Section_L_Attachment_Task_Order_1_PWS.pdf

PDF 905 KB Posted

Attached to
CAF Contracted Air Support (CAS) Federal contract opportunity
Solicitation number
FA4890-17-R-0007
Issued by
Department of the Air Force Air Combat Command

About this file

Revised Task Order PWS

View the file

Other files for this federal contract opportunity

Other files attached to CAF Contracted Air Support (CAS), newest first.
File Type Posted
WD2015-5253_Rev_6.pdf PDF
Section_J_Attachment_CAF_CAS_Master_PWS.pdf PDF
Appendix_N_-_CAF_CAS_Blue_1_and_Mission_Lead_Evaluation.pdf PDF
Appendix_M_-_Definitions,_Abbreviations,_and_Acronyms.pdf PDF
Appendix_D_-_Government_Furnished_Equipment.pdf PDF
Appendix_G_-_Quality_Management_System.pdf PDF
Appendix_C_-_Publications_and_Forms.pdf PDF
Section_B,_Attachment_1_-_IDIQ_Pricing_Worksheet.xlsx XLSX spreadsheet
Section_J_Attachment_CAF_CAS_Master_PWS.pdf PDF
CAF_CAS_FOPR_Ordering_Guide.pdf PDF
CAF_CAS_Update_6_Aug_2018.pdf PDF
Pre-RFP_Conference_Attendees_(7_June_2018).pdf PDF
DRAFT_TO_Ordering_Guide_24_May_2018.pdf PDF
DRAFT_CAF_CAS_Master_PWS_2_Jun_2018.pdf PDF
OL_Fielding_Release_for_Industry.pdf PDF
DRAFT_CAF_CAS_Task_Order_1_Master_PWS_2_Jun_2018.pdf PDF
DRAFT_CAF_CAS_Appendix_I_-_Aircraft_Attributes_4_Jun_2018.pdf PDF
CAF_CAS_Pre-RFP_Conf-7_June_18.pdf PDF
CAF_CAS_Industry_Update_Teleconference_-_8_May_18.pdf PDF
CAF_CAS_Proposal_Writing_Conf_-_24_May_18.pdf PDF
CAF_CAS_Appendix_I_-_Aircraft_Attributes.pdf PDF
DRAFT_CAF_CAS_Appendix_C_-_Publications_and_Forms_2_Apr_2018.pdf PDF
DRAFT_CAF_CAS_Appendix_G_-_Quality_Management_System_-_2_Apr_2018.pdf PDF
DRAFT_FA4890-17-R-0007_2_Apr_2018.pdf PDF
CAF_ADAIR__Max_PPFH_Memo_2_Apr_2018.pdf PDF
DRAFT_CAF_CAS_Master_PWS_2_Apr_2018.pdf PDF
Q&A_Format.docx DOCX document
DRAFT_CAF_CAS_Appendix_M_-_Definitions,_Abbreviations,_and_Acronyms.pdf PDF
DRAFT_CAF_CAS_Appendix_N_-_CAF_ADAIR_Blue_1_Evaluation_2_Apr_2018.pdf PDF
Attachment_2-AFSOC_CCAS_PWS_(similar_past_effort).PDF PDF
Attachment_1-Market_Research_Questionnaire.pdf PDF
Notice_to_Industry_17_Jan_18.pdf PDF
CAF_ADAIR_Sections_L&M_17_Jan_18.pdf PDF
Airworthiness_Assessment_Technical_Evaluation_Training.pdf PDF
Spectrum_Management.pdf PDF
Projected_NEPA-EIAP.pdf PDF
Fundamentals_of_USAF_Airworthiness_Process.pdf PDF
Follow-up_Questions_for_Industry_19_Sep17rev1.pdf PDF
Follow-up_Questions_for_Industry_19_Sep17.pdf PDF
Additional_Questions_for_Industry.pdf PDF
JBLE_Base_Map_with_71_FTS.pdf PDF
Q&A_Format.docx DOCX document
DRAFT_CAF_ADAIR_Kingsley_PWS_25_Jul_17.pdf PDF
DRAFT_CAF_ADAIR_Hickam_PWS_25_Jul_17.pdf PDF
DRAFT_CAF_ADAIR_Kelly_PWS_25_Jul_17.pdf PDF
DRAFT_CAF_ADAIR_Appendix_G_-_Quality_Management_System_25_Jul_17.pdf PDF
DRAFT_SF_33_25_Jul_17.pdf PDF
CAF_ADAIR_Risk_Assessment_17_May_17.pdf PDF
DRAFT_CAF_ADAIR_Appendix_I_Government_-_Aircraft_Attributes_and_Fielding_25_Jul_17.pdf PDF
DRAFT_Pricing_Table_Section_J_Attachment_2_-_25_Jul_17.xlsx XLSX spreadsheet
Show all 50

CAF Contracted Air Support (CAS) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Version 1.1 i

PERFORMANCE WORK STATEMENT

FOR

THE COMBAT AIR FORCES (CAF)

CONTRACTED AIR SUPPORT (CAF CAS)

TASK ORDER 1

ii

SECTION A DESCRIPTION OF SERVICES 1

1. SCOPE AND COMPLIANCE. 1

1.1. TASK ORDER 1 SCOPE AND COMPLIANCE. 1

1.2. Minimum Guarantee. 1

1.3. Task Orders. 1

1.4. Compliance Documents. 2

1.5. Service Guidance. 2

1.6. Public Aircraft Operations. 3

1.7. Airworthiness Assessment. 3

1.8. FAA Airworthiness Certificates. 3

1.9. Precedence between PWS and 14 CFR. 3

1.10. Aircraft Modifications. 3

1.11. Technology Validation (ADAIR only). 4

1.12. Spectrum Management. 4

1.13. Government Support to Operations. 5

2. PROGRAM MANAGEMENT AND ADMINISTRATION 5

2.1. Government Program/Contract Management. 5

2.2. Contractor Program/Contract Management. 6

3. OPERATIONS AND MAINTENANCE 10

3.1. ADAIR Operations. 10

3.2. CCAS Operations. 11

3.3. Contractor Flight Operations Procedures (FOP). 11

Table A3.1a. 17

Table A3.1b. 18

Table A3.2a. 19

Table A3.2b. 20

3.4. Ground Operations Procedures (GOP). 25

3.5. Contractor’s Quality Management System. 28

SECTION B SERVICE SUMMARY 31

1. SERVICE SUMMARY (SS) NARRATIVE. 31

1.1. Purpose. 31

1.2. Components. 31

1.3. Quality Assurance Surveillance Plan (QASP). 31

1.4. Right to Surveil. 31

Table B1.1 33

2. MEASUREMENT, ANALYSIS, AND IMPROVEMENT (MA&I) 34

iii

2.1. Quality Assurance. 34

Table B2.1 34

SECTION C GOVERNMENT-FURNISHED PROPERTY AND SERVICE 35

(APPLICABLE AT THE TASK ORDER LEVEL) 35

1. GENERAL INFORMATION. 35

1.1. On Base Support. 35

1.2. Government Furnished Property (Facilities and Equipment). 35

1.3. Government Furnished Equipment. 35

1.4. Government Furnished Facilities. 35

1.5. Base Operations Flight Planning, Weather, and Services facilities. 35

1.6. Government Provided Fuel. 36

1.7. Government Furnished Services. 36

SECTION D CONTRACTOR INTEGRATION 38

1. EXPECTED CLASSIFIED PERFORMANCE. 38

1.1. SECURITY. 38

1.2. Security Plan. 38

1.3. Foreign Contractor Participation. 38

1.4. Visitor Group Security Agreement (VGSA). 39

1.5. Notification. 40

1.6. Temporary Duty (TDY) Notification. 40

1.7. Security Manager Appointment. 40

1.8. Pass and Identification Items. 40

1.9. For Official Use Only (FOUO). 41

1.10. Reporting Requirements. 41

1.11. Physical Security. 41

1.12. Classified Material. 41

1.13. Controlled/Restricted Areas. 41

1.14. Key Control (On-Base). 41

1.15. Key Replacement (On-Base). 41

1.16. Lock Combinations. (On-Base). 42

1.17. Computer Security (COMPUSEC). 42

1.18. Information Security (INFOSEC). 42

1.19. Privacy Act. 42

1.20. Operations Security (OPSEC). 42

1.21. Communications Security (COMSEC). 42

1.22. Antiterrorism Training. 42

iv

1.23. Contractor Consent to Background Checks. 42

1.24. Access to Installation (OL) During Force Protection Conditions (FPCONs). 43

1.25. Property Protection. (On-Base). 43

2. FACILITY MANAGEMENT/CONSERVATION OF UTILITIES 43

2.1. Building Custodian/Facility Manager (On-Base). 43

2.2. Housekeeping, Grounds Keeping and Custodial Services (On-Base). 44

2.3. Environment Controls (On-Base). 44

3. ENVIRONMENTAL SAFETY & OCCUPATIONAL HEALTH PROGRAM. 44

3.1. Environmental Safety & Occupational Health (ESOH) Plan (On-Base). 44

3.2. Environmental Safety & Occupational Health (ESOH) Plan (Off-Base). 44

3.3. Environmental Protection Plan (EPP) (On-Base). 44

3.4. Environmental Protection Plan (EPP) (Off-Base). 45

4. COMMUNICATIONS 46

4.1. Personal Electronic or Communication Devices. (On-Base). 46

4.2. Land Mobile Radio (LMR) Management (On-Base). 46

5. VEHICLES. 46

5.1. Vehicle Training Certification and Licensing (On-Base). 46

6. ACMI CAPABILITY MANAGEMENT 46

6.1. Contractor provided ACMI capabilities: 46

6.2. Government provided P5CTS Pods. 46

SECTION E GENERAL INFORMATION 47

1. TRANSITION. 47

1.1. Phase-In. 47

1.2. Performance Start. 47

1.3. Joint Inventories. 48

1.4. Importation/Modernization. 48

1.5. Temporary Duty Transition. 48

1.6. Phase-Out Plan. 48

2. PERSONNEL 49

2.1. Program Manager. 49

2.2. Site Manager. 49

2.3. Facilities Security Officer (FSO). 50

2.4. Pilots. 50

2.5. Aircrew 51

2.6. Additional Personnel Requirements. 51

3. EMPLOYEE TRAINING. 52

v

3.1. Training Responsibility. 52

3.2. Training Records. 52

4. FAMILIARIZATION FLIGHTS. 53

5. CHARGEABLE FLIGHT OPERATIONS AND STANDARDS: 53

6. TEAMING. 54

7. ORGANIZATIONAL CONFLICT OF INTEREST. 54

8. ON-RAMP PROCEDURES. 56

8.1. Internal On-Ramp. 56

8.2. External On-Ramp. 56

9. OFF-RAMP PROCEDURES. 57

10. INSURANCE. 57

SECTION F OL AND TEMPORARY SUPPORT DESCRIPTION OF SERVICES 58

1. TASK ORDER SCOPE AND COMPLIANCE. 58

SECTION A

DESCRIPTION OF SERVICES

1. SCOPE AND COMPLIANCE. The objective of the Combat Air Forces (CAF)

Contracted Air Support (CAS) program is to obtain non-personal services to provide realistic advanced adversary air threats from industry Adversary Air (ADAIR) sources to support pilot combat readiness training and Contracted Close Air Support (CCAS) sorties in order to facilitate Joint Terminal Attack Controller (JTAC) training. Contractor ADAIR support is needed to support approximately 30,000 sorties annually in the CONUS, Alaska, and Hawaii initially however it may expand within the Air Force and to other Departments within the DoD.

CCAS is currently needed to support approximately 10,000 sorties annually in the CONUS however may expand as well during the life of this program. CAF CAS contractors shall support multiple customers/locations across the CAF and shall provide complete CAS services including, but not limited to: aircraft; aircraft systems support; pilots; aircraft maintenance;

support equipment; program, quality and contract management to meet Performance Work

Statement (PWS) requirements. For the purpose of this PWS, the term “CAF” refers to the

“Combat Air Forces” for all DoD branches, unless cited directly in context to a single DoD branch.

1.1. TASK ORDER 1 SCOPE AND COMPLIANCE. This PWS pertains to performance needed in the Indefinite Delivery, Indefinite Quantity (IDIQ) Multi-Award Contract (MAC) required for program management across the enterprise. Elements contained herein are retained for reference of performance required at the Operating Location (OL) Task Order

(TO) level needed for the contractor to produce Contract Data Requirements List (CDRL) items needed at the IDIQ. Actual performance on Task Order 1 pertains only to those program management functions required to manage the enterprise.

1.2. Minimum Guarantee. Upon award of the Indefinite Delivery, Indefinite Quantity (IDIQ) contract, the Government will issue an initial task order to satisfy the minimum guarantee to each of the IDIQ awardees. Performance under this initial task order/minimum guarantee award requires the Contractor to perform program management functions needed to complete all Contract Data Requirements List (CDRL) deliveries at the IDIQ level. Invoicing for the minimum guarantee is tied to delivery of CDRL 15 (Security Plan) to initiate follow-on contractor to Government security discussions per PWS Section D, paragraph 1.2.

1.3. Task Orders. Contractors awarded Task Orders shall provide complete CAF CAS services including, aircraft, aircraft systems support, aircraft maintenance, logistics, pilots, contract, and program management to meet Task Order PWS requirements. Operating

Location (OL) Task Order locations may expand in the future to support additional CAF CAS requirements. Contractor operations may be located on or off-base as required to best support the OLs.

1.3.1. Task Order 1 Performance. Contractors shall:

1.3.1.1. Make ready and provide a minimum of 12 (ADAIR) and/or 8 (CCAS) aircraft which meet aircraft systems attributes for performance characteristics detailed in Appendix I and J, for competition at the task order level.

1.3.1.2. Provide program management for delivery of CDRLs 2 (AADP), 12 (CTRS), 13 (Technology Validation Plan) and 15 (Security Plan) following IDIQ MAC award.

1.3.1.3. Provide for program management for delivery of all other CDRLs required per

Appendix B, at contractor’s discretion.

1.3.2. Due to the flying hour quantity, cyclical nature, exercise support, or increased required level of support, some CAF CAS requirements are best suited to be met through a

Contractor Temporary Duty (TDY) capability versus a continual presence.

1.3.3. Scheduled Flying versus Aircraft Committed to the Schedule. Contractor provided aircraft shall be of sufficient quantity to support the scheduled typical, maximum, and surge turn patterns. These turn patterns will be managed locally by each using OL via the OL GFR, in coordination with the Government Program Office (GPO), to close out each OL’s annual flying sorties by the end of that task order’s period of performance. The Contractor shall assume and program for attrition (operations, weather, and maintenance) in the pricing structures to ensure the schedule front lines are covered, regardless of number of Contractor aircraft committed to the schedule.

1.3.4. Each OL includes temporary deployable support (normally 2 events). This support is absorbed into the total flying program by OL. Cost of TDY support is cost reimbursable and should not be included in the Contractor’s cost per flying hour planning.

1.3.5. (ADAIR) Additional TDY may be requested by the Government. TDY requests will be for a standard two-week TDY (five operations days per week) to provide a baseline 6 Turn

4, with the final day providing a 6 Turn 0. TDY’s may be a day/day turn or day/night turn depending on supported venue. Government may deviate from this standard baseline for unique requirements, but will address support on these venues individually.

1.3.6. (CCAS) Additional TDYs may be requested by the Government, but will address requested support on these venues individually.

1.4. Compliance Documents. Appendix C, Publications and Forms, lists all compliance guidance. When referenced as advisory guidance, the document may be further refined in this

PWS, be levied via Flight Operations Procedures/Ground Operations Procedures (FOP/GOP) approval, or may regulate the way a Government entity operates, with whom the Contractor must integrate. The Contractor shall utilize and adhere to these documents, updates or revisions thereto, in satisfying the performance requirements of this PWS. The applicable version of each document provided is current as of the effective date of the solicitation.

1.5. Service Guidance. DCMA INST 8210.1C, Change 1 (AFI 10-220) references to Air

Force Material Command (AFMC) Supplements are waived for this contract. Wherever referenced, Air Force Instructions (AFIs) automatically include any MAJCOM and

Wing/Group supplement and, except where specifically stated in this PWS, Contractors shall follow applicable MAJCOM supplements for the host OL. Where specifically stated, Contractors shall follow PWS prescribed supplements listed if servicing a different MAJCOM.

When deployed to a site utilizing differing MAJCOM supplements, utilize the most restrictive guidance unless specifically approved by the Government Flight Representative (GFR). This

PWS, as an umbrella CAS contract, utilizes AFIs as the primary service guidance reference.

On task orders servicing other DoD branches, AFI’s referenced in this PWS will be replaced by equivalent instructions from that branch. Section F of the applicable task order will provide details of interchangeable service guidance documents.

1.6. Public Aircraft Operations. The Contractor shall provide Contractor-Owned Contractor-

Operated (COCO) aircraft for this contract. The flight operations required by this contract have been determined to be Public Aircraft Operations (PAO) and shall be conducted under the

DoD Technical Airworthiness Authority (TAA). The aircraft flight and ground operations shall be conducted using Federal Aviation Administration (FAA) approved data, to include specifications, drawings, procedures, manuals, and limitations. Operations requiring deviation from the FAA approved technical data, procedures, and limitations shall be specifically approved by the appropriate DoD TAA. During the period of the contract, the appropriate

DoD TAA or the Delegated Technical Authority (DTA) reserves the right to inspect aircraft and operations records to verify compliance.

1.7. Airworthiness Assessment. The Contractor shall support the DoD airworthiness assessments and shall provide an Aircraft Airworthiness Data Package (AADP), IAW AWB-

1012, USAF Airworthiness Requirements for Contractor Owned, Contractor Operated

(COCO) Aircraft, to the Contracting Officer (CO) for all aircraft being utilized for this contract. The AADP shall be submitted in English. Contractors shall submit follow-on

AADPs for aircraft modifications and enhancements in a timely manner to ensure no break in services throughout the life of the contract.

1.8. FAA Airworthiness Certificates. All aircraft utilized in support of this contract shall possess either a Standard or Special FAA-issued Airworthiness Certificate. Special

Airworthiness (AW) certificates may include additional operational limitations beyond those documented in the technical data, which may impose requirements or limits on the operation and maintenance of the aircraft.

1.9. Precedence between PWS and 14 CFR. For clarity, all references to the Federal

Aviation Regulation in this PWS will be by reference to Title 14 CFR and abbreviated with the acronym “14 CFR.” All references to the Federal Acquisition Regulation will be abbreviated with the acronym “FAR”. When the requirements of this PWS exceed the minimum requirements of 14 CFR, this PWS takes precedence. Definitions contained in 14 CFR, Part 1 apply to all situations and conditions related to flight operations, aircraft maintenance, and flight crew certifications and qualifications, except as noted or defined otherwise herein.

1.10. Aircraft Modifications. The Contractor shall operate and maintain their aircraft, which possess standard certificates of airworthiness, using approved FAA data and procedures. The

Contractor shall install required modifications using 14 CFR type certification procedures or other FAA-approved methods. Contractor aircraft which do not conform to an approved type design, but require modifications, shall use the DoD airworthiness process and obtain approval from the appropriate DoD TAA.

1.11. Technology Validation (ADAIR only). The Contractor shall validate installation and working function of technology advancements required for the contract. Determination if a validation is required will be made on a case-by-case basis following direct Government

Program Office (GPO)/Contractor discussion on the technology in question. This validation will be conducted using the following dual track process using both a third party and a

Contractor/Government Avionics Validation Flight Evaluation (CAVFE).

1.11.1. The Contractor shall validate technological solutions through a Government approved third party using a Contractor produced Third Party Validation Plan IAW CDRL 13.

Third party validation shall culminate in a Contractor produced Third Party Validation Report

IAW CDRL 14 for each piece of technology enhancement on the contract.

1.11.2. OL CAVFE. The Contractor shall conduct a flight evaluation against Government assets for each Contractor owned aircraft and technological advancement following initial fielding of the advancement. CAVFE:

1.11.2.1. Shall be at the request of the Government. Government reserves the right to request additional CAVFEs by DoD Mission Design Series (MDS) as required.

1.11.2.2. Shall be against a 4th Gen or 5th Gen DoD asset as a minimum, as applicable by awarded task orders.

1.11.2.3. Shall be conducted in the primary mode expected for employment (or as directed by a Systems Program Office (SPO) on the Contractor aircraft.

1.11.2.4. Shall be reviewable by the OL GFR and host OL’s Weapons Officer.

1.11.2.5. Shall include a minimum of one engagement by Contractor aircraft per installed technology ensuring accuracy of scan, track and target capabilities against 4th Gen and 5th Gen assets as applicable.

1.11.2.6. Will normally be conducted in support of a line CAF ADAIR support sortie, but may be tasked as a dedicated effort when needed.

1.11.2.7. May be informed by and include any item of interest from any DoD SPO.

1.12. Spectrum Management. Contractors are responsible for obtaining Radio Frequency

(RF) spectrum support for all commercial Spectrum Dependent Systems (SDS) through the

FCC. All approved FCC licenses shall be coordinated through DoD Area Frequency

Coordinators and presented to the host OL installation frequency manager NLT 10 business days prior to transmitting. For SDS, FCC identification numbers/copy of FCC licenses shall accompany coordination requests. If any military SDS equipment is used by the Contractor, the Contractor is responsible for ensuring the SDS equipment has been spectrum certified through the National Telecommunication and Information Administration (NTIA) and radio frequency licenses shall be obtained prior to operation. If military Identification, Friend, or

Foe (IFF) (Secondary Surveillance Radar) equipment is installed on any Contractor aircraft, the

Contractor shall ensure the IFF systems (Interrogator and Transponder) have spectrum certification including Air Traffic Control Radar Beacon System, Identification Friend of Foe, Mark XII/Mark XIIA, Systems (AIMS) platform certification, and are licensed prior to placing into operational use. The Contractor is required to obtain appropriate national level authorization prior to conducting any electronic attack tests, training, or operational exercise activities.

1.13. Government Support to Operations. Contractor requirements to integrate and operate are identified in Section E, General Information. Government furnished supplies and services are identified in Section C, Government Furnished Property and Service. Regardless of on-base or off-base operations, the Contractor is required to be self-sustaining to the maximum extent possible.

2. PROGRAM MANAGEMENT AND ADMINISTRATION

2.1. Government Program/Contract Management. The Acquisition Management and

Integration Center (AMIC) Government Program Office (GPO) is the Government’s manager of the CAF CAS program and is office of primary responsibility for the PWS and task orders.

2.1.1. The OL GFR/Government Ground Representative (GGR) is the first management tier for supported OL personnel to communicate significant issues and new requirements.

2.1.2. The CAF CAS Program Manager (PM) is the MAJCOM level management tier for supported OL personnel to communicate significant issues and new requirements.

2.1.3. The AMIC Contracting Officer (CO) has the authority to enter into, administer, terminate contracts, or direct the Contractor. The AMIC CO is the only person with legal authority to bind the Government and direct the Contractor unless specifically delegated.

2.1.4. ACC/A3T is the CAF requirement owner and as such determines CAF ADAIR service priorities and operating locations. ACC/A3T adjudicates MAJCOM requirements with other participating MAJCOMs. Commander, Naval Air Forces (CNAF) is the Navy requirement owner and as such determines Navy ADAIR service priorities and operating locations.

2.1.5. ACC/A3J is the CAF requirement owner and as such determines CAF CCAS services priorities and operating locations.

2.1.6. The host OL Operations Groups (OGs) are OL-level requirement owners who identify their CAF ADAIR requirement needs to ACC/A3T, via their respective MAJCOM

A3T offices. CNAF is the Navy requirement owner who identify Navy ADAIR requirements needs. The host OL Air Support Operations Groups (ASOGs) are OL-level requirement owners who identify their CAF CCAS requirement needs to ACC/A3J.

2.1.7. AFICA KC (OL-ACC) is the GFR and GGR approving authority responsible for designating OL GFR and GGRs, as nominated by the host OLs. GFRs and GGRs maintain surveillance of flight and ground operations and perform duties prescribed by DCMA INST

8210.1C, Change 1 (AFI 10-220) and IAW AMIC CAF CAS Program Management Plan

(PMP).

2.1.8. Each OL will provide a GFR and GGR (and alternates) to surveil flight and ground operations, including temporary duty locations. GFRs and GGRs must be DCMA and AMIC-trained and surveil the Contractor using the criteria outlined in the PWS, DCMA INST

8210.1C, Change 1/AFI 10-220, Quality Assurance Surveillance Plan (QASP), and the approved Quality Management System (QMS). As the GFR/GGR main responsibility is to maintain surveillance focused on safe operations, the GFR/GGRs will be attached to and operate as part of the host Wing Safety Office, with dual responsibilities to the GPO and host

Wing Commander.

2.2. Contractor Program/Contract Management. The Contractor shall provide a focal point and primary interface to include a point of contact and an alternate for all contract coordination.

The Contractor shall provide all contract administration required to fulfill contract requirements and address all contractual issues and correspondence with the CO. The

Contractor shall:

2.2.1. Provide comprehensive management of their respective OL’s efforts and interact with AMIC and host OL personnel to ensure mission success. Contractor management shall aggressively pursue timely responsiveness to CO, GFR/GGR, and PM requests by responding within 3 work hours of Government request. The Contractor shall be responsible for the actions of any Sub-Contractors and ensure Sub-Contractors understand and comply with the provisions herein.

2.2.2. Provide all electronic data exchanged between the Government and the Contractor in a format compatible with existing Government-preferred software (currently Microsoft Office software Version 10 or higher). The Government will consider any cost-effective proposals submitted by the Contractor detailing alternative or supplemental methods of data exchange.

The Contractor shall also provide non-proprietary format internet e-mail communications accounts to receive and coordinate mission information, tasking(s), and general administrative matters.

2.2.3. Provide an organizational structure with the Contractor leadership hierarchy, identification of key personnel, assigned roles and responsibilities, and lines of authority IAW

CDRL 01 (Organizational Structure and Personnel Listing). Provide a certified/qualified workforce. There shall be no mission impact due to position vacancies or unqualified personnel. The organizational structure shall include personnel and positions included in

Section E, para 2.0.

2.2.4. Ensure all aircraft provided for this contract meet Air Force Airworthiness requirements, policies and procedures as outlined in the TO specific Service guidance (ie., USAF AWB-1012).

2.2.4.1. Submit an AADP for all Contractor-provided aircraft for initial performance, IAW CDRL 02 (Aircraft Airworthiness Data Package). The Contractor shall provide an AADP for each aircraft utilized for this contract.

2.2.5. Provide sufficient aircraft which meet aircraft systems attributes and performance characteristics as detailed in Appendix I and J.

2.2.6. Submit for Government review and approval, specific written procedures for overarching general Flight and Ground Operating Procedures (FOPs/GOPs) IAW CDRL 03

(Flight Operating/Ground Operating Procedures). Core FOPs and GOPs will be approved at the GPO. Local FOPs and GOPs will be approved by the OL GFR. All FOPs/GOPs will be submitted for review via the GPO for coordination with the OL GFR/GGR. The Contractor shall not begin flight or ground operations until the combined Core and OL FOP/GOPs are approved in writing by the GPO and GFR. Adhere to submitted and approved Contractor FOPs and GOPs in accordance with DCMA INST 8210.1C, Change 1 (AFI 10-220). Content of the

FOPs and GOPs shall adhere to all applicable portions and subparagraphs of PWS, Section A, Para 3.0., "Operations and Maintenance."

2.2.7. (ADAIR only) Provide pilots to operate and perform advanced tactically-relevant missions including threat presentations for air-to-air (A-A) tracking, threat presentation, targeting, and offensive and defensive operations, to include associated equipment systems that interface with various platforms and ground force personnel. Simulate advanced threat aircraft capabilities and tactics in an A-A environment. Deploy aircraft, equipment, and personnel required to support training as directed by the Government.

2.2.8. (CCAS Only) Provide pilots to operate and perform tactically-relevant missions including sorties that shall simulate permissive and non-permissive Type 1, Type 2, and Type 3 controls to include day (live and dry) and night (dry) operations. Dry CAS would simulate multiple delivery profiles to include low and high angle strafe, level, loft, pop-up, and dive deliveries. Live CAS shall execute multiple delivery profiles to include high and low angle strafe with a minimum of 7.62mm and up to 30mm guns, level, loft, pop-up, and dive in delivery of BDU-33’s or Mk-76’s. During mission accomplishment, Contractor shall simulate close air support, armed escort, armed reconnaissance, and non-traditional intelligence, surveillance, and reconnaissance as briefed and required to support training.

2.2.9. Actively participate in Government-directed meetings/briefings at both the Program

Management and Wing levels; such as Program Management Reviews, Wing Flight and

Ground Safety, Wing Scheduling, and operational briefs and debriefs. The Site Manager or alternate shall participate in local organization planning meetings not listed here when requested. Proactively engage the Government via the OL GFR/GGR (or GPO).

2.2.10. Develop, document, implement, maintain, and continuously improve a comprehensive higher-level QMS ensuring compliance with all requirements of this PWS and

Appendix G, Quality Management System. The Contractor shall comply with the most current version of either ISO 9001, AS9100, or AS9110. The Contractor’s QMS shall be captured in a

Quality Manual IAW CDRL 04, including an embedded Risk Management Plan, and presented for Government review and acceptance. The Contractor shall provide a monthly summary report IAW CDRL 06 (Monthly Report), showing Contractor status in meeting both internal and external metrics. The Contractor’s QMS shall include content in the PWS Section A, para

3.5.

2.2.11. Provide aircraft maintenance operations to maintain Contractor aircraft and subsystems necessary to support requirements.

2.2.12. Allow GFR/GGR/GPO/CO access to all work areas and data, provide support, and do not interfere with the GFR/GGR and other designated personnel in the performance of their official duties. Allow unescorted access to appropriately cleared personnel assigned to evaluate functions or execute Wing oversight duties (i.e., Wing Safety, Civil Engineering, Security Forces, etc.) within controlled and restricted areas.

2.2.13. Meet Environmental, Safety and Occupational Health (ESOH) program statutory and regulatory requirements. Ensure Operational Risk Management (ORM) is institutionalized within all Contractor workplaces.

2.2.14. Control, track, and document financial information to reflect current and previous fiscal year contract cost data, projected funding requirements, and site-specific expenditures

IAW CDRL 05 (Service Contract Cost Performance Report).

2.2.15. Provide a Risk Management Plan for Government acceptance as part of CDRL 04

(Quality Manual).

2.2.16. Establish and maintain a property control system for all GFE, per CDRL 07

(Property Control Plan), IAW FAR 45.5. This system shall be reviewed and, if satisfactory, approved in writing by the Government Property Administrator or representative.

2.2.17. Provide all equipment, personnel, materials, and tools as required to meet PWS except those equipment, materials, and services identified as Government provided in Section

C, Government Furnished Property and Services or identified within the specific TO.

2.2.18. Establish a Crashed, Damaged, or Disabled Aircraft Recovery (CDDAR) program.

2.2.19. Establish a mishap prevention program, mishap response plan, and mishap notification procedures.

2.2.20. Control and supervise all employees of the Contractor; and ensure compliance to the PWS for all employees providing service through sub-contracting and teaming arrangements. The Contractor, through its personnel and administrative control, shall perform the tasks herein, as prescribed in the applicable Task Order PWS, mandatory directives, technical manuals, technical orders, or other technical data contained in or referenced by the contract. The Contractor and its employees shall not supervise, direct or control the activities of Government personnel or the employees of any other Contractor. The Government will not exercise any supervision or control over the Contractor’s employees in their performance of contractual services under this contract. The Contractor is accountable to the Government for the actions of its personnel.

2.2.21. Provide a program to document all qualifications and certifications of personnel.

2.2.22. Provide for travel to and operate from TDY locations. TDYs shall be specified and performed as required by individual Task Order on a cost reimbursable basis. Provide sufficient qualified personnel, tools, and other support equipment items/materials as requested and approved by the PM. TDY support requests shall be communicated from the requirement owner and processed through the PM. The Contractor shall be allowed a minimum of one normal duty day of no/very limited local contract flying immediately preceding and following

TDY. The Contractor shall be responsible for making arrangements for all airfare, car rental, lodging, and subsistence required. All Contractor travel required by the Government shall be approved by the CO or CO appointed designee in advance. The GPO can approve Contractor travel below $10,000. The CO or appointed designee must approve Contractor travel greater than $10,000. Reimbursement for the Contractor’s Maintenance Recovery Teams (MRTs) for off-OL aircraft recovery shall be accounted for under CLINs 0008 and 0009. MRT reimbursements are only authorized for Contractor aircraft recovery operations incidental to contracted OL support or Government-directed operations.

2.2.22.1. Reimbursable travel costs will be negotiated prior to commencement of each trip, unless an exception is approved by CO. The Contractor shall arrange employee travel and shipping, provide an initial estimate to the GPO. Ensure travel expenses are reasonable and

IAW the Joint Travel Regulation (JTR). All travel cost estimates will be assigned a unique tracking number by the Contractor. If the actual amount exceeds the projected estimate by

10% or more, the Contractor shall submit a revised estimate the day the discrepancy is discovered and receive Government approval prior to committing expenses. The Contractor shall provide detailed explanation and justification for the additional amount. The Contractor shall reference the associated cost estimate control number for each invoiced item submitted under reimbursable CLINs. Receipts shall be attached in Wide Area Workflow (WAWF) identifying actual costs.

2.2.22.2. Commercial air travel is authorized for Contractor personnel traveling between their normal work location and the location of Government-directed TDYs, meetings, and conferences. Transportation costs may be based on actual costs incurred, vehicle mileage, or a combination thereof at the discretion of the GPO/CO. The Contractor is not authorized reimbursement for first-class airfare and shall use economy/discount airfares. Costs incurred for lodging, meals, and incidental expenses will be reimbursed to the extent they are reasonable for the travel location. The Contractor is not authorized reimbursement for deluxe accommodations.

2.2.22.3. Rental Fees. The Contractor is authorized vehicle rental fees and associated costs for not more than one midsize vehicle per minimum two employees, per location, during each cost-reimbursable travel event. Any deviation from this type of vehicle shall require prior approval by the CO/GPO before the Contractor incurs any costs. The Contractor shall take advantage of reduced weekly rental rates to the maximum extent possible.

2.2.23. The Contractor shall report ALL Contractor labor hours (including Subcontractor labor hours) utilized for performance of services under this contract via the DoD Enterprise

Contractor Manpower Reporting Application (ECMRA) https://www.ecmra.mil. The

Contractor is required to complete all data fields.

2.2.23.1. Reporting inputs shall be for labor executed during the period of performance for each Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31

October of each calendar year. Contractors may direct questions to the ECMRA help desk.

2.2.23.2. Uses and Safeguarding of Information: Information from the secure web site is considered to be proprietary in nature when the contract number and Contractor identity are associated with the direct labor hours and direct labor funds. At no time shall any data be released to the public with the Contractor’s name and contract number/TO number associated with the data.

2.2.23.3. Ensure data for service requirements are input via the ECMRA link. User manuals for Government personnel and Contractors are available on the CMRA website, https://www.ecmra.mil.

2.2.24. Associate Contractors Agreements (ACA). Negotiate with associate Contractors to develop appropriate Associate Contractor Agreements (ACAs) towards the integrated support, cooperation, exchange, and sharing of information essential to successful performance of the individual efforts. Submit completed ACA(s) to the CO NLT 90-days after TO award.

2.2.24.1. These agreements shall not restrict the Government’s rights established pursuant to this or any other contract. The Contractor shall not duplicate contracted functions intended by the Air Force to be provided by an associate Contractor pursuant to the terms of their contract. The agreements shall include the basis for sharing information, data, technical knowledge, expertise, and/or resources essential to the integration of the CAF CAS contract which shall ensure the greatest degree of cooperation for the development of the program to meet the terms of the contract.

2.2.24.2. Liability for the improper disclosure of any proprietary data contained in or referenced by any agreement shall rest with the parties to the agreement, not the Government.

2.2.25. Report on Small Business Subcontracting Goals. The Contractor shall report how they have performed compared to their goals every six months via the Electronic Subcontract

Reporting System (eSRS).

3. OPERATIONS AND MAINTENANCE

3.1. ADAIR Operations. Contractors shall:

3.1.1. Provide advanced ADAIR sorties to meet Task Order PWS requirements and

Appendix I and J. Projected annual/monthly/daily sortie requirements and required turn patterns are outlined within Section F, Task Order Description of Services.

https://www.ecmra.mil/ https://www.ecmra.mil/

3.1.2. Provide sufficient Air Combat Maneuvering Instrumentation (ACMI) capabilities to support scheduled front lines at each OL, where GFE P5CTS pods are not provided. ACMI capabilities shall:

3.1.2.1. Integrate and be real-time interoperable with existing USAF P5CTS pods carried on Government and coalition platforms.

3.1.2.2. Integrate and be real-time interoperable with USAF P5CTS ground system

(AN/GSQ-T105) to ensure real-time Range Training Officer (RTO) monitoring where currently fielded. Where no existing USAF AN/GSQ-T105 system is utilized, there is no requirement for the Contractor to provide a ground RTO system capability.

3.1.2.3. Contractor shall also provide all necessary support functions (upload/download/ storage/maintenance/data processing) required to support their technical solution.

3.1.3. Integrate as part of the sponsoring unit per this PWS. Participate in mission briefs and debriefs.

3.1.4. Provide a Contractor FOP with attached Contractor Threat Replication Standards

(CTRS), and GOP for GFR approval. Contractor FOPs and GOPs shall be embedded as part of the larger QMS.

3.2. CCAS Operations. Contractors shall:

3.2.1. Provide advanced CCAS sorties to meet Task Order PWS requirements and

Appendix I and J. Projected annual/monthly/daily sortie requirements and required turn patterns are outlined within Section F, Task Order Description of Services.

3.2.2. Integrate as part of the sponsoring unit per this PWS. Participate in mission briefs and debriefs.

3.2.3. Not operate in an air-to-air opposed environment.

3.2.4. Provide Contractor FOPs and GOPs to the GFR for approval.

3.3. Contractor Flight Operations Procedures (FOP). The Contractor shall operate their aircraft IAW 14 CFR. Ensure adherence to Government approved Contractor Flight Operations

Procedures IAW DCMA INST 8210.1C, Change 1 (AFI 10-220) as applied in this PWS.

Unless specifically addressed in this PWS, all other paragraphs of DCMA INST 8210.1C, Change 1 (AFI 10-220) Chapter 4 do not apply. Where conflicts, uncertainty, or a need to modify this baseline at the local level exists, Contractors shall coordinate via GFRs with the

GPO for adjudication with ACC/A3T. Contractor Flight Operations shall:

3.3.1. Maintain a Letter of X’s, by task order, identifying all the qualifications and certifications for every pilot employed. Update the Letter of X’s monthly and provide to the

GFR at each serviced OL via CDRL 06 (Monthly Report).

3.3.2. Establish an Aviation Risk Management program IAW AFI 90-802, Risk

Management, principles that is integrated with local instructions and procedures for both supported and deployed OLs.

3.3.3. (ADAIR Only) Develop and maintain, as an attachment to the FOP, a Contractor specific CTRS IAW CDRL 12 (Contractor Threat Replication Standards).

3.3.4. Plan and execute ADAIR in scenario as directed by the serviced OL’s Blue 1, or designated Instructor Pilot (IP), for each scheduled line; or CCAS procedures in scenario as provided by the Joint Terminal Attack Controller (JTAC) Instructor or mission lead.

3.3.5. Ensure all pilots attend mission brief with the applicable Blue 1 or JTAC Instructor/

Mission Lead unless specifically cleared off utilizing alternate coordination methods. At a minimum, ensure applicable “General Briefing Guide” items (Attachment 3, 11-2F-16V3 or equivalent guidance) are covered to ensure safe mutual operations.

3.3.6. Ensure aircrew duty and rest limitations IAW DCMA INST 8210.1C, Change 1 (AFI

10-220), paragraph 4.1.13.

3.3.7. Be conducted IAW AFI 11-202 Volume 3, General Flight Rules; AFI 11-214, Air

Operations Rules and Procedures; AFTTP 3-3, Air Force Tactics, Techniques, and

Procedures; AFTTP 3-1, Air Force Tactics, Techniques, and Procedures; Joint Publication 3-

09.3, Close Air Support; AFTTP(I) 3-2.6, Multi-Service Procedures for the Joint Application of

Firepower; and all applicable local and FAA directives.

3.3.8. Respond to and follow Air Traffic Control vectors from approved facilities per FAA and AFI guidelines.

3.3.9. Be conducted under positive tactical control. Pilots are responsible to respond to tactical vectors and instructions by the applicable controlling authority (Ground Controller

Intercept (GCI), Baron Controllers, Range Control Officer, JTAC, etc.). If positive control is unavailable, mission flights shall remain autonomous, and adhere to the briefed presentations and Special Instructions (SPINS).

3.3.10. ADAIR profiles may include Beyond Visual Range (BVR) engagements, dissimilar air combat maneuvers, offensive & defensive within visual range maneuvers, multi-ship tactics, or operational test support as defined in the applicable Task Order. Presentations may be flown as singles, elements, flights, mixed flights, or force packages. All aircraft shall have the capability to remain within the confines of the working airspace, and in some limited cases be capable of maintaining navigational awareness in a GPS denied environment (TO specific).

3.3.11. CCAS profiles may include Close Air Support Mission Profiles (CMP) IAW ACC

Ready JTAC Program, Ready Tasking Message, single-ship/two-ship CAS employment/tactics, CAS Execution Template IAW JFIRE, simulated weapons delivery, live weapons delivery, CAS Tactics, Techniques and Procedures in accordance with mission design series (MDS) instructions and manuals using both Latitude/Longitude (Lat/Long) and Military

Grid Reference System (MGRS). Scenarios may include single or multiple OLs for the

TACP/JTAC.

3.3.12. Operate aircraft from designated locations only. If on-base, the Government will provide suitable parking for all Contractor aircraft. Parking will be coordinated with the applicable Airfield Management, Maintenance Group and/or other Government authorities

(Civil authorities where applicable). Aircraft approved under this contract are not subject to landing fees at DoD controlled airfields.

3.3.13. (CCAS Only) Establish procedures for live fire, laser, and gunnery operations IAW

AFI 11-214, AFI 11-202, and MDS equivalent service guidance.

3.3.14. Establish aircrew and Contractor response to airborne and ground emergencies IAW

DCMA INST 8210.1C, Change 1 (AFI 10-220), para 4.4.11.

3.3.15. (ADAIR Only) Participate in flight debriefs at the discretion of the blue flight leads

IAW Section F, and may include items such as Air-to-Air or Air-to-Ground shot/bomb times and outcome, deviations from briefed/planned lines, tally-times, situational awareness, detections, deviations from AFI 11-214, or other information pertinent to the sortie and student desired learning objectives. These debriefs may be conducted face-to-face by the designated contract flight representative as prescribed in Section F. If appropriate for the venue, the

Contractor shall also participate in those mass debriefs associated with the venue (example:

air-to-air validation for RED FLAG). Complete “Blue 1 Contractor Evaluation” (Appendix N) concurrent to the debrief and provide to the OL GFR IAW CDRL 11 (Blue 1 Contractor

Evaluation).

3.3.16. (CCAS Only) Participate in Close Air Support debriefs at the discretion of the

JTAC Instructor/Evaluator or mission lead IAW Section F, and may include all details of the

Close Air Support Execution Template to include routing/safety of flight, Close Air Support check-in, abort code, situation update, sensor taskings, gameplan, ground commander’s intent, 9-line brief, remarks/restrictions, readbacks, target correlation, target talk-on (enhanced target description, mark, video datalink), attack, effects assessed, battle damage assessment, type of control used, final clearance instructions, threat mitigation, time-on-target, time-to-target, friendly location, airspace, and threats. These debriefs may be conducted face-to-face by the designated contract flight representative as prescribed in Section F. Complete “JTAC Lead

Contractor Evaluation” (Appendix N) concurrent to the debrief and provide to the OL GFR per

CDRL 11 (JTAC Mission Lead Evaluation).

3.3.17. Per DCMA INST 8210.1C, Change 1 (AFI 10-220), para 4.1.15.2, utilize electronic flight bags (EFBs) IAW FAA standards and guidance. USAF produced publications, instructions, and technical orders may be loaded and utilized on Contractor EFBs where applicable per Contractor FOPs.

3.3.18. Per DCMA INST 8210.1C, Change 1 (AFI 10-220), para 4.4.6, Arm/De-arm IAW published Original Equipment Manufacturer (OEM) technical order guidance. End of runway checks are not required on this PWS. However, if end of runway checks are required corporately or due to local operating constraints, conduct these IAW locally produced procedures.

3.3.19. Establish procedures for bed down at deployed locations.

3.3.20. On a daily basis when flights are flown or scheduled (e.g. – weather cancelled), provide the following on the DCMA Form 644 to the GFR within 60 minutes of landing:

3.3.20.1. Block 10 – Number of flights (individual sorties).

3.3.20.2. Block 11 – Hours flown (in tenths of hours).

3.3.20.3. Block 12 – Brief statements as to flight results (use continuation sheets if needed):

3.3.20.3.1. Trouble encountered during flight

3.3.20.3.2. Weather (only if impacting the sortie)

3.3.20.3.3. Conditions preventing completion of flight (include both external drivers as well as Contractor limitations/issues)

3.3.20.3.4. All mission cancellations with reason

3.3.20.3.5. Provide all data by affected formation/position

3.3.20.3.6. If mission(s) were satisfactorily accomplished (in the Contractor’s opinion) then provide “IAW PWS” by formation/position.

3.3.21. All pilots shall:

3.3.21.1. Meet the minimum hiring standards identified in Section E.

3.3.21.2. Be current, qualified, and proficient for assigned missions.

3.3.21.3. Be a Subject Matter Expert (SME) on ADAIR or CCAS execution, as applicable.

3.3.21.4. (ADAIR Only) Be intimately knowledgeable with and capable of complying real-time with AFTTP 3-1, to include ATRG and CTRS, AFTTP Shot and Kill Procedures, Brevity, and an understanding of Range Training Officer (RTO) and non-RTO procedures.

3.3.21.5. (CCAS Only) Be intimately knowledgeable with and capable of complying real-time with Joint Publication 3-09.3, AFTTP (I) 3-2.6, AFTTP 3-1, and AFTTP3-2.5, Multi-

Service Brevity Codes.

3.3.21.6. Be intimately knowledgeable with and capable of complying real-time with

AFI 11-214 (Air Operations Rules and Procedures), and AFI 11-202 Volume 3 (General

Flight Rules), and all applicable parts of 14 CFR parts 60 through 109.

3.3.21.7. Be familiar with AFI 11-202, Volume 1, Aircrew Training; Volume 2, Aircrew Standardization/Evaluation Program, and associated AFI 11-2MDS comparable

Volumes.

3.3.21.8. Be intimately knowledgeable with and capable of complying real-time with local aviation operations instructions as identified in Section F (applicable at the TO level).

3.3.21.9. Be intimately knowledgeable with and capable of complying real-time with locally produced standards, exercise directives, administration standards, developed scenarios, air tasking orders (or mission type orders), range instructions, standard operating procedures

(SOPs) and published special instructions (SPINS) applicable to each OL (applicable at the TO level).

3.3.21.10. Execute IAW briefed mission responsibilities, IDIQ and Task Order contract requirements.

3.3.21.11. Have and maintain a current security clearance to the level for the mission performed. Minimum of SECRET//NOFORN level required. This does not preclude initial contract performance, brief, and debrief at the UNCLASSIFIED level. SECRET Special

Access Program may be required for pilots at a later date as determined by the Government.

Specific security requirements may vary by serviced OL and may be further defined in each

Section F.

3.3.21.12. Have a minimum of 10 takeoffs, 10 landing, and 20 hours in the type and model aircraft being operated to provide direct, unsupervised, CAF CAS support.

3.3.22. Pilot Training. Contractor FOPs shall provide a training program addressing the following minimums from AFI 11-202 Vol 1 and comparable AFI 11-2MDS Vol 1 programs.

These programs may be further tailored on execution to individual pilot experience, with approval from servicing GFR.

3.3.22.1. Initial Qualification Training (IQT):

3.3.22.1.1. Baseline a program for conversion from DoD specific aircrafts to

Contractor owned aircrafts. Program shall account for various experience levels, qualifications, and tactical flying recency of hired pilots.

3.3.22.1.2. Provide a program that permits IQT with existing manpower/assets without reducing services provided to the task order. The Contractor’s IQT will not take place on Government facilities.

3.3.22.1.3. Contractor approval via DD Form 2627 is not required prior to entering personnel into IQT. Complete IQT with GFR approval on the DD Form 2628.

3.3.22.2. Mission Qualification Training (MQT):

3.3.22.2.1. Baseline a program to bring an aircraft qualified pilot to contract mission ready.

3.3.22.2.2. This contract requires previously qualified flight leads. However, Contractor shall provide a flight lead upgrade program that is integrated into the MQT program to ensure no break in services provided on the task order due to aircraft conversion training.

3.3.22.2.3. MQT may be conducted concurrent to contract performance at the serviced OL. Provide a program that ensures full integration with task order performance while ensuring individual blue syllabus requirements are met.

3.3.22.2.4. GFR approval via DD Form 2627 is required prior to any MQT sorties flown concurrent to providing direct support to the Government. Submission of resume and

DD Form 1821 concurrent to the DD Form 2627 is not required, but the OL GFR may request to view the Contractor’s training history and background documentation if desired. Complete

MQT with GFR approval on the DD Form 2628.

3.3.22.3. Mission Commander:

3.3.22.3.1. Contractor may present previous mission commander trained individuals to be nominated to GFR as mission commanders.

3.3.22.3.2. Contractor shall present a program for a Mission Commander upgrade if not previously qualified.

3.3.22.3.3. Upgrade sorties may be conducted on contract performance sorties, but shall ensure no break in services provided on the task order due to upgrade.

3.3.22.4. Ground Training. AFI 11-2MDS Vol 1, Ready Aircrew Program (RAP)

Tasking Message (RTM) comparable ground and simulator training/currency items are identified in the currency section of this PWS. All other AFI 11-2MDS RTM Ground and

Simulator training items are not required (e.g., Local Area Survival, Water Survival, Instrument Refresher Course, etc.). AFI 11-404 Centrifuge requirements are not applicable.

3.3.23. Pilot Currency. Contractor FOPs shall provide a program for pilot currency and re-currency/re-qualification (both air and ground) requirements that mirror intent of AFI 11-202, Volume 1, and a comparable MDS, Volume 1. The currency and re-currency/re-qualification program should take into account the experience and flying rate/type of its workforce.

3.3.23.1. Pilot currency shall address the minimum…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.