Appendix_G_-_Quality_Management_System.pdf

PDF 217 KB Posted

Attached to
CAF Contracted Air Support (CAS)
Solicitation number
FA4890-17-R-0007
Issued by

About this file

Appendix G (9 of 12)

View the file

Other files

File Type Posted
Section_J_Attachment_CAF_CAS_Master_PWS.pdf PDF
FA4890-17-R-0007-0001_Amendment.pdf PDF
Section_B,_Attachment_1_-_IDIQ_Pricing_Worksheet.xlsx XLSX spreadsheet
Appendix_I_-_Aircraft_Attributes.pdf PDF
CDRL_2_-_Air_Worthiness_Data_Package.pdf PDF
FA4890-17-R-0007_QA.pdf PDF
CDRL_1_-_Organizational_Structure_and_Personnel_Listing.pdf PDF
WD2015-5253_Rev_6.pdf PDF
Appendix_L_-_CAF_CAS_Draft_DD_254.pdf PDF
FA4890-17-R-0007-0001_Conformed_Solicitation.pdf PDF
Section_L_Attachment_Task_Order_1_PWS.pdf PDF
Appendix_C_-_Publications_and_Forms.pdf PDF
Section_L_Attachment_Task_Order_1_PWS.pdf PDF
Appendix_I_-_Aircraft_Attributes.pdf PDF
Appendix_N_-_CAF_CAS_Blue_1_and_Mission_Lead_Evaluation.pdf PDF
FA4890-17-R-0007_SF33.pdf PDF
Appendix_B_-_Contract_Data_Requirements_List_(CDRL).docx DOCX document
Appendix_M_-_Definitions,_Abbreviations,_and_Acronyms.pdf PDF
Appendix_D_-_Government_Furnished_Equipment.pdf PDF
Section_J_Attachment_CAF_CAS_Master_PWS.pdf PDF
Section_B,_Attachment_1_-_IDIQ_Pricing_Worksheet.xlsx XLSX spreadsheet
CAF_CAS_FOPR_Ordering_Guide.pdf PDF
QAs_in_Response_to_FBO_Posting_16_Aug_18.pdf PDF
CAF_CAS_Update_6_Aug_2018.pdf PDF
Pre-RFP_Conference_-_CAF_CAS__slides.pdf PDF
Pre-RFP_Conference_Attendees_(7_June_2018).pdf PDF
DRAFT_CAF_CAS_Task_Order_1_Master_PWS_2_Jun_2018.pdf PDF
DRAFT_CAF_CAS_Appendix_I_-_Aircraft_Attributes_4_Jun_2018.pdf PDF
Pre-RFP_Conference__Agenda_-_5_Jun_18.pdf PDF
DRAFT_CAF_CAS_Sections_L_M_5_Jun_2018.pdf PDF
DRAFT_CAF_CAS_Master_PWS_2_Jun_2018.pdf PDF
DRAFT_TO_Ordering_Guide_24_May_2018.pdf PDF
OL_Fielding_Release_for_Industry.pdf PDF
Consolidated_Q&As_CAF_Contracted_Air_Support_11_May_2018.pdf PDF
Telecom_Points_of_Interest.pdf PDF
CAF_CAS_Pre-RFP_Conf-7_June_18.pdf PDF
CAF_CAS_Proposal_Writing_Conf_-_24_May_18.pdf PDF
Notice_to_Industry_for_NEPA_23_Apr_18.pdf PDF
CAF_CAS_Industry_Update_Teleconference_-_8_May_18.pdf PDF
Attachment_X_CAF_CAS_Engineering_Feasibility_Assessment.docx DOCX document
CAF_CAS_Appendix_I_-_Aircraft_Attributes.pdf PDF
Q&A_Format.docx DOCX document
DRAFT_CAF_CAS_Appendix_I_-_Aircraft_Attributes_2_Apr_2018.pdf PDF
DRAFT_CAF_CAS_Appendix_C_-_Publications_and_Forms_2_Apr_2018.pdf PDF
DRAFT_IDIQ_Pricing_Table_Section_J_Attachment_2_-2_Apr_18_-_Protected.xlsx XLSX spreadsheet
DRAFT_CAF_CAS_Appendix_M_-_Definitions,_Abbreviations,_and_Acronyms.pdf PDF
DRAFT_CAF_CAS_Appendix_N_-_CAF_ADAIR_Blue_1_Evaluation_2_Apr_2018.pdf PDF
DRAFT_TO_Ordering_Guide_2_Apr_2018.pdf PDF
DRAFT_CAF_CAS_Appendix_G_-_Quality_Management_System_-_2_Apr_2018.pdf PDF
DRAFT_FA4890-17-R-0007_2_Apr_2018.pdf PDF
Show 40 more

Latest 50 of 85 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract No. FA4890-17-R-0007

Mod

CAF CAS PWS – Appendix G

G-1

THE COMBAT AIR FORCES (CAF)

CONTRACTED AIR SUPPORT (CAS) SERVICES

FA4890-17-R-0007

APPENDIX G - QUALITY MANAGEMENT SYSTEM REQUIREMENTS

1. Registration

a. Compliant to the most current version of either ISO 9001:2015, AS9100, or AS9110

Quality Management System standard.

b. The contractor shall develop, document, implement, maintain and continuously improve a comprehensive higher-level Quality Management System (QMS) that assures compliance with selected standard and all requirements of this PWS, (see Part

I, Section E, Contract Clauses 52.246-2, 52.256-3, 52.246-4, 52.246-5, 52.246-11).

c. Where any requirement(s) of the standard cannot be applied, the requirement(s) can be considered for exclusion. Such exclusions cannot affect the organization’s ability, or responsibility, to provide product that meets customer and applicable regulatory requirements. Provide complete justification for any exclusion to the standard.

2. Quality Management System

a. The QMS shall document the organizations quality management structure, personnel authority and responsibility, identify personnel designated to perform QC functions, number of QC personnel (to include dedicated and additional duty personnel), and skill set for each QC representative.

b. The QMS shall incorporate a comprehensive risk management plan to include a risk matrix/table that identifies all high and moderate risks and how each will be monitored, measured and controlled. The plan shall be updated annually as a minimum.

c. The QMS shall describe the processes and procedures used to:

1. Enforce strict use of techical data. Strict use of tech data means ensuring all applicable technical orders/maintenance manuals are complete, current with applicable changes, available in the immediate work area, and open to applicable task/step/paragraph.

2. Ensure forms used to document any maintenance related action for aircraft or equipment are documented according to Ground Operating Procedures, specific equipment technical order requirements and applicable command directives and supplements.

3. Establish and maintain proficiency of personnel and specific procedures with complying with clause 7.2.Competence when initially determining qualifications for newly hired personnel.

4. Establish and maintain the training program and specific procedures for evaluating the effectiveness of training.

5. Establish and describe an inspection system that prioritizes surveillance activities based on Risk and covers every contract requirement on a recurring basis.

6. The contractor shall provide a monthly QMS summary report to AMIC PM and

DRQ showing contractor status in meeting both internal and external metrics.

This report is due NLT the 7th business day following the last calendar day of previous month. The report shall include:

a. Detailed status of any open internal and external non-conformances (ie

KTR CARs, COR CARs, base agency inspection write-ups, etc).

b. Internal inspection and audit results. Includes detailed report/documentation of non-conformances and customer feedback/surveys. Include execution of the plan and rational for any deviations.

c. Analysis of data collected to provide information related to customer satisfaction, requirements conformity and trends.

d. Services summary results to include compliance with special interst items

e. Any new program risks.

7. Describe which existing operating instructions or standard operating procedures from current efforts will readily adapt to this contracted effort, plus the specific procedures and frequency for validating the continued accuracy and effectiveness of Flight Operating Procedures/Ground Operating Procedures and achieving the desired effect.

3. Quality Management Representative Contractor’s Quality Management Representative shall be a Certified Quality Auditor or

Lead Auditor in the selected standard within 3 months after performance start. Certified

Quality Auditor shall maintain the certification through the life of the contract.

4. Requirements

a. Draft Quality Manual is due to the Government 60 days after the start of the transition period of the Task Order. A desktop review will be accomplished by the Government.

b. The contractor’s comprehensive QMS shall be in place and performing NLT 30 days after performance start date (to include Operating Instructions, Site Operating

Procedures, Work Instructions, etc. required to meet contract requirements).

c. The contractor shall notify DRQ of any changes to the QMS within two business days of implementation and provide the changed document(s) with references to the changes.

d. The contractor shall maintain and make available to the Government their measurement, analysis and improvement processes and supporting documentation.

e. The contractor shall be responsible for the quality of all products and/or services regardless of a validated QMS.

File details come from the government source that posted it.