint Region Marianas Audio Visual (AV) Refresh
Attachment 2 - 52.212-2 Instructions to Offerors - Section L_14 Aug 2026_4 pages.pdf Aug 14, 2026 Joint Base MDL - Kitchen Exhaust Hood Maintenance
52.212-2 REVISED.pdf Revision not stated H265--Imaging Testing and Inspection Services - Medical Physicist
HT940827RE003_Evaluation_52.212-2.pdf Revision not stated Nutrition Care Services; Military Treatment Facilities - Forts Irwin, Leonard Wood, Riley, Stewart, and West Point
52.212-2 Evaluation Factors - DHR Admin Services FY27-30.pdf Revision not stated DHR Installation Administrative Services FY27-30
Attachment 2- 52.212-2 Evaluation - Commercial Products and Commercial Services.docx Revision not stated PMI On Sterilizing Equipment
FAR 52.212-2 Information for Quote .pdf Revision not stated Cyber Platform
52.212-2 Evaluation - Commercial Products and Commercial Services.pdf Revision not stated Advance Wiring Kit - Brand Name or Equal
52.212-2 Evaluation - Commercial Products and Commercial Services.pdf Revision not stated MC Machinery Press Brake - Model BB6020 or Equal with Installation and Training
Addendums-FAR 52.212-2.pdf Revision not stated Hangar Fan Replacements
Addendums-FAR 52.212-2.pdf Revision not stated Hangar Fan Replacements
HT940826RE017_Evaluation_52.212-2.docx Revision not stated Nutrition Care Services; Forts Irwin, Leonard Wood, Riley, Stewart, and West Point
FAR 52.212-2 Revised evaluation factor.pdf Revision not stated H312--Fire Door Inspection and Repair Service
ATTACHMENT 2-52.212-2 Evaluation - 36C26226Q1007_V2.pdf Revision not stated Campus & BLDG GIS for Space Visualization, Management/Wayfinding
Att3 - 52.212-2_Social Media Mgt..pdf Revision not stated Social Media Management
Show all 20

Who attaches FAR 52.212-2

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 4

52.212-2-- Evaluation -- Commercial Items (Oct 2014)

METHODOLOGY AND WEIGHTS

The overall evaluation methodology will be Lowest Price Technically Acceptable (LPTA) as tailored IAW FAR 13.106-2. The Government will select the proposal found to be most advantageous to the Government with technical approach and price considered. The evaluation criteria are divided into two (2) factors: Technical Capability and Cost/Price. Technical Capability will be assessed as acceptable or unacceptable based on meeting the requirements of the Statement of Work (SOW) (attachment 1).

Discussions: IAW FAR 13.106-2(b)(3), discussions are not required; however the Government reserves the right to conduct discussions if it is determined to be in the best interests of the Government.

1. Factor 1: Technical: This technical proposal will be rated as “Acceptable” or “Unacceptable” based on the technical proposal evaluation definitions stated below.

Acceptable - Meets all specified technical capability requirements necessary for acceptable contract performance.

Unacceptable - Fails to meet one or more specified technical capability requirements. Proposals with an unacceptable rating are considered not awardable.

In accordance with SOW paragraph 2.1, the Contractor shall provide at a minimum the below as specified in the Senior Leadership Workshop (SLW) Statement of Work (SOW), dated 26 June 2017, schedule and events for the SLW. Contractors who fail to meet the sub-factors will be deemed technically unacceptable. Contractors shall provide supporting rationale on its ability to perform the requirements in the SOW by addressing the following technical sub-factors:

Sub-factor 1: In accordance with SOW dated 26 June 2017, paragraph 2.1 Summary of Requirements, the Contractor shall provide the following at a minimum:

1.1 Availability: The Offeror’s proposal will be evaluated on the availability of its meeting space and associated overnight accommodations within the required period of performance.

1.2 Adequacy of Conference Space: The Offeror’s proposal will be evaluated on the adequacy of the SLW/meeting room space according to the requirements set forth in para 2.1 of the SOW.

1.3 Ability to Meet Audio Visual and Information Technology Needs: The Offeror’s proposal will be evaluated on the ability to meet all AV/IT needs set forth in para 2.1.

1.4 Ability to Provide a dedicated facility/meeting planner: The Offeror’s proposal will be evaluated on the ability to provide a facility/meeting planner as described in para 2.9.

The hotel must be capable of offering facilities within a 40-mile radius of Dulles International Airport.

Sub-factor 2: In accordance with SOW dated 26 June 2017, paragraph 1.2 and 2, the Contractor shall provide the following at a minimum:

2.1 Travel, lodging and meals for Government personnel attending the conference shall be reimbursed in accordance with the standard per diem rates in the DOD Joint Travel Regulation.

Note to Offerors - Offerors shall address as specifically as possible the proposed methodology for accomplishing/satisfying these subfactors. All requirements specified in the solicitation’s SOW are mandatory. By the Offeror’s submitted response, the Offeror is representing that the Offeror can and will perform all requirements specified in the solicitation’s SOW. Do not merely reiterate the requirements in the solicitation’s SOW but instead discuss how you will perform the requirements.

2. Factor 2: Cost/Price: Cost/Price will be evaluated for reasonableness and completeness.

Other than Certified Cost and Pricing Data may be requested if determined necessary by the Contracting Officer.

Pricing shall be included in the proposal and submitted on the Pricing Schedule (Attachment 2).

(a) Price Reasonableness as defined: The offeror’s Price proposal will be evaluated to ensure it is fair and reasonable, with guidance from FAR 15.404. For additional information see

FAR 31.201-3.

(b) Completeness as defined: A proposal is complete when all cost/price data, as outlined in the solicitation, has been submitted in the required format.

(End of Provision)

File details come from the government source that posted it. Updated .