9-Draft_CDRL_A003_DI-MGMT-80004A_DID.pdf

Data Item Description Rev. A PDF 219 KB Posted

Attached to
Aerial Targets Operations and Maintenance Services
Solicitation number
FA4890-14-R-0012
Issued by

About this file

9-DRAFT CDRL A003 DI-MGMT-80004A DID

View the file

Other versions and copies of DI-MGMT-80004A

File Revision Posted Attached to
Attachment_18_A00L_DI-MGMT-80004A.pdf Rev. A Amendment-1 RFP FA8119-25-R-0011 Multi-platform Sustainment Engineering Services Support
Attachment_17_A00L_DI-MGMT-80004A.pdf Rev. A Draft Solicitation FA8119-25-R-0011 Multi-platform Sustainment Engineering Services Support
Attachment 4 - Data Item Description_DI-MGMT-80004A.pdf Rev. A PMA-281 Software (SW) & Hardware (HW) Development and Sustainment Multiple-Award Indefinite-Delivery/Indefinite-Quantity (IDIQ) Contract
DRAFT~_DI-MGMT-80004A_Mgmt_Plan_5-9-19.pdf Rev. A Law Enforcement Professional (LEP) Program
ATTACH_B_DI-MGMT-80004A.PDF Rev. A Aviation Maintenance Management
A003_HEEWJ_DI-MGMT-80004A_Management_Plan.pdf Rev. A N00421-18-R-0009 High Endurance Electronic Warfare Jet (HEEWJ) Capabilities
DI-MGMT-80004A-T-Management-Plan-Tailoring.pdf Rev. A Constant Speed Drive Performance Based Logistics
DI-MGMT-80004A-T-Management-Plan-Tailoring.pdf Rev. A Constant Speed Drive Performance Based Logistics
F-15_Supply_Services_CDRL_-_A003_DI-MGMT-80004A_MG.pdf Rev. A RSAF F-15 Supply Services
0707-07_-_Forensic_Equipment_Maritime_Testing_-_DI-MGMT-80004A_(Mgmt_Plan).pdf Rev. A H-EQ TEST/CHEMICAL
CDRL_A003_DID_DI-MGMT-80004A_Management_Plan.pdf Rev. A Aerial Targets
FA810515R0008_DI-MGMT-80004.pdf Revision not stated TOMA Support
DI-MGMT-80004.pdf Revision not stated T56 Component Improvement Program (CIP)
Show all 13

Who attaches DI-MGMT-80004A

Other files

File Type Posted
FBO_RFP_Notice_for_Combined_Synopsis-Solicitation_FA4890-14-R-0012.pdf PDF
Govt_Responses_to_Industry_RFP_Ques_(FBO_3Nov14).pdf PDF
2-PPC-Site_Visit_Info_(FBO_24Oct14).pdf PDF
Govt_Responses_to_Industry_RFP_Ques_(FBO_24Oct14).pdf PDF
Govt_Responses_to_Industry_RFP_Ques_2Oct14.pdf PDF
1-Prelim_Site_Visit-Conf_Info_10Sep14.pdf PDF
Corrected-CDRL_A012_Incident_Report.pdf PDF
Govt_Req_for_Comments_4Aug14.pdf PDF
Draft_AT_14R0012_PWS_App_L_(QF-4_to_QF-16_Trans_HAFB)_1Jul14.docx DOCX document
Draft_AT_14R0012_PWS_App_C_(Pubs_Forms)_1Apr14.docx DOCX document
Draft_AT_14R0012_PWS_App_G_(QMS)_1Jul14.docx DOCX document
Draft_AT_14R0012_PWS_App_F_(Incentive-Awd_Fee_Plan)_31Jul14.docx DOCX document
Draft_AT_14R0012_PWS_App_I_(Illustrations)_1Apr14.docx DOCX document
Draft_AT_14R0012_PWS_App_K_(Workload_Data)_1Jul14.docx DOCX document
Draft_RFP_14R0012_1Aug14_1500.pdf PDF
Bidders_Library-FBO_31Jul14.pdf PDF
REV_Draft_PWS_App_G_(Quality_Mgmt_Sys)_AT_14R0012_1Jul14.pdf PDF
REVISED_Resp_to_Ques_to_Govt-Industry_Day_ _One-on-Ones_2Jul14.pdf PDF
Resp_to_Ques_to_Govt-Industry_Day_ _One-on-Ones_13Jun14_1530.pdf PDF
Req_for_OCI_Mitigation_Plan_11Jun14_(due_29Jul14).pdf PDF
Clarification_of_Vehicles_22May14-Industry_Day.pdf PDF
7-Rev_CM_Draft_AT_14R0012_CLIN_Structure_22May14.pdf PDF
AT_Industry_Day_Briefing_(posted_to_FBO_22May14).pdf PDF
Industry_Day_Attendees_Posted_to_FBO_21May14.pdf PDF
CBA_09C0004_Holloman_ _DS2_7May12-1May15.pdf PDF
CBA_09C0004_Tyndall_ _DS2_5Aug13-31Jul16.pdf PDF
Explanation_of_Posting_CBAs_to_FBO.pdf PDF
7-Draft_PWS_App_F_Incentive-Award_Fee_Plan.pdf PDF
Draft_14R0012_Sections_L M_Posted_to_FBO_16May14_(FINAL).pdf PDF
Draft_AT_14R0012_CLIN_Structure_15May14.pdf PDF
AT_II_Industry_Day_Invitation_21May14.pdf PDF
10-Draft_PWS_App_I_(Illustrations)_AT_14R0012_1Apr14.docx DOCX document
11-Draft_PWS_App_J_(Proposal_Inc)_AT_14R0012_1Feb14.docx DOCX document
12-Draft_PWS_App_L_(QF-4_to_QF-16_Trans_HMN)_AT.docx DOCX document
8-Draft_PWS_App_G_(Quality_Mgmt_Sys)_AT_14R0012_1Apr14.docx DOCX document
7-Draft_App_D_FSAT_Bldg_9310.pdf PDF
8-Draft_App_D_Subscale_Bldg_256.pdf PDF
12-Draft_App_D_HMN_R14s_Spt_Equipment.pdf PDF
6-Draft_PWS_App_E_(GFF)_AT_14R0012_1Apr14.docx DOCX document
10-Draft_App_D_Subscale_Launch_Pad.pdf PDF
4-Draft_App_D_Subscale_R14.pdf PDF
3-Draft_App_D_RIS_R14s.pdf PDF
Draft_PWS_App_D_(GFE)_AT_14R0012_1Apr14.pdf PDF
11-Draft_App_D_Holloman_R14_105DM.pdf PDF
9-Draft_App_D_Hangar_5_TAS_2.pdf PDF
1-Draft_App_D_GFE_Annual_Inventory.xls XLS spreadsheet
6-Draft_App_D_Hangar_5_TAS.pdf PDF
Draft_PWS_App_H_(GFV)_AT_14R0012_1Apr14.docx DOCX document
5-Draft_App_D_Full_Scale_R14s.pdf PDF
2-Draft_App_D_ADPE.pdf PDF
Show 40 more

Latest 50 of 110 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA ITEM DESCRIPTION

Title: Management Plan

Number: DI-MGMT-80004A Approval Date: 30 OCT 2006 AMSC Number: 7621 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility: NS/DA02 Applicable Forms: N/A

Use/relationship: The management plan describes the contractor’s organization, assignment of functions, duties, and responsibilities, management procedures and policies, and reporting requirements for the conduct of contractually-imposed tasks, projects, or programs.

This Data Item Description (DID) contains format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.

This DID may be applied in any contract or program phase where the contract management is under the direction and control of the contractor.

Requirements:

1. Reference documents. None.

2. Format. The plan shall be in a format that the contractor devises and conforms to the following:

a. Identification. The plan shall be identified with the preparing office or contractors title, the identifying numbers or designation of the Contract/Procurement Request, the identify and/or nomenclature of the system/component/program/project, the security classification and the Government activity issuing the controlling contract.

b. Descriptive material. As may be needed to clarify or explain matters in the text, the plan may include descriptive material, sketches, drawings, photographs, tables, forms, graphs, worksheets, charts, etc.

c. Page size. The plan may be typewritten or printed on standard size paper, e.g., 8 ½ x 11 inches or metric A4. The pages shall be sequentially numbered and security bound together. As necessary, graphic material may be one-way fold-outs. All attachments shall be identified and referenced in the text. Each section and paragraph shall be numbered.

d. Table of contents and index. Plans of more than 30 pages in length shall contain a

Source: http://www.assistdocs.com -- Downloaded: 2008-03-18T16:48Z Check the source to verify that this is the current version before use.

h. delivery procedures

DI-MGMT-80004A

table of contents. Plans more than 120 pages in length shall also include an Index.

e. Legibility. The document shall be legible and reproducible.

3.1 General. The Management Plan shall consist of the organizational structure, the assignment of functions, duties, and responsibilities, the procedures and policies and the reporting requirements that are established for the initiation, monitoring, control, completion, test and verification, and reporting of contractual tasks, projects, and programs.

3.2 Specific contents. The Management Plan shall cover the organizational structure, program management methodology, personnel, security, and the reports as described herein. Other subjects to be included are as follows:

a. design control

b. reliability

c. configuration control

d. standardization

e. quality assurance

f. provisioning

g. control of Government property

i. tests

j. certifications

k. packaging

l. shipping

m. other

3.3 Organizational structure. The plan shall present an organizational chart and supporting narrative portraying the contractor’s business (corporate) structure. It shall describe the functional relationships and responsibilities among the organizational elements that will participate in the accomplishment of the contractual commitments.

DI-MGMT-80004A

3.4 Program management. The plan shall present an organizational chart and supporting narrative describing the management office the contractor establishes to manage the contractual commitments. The plan shall define the direct lines of control, responsibilities, functional relationships, and authority between the management office and the contractor’s other organizational elements. The plan shall also describe all interfaces between the contractor and the Government and between the contractor and other contractors which are necessary and pertinent to the accomplishment of contractual tasks, projects and programs.

3.5 Methodology.

a. The plan include a narrative description of the technical approach or methods the contractor will employ to accomplish contractual tasks, projects, and programs, including, as applicable, development, tests, manufacture, construction, formulation, installation, logistics support, training, maintenance documentation, and configuration controls.

b. The plan shall include a milestone chart graphically depicting the schedule of events associated with accomplishing each contractual commitment.

3.6 Personnel.

a. The plan shall list the personnel staffing of the contractor’s management office that directs the contractual tasks, projects, and programs and assist in completing the contract. The listing shall include the education, training, skills, experience, and security clearance that personnel require to fill each such position and shall state the identity, background, and work experience of the personnel assigned to fill these positions.

b. The plan shall also describe the staffing required for proper accomplishment of each contractual task by skill type, skill level, number of personnel, and security clearance. When submitted as part of a proposal, the plan shall state how many such personnel are currently available and how many new hires are required to staff fully to accomplish each task as scheduled.

3.7 Security.

a. Provide a Standard Practice Procedure (SPP) which fully describes the security program, safeguards emergency procedures to be established to the protection of Government-furnished and contractor-developed classified materials prepared In conjunction with the project. The SPP shall be prepared in accordance with guidelines contained in the Industrial Security Manual, Purchase Description, and such additional requirements as may be stipulated by the cognizant security compliance organization. The SPP shall require approval by the Government.

DI-MGMT-80004A

b. Develop a comprehensive security accreditation plan to demonstrate how the computer security requirements stipulated in the PD, as applicable, have been accounted for in the system design, and how satisfaction of each requirement will be explicitly demonstrated in the test program. This plan shall also identify any specific support equipment or software to be provided for demonstration of design compliance and/or system compliance with the planned security requirements. The plan shall require approval by the Government prior to implementation.

c. Reports. The plan shall describe the management methods the contractor will employ to ensure meeting all preparations, format, and submittal requirements established by the CDRL (DD Form 1423) for data to be delivered to the Government.

4. END OF DI-MGMT-80004A

DATA ITEM DESCRIPTION
Requirements:

File details come from the government source that posted it. Updated .