DRAFT_CAF_CAS_Master_PWS_2_Apr_2018.pdf

PDF 883 KB Posted

Attached to
CAF Contracted Air Support (CAS) Federal contract opportunity
Solicitation number
FA4890-17-R-0007
Issued by
Department of the Air Force Air Combat Command

About this file

DRAFT CAF CAS Master PWS

View the file

Other files for this federal contract opportunity

Other files attached to CAF Contracted Air Support (CAS), newest first.
File Type Posted
WD2015-5253_Rev_6.pdf PDF
Section_L_Attachment_Task_Order_1_PWS.pdf PDF
Section_J_Attachment_CAF_CAS_Master_PWS.pdf PDF
Appendix_N_-_CAF_CAS_Blue_1_and_Mission_Lead_Evaluation.pdf PDF
Appendix_M_-_Definitions,_Abbreviations,_and_Acronyms.pdf PDF
Appendix_D_-_Government_Furnished_Equipment.pdf PDF
Appendix_G_-_Quality_Management_System.pdf PDF
Appendix_C_-_Publications_and_Forms.pdf PDF
Section_B,_Attachment_1_-_IDIQ_Pricing_Worksheet.xlsx XLSX spreadsheet
Section_J_Attachment_CAF_CAS_Master_PWS.pdf PDF
CAF_CAS_FOPR_Ordering_Guide.pdf PDF
CAF_CAS_Update_6_Aug_2018.pdf PDF
Pre-RFP_Conference_Attendees_(7_June_2018).pdf PDF
DRAFT_TO_Ordering_Guide_24_May_2018.pdf PDF
DRAFT_CAF_CAS_Master_PWS_2_Jun_2018.pdf PDF
OL_Fielding_Release_for_Industry.pdf PDF
DRAFT_CAF_CAS_Task_Order_1_Master_PWS_2_Jun_2018.pdf PDF
DRAFT_CAF_CAS_Appendix_I_-_Aircraft_Attributes_4_Jun_2018.pdf PDF
CAF_CAS_Pre-RFP_Conf-7_June_18.pdf PDF
CAF_CAS_Industry_Update_Teleconference_-_8_May_18.pdf PDF
CAF_CAS_Proposal_Writing_Conf_-_24_May_18.pdf PDF
CAF_CAS_Appendix_I_-_Aircraft_Attributes.pdf PDF
DRAFT_CAF_CAS_Appendix_C_-_Publications_and_Forms_2_Apr_2018.pdf PDF
DRAFT_CAF_CAS_Appendix_G_-_Quality_Management_System_-_2_Apr_2018.pdf PDF
DRAFT_FA4890-17-R-0007_2_Apr_2018.pdf PDF
CAF_ADAIR__Max_PPFH_Memo_2_Apr_2018.pdf PDF
Q&A_Format.docx DOCX document
DRAFT_CAF_CAS_Appendix_M_-_Definitions,_Abbreviations,_and_Acronyms.pdf PDF
DRAFT_CAF_CAS_Appendix_N_-_CAF_ADAIR_Blue_1_Evaluation_2_Apr_2018.pdf PDF
Attachment_2-AFSOC_CCAS_PWS_(similar_past_effort).PDF PDF
Attachment_1-Market_Research_Questionnaire.pdf PDF
Notice_to_Industry_17_Jan_18.pdf PDF
CAF_ADAIR_Sections_L&M_17_Jan_18.pdf PDF
Airworthiness_Assessment_Technical_Evaluation_Training.pdf PDF
Spectrum_Management.pdf PDF
Projected_NEPA-EIAP.pdf PDF
Fundamentals_of_USAF_Airworthiness_Process.pdf PDF
Follow-up_Questions_for_Industry_19_Sep17rev1.pdf PDF
Follow-up_Questions_for_Industry_19_Sep17.pdf PDF
Additional_Questions_for_Industry.pdf PDF
JBLE_Base_Map_with_71_FTS.pdf PDF
Q&A_Format.docx DOCX document
DRAFT_CAF_ADAIR_Kingsley_PWS_25_Jul_17.pdf PDF
DRAFT_CAF_ADAIR_Hickam_PWS_25_Jul_17.pdf PDF
DRAFT_CAF_ADAIR_Kelly_PWS_25_Jul_17.pdf PDF
DRAFT_CAF_ADAIR_Appendix_G_-_Quality_Management_System_25_Jul_17.pdf PDF
DRAFT_SF_33_25_Jul_17.pdf PDF
CAF_ADAIR_Risk_Assessment_17_May_17.pdf PDF
DRAFT_CAF_ADAIR_Appendix_I_Government_-_Aircraft_Attributes_and_Fielding_25_Jul_17.pdf PDF
DRAFT_Pricing_Table_Section_J_Attachment_2_-_25_Jul_17.xlsx XLSX spreadsheet
Show all 50

CAF Contracted Air Support (CAS) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

i

PERFORMANCE WORK STATEMENT

FOR

THE COMBAT AIR FORCES (CAF)

CONTRACTED AIR SUPPORT (CAF CAS)

ii

TABLE OF CONTENTS

SECTION A DESCRIPTION OF SERVICES

1.0 Scope and Compliance

PAGE NO.

1.1 Task Orders

1.2 1.3 1.4

1.2 Mandatory Compliance Documents

2.0 Program Management

1.3 Service Guidance 2

1.4 Public Aircraft Operations 2

1.5 Airworthiness Assessment 2

1.6 Conflict between PWS and 14 CFR 2

1.7 Aircraft Modifications

1.6

1.8 Spectrum Management

On-Base versus Off-base Operations

1.8 Government Support to Operations

2.0 Program Management and Administration

2.5 Program Management Review Meetings

2.1 Government Program/Contract Management

3.0 Certification

2.2 Contractor Program/Contract Management 3

3.0 Operations and Maintenance 8

3.1 Operations 8

3.2 Contractor Flight Operations Procedures (FOP) 8

3.3 Ground Operations Procedures (GOP) 16

SECTION B SERVICE SUMMARY

1.0 Service Summary (SS) Narrative

2.0

1.1 Purpose 18

1.2 Components 18

1.3 Quality Assurance Surveillance Plan (QASP) 18

1.4 Right to Surveil 18

1.5 SS Table 19

2.0 Measurement, Analysis and Improvement (MA&I)

2.1 Quality Assurance

2.2 Risk Assessment 21

SECTION C GOVERNMENT FURNISHED PROPERTY & SERVICES

1.0 General Information

1.1 On Base Support 23

1.2 Government Furnished Property 23

1.3 Government Furnished Equipment 23

1.4 Government Furnished Facilities 23

1.5 Base Operations Flight Planning, Weather, and Services Facilities FasGovernment Furnished Materials

1.6 Government Provided Fuel 24

1.7 Government Furnished Services 24

SECTION D GENERAL INFORMATION

S

SECTION

iii

SECTION D CONTRACTOR INTEGRATION

1.0 Security

General

Informati on

1.1 Phase-In 26

1.2 Visitor Group Security Agreement (VGSA) 26

1.3 Notification 27

1.4 Security Manager Appointment 27

1.5 Pass and Identification Items 27

1.6 For Official Use Only (FOUO) 27

1.7 Reporting Requirements 27

1.8 Physical Security 27

1.9 Classified Material 27

1.10 Controlled/Restricted Areas 28

1.11 Operating Instructions (OI) 28

1.12 Key Control 28

1.13 Replacement 28

1.14 Lock Combinations 28

1.15 Computer Security (COMPUSEC) 29

1.16 Information Security (INFOSEC) 29

1.17 Privacy Act 29

1.18 Operations Security (OPSEC) 29

1.19 Antiterrorism Training 29

1.20 Contractor Consent to Background Checks 29

1.21 Access to Installation During Force Protection Conditions 30

1.22 Property Protection 30

1.23 Personal Electronic or Communication Devices 30

1.24 Land Mobile Radio (LMR) Management 30

1.25 Vehicle Training Certification and Licensing 30

2.0 Facility Management/Conservation of Utilities

Informati on

2.1 Facility Custodian/Facility Manager (On-Base) 30

2.2 Housekeeping, Grounds Keeping and Custodial Services (On-Base) 30

2.3 Environmental Controls 30

3.0 Environmental Safety & Occupational Health Program

Informati on

3.1 Environmental Safety & Health Plan (On-base) 31

3.2 Environmental Protection Plan 31

4.0 Communications

Informati on

4.1 Personal Electronics or Communication Devices (On-Base) 32

4.2 Land Mobile Radio Management (On-Base) 32

5.0 Vehicles

Gener al Infor mation

5.1 Vehicle Training and Certification

Gener al Infor mation iv

SECTION E GENERAL INFORMATION

1.01.0

1.0 Transition

2.0 11.11.11.1.1

1.1 Phase-In

1.2

1.2 Joint Inventories

1.3 Phase-Out

1.4

2.0 Personnel

2.1 Program Manager

2.2 Site Manager

2.3 Pilots

2.4 Additional Personnel Requirements

3.0 Employee Training

3.1 Training Responsibility

3.2 Training Records

3.3 Familiarization Flights

4.0 Chargeable Flight Operations and Standards

APPENDICES

A OL Description of Services

B Contract Data Requirements Lists (CDRL)

C Publications and Forms

D Government Furnished Equipment

E Government Furnished Facilities

F Reserved for Performance Incentive/Award Fee Plan

G Quality Management System (QMS)

H Reserved

I Aircraft Attributes Gener al Infor mation

J Proposal Incorporations Gener al Infor mation

K Reserved

L Security Information (DD Form 254)

M Definitions, Abbreviations and Acronyms

N Blue 1 Feedback Service Summary (CDRL 11)

O Key Personnel Qualifications (Reserved)

SECTION A

DESCRIPTION OF SERVICES

ADVISORY NOTICE FOR CONFLICT IN COMMON TERMS

The following terms are standardized for this acquisition:

Combat Air Force (CAF) – Refers to combat coded squadrons and Formal Training

Units in all serviced MAJCOMs, as well as Tactical Air Control Party training venues.

CAF Contracted Air Support (CAF CAS) – Refers to this IDIQ, in its entirety with all associated pools.

CAF Adversary Air (CAF ADAIR) – Refers solely to those aircraft categories and contractors performing Adversary Air support.

Contracted Close Air Support (CCAS) – Refers solely to those aircraft categories and contractors performing Close Air Support (TACP Training) support.

Contract Administration Services (CAS) – Will not be utilized in these documents. If needed, this will be spelled out.

Close Air Support (CAS) – Will not be utilized in these documents. If needed, this will either be spelled out or referred to as “CCAS.”

Tactical Air Control Party (TACP) – Refers to all Joint Terminal Air Controller (JTAC) and Air Liaison Officer (ALO) CAS training venues.

1.0 SCOPE AND COMPLIANCE. The objective of the Combat Air Forces (CAF)

Contracted Air Support (CAS) acquisition is to obtain non-personal services to provide realistic advanced adversary air threats from industry Adversary Air (ADAIR) sources to support pilot combat readiness training and Contracted Close Air Support (CCAS) sorties in order to facilitate Tactical Air Control Party (TACP) training. Contractor ADAIR support is needed to support approximately 30,000 sorties annually in the CONUS, Alaska, and Hawaii initially however may expand within the Air Force and to other Departments within the DoD. CCAS support is currently needed to support approximately 10,000 sorties annually in the CONUS however may expand as well during the life of this acquisition. CAF CAS contractors will support multiple customers/locations across the CAF and shall provide complete CAS services including, but not limited to: aircraft; aircraft systems support; pilots; aircraft maintenance;

support equipment; program, quality and contract management to meet Performance Work

Statement (PWS) requirements.

1.1 Minimum Guarantee. Upon award of the IDIQ contract, the Government will issue an initial task order to satisfy the minimum guarantee to each of the IDIQ awardees. Performance under this initial task order/minimum guarantee award requires that Contractor obtain USAF

Airworthiness Flight Certification per PWS paragraph 1.6, and subparagraphs, for up to 12

ADAIR aircraft or 8 CCAS aircraft and must be completed within the first 12 months of IDIQ performance period.

1.2 Task Orders. Contractors awarded Task Orders shall provide complete CAF CAS services including, aircraft, aircraft systems support, aircraft maintenance, logistics, pilots, contract, and program management to meet Task Order PWS requirements. OL Task Order locations may expand in the future to support additional CAF CAS requirements. Contractor operations may be located on or off-base as required to best support the OLs. Initial Task Order locations, projected sorties, and projected Contractor operating beddown location are as identified below in Table A1.1.

1.2.1 Due to the flying hour quantity, cyclical nature, exercise support, or increased required level of support, some CAF CAS requirements are best suited to be met through a Contractor deployment capability versus a continual presence.

1.2.2 Scheduled versus Contracted Flying Hours. Contractor manning and presence must be of sufficient quantity to support the scheduled typical, maximum, and surge turn patterns. These turn patterns will be managed locally by each using wing, in coordination with the Government

Program Office (GPO), to close out each OL’s annual flying sorties at the end of that task order’s period of performance. The Contractor must assume and program for attrition between scheduled front lines and contracted flying hours in the pricing structures at all OLs to ensure the schedule front lines are covered, regardless of actual flown hours.

1.2.3 Each OL includes some temporary deployable support (normally 2 events). This support is absorbed into the total flying program by OL. Cost of deployment support is cost reimbursable and should not be included in the Contractor’s cost per flying hour planning.

1.2.4 Additional TDYs may be requested by the Government. Pricing for these additional

TDYs will be consistent with the Deployment CLIN and is based on a standard two-week TDY to provide a baseline 6 Turn 4 with the day being a 6 Turn 0.

1.3 Mandatory Compliance Documents:

Title 14, Code of Federal Regulations (14 CFR)

FAA Advisory Circular AC No: 00-1.1A

US Armed Forces PAO Decision Tool, 07 July 2014

Airworthiness Bulletin 1012

Air Force Policy Memorandum to Establish Policy for Contract Air Support for

Adversary Air and Joint Terminal Attack Controller Contract Close Air Support, 7

May 16

DCMA INST 8210.1C(AFI 10-220), Contractor’s Flight and Ground Operations

DoD/USAF Service guidance within other mandatory compliance documents listed in Appendix B

1.4 Service Guidance. DCMA INST 8210.1C (AFI 10-220) references to AFMC

Supplements are waived for this contract. Wherever referenced, any AFI automatically includes any MAJCOM and Wing/Group supplement and, except where specifically stated in this PWS, Contractors will follow applicable MAJCOM supplements for the host wing. Where specifically stated, Contractors will follow PWS prescribed supplements listed if servicing a different MAJCOM. When deployed to a site utilizing differing MAJCOM supplements, utilize the most restrictive guidance unless specifically approved by the GFR.

1.5 Public Aircraft Operations. The Contractor will provide Contractor-Owned Contractor-

Operated (COCO) aircraft for this contract. The flight operations required by this contract have been determined to be Public Aircraft Operations (PAO) and shall be conducted under the

USAF Technical Airworthiness Authority (TAA). The aircraft flight and ground operations shall be conducted using Federal Aviation Administration (FAA) approved data, to include specifications, drawings, procedures, manuals, and limitations. Operations requiring deviation from the FAA approved technical data, procedures, and limitations shall be specifically approved by the USAF TAA. During the period of the contract, the USAF TAA or the

Delegated Technical Authority (DTA) reserves the right to inspect aircraft and operations records to verify compliance.

1.6 Airworthiness Assessment. The Contractor shall support the USAF airworthiness assessments and must provide Aircraft Airworthiness Data Package (AADP), IAW AWB-

1012, to the Contracting Officer (CO) for all aircraft being utilized for this contract. The

AADP must be submitted in English. Contractors will submit follow-on AADP for aircraft modifications and enhancements in a timely manner to ensure no break in services throughout the life of the contract.

1.7 FAA Airworthiness Certificates. All aircraft utilized in support of this contract must possess either a Standard or Special FAA-issued Airworthiness Certificate. Special AW certificates may include additional operational limitations beyond those documented in the technical data, which may impose requirements or limits on the operation and maintenance of the aircraft.

1.8 Conflict between PWS and 14 CFR. For clarity, all references to the Federal Aviation

Regulation in this PWS will be by reference to Title 14 CFR and abbreviated with the acronym

“14 CFR.” All references to the Federal Acquisition Regulation will be abbreviated with the acronym “FAR”. When the requirements of this PWS exceed the minimum requirements of 14

CFR, this PWS takes precedence. Definitions contained in 14 CFR, Part 1 apply to all situations and conditions related to flight operations, aircraft maintenance, and flight crew certifications and qualifications, except as noted or defined otherwise herein.

1.9 Aircraft Modifications. The Contractor shall operate and maintain their aircraft, which possess standard certificates of airworthiness, using approved FAA data and procedures. The

Contractor shall install required modifications using 14 CFR type certification procedures or other FAA-approved methods. Contractor aircraft which do not conform to an approved type design, but require modifications, shall use the USAF airworthiness process and obtain approval from the USAF TAA.

1.10 Technology Validation (ADAIR only). The Contractor will validate installation and working function of technology advancements required on the contract. This validation will be conducted using the following dual track process using both a third party and a government fly-off.

1.10.1 The contractor will validate technological solutions through a government approved third party using a contractor produced Third Party Validation Plan IAW CDRL A13. Third party validation will culminate in a contractor produced Third Party Validation Report IAW

CDRL A14 for each piece of technology enhancement on the contract.

1.10.2 OL Government Fly-Off: The Contractor will conduct a flyoff against Government assets for each Contractor owned MDS and technological advancement. Fly-off:

1.10.2.1 Shall be against a 4th Gen and 5th Gen USAF asset as a minimum, as applicable by awarded task orders. Government reserves the right to request additional fly-offs by USAF

MDS as required.

1.10.2.2 Shall be conducted in the primary mode expected for employment on the Contractor

MDS,

1.10.2.3 Shall be reviewable by the OL GFR and host wing’s weapons officer.

1.10.2.4 Shall include a minimum of one engagement by Contractor MDS per installed technology ensuring accuracy of scan, track and target capabilities against 4th Gen and 5th Gen assets as applicable.

1.10.2.5 Will normally be conducted in support of a line CAF ADAIR support sortie, but may be tasked as a dedicated effort when needed.

1.10.2.6 May be informed by and include any item of interest from any USAF SPO.

1.11 Spectrum Management. Contractors are responsible for obtaining radio frequency (RF) spectrum support for all commercial spectrum dependent systems (SDS) through the FCC. All approved FCC licenses must be coordinated through DoD Area Frequency Coordinators and presented to the host base installation frequency manager NLT 10 business days prior to transmitting. For SDS, FCC identification numbers/copy of FCC licenses must accompany coordination requests. If any military SDS equipment is used by the Contractor, the Contractor is responsible for ensuring the SDS equipment has been spectrum certified through the

National Telecommunication and Information Administration (NTIA) and radio frequency licenses must be obtained prior to operation. If military Identification, Friend, or Foe (IFF)

(Secondary Surveillance Radar) equipment is installed on any Contractor aircraft, the

Contractor must ensure the IFF systems (Interrogator and Transponder) have spectrum certification including AIMS platform certification and are licensed prior to placing into operational use. The Contractor is required to obtain appropriate national level authorization prior to conducting any electronic attack tests, training, or operational exercise activities.

1.12 Government Support to Operations. Contractor requirements to integrate and operate are identified in Section E, General Information. Government furnished supplies and services are identified in Section C, Government Furnished Property and Services. Regardless of on- or off- base operations, the Contractor is required to be self-sustaining to the greatest extent possible.

2.0 PROGRAM MANAGEMENT and ADMINISTRATION

2.1 Government Program/Contract Management. The Acquisition Management and

Integration Center (AMIC) GPO is the Government’s manager of the CAF CAS program and is office of primary responsibility for the PWS and task orders.

2.1.1 The OL GFR/GGR is the first management tier for supported OL wing personnel to communicate significant issues and new requirements.

2.1.2 The CAF CAS Program Manager (PM) is the MAJCOM level management tier for supported OL wing personnel to communicate significant issues and new requirements.

2.1.3 The AMIC Contracting Officer (CO) has the authority to enter into, administer, terminate contracts, or direct the Contractor. The AMIC CO is the only person with legal authority to bind the Government and direct the Contractor.

2.1.4 ACC/A3T is the CAF requirement owner and as such determines CAF ADAIR services priorities and operating locations. ACC/A3T adjudicates MAJCOM requirements with other participating MAJCOMs.

2.1.5 ACC/A3J is the CAF requirement owner and as such determines CAF CCAS services priorities and operating locations.

2.1.6

2.1.6.1 The host OL Operations Groups (OGs) are wing-level requirement owners who identify their CAF ADAIR requirement needs to ACC/A3T, via their respective MAJCOM A3T offices.

2.1.6.2 The host OL Air Support Operations Groups (ASOGs) are wing-level requirement owners who identify their CAF CCAS requirement needs to ACC/A3J.

2.1.7 AFICA KC (OL-ACC) is the Government Flight Representative (GFR) and Government

Ground Representative (GGR) approving authority responsible for designating OL GFR and

GGRs, as nominated by the host wings. GFRs and GGRs maintain surveillance of flight and ground operations and perform duties prescribed by DCMA INST 8210.1C/AFI 10-220, Contractor's Flight and Ground Operations, and IAW AMIC CAF CAS Program Management

Plan (PMP).

2.1.8 Each OL will provide a GFR and GGR (and alternates) to surveil flight and ground operations, including deployment locations. GFRs and GGRs must be DCMA and AMIC trained and surveil the Contractor using the criteria outlined in the PWS, DCMA INST

8210.1C/AFI 10-220, Contractor’s Flight and Ground Operating Procedures, Quality

Assurance Surveillance Plan (QASP), and the approved Quality Management System (QMS).

As the GFR/GGR main responsibility is to maintain surveillance focused on safe operations, the GFR/GGRs will be attached to and operate as part of the host wing safety office, with dual responsibilities to the GPO and host wing commander.

2.2 Contractor Program/Contract Management. The Contractor shall provide a focal point and primary interface to include a point of contact and an alternate for all contract coordination.

The Contractor will provide all contract administration required to fulfill contract requirements and address all contractual issues and correspondence with the CO. The Contractor shall:

2.2.1 Provide comprehensive management of their respective OL’s efforts and interact with

AMIC and host wing personnel to ensure mission success. Contractor management shall aggressively pursue timely responsiveness to CO, GFR/GGR, and PM requests by responding within 3 work hours of Government request. The Contractor shall be responsible for the actions of any sub-Contractors and ensure sub-Contractors understand and comply with the provisions herein.

2.2.2 Provide all electronic data exchanged between the Government and the Contractor in a format compatible with existing Government-preferred software (currently Microsoft Office software Version 10 or higher). The Government will consider any cost-effective proposals submitted by the Contractor detailing alternative or supplemental methods of data exchange.

The Contractor shall also provide non-proprietary format internet e-mail communications accounts to receive and coordinate mission information, taskings, and general administrative matters.

2.2.3 Provide an organizational structure with the Contractor leadership hierarchy, identification of key personnel, assigned roles and responsibilities, and lines of authority IAW

CDRL A01. Provide a certified/qualified workforce. There shall be no mission impact due to position vacancies or unqualified personnel. The organizational structure shall include personnel and positions included in Section E, para 2.0.

2.2.4 Ensure all aircraft provided for this contract meet Air Force Airworthiness requirements, policies and procedures as outlined in the USAF Airworthiness Bulletin (AWB-1012, USAF

Airworthiness Requirements for Contractor Owned, Contractor Operated (COCO) Aircraft).

2.2.4.1 Submit an AADP for all Contractor-provided aircraft for initial performance, IAW

CDRL A02. The Contractor shall provide an AADP IAW AWB 1012 for each aircraft utilized for this contract.

2.2.5 Provide sufficient aircraft which meet aircraft systems attributes and performance characteristics as detailed in Appendix I and J.

2.2.6 Submit for Government review and approval, specific written procedures for overarching general Flight and Ground Operating Procedures (FOPs/GOPs) IAW CDRL A03. Core FOPs and GOPs will be approved at the GPO. Local FOPs and GOPs will be approved by the OL

GFR. All FOPs/GOPs will be submitted for review via the GPO for coordination with the OL

GFR/GGR. The Contractor shall not begin flight or ground operations until the combined core and local operating annex procedures are approved in writing by the GPO and GFR. Adhere to submitted and approved Contractor FOPs and GOPs in accordance with DCMA INST

8210.1C/AFI 10-220. Content of the FOPs and GOPs will adhere to all applicable portions and subparagraphs of PWS, Section A, Para 3.0., "Operations and Maintenance."

2.2.7 (ADAIR only) Provide pilots to operate and perform advanced tactically-relevant missions including threat presentations for air-to-air (A-A) tracking, threat presentation, targeting, and offensive and defensive operations, to include associated equipment systems that interface with various platforms and ground force personnel. Simulate advanced threat aircraft capabilities and tactics in an A-A environment. Deploy aircraft, equipment, and personnel required to support training as directed by the Government.

2.2.8 (CCAS Only) Provide pilots to operate and perform tactically-relevant missions including sorties that will simulate permissive and non-permissive Type 1, Type 2, and Type 3 controls to include day and night dry operations,. Dry CAS would simulate multiple delivery profiles to include low and high angle strafe, level, loft, pop-up, and dive deliveries. Live CAS will execute multiple delivery profiles to include high and low angle strafe with minimum 7.62mm up to 30mm guns, level, loft, pop-up, and dive in delivery of BDU- 33’s or Mk-76’s. During mission accomplishment, contractor will simulate armed escort, armed reconnaissance, and non-traditional intelligence, surveillance, and reconnaissance as briefed and required to support training.

2.2.9 Actively participate in Government-directed meetings/briefings at both the Program

Management and Wing levels; such as Program Management Reviews, Wing Flight and

Ground Safety, Wing Scheduling, and operational briefs and debriefs. The Site Manager or alternate shall participate in local organization planning meetings not listed here when requested. Proactively engage the government via the OL GFR/GGR (or GPO) on issues the government can resolve.

2.2.10 Develop, document, implement, maintain, and continuously improve a comprehensive higher-level QMS ensuring compliance with all requirements of this PWS and Appendix G, Quality Management System. The Contractor shall comply with the most current version of either ISO 9001, AS9100, or AS9110. The Contractor’s QMS will be captured in a Quality

Manual IAW CDRL 4, including an embedded Risk Management Plan, and presented for government review and acceptance. The Contractor shall provide a monthly summary report, CDRL A06 showing Contractor status in meeting both internal and external metrics. The

Contractor’s QMS must include content in the PWS Section A, para 3.5.

2.2.11 Provide aircraft maintenance operations to maintain Contractor aircraft and subsystems necessary to support requirements.

2.2.12 Allow GFR/GGR/GPO/CO access to all work areas and data, provide support, and do not interfere with the GFR/GGR and other designated personnel in the performance of their official duties. Allow unescorted access to appropriately cleared personnel assigned to evaluate functions or execute Wing oversight duties (i.e., Wing Safety, Civil Engineering, Security

Forces, etc.) within controlled and restricted areas.

2.2.13 Meet Environmental, Safety and Occupational Health (ESOH) program statutory and regulatory requirements. Ensure Operational Risk Management (ORM) is institutionalized within all Contractor workplaces.

2.2.14 Control, track, and document financial information to reflect current and previous fiscal year contract cost data, projected funding requirements, and site-specific expenditures IAW

CDRL A05, Service Contract Cost Performance Report.

2.2.15 Provide a Risk Management Plan for Government acceptance as part of CDRL A04.

2.2.16 Establish and maintain a property control system for all GFE, per CDRL A07, IAW

FAR 45.5. This system shall be reviewed and, if satisfactory, approved in writing by the

Government Property Administrator or representative.

2.2.17 Provide all equipment, personnel, materials, and tools as required to meet Task Order

PWSs except those equipment, materials, and services identified as Government provided in

Section C, Government Furnished Property and Services or identified within the specific TO.

2.2.18 Establish a Crashed, Damaged, or Disabled Aircraft Recovery (CDDAR) program.

2.2.19 Establish a mishap prevention program, mishap response plan, and mishap notification procedures.

2.2.20 Control and supervise all employees of the Contractor; and ensure compliance to the

PWS for those employees providing service through sub-contracting and teaming arrangements. The Contractor, through its personnel and administrative control, shall perform the tasks herein, as prescribed in the applicable Task Order PWS, mandatory directives, technical manuals, technical orders, or other technical data contained in or referenced by the contract. The Contractor and its employees shall not supervise, direct or control the activities of

Government personnel or the employees of any other Contractor. The Government will not exercise any supervision or control over the Contractor’s employees in their performance of contractual services under this contract. The Contractor is accountable to the Government for the actions of its personnel.

2.2.21 Provide a program to document all qualifications and certifications of personnel.

2.2.22 Provide for travel to and operate from temporary duty (TDY) locations. Reimbursement for Maintenance Response Teams (MRTs) for off-station aircraft recovery shall also be accounted for as TDY. Temporary duty shall be specified and performed as required by individual Task Order on a cost reimbursable basis. Provide sufficient qualified personnel, tools, and other support equipment items/materials as requested and approved by the PM.

Deployment support requests shall be communicated from the requirement owner and processed through the PM. The contractor shall be allowed a minimum of one normal duty day of no/very limited local flying immediately preceding and following deployment. The

Contractor shall be responsible for making arrangements for all airfare, car rental, lodging, and subsistence required. All Contractor travel required by the Government shall be approved by the GPO or CO in advance. The GPO can approve Contractor travel below $10,000. The CO must approve Contractor travel greater than $10,000.

2.2.22.1 Reimbursable travel costs will be negotiated prior to commencement of each trip, unless an exception is approved by CO. The Contractor shall arrange employee travel and shipping, provide an initial estimate to the GPO. Ensure travel expenses are reasonable and

IAW the Joint Travel Regulation (JTR). All travel cost estimates will be assigned a unique tracking number by the Contractor. If the actual amount exceeds the projected estimate by 10% or more, the Contractor will submit a revised estimate the day the discrepancy is discovered and receive Government approval prior to committing expenses. The Contractor must provide detailed explanation and justification for the additional amount. The Contractor shall reference the associated cost estimate control number for each invoiced item submitted under reimbursable CLINs. Receipts will be attached in Wide Area Workflow (WAWF) identifying actual costs.

2.2.22.2 Commercial air travel is authorized for Contractor personnel traveling between their normal work location and the location of Government-directed TDYs, meetings, and conferences. Transportation costs may be based on actual costs incurred, vehicle mileage, or a combination thereof at the discretion of the GPO/CO. The Contractor is not authorized reimbursement for first-class airfare and shall use economy/discount airfares. Costs incurred for lodging, meals, and incidental expenses will be reimbursed to the extent they are reasonable for the travel location. The Contractor is not authorized reimbursement for deluxe accommodations.

2.2.22.3 Rental Fees. The Contractor is authorized vehicle rental fees and associated costs for not more than one midsize sedan per two employees, per location, during each cost-reimbursable travel event. Any deviation from this type of vehicle shall require prior approval by the CO/GPO before the Contractor incurs any costs. The Contractor shall take advantage of reduced weekly rates to the maximum extent possible.

2.2.23 The Contractor shall report ALL Contractor labor hours (including Subcontractor labor hours) utilized for performance of services under this contract via the DoD Enterprise

Contractor Manpower Reporting Application (ECMRA) https://www.ecmra.mil. The

Contractor is required to complete all data fields.

2.2.23.1 Reporting inputs will be for labor executed during the period of performance for each https://www.ecmra.mil/

Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October of each calendar year. Contractors may direct questions to the CMRA help desk.

2.2.23.2 Uses and Safeguarding of Information: Information from the secure web site is considered to be proprietary in nature when the contract number and Contractor identity are associated with the direct labor hours and direct labor funds. At no time will any data be released to the public with the Contractor’s name and contract number/TO number associated with the data.

2.2.23.3 Ensure data for Air Force service requirements are input at the Air Force CMRA link. However, user manuals for Government personnel and Contractors are available at the

Army CMRA link at http://www.ecmra.mil.

2.2.24 Associate Contractors Agreements (ACA). Negotiate with associate Contractors to develop appropriate Associate Contractor Agreements (ACAs) towards the integrated support, cooperation, exchange, and sharing of information essential to successful performance of the individual efforts. Submit completed ACA(s) to the CO NLT 90-days after TO award.

2.2.24.1 These agreements must not restrict the Government’s rights established pursuant to this or any other contract. The Contractor shall not duplicate contracted functions intended by the Air Force to be provided by an associate Contractor pursuant to the terms of their contract.

The agreements shall include the basis for sharing information, data, technical knowledge, expertise, and/or resources essential to the integration of the CAF CAS contract which shall ensure the greatest degree of cooperation for the development of the program to meet the terms of the contract.

2.2.24.2 Liability for the improper disclosure of any proprietary data contained in or referenced by any agreement shall rest with the parties to the agreement, not the Government.

2.2.25 Report on Small Business Subcontracting Goals. During Contractor performance, awardees will report how they have performed compared to their goals and the 5% requirement every six months via the Electronic Subcontract Reporting System (eSRS) and the Government will document performance accordingly. Failure to meet or make positive progress toward meeting the 5% small business subcontracting requirement may negatively impact a

Contractor’s performance ratings.

3.0 OPERATIONS AND MAINTENANCE

3.1 ADAIR Operations. Contractors shall:

3.1.1 Provide advanced ADAIR sorties to meet Task Order PWS requirements and Appendix I and J. Projected annual/monthly/daily sortie requirements and required turn patterns are outlined within each Task Order Description of Services (Appendix A).

http://www.ecmra.mil/

3.1.2 Provide sufficient P5CTS pods to support scheduled front lines at each OL. Contractor provided pods must integrate with the existing USAF rangeless ACMI system, and be interoperable with current USAF P5 pods. Contractor shall also provide all necessary support functions (upload/download/storage/maintenance/data processing) required to support

Contractor provided P5CTS pods.

3.1.3 Integrate as part of the host unit per this PWS and Appendix A. Participate in mission briefs and debriefs.

3.1.4 Provide a Contractor Flight Operations Procedures (FOP) with attached Contractor Threat

Replication Standards, and Ground Operations Procedures (GOP) for GFR approval.

Contractor FOPs and GOPs will be embedded as part of the larger Quality Management

System.

3.2 CCAS Operations. Contractors shall:

3.2.1 Provide advanced CCAS sorties to meet Task Order PWS requirements and Appendix I and J. Projected annual/monthly/daily sortie requirements and required turn patterns are outlined within each Task Order Description of Services (Appendix A).

3.2.2 Integrate as part of the sponsoring unit per this PWS and Appendix A. Participate in mission briefs and debriefs.

3.2.3 Not operate in an air-to-air opposed environment.

3.2.4 Provide a Contractor Flight Operations Procedures (FOP) and Ground Operations

Procedures (GOP) for GFR approval.

3.3 Contractor Flight Operations Procedures (FOP). The Contractor shall operate their aircraft IAW 14 CFR. Ensure adherence to Government approved Contractor Flight Operations

Procedures IAW DCMA INST 8210.1C/AFI 10-220 as applied in this PWS. Unless specifically addressed in this PWS, all other paragraphs of of DCMA INST 8210.1C/AFI 10-

220 chapter 4 do not apply. Contractor FOPs (CDRL A03) must be submitted no later than 60 calendar days after transition start. Where conflicts, uncertainty, or a need to modify this baseline at the local level exists, Contractors will coordinate via GFRs with the GPO for adjudication with ACC/A3T. Contractor Flight Operations shall:

3.3.1 Maintain a Letter of X’s, by task order, identifying all the qualifications and certifications for every pilot employed. Update the Letter of X’s monthly and provide to the GFR at each serviced OL via CDRL 06.

3.3.2 Establish an Aviation Risk Management program IAW AFI 90-802 principles that is integrated with local instructions and procedures for both supported and deployed OLs.

3.3.3 (ADAIR Only) Develop and maintain, as an attachment to the FOP, a Contractor specific

Contractor Threat Replication Standards (CTRS) IAW CDRL A12.

3.3.4 Plan and execute ADAIR in scenario as directed by the serviced OL’s Blue 1 (or designated IP) for each scheduled line; or CCAS procedures in scenario as provided by the

JTAC Instructor or mission lead.

3.3.5 Ensure all pilots attend mission brief with the applicable Blue 1 or JTAC Instructor/

Mission Lead unless specifically cleared off utilizing alternate coordination methods. At a minimum, ensure applicable “General Briefing Guide” items (Attachment 3, 11-2F-16V3 or equivalent guidance) are covered to ensure safe mutual operations.

3.3.6 Ensure aircrew duty and rest limitations IAW DCMA INST 8210.1C/AFI 10-220 paragraph 4.1.13.

3.3.7 Be conducted IAW AFI 11-202 Volume 3 (General Flight Rules), AFI 11-214 (Air

Operations Rules and Procedures), AFTTP 3-3 (Air Force Tactics, Techniques, and

Procedures), AFTTP 3-1 (Air Force Tactics, Techniques, and Procedures), Joint Publication 3-

09.3 (Close Air Support), AFTTP(I) 3-2.6 (Multi-Service Procedures for the Joint Application of Firepower), and all applicable local and FAA directives.

3.3.8 Respond to and follow Air Traffic Control vectors from approved facilities per FAA and

AFI guidelines.

3.3.9 Be conducted under positive tactical control. Pilots are responsible to respond to tactical vectors and instructions by the applicable controlling authority (Ground Controller Intercept

(GCI), Baron Controllers, Range Control Officer, JTAC, etc.). If positive control is unavailable, mission flights shall remain autonomous, and adhere to the briefed presentations and Special instructions (SPINS).

3.3.10 ADAIR profiles may include Beyond Visual Range (BVR) engagements, dissimilar air combat maneuvers, offensive & defensive within visual range maneuvers, multi-ship tactics, or operational test support as defined in the applicable Task Order. Presentations may be flown as singles, elements, flights, mixed flights, or force packages. All aircraft must have the capability to remain within the confines of the working airspace, and in some limited cases be capable of maintaining navigational awareness in a GPS denied environment (Task Order specific).

3.3.11 CCAS profiles may include Close Air Support Mission Profiles (CMP) IAW ACC

Ready JTAC Program, Ready Tasking Message, single-ship/two-ship CAS employment/tactics, CAS Execution Template IAW JFIRE, simulated weapons delivery, live weapons delivery, CAS Tactics, Techniques and Procedures in accordance with mission design series (MDS) instructions and manuals using both Latitude/Longitude (Lat/Long) and Military

Grid Reference System (MGRS). Scenarios may include single or multiple operating locations

(OPs) for the TACP/JTAC.

3.3.12 Operate aircraft from designated locations only. If on-base, the Government will provide suitable parking for all Contractor aircraft. Parking will be coordinated with the applicable

Airfield Management, Maintenance Group and/or other Government authorities (Civil authorities where applicable). Aircraft approved under this contract are not subject to landing fees at DOD controlled airfields.

3.3.13 (CCAS Only) Establish procedures for live fire, laser, and gunnery operations IAW AFI

11-214, AFI 11-202 and MDS equivalent service guidance.

3.3.14 Establish aircrew and contractor response to airborne and ground emergencies IAW

DCMA INST 8210.1C para 4.4.11.

3.3.15 (ADAIR) Participate in flight debriefs at the discretion of the blue flight leads IAW

Appendix A, and may include items such as Air-to-Air or Air-to-Ground shot/bomb times and outcome, deviations from briefed/planned lines, tally-times, situational awareness, detections, deviations from AFI 11-214, or other information pertinent to the sortie and student desired learning objectives. These debriefs should be conducted face-to-face by the designated contract flight representative should time and distance allow. If appropriate for the venue, the contractor shall also participate in those mass debriefs associated with the venue (example: air-to-air validation for RED FLAG). Complete “Blue 1 Contractor Evaluation” (Appendix N) concurrent to the debrief and provide to the OL GFR per CDRL A11.

3.3.16 (CCAS) Participate in Close Air Support debriefs at the discretion of the JTAC

Instructor or mission lead IAW Appendix A, and may include all details of the CCAS

Execution Template to include routing/safety of flight, CCAS check-in, abort code, situation update, sensor taskings, gameplan, ground commander’s intent, 9-line brief, remarks/restrictions, readbacks, target correlation, target talk-on (enhanced target description, mark, video datalink), attack, effects assessed, battle damage assessment, type of control used, final clearance instructions, threat mitigation, time-on-target, time-to-target, friendly location, airspace, and threats. These debriefs should be conducted face-to-face by the designated contract flight representative should time and distance allow. Complete “JTAC Lead

Contractor Evaluation” (Appendix N) concurrent to the debrief and provide to the OL GFR per

CDRL A11.

3.3.17 (DCMA INST 8210.1C/AFI 10-220 para 4.1.15.2) Utilize electronic flight bags (EFBs)

IAW FAA standards and guidance. USAF produced publications, instructions, and technical orders may be loaded and utilized on Contractor EFBs where applicable per Contractor FOPs.

3.3.18 (DCMA INST 8210.1C/AFI 10-220 para 4.4.6) Arm/De-arm IAW published OEM technical order guidance. End of runway checks are not required on this PWS. However, if end of runway checks are required corporately or due to local operating constraints, conduct these IAW locally produced procedures.

3.3.19 Establish procedures for beddown at deployed locations.

3.3.20 On a daily basis when flights are flown or scheduled (e.g. – weather cancelled), provide the following on the DCMA Form 644 to the GFR within 60 minutes of landing:

3.3.20.1 Block 10 – number of flights (individual sorties).

3.3.20.2 Block 11 – Hours flown (in tenths of hours).

3.3.20.3 Block 12 – Brief statements as to flight results (use continuation sheets if needed):

Trouble encountered during flight

Weather (only if impacting the sortie)

Conditions preventing completion of flight (include both external drivers as well as

Contractor limitations/issues)

All mission cancellations with reason

Provide all data by affected formation/position

If mission(s) were satisfactorily accomplished (in the contractor’s opinion) then provide “IAW PWS” by formation/position.

3.3.21 All pilots shall:

3.3.21.1 Meet the minimum hiring standards identified in Section E.

3.3.21.2 Be current, qualified, and proficient for assigned missions.

3.3.21.3 Be a Subject Matter Expert (SME) on ADAIR or CCAS execution, as applicable.

3.3.21.4 (DCMA INST 8210.1C/AFI 10-220 para 4.1.1.) (ADAIR Only) Be intimately knowledgeable with and capable of complying real-time with AFTTP 3-1, to include ATRG and CTRS, AFTTP Shot and Kill Procedures, Brevity, and an understanding of Range Training

Officer (RTO) and non-RTO procedures.

3.3.21.5 (DCMA INST 8210.1C/AFI 10-220 para 4.1.1.) (CCAS Only) Be intimately knowledgeable with and capable of complying real-time with Joint Publication 3-09.3 (Close

Air Support), AFTTP(I) 3-2.6 (Multi-Service Procedures for the Joint Application of

Firepower), AFTTP 3-1 and Brevity.

3.3.21.6 (DCMA INST 8210.1C/AFI 10-220 para 4.1.1.) Be intimately knowledgeable with and capable of complying real-time with AFI 11-214 (Air Operations Rules and Procedures), and AFI 11-202 Volume 3 (General Flight Rules).

3.3.21.7 (DCMA INST 8210.1C/AFI 10-220 para 4.1.1) Be familiar with AFI 11-202, Volume

1 (Aircrew Training), Volume 2 (Aircrew Standardization/Evaluation Program), and associated 11-2MDS comparable Volumes.

3.3.21.8 (DCMA INST 8210.1C/AFI 10-220 para 4.4.1.1) Be intimately knowledgeable with and capable of complying real-time with local aviation operations instructions as identified in

Task Order Description of Services (Appendix A).

3.3.21.9 (DCMA INST 8210.1C/AFI 10-220 para 4.4.1.1) Be intimately knowledgeable with and capable of complying real-time with locally produced standards, exercise directives, administration standards, developed scenarios, air tasking orders (or mission type orders), range instructions, standard operating procedures (SOPs) and published special instructions

(SPINS) applicable to each OL.

3.3.21.10 Execute IAW briefed mission responsibilities, IDIQ and Task Order contract requirements.

3.3.21.11 Have and maintain a current security clearance to the level for the mission performed. Minimum of SECRET//NOFORN level required. Must be SECRET Special

Access Program eligible for eventual brief and debrief capability. Specific security requirements may vary by serviced OL and may be further defined in each Appendix A. This does not preclude initial contract performance, brief, and debrief at the UNCLASSIFIED level as the program matures.

3.3.21.12 (DCMA INST 8210.1C/AFI 10-220 para 4.3.3.) Have a minimum of 10 takeoffs, 10 landing, and 20 hours in the type and model aircraft being operated to provide direct, unsupervised, CAF CAS support.

3.3.22 Pilot Training. Contractor FOPs shall provide a training program addressing the following minimums from AFI 11-202 Vol 1 and comparable 11-2MDS Vol 1 programs.

These programs may be further tailored on execution to individual pilot experience, with approval from servicing GFR.

3.3.22.1 Initial Qualification Training (DCMA INST 8210.1C/AFI 10-220 para 4.5.1):

3.3.22.1.1 Baseline a program for conversion from DoD specific aircrafts to Contractor owned aircrafts. Program must account for various experience levels, qualifications, and tactical flying recency of hired pilots.

3.3.22.1.2 Provide a program that permits IQT with existing manpower/assets without reducing services provided to the task order. The contractor’s IQT will not take place on government facilities.

3.3.22.1.3 (DCMA INST 8210.1C/AFI 10-220 para 4.1.5) Contractor approval via DD Form

2627 is not required prior to entering personnel into IQT. Complete IQT with GFR approval on the DD Form 2628.

3.3.22.2 Mission Qualification Training (DCMA INST 8210.1C/AFI 10-220 para 4.5.1):

3.3.22.2.1 Baseline a program to bring an aircraft qualified pilot to contract mission ready.

3.3.22.2.2 This contract requires previously qualified flight leads. However, Contractor will provide a flight lead upgrade program that is integrated into the MQT program to ensure no break in services provided on the task order due to aircraft conversion training.

3.3.22.2.3 MQT may be conducted concurrent to contract performance at the serviced OL.

Provide a program that ensures full integration with task order performance while ensuring individual blue syllabus requirements are met.

3.3.22.2.4 (DCMA INST 8210.1C/AFI 10-220 para 4.1.5) GFR approval via DD Form 2627 is required prior to any MQT sorties flown concurrent to providing direct support to the

Government. Submission of resume and DD Form 1821 concurrent to the DD Form 2627 is not required, but the OL GFR may request to view the contractor’s training history and background documentation if desired. Complete MQT with GFR approval on the DD Form

2628.

3.3.22.3 Mission Commander (DCMA INST 8210.1C/AFI 10-220 para 4.5.1):

3.3.22.3.1 Contractor may present previous mission commander trained individuals to be nominated to GFR as mission commanders.

3.3.22.3.2 Contractor will present a program for a Mission Commander upgrade if not previously qualified.

3.3.22.3.3 Upgrade sorties may be conducted on contract performance sorties, but must ensure no break in services provided on the task order due to upgrade.

3.3.22.4 Ground Training. (DCMA INST 8210.1C/AFI 10-220 para 4.6) AFI 11-2MDS Vol 1

RTM comparable ground and simulator training/currency items are identified in the currency section of this PWS. All other 11-2MDS RTM Ground and Simulator training items are not required (e.g. – Local Area Survival, Water Survival, Instrument Refresher Course, etc.) AFI

11-404 Centrifuge requirements are not applicable.

3.3.23 Pilot Currency (DCMA INST 8210.1C/AFI 10-220 para 4.5.2 and 4.5.7). Contractor

FOPs shall provide a program for pilot currency and recurrency/requalification (both air and ground) requirements that mirror intent of 11-202, Volume 1, and a comparable MDS, Volume

1. The currency and recurrency/requalification program should take into account the experience and flying rate/type of its workforce.

3.3.23.1 Pilot currency must address the minimums currencies in Table A3.1a. (ADAIR) or

Table A3.1b. (CCAS).

3.3.23.2 Ground Training/Currency (DCMA INST 8210.1C/AFI 10-220 para 4.5.7. and 4.6).

The 11-2MDS Vol 1 RTM comparable ground training/currency items identified in Table

A3.2a. (ADAIR) or A3.2b. (CCAS) are required.

3.3.24 Pilot Proficiency “Lookback” (DCMA INST 8210.1C/AFI 10-220 para 4.5.2).

Contractor FOPs shall provide a program for pilot proficiency (lookback) requirements that mirror intent of 11-202, Volume 1, and a comparable MDS, Volume 1 and Ready Aircrew

Program (RAP) Tasking Message (RTM).

3.3.24.1 The intent for a proficiency requirement is not for applicable military combat proficiency, but rather to ensure the Government receives services that are:

3.3.24.1.1 Safe to operate in the expected environment (e.g. - local training versus Large Force

Employment (LFE))

3.3.24.1.2 Adequate for the investment.

Table A3.1a.

Notes:

* - See Definitions in Appendix M

1. See Appendix M for demanding/non-demanding sortie definitions. In addition, non-High-End pilots will fly in a supervised status

(with contract supervisor or IP) any time a non-demanding sortie is required.

2. Re-currency supervision level will be the contract supervisor or instructor, in the aircraft or chase, qualified and current in the Event.

3. Supervision will be the contract supervisor or instructor, qualified and current in the event.

4. Currency may be updated with performing the event in any fighter type aircraft flown while in DoD service, by Contractor servicing any DoD contract, or Contractor produced in-house training line.

5. Demanding Sortie currency is required for supporting High-End Venues. To regain currency, contract pilot must first have ACBT currency, then a demanding sortie in a low-end environment prior to flying in a high-end environment.

6. LOWAT – Event is defined as performing realistic, mission oriented air-to-air operations while in a LOWAT certified low altitude block (at or below 1000 ft AGL over land). Event includes skills necessary to seek out, and engage offensively, an aerial target at low altitude. This event also includes low altitude navigation, tactical formation, defensive maneuvering to avoid or negate threats. LOWAT currency is not required if supporting an operating location that cannot or does not maintain a LOWAT currency below 1,000’ AGL.

However, LOWAT must be regained if tasked to deploy to a location where it will be required.

7. Currency is required in the pilots low altitude category for operations below 1000 feet. Loss of currency requires pilots to operate above 1000’ AGL.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.